ABSTRACT OF COST
Name of work : Civil work for 40mtrs GBT with pile and DG foundation
Name of site : Ramnagar , Kendrapada
Name Of Contractor : Konark Power Control
RA Bill No. : First and final
Work Order No. : BST/SER/CIVIL/ORI/08-09/028
SI. No. Description Unit Rate This Bill Remark
/ .. ,
QTY/ Amount
1 Cleaning of site of brushes & shrubs before Per site 1667 ( '.. 01 (' 1667.00//
1--
2
commencement of work
Earth work excavation in normal soil Cu .M 87 .[ -'
/' 13.00 (
/
1131.00 ( ---/
3 Mobilization equipment for boring piles, pile Per site 6388 ( 01 ",,/ 6388.00 .( ,
boring manual assembly to site
,.,----"
/" /'
4 Constructing RCC board piles using the RM 821,( 81 ,/ "
66501.00 I
controlled concrete grade M-20 design mix
with betonies slurry including steel
reinforcement, ring etc. as per design.
" ~ ..---.r - - '"
5 PCC Cum 2309 (" 1.45 ( ~ -3348.05 f
4000 {_______. -- t: f =
-
6 RCC Cum 12.71 50840.00
7
8
9
10.
Centering and Shuttering
Sand filling
Plastering
Collection of template from ware house and
delivering at site at ground level.
Sqm
Cum
Sqm
L.S
96
335 (
105
1304
{
1
C 1--1
24.96 .('
.. 1.45 {' ,
13.44'0,(
(
/
"
,2396.16
485.75
1411.20
1304.00
C
!
f
( --
-
11. Fixing of tower template in line and level. L.S 869 ( 1 f . 869.00 \
r- 1- -
12. Dewatering adjacent pits to 'the excavated
trench of size 1.sm*1.sm can be digged so
that water can be pumped out. So the water
Per
Hour
137
( 97
j
f 13289.00
1
13.
concreting can be done.
DG Foundation
- .- -- -----_&&,:;::..~--- --- -- ...._... .
14 Earth work excavation in normal soil of DG Cum 87 8 696.00 ~
foundation
'J
15. PCC Cum 2309 0.784 1810.25 [ ·'~c\d~ a.
16. RCC Cum 4000 4 16000,00.."L , 1'1.tpJ',
t\\'-L
,.!¥t>W'cJ~
17 Supplying, Cutting, Bending, Binding, and KG 51 440 22440.00)
typing of HYSD steel reinforcement bars
Rupees Two Lakhs Seventy Six Thousand Seven Hundred Fifteen Only Total 2,76,715.41
.. , , - -,. , ('
Q '
1).(lJ~<'l: ...... . ... . .. . .. • .• ••.•• . • • .. •.
MEASUREMENT SHEET
Name of the Site : RamNager (Kendrapada)
Name of the Circle : Orissa
N<:lme of the Contractor : Konark Power Control
Tower Height : 40mtr. (Obt) Pile With DO Foundation
Item Description Unit No. L B HID Qty. Remarks
Code
1. Cleaning of Site of Bushes & Per Site - - - - 01
Shrubs before
commencement of work.
,
2. Earth work Excavation in Cum 1 3.8 3.8 0.9 13.00
Normal Soil of Tower
Foundation
3. Mobilization of eqUipment for 1 1
boring Piles, Pile boring
Manual assembly to site
4. Constructing RCC bored Piles Rm 9 9 81
using the controlled Concrete
Grade M-20 design mix with
bentonite slurry including
Steel reinforcement., rings
I etc as per design (300 MM )
5. PCC (1:4:8)
a. Tower Foundation Cum 1 3.8 3.8 0.1 1.45 I
E I
I
Total 24.96
if ;P;Konark ~qwe(
'
Con*'"
,v O
i
,, ~ ~\
\V / ( ;
;5;oprjetor
MEASUREMENT SHEET
Name of the Site : RamNager (Kendrapada)
Name of the Circle ': Orissa
Name of the Contractor : Konark Power Control
Tower Height : 40mtr. (Gbt) Pile with DG foundation
pRfPrietor
BS Transe Ltd. Engineer Contractor
Name {;'t-lj4?f7Pr I( () })fLc;-lj~'\
?Yalltz:.....•.•... •..• ,..•......•....
MEASUREMENT SHEET
3. RCC Cum 4
•
As oer Drawin
4. Back filling Cum .8
I
5. Supply cutting bending & KG
typing of HYSD steel As per
BS TransComm Ltd.
Name