You are on page 1of 5

?Jaw: .... .......... . .... ....... ... .

ABSTRACT OF COST
Name of work : Civil work for 40mtrs GBT with pile and DG foundation
Name of site : Ramnagar , Kendrapada
Name Of Contractor : Konark Power Control
RA Bill No. : First and final
Work Order No. : BST/SER/CIVIL/ORI/08-09/028
SI. No. Description Unit Rate This Bill Remark

/ .. ,
QTY/ Amount

1 Cleaning of site of brushes & shrubs before Per site 1667 ( '.. 01 (' 1667.00//
1-­-
2
commencement of work
Earth work excavation in normal soil Cu .M 87 .[ -'
/' 13.00 (
/
1131.00 ( ---­/

3 Mobilization equipment for boring piles, pile Per site 6388 ( 01 ",,/ 6388.00 .( ,
boring manual assembly to site
,.,----"
/" /'
4 Constructing RCC board piles using the RM 821,( 81 ,/ "
66501.00 I
controlled concrete grade M-20 design mix
with betonies slurry including steel
reinforcement, ring etc. as per design.
" ~ ..---.r - - '"
5 PCC Cum 2309 (" 1.45 ( ~ -3348.05 f
4000 {_______. --­ t: f =­

6 RCC Cum 12.71 50840.00
7
8
9
10.
Centering and Shuttering
Sand filling
Plastering
Collection of template from ware house and
delivering at site at ground level.
Sqm
Cum
Sqm
L.S
96
335 (
105
1304
{
1
C 1--1
24.96 .('
..­ 1.45 {' ,
13.44'0,(
(
/
"
,2396.16
485.75
1411.20
1304.00
C
!

f
( --­

11. Fixing of tower template in line and level. L.S 869 ( 1 f . 869.00 \
r- 1-­ -
12. Dewatering adjacent pits to 'the excavated
trench of size 1.sm*1.sm can be digged so
that water can be pumped out. So the water
Per
Hour
137
( 97

j
f 13289.00
1

table foundation trench is lowered and

13.
concreting can be done.

Supplying, cutting, bending binding and typing


of HYSD steel reinforcement bars.
KG 51 r-­ 1689 /
/'
86139.00 (
-'

DG Foundation
- ­ .- ­ -- -----_&&,:;::..~--- --- -- ...._... .
14 Earth work excavation in normal soil of DG Cum 87 8 696.00 ~
foundation
'J
15. PCC Cum 2309 0.784 1810.25 [ ·'~c\d~ a.
16. RCC Cum 4000 4 16000,00.."L , 1'1.tpJ',
t\\'-L
,.!¥t>W'­cJ~
17 Supplying, Cutting, Bending, Binding, and KG 51 440 22440.00)
typing of HYSD steel reinforcement bars
Rupees Two Lakhs Seventy Six Thousand Seven Hundred Fifteen Only Total 2,76,715.41

.. , , - -,. , ('

Q '
1).(lJ~<'l: ...... . ... . .. . .. • .• ••.•• . • • .. •.

MEASUREMENT SHEET
Name of the Site : RamNager (Kendrapada)
Name of the Circle : Orissa
N<:lme of the Contractor : Konark Power Control
Tower Height : 40mtr. (Obt) Pile With DO Foundation
Item Description Unit No. L B HID Qty. Remarks
Code
1. Cleaning of Site of Bushes & Per Site - - - - 01
Shrubs before
commencement of work.

2. Earth work Excavation in Cum 1 3.8 3.8 0.9 13.00
Normal Soil of Tower
Foundation
3. Mobilization of eqUipment for 1 1
boring Piles, Pile boring
Manual assembly to site
4. Constructing RCC bored Piles Rm 9 9 81
using the controlled Concrete
Grade M-20 design mix with
bentonite slurry including
Steel reinforcement., rings
I etc as per design (300 MM )

5. PCC (1:4:8)
a. Tower Foundation Cum 1 3.8 3.8 0.1 1.45 I

6. RCC M-20 Grade (1:1.5:3)


a. Tower foundation Raft Cum 1 3.6 3.6 0.8 10.36
i
b. Columns Cum 4 0.7 0.7 1.2 2.35 r I

Total 12.71
7. Centering & Shuttering
I a. Tower Raft Sqm 1 4 3.6 0.8 11.52

I b. Columns Sqm 4 4 0.7 1.2 13.44

E I
I

Total 24.96

if ;P;Konark ~qwe(
'
Con*'"
,v O
i
,, ~ ~\

\V / ( ;

;5;oprjetor

~s-. s , omm L~d


. . ngineer . ~'!
f Contractor
Name ~4 . I k (.,.7;) -~
. I /
---~~......"r. Plot=
lVo-59/2919 lCalinga NagaY; PatrapadfiJ Bhubti!J'tts'ff/iJav-75iI 0 19 1:-
.,
9 7 ~ ----­ df

15a~e : .... ..... ~ ............ .,......

MEASUREMENT SHEET
Name of the Site : RamNager (Kendrapada)
Name of the Circle ': Orissa
Name of the Contractor : Konark Power Control
Tower Height : 40mtr. (Gbt) Pile with DG foundation

Item Description Unit No. L B H/D Qty. Remarks


Code
9. Sand filling Ground level Cum 1 3.8 3.8 0.100 1.45
10. Plasterinq (1:4 Cement Mortar)
a. Tower Columns Sqm 16 0.70 1.2 13.44
11. Collection of templates from LS 1 - - - 1.00
warehouse/fabricator &
delivering at site at ground
level.
12. Fixing of Tower Template LS 1 - - - 1.00
Plate in Line & Level
13. Cube Test Report 7 & 28 days Per Site 1 - - - 1.00
14. Dewatering adjacent pits to Per 97 97 I
the excavated trench of size Hour
115m x 15m can be digged . I
I so that water accumulates in i
these pits and accumulated /i
water can be pumped out so I
the water table in the
foundation trench is lowered
and concreting can be done. I

For Konark Power Control


;\ (/~
~ / i.0l"

pRfPrietor
BS Transe Ltd. Engineer Contractor
Name {;'t-lj4?f7Pr I( () })fLc;-lj~'\
?Yalltz:.....•.•... •..• ,..•......•....

MEASUREMENT SHEET

Name of the Site : RamNager (Kendrapada)

Name of the Circle : Orissa

Name of the Contractor : Konark Power Control

Tower Height : 40mtr. (Obt) Pile with DO foundation

Item Description Unit No. L B HID Qty. Remarks


Code
15. Cleaning of Sites including all LS 1 - - - 1.00
debris & wastaqes.
16. Supplying Cutting, Bending, Kg. As per Bar Bending Schedule 1689.00
Binding & Typing of HYSD '
Steel Reinforcement Bars. !

For Kooark P9wer Con trol


~-'- ~. 0'""'\
BS TransComm Ltd. Engineer
c~<
. neLOr

Name Site : RamNager (Kendrapada)


of the Circle : Orissa
Name of the Power
Height : 40mtr. (Gbt) Pile
Name foundation

Description Unit No.

Earth work Excavation in Cum


normal soil of DG
foundation
• 2. PCC Cum As per Drawing

3. RCC Cum 4

As oer Drawin
4. Back filling Cum .8
I
5. Supply cutting bending & KG
typing of HYSD steel As per

For Konark POIJIier Con trol


r

BS TransComm Ltd.

Name