July,
2010
Prepared By,
AnoopPradhan Sankar
Anupam Paul
Arinze Okoye
Lakmini Serasingha
Maroun Tayah
Table of Contents
Contents
Page No
Page | 2
1.0 Risk Plan
1.1 Technical
condition)
Equipment 1. Storage of
2. Malfunction 2. Rapid
replacement of
Page | 3
3. Misappropriate damaged
handling equipment
3. Shortage of 2. Consider
supply multiple vendors
when purchasing
1. Hire specialized
labor
1. Unskilled
2. Liability
workers/contract
Labor insurance
ors
3. Business
2. Safety issues
interruption
insurance
1.2 Finance
Agree on maximum
fluctuation
Page | 4
s
1. Market/
Economic
1. Alternative
conditions
sources
2. Transaction 2. Difficulty in
2. Have multiple
costs creating a
financial
sound
associations
relationship
with financial
institutions
Not obtaining
1. Interest charges if
timely
not paid on time
3. Lack of funds payments
2. Use of the buffer
from the
projection
sponsor
1. Insurance
1. Earthquake
Natural 2. Deploy
2. Rain and flood
calamities emergency
3. Soil Collapse
procedures
Page | 5
1.4 Laws and Regulations
In charge of
communication
with the
Design
Stakeholders and Anupam
contingency
planning
In charge
equipment and
Equipment material Maroun
procurement and
operations
In charge of
recruiting and
Labor training unskilled Anoop
personnel
In charge of the
Finance Arinze
project finances
In charge of legal
Public relations and political Lakmini
relations
Page | 7
2.3 Quality system description
i. Determine and document any areas that require
improvement.
ii. MS Project
Page | 10