Professional Documents
Culture Documents
Henry M. Sarkissian
CEO
Arabian BEMCO has
1- Power Projects Page 6-11
three distinct business
Power Generation
units operating as
Director is responsible
scope of their
specialties giving
specialties,
Arabian BEMCO a
wealth of professional
and specialized
resources to integrate
>
Among the Oil & Gas projects
executed for ARAMCO is the 519,000 • Compressor Stations
Barrels Medinah bulk storage facility,
Of Hydrocarbon the PP9 2,000,000 BPDD crude oil • Off site Works
pipeline
i li th t ties
that ti i t the
into th east-west
t t
Refrigeration
BEMCO executed on EPC basis a large number of central refrigeration and district
cooling plants using technologies from centrifugal reciprocating and screw
compression technologies to absorption technologies for applications in HVAC,
district cooling and Gas Turbines Inlet air Cooling (TIAC) facilities for Power
Plants.
>
Plants (Over 10,000 TR) and PP9 (over 50,000 TR)
Central Refrigeration
400,000
400 000 Tones of • Large Chiller Plants
Refrigeration • District Cooling
• Turbine Inlet Air Cooling Central Reciprocating Chiller Plant
Sewage Water Treatment – KKIA Riyadh 10,000 m3/day Boweib Water Treatment Plant 60,000 m3/day
Water
BEMCO executed on EPC basis numerous water treatment plants using
Among BEMCO’s list of projects are ARAMCO’s Waste Water & Spent Caustic
Systems & Juaymah Gas Plant (6,000 m3/day), New Doha Int’l Airport • Water & Sewage Treatment
Domestic Waste Water Treatment Plant (17,000 m3/day), Boweib Water • Industrial / Domestic Water Treatment
Electromechanical
BEMCO has more than 30 years of experience in the Design, Supply, Installation, Testing
and Commissioning of Mechanical, Electrical, and low current systems. BEMCO has
undertaken a large number of complex projects on “design and build” basis and
executed on a rush schedule to the full satisfaction of the Clients.
Among these projects executed are Makkah and Madinah Holly Haram,
Haram the Four Seasons
Hotel in Amman-Jordan, the Conference Center Palace in Riyadh and 300 villas in Hafr
Al-Baten.
Building Services Works
• Large Commercial & Residential Complexes
• Royal Palaces, Luxury Hotels and High Rise Buildings
• Holly Haram of Makkah and Madinah
BEMCO’s Civil Business Unit executes Civil Works for BEMCO’s turnkey
projects in the Power & Industrial Sector related to large Power
Plants, Oil & Gas Facilities, Refrigeration and Water Projects.
BEMCO also Executes the construction of large complexes as a general
contractor for projects such as Housing and Commercial Buildings in
PP9 and Shoaiba Power Plants.
Project
p
Developer
BEMCO Financial
Concessionaire & Technical
Concessionaire Advisors
Equity- Debt-70-75%
25-30%
Financial Institutions
Pension Funds
Private Investors PROJECT Multilateral,,
Bilateral Agencies
Off-taker
COMPANY
(Fuel or
O&M
Feedstock
Agreement) Contract
Partial List of Project Development Studies and Proposals
Project Structured Financing • 1,200 MW Shoaiba CC Power Plant – 1991 Study and
presentation conducted by GE, BECHTEL and BEMCO for SCECO –
West
West.
and Projects Development • 1,750 MW Shoaiba Steam Power Plant – 1997, Official tender for
BOO concept for SCECO – West, Joint Venture BEMCO-ENRON.
BEMCO has offered and implemented in some of its projects long-
• 1,050 MW Shoaiba Steam Power Plant – 1998, Official Tender for
term Project Structured Financing as well as deferred payment Structured Project Financing for SCECO – West, Joint Venture
BEMCO-ENRON.
options with tenures between 5-10 years. As the power sector
• 25,000m3/day STP -2000/2001, Official tender for BOT Concept
evolves, BEMCO continues to pioneer this concept at the forefront for Jeddah Industrial City (JIC), Upgrading and Expansion of
existing STP.
of the movement.
• 150MW CC Power Plant – 2001, Tender for BOO Concept for
Hadeed Iron and Steel Company.
BEMCO has initiated several concepts for the implementation of • 480MW PP-9 Power Plant -2004, Implementation of Deferred
Payment Project Financing.
Independent Power Projects (IPP) in the Kingdom of Saudi Arabia.
• 350MW Marib-2
Marib 2 Power Plant 2005, 2005 Proposal for Long-term
Long term
In this process, BEMCO has worked with International Developers financing for the Ministry of Electricity in Yemen.
in the Integration of the project development. 36,000 m3/day Desalination Plant – 2006, Official tender for BOT
concept for the General Authority of Civil Aviation (GACA) – Joint
Venture BEMCO - GE
BEMCO utilizes a modern and systematic approach
in the implementation of projects from its pre- • Large resources with over 4000 direct employees,
extensive fleet of construction equipment, vehicles
award phase of development, conceptual design, and facilities, quick and swift mobilization.
BEMCO has evolved to
pricing, proposal preparation, bid submittal and
become a world class • Over 400 Engineers in all disciplines including
negotiation; through the engineering, Civil, Electrical, mechanical, Instrumentation and
Power Industrial and
Power, procurement and construction phase.phase BEMCO
BEMCO’ss Control
Control.
Civil Contractor with vast resources of Manpower, Plant & Equipment,
• Highly qualified Engineering and Design group
and Fabrication facilities in construction, coupled comprising over 150 Engineers, Designers and CAD
capabilities to Develop, Operators.
with its single point responsibility Project
Engineer, Procure, Management approach ensures customer • Highly qualified technicians for specialized work;
Construct, Test, Start- satisfaction and success in the execution of its such as welding, high voltage cabling, others.
up and Commission projects.
p j
• Global procurement capabilities
Projects on a turnkey • Large fabrication workshop with state of the art
BEMCO’s IT infrastructure is a key ingredient to
basis. Equipments.
manage and track the progress of our projects.
BEMCO has a centralized database with • Competitive pricing with international bidding
standards
BEMCO’s vast information being shared between its head office,
branches and sites. We take pride in using state • Testing & Commissioning Services and O&M
resources permit the
of the art ERP software such as J.D. Edwards and
implementation of
Primavera. Project
large and complex Management
Planning and Scheduling
projects in record time. Quality Control
Cost Control Start-up &
Procurement Commissioning
Reporting
Operation & Maintenance
Sourcing
Power p plants &
Purchasing
P h i
Substation, Protection
& Logistics
& Control, Firefighting
systems, HVAC
Project
Evolution Engineering
Fabrication
Basic & Detailed Steel Structure
Engineering Pipe pre-fabrication
Skids Ducting
Erection
Award
Mechanical Erection,
Electrical &
Instrumentation
Works
Project Management Management Philosophy
BEMCO s Project Management objective is to identify, monitor and correct any deviations from the original
BEMCO’s
project scope of work quality, cost and schedule. To achieve the above objective, the following functions
are monitored during project execution:
Planning and Scheduling:
Planning is performed to address as a minimum the following: Scope of work, assumptions and risks, Each business line is led by a senior vice-president who is
execution strategy, specific contract requirements, engineering design, procurement, tasks and work break
down, resources, construction requirements, inspection and test requirements, tooling and equipments
supplies.
responsible for the projects in a vertical structure and
Quality & Safety Control:
Designed to ensure that all quality and safety requirements are implemented through all the stages of a
project. responsible for business development, proposals
Cash Flow Control:
Designed to know the status of Billing and Collection during any stage of a project execution. preparation, project execution and hand over.
Budget/Cost Control:
Designed to check expenses on a project as they are incurred. It is intended to keep track of each cost
element or cost center,
center to identify reasons for cost variance against budget of the item throughout the
various stages of project.
Contract Administration:
Designed to secure legal and contractual rights for the company in an efficient and timely manner. This
function is to be carried out jointly by the Project Manager and Contract Administration Section .
Gas Turbine Elevation Design 500 MVA Transformer, weight 400 tons including trailer, transported to site via special trailer equipped with 320 wheels
Engineering Procurement
Procurement for all projects is carried out in compliance with strict
Engineering and Procurement Groups work closely with each company policies and ISO certified procedures.
other to ensure early sourcing of major and long-lead
The Procurement Business Process is stream-lined into the following
equipment and to ensure compliance with the technical
basic phases, to ensure quality and timely delivery of materials to site.
requirements and customer specifications.
Vendor selection
Q lit Engineering
Quality E i i i Turnkey
in T k EPC Industrial
I d t i l and
d Power
P projects
j t isi
Ensuring specification compliance
the essence of success. BEMCO’s Professional group of engineers,
Expediting material production and delivery
designers and draftsmen provide conceptual designs from the
Achieving quality requirement, by arranging the quality tests
proposal stage of a project all the way to detailed construction
Tracking shipments and site delivery
drawings and as-built drawings at the construction stage. The group
utilizes computer aided design (CAD) systems for all its two and To achieve a successful procurement performance, BEMCO utilizes J.D.
three dimensional designs, as well as state of the art engineering Edwards and ERP system, to map and to allow recording of procurement
software for piping, electrical and structural designs and data at all phases of the Business Process yielding detailed reports on
calculations. The Group is supported by its offices in Lebanon, each phase and for greater procurement control.
Egypt, India, and USA.
CNC Plasma and Gas Cutting Machine CNC Beam Drilling and Saw Cutting Machine
BEMCO owns a large,
Fabrication modern and automated
Partial list of Fabrication:
fabrication workshop to Pressure tanks and vessels
Today’s demanding construction
deliver and erect high Pipe and electrical steel supports
quality products on an
market requires from qualified Pipe fabrication and welding 2”
expedited and continuous
basis. This workshop facility diameter and above
and successful contractors
consists of 80,000 sq.m. of
Platforms, Ladders and Stairs
extensive in house fabrication of fabrication floor space with
resources, equipment and Pumps and compressor skids
various mechanical, structural over 2,200 highly qualified complete with piping, tubing and
technicians, engineers and
electrical
and electrical components for its management personnel. It
has basic and detailed Steel Structures
turnkey projects. engineering capabilities and Pipe Spool
is ASME certified for
pressure vessels.
BEMCO has its own Start-up & Commissioning, Operation & Maintenance Steam Turbine – Shoaiba Stage 2, Phase I
service group (BEMCO Services Co.) This Group is a formidable team of Highest Quality Erection & Construction
constitutes an essential part of a successful
professional engineers and technicians specialized in Maintaining,
turnkey project.
Operating, Testing and Commissioning of Electrical and Mechanical systems
BEMCO’s competences are demonstrated by
for Industrial, Power and Commercial Projects. To support this well trained
the successful completion of major
team, BMECO has assembled a large inventory of precision instruments and
industrial, power, electromechanical & civil
tools for the testing, commissioning and start-up of the projects.
projects.
Partial list of System Testing Capabilities: The significant resources and years of
experience in Engineering, Procurement,
• Hi-pot Testing of Cables • MV Circuit Breakers
Construction, Mechanical Erection, Electrical
• LV, MV and HV Switchgears • Chilled Water Plants
and Instrumentation activities, along with a
• Protection and Intertip Relays • AHU’s and FCU’s
fully owned large modern and highly
• Pilots Differential Protection • CCMS efficient fabrication workshop and
• Distance Relays • Variable Frequencies Drivers construction equipment enables BEMCO to
• Power Transformers • PLC & DDC Controlled Systems erect and construct the highest quality
projects.
ARABIAN BEMCO BEMCO INTERNATIONAL Partial list of international companies
PROJECT & CONSTRUCTION PROJECT & CONSTRUCTION with whom BEMCO has worked in the
MANAGEMENT MANAGEMENT (Lebanon)
past and present:
Projects Siemens – Germany
General Electric – USA
ABB – Switzerland
Alstom – France
AREVA - France
BEMCO STEEL TRUBA ARABIA CO. TECHMASTER INC. Mitsui – Japan
FABRICATIONS ERECTION TEAM ILLINOIS, USA Marubeni - Japan
Mitsubishi Heavy Industries– Japan
Doosan Heavy Industries – Korea
Hitachi – Japan
BEMCO SERVICES TECHMASTER ENG’G GEDAC ELECTRIC Toshiba – Japan
START-UP & COMMI. EGYPT & INDIA MANUFACTURING OF POWER,
Nuovo Pignone – Italy
OPERATION & MAINTENANCE LIGHT. & ELEC. SYSTEMS
YIT – Finland
S
Spie-Batignolles
ll – France
REGIONAL OFFICES Bechtel – USA
Bemco has formed strategic affiliated companies working as Lurgi – Germany
Profit Centers providing highly competitive and quality services. PB Power - UK
Belleli – Italy
BEMCO International (Offshore) in Lebanon takes responsibility on Foster Wheeler - Italy
assigned projects, proposals, engineering, procurement and project Shaw Group Inc. – USA
management
management. CBI – USA
Mot MacDonald - UK
TRUBA ARABIA is specialized in heavy Mechanical Erection works for Black & Veatch – USA
Utility Boilers, large Steam & Gas Turbines, Petrochemical, Cement
TermoMeccanica – Italy
and Refinery Complexes.
Korea Power Engineering Company (KOPEC) – Korea
GEDAC has been at the forefront in the Middle East since 1978
Hyundai Heavy Industries– Korea
manufacturing and assembling electrical switchgears and control Ishikawajima-Harima Heavy Industries Co. (IHI) – Japan
panels in the medium and low voltage range. Hitachi Zosen – Japan
International Power – UK
BEMCO Steel Industries (BSI) is specialized in manufacturing of WATERLEAU – Belgium
structural and sheet steel, pre-fab pipes, skids ducts, vessels and APINA – Spain
tanks. CADAGUA – Spain
IBERINCO – Spain
BEMCO Services is specialized in Operation, Maintenance, Testing & Weir – UK
Commissioning systems for Power, Industrial and Building Services. Enpropie – France
EFACEC – Portugal
Impregilo Arabia is specialized in Engineering and Construction of DURO Felgueraca - Spain
infrastructure, high rise buildings, and marine works.
Partial List of Power Projects
REFRIGERATION PROJECTS
POWER GENERATION PROJECTS
Riyadh Power Plant No. 10 – PP10 3,000MW West Bay District Cooling Plant II 30,000 Tons - Qatar
Construction of Qurayyah Open Cycle Power Plant 2,565MW New Doha International Airport (NDIA) Chiller Plant 12,000 tons - Qatar
PP9 A&B, Grass Root Combined Cycle Power Plant 1,800MW Turbine Inlet Air Cooling System for Block C at PP9 (for 10 GTG Units)
PP9, Blocks C&D 1,700MW Turbine Inlet Air Cooling System for Block D at PP9 (for 10 GTG Units)
PP9, Block F 1,000MW
Turbine Inlet Air Cooling System for Block E at PP9 (for 8 GTG Units)
PP9, Grass Root Block E 680MW
Al F
Fujairah
j i h IWPP – Combined
C bi d CCycle,
l UU.A.E
AE 255MW Turbine Inlet Air Cooling System for Block F at PP9 (for 12 GTG Units)
Aweer Power Plant, Dubai, U.A.E. 490MW Juba Turbine Inlet Air-cooling Project (for 9 GTG Units)
Maarib power Plant, Yemen 490MW Hail Turbine Inlet Air-cooling Project (for 5 GTG Units)
Sadaf Al-Jubail Co-Generation 250MW KAAU Chiller, Two Chiller Units with two Ice Storage Tanks
Tabouk Power Plant 170MW
West Bay District Cooling – Qatar, Refrigeration Capacity of 30,000 tons
PP7 Extension Power Plant 500MW
Asir Extension Power Plant 225MW King Abdul Aziz University Piping, Installation of main chilled water pipes which links two chillers
Jizan extension Power Plant 225MW With other University facilities
Najran Power Plant 350MW King Khalid National Guard Hospital A/C Plant, 4 Centrifugal Chillers
Tihama Power Plant 170MW King Fahd International Airport (I&II) Capacity of 15,000 tons
Duba Power Plant 80MW
King Abdul Aziz International Airport Jeddah, Replacement of evaporator and condenser Vessels
Madina Extension Power Plant 170MW
Hail Power Plant Extension 85MW Two chiller plants, and two ice Tanks
New Doha International Airport (NDIA) - Qatar 40MW Ajyad Central Chiller Plant,Capacity 60,000 tons central
ARAMCO’s Rastanura Refinery Upgrade, Laboratory & Refinery Operations Building
TRANSMISSION & DISTRIBUTION PROJETS Amino Plant, Capacity 3,000 tons/year
Aqaba Substation – Jordan 400/132 KV GIS 480MVA
Prophet Mosque Extension Chiller Plant, Capacity 21,000 tons
Taif Substation 380/110 KV GIS 1,000 MVA
Hail Substation 380/132 KV AIS/GIS 800MVA WATER PROJECTS
Abha North Substation 132/33/13.8 KV AIS 386MVA ARAMCO’s Waste Water & Spent Caustic Systems at Juaymah Gas Plant 6,000 m3/day
Sakaka & Al Jouf Reinforcement 132/13.8 KV GIS 240 MVA King Khalid International Airport Wastewater Treatment Capacity 10,000 m3/day
Idwa & Kilabiyah Substations 115 KV AIS 80MVA Boweib Water Treatment Plants Capacity 60,000 m3/day
Tufaih Substation 115 KV AIS 80MVA
Salboukh Water Treatment Plants Capacity 60,000 m3/day
Saudia City Substation 110 KV GIS 120 MVA
Haram III Substation 110 KV GIS 120 MVA Seawater Pump House Upgrade Phase I, Capacity 60,000 m3/hr
Al Aous Substation 110 KV GIS 120 MVA Seawater Pump House Upgrade Phase II, Capacity 60,000 m3/hr
Nuzha Substation 115KV 13.8 KV GIS 120 MVA Qatar (NDIA) Waste Water Treatment Plant 17,000 m3/day
Safa Substation 110 KV GIS 120 MVA Partial List of Civil Projects
Sawamlah & Al Leith Substations 110/33/13.8 KV AIS 160 MVA
Maarib Power Plant Housing Complex - Yemen
Khayber Substation 110/33/13.8 KV AIS 160 MVA
PP9 Gas Insulated Bus Duct 30 Km, 380 KV Shoaiba Power Plant Housing Complex – Jeddah
Makkah Haram II Substation 110 KV GIS 160MVA Power Plant 9 & Family Housing Complex – Riyadh
Madinah Haram II Substation 110 KV GIS 120MVA School Complex for Royal Commission - Yanbu
Jeddah Ind. City II Substation 110 KV GIS 120MVA Lab Bldg. – ARAMCO, Ras Tanura
Nuzlah Yamaniyah Substation 110 KV GIS 120MVA
New Doha International Airport (NDIA) – Qatar
Jeddah Rawdah Substation 110 KV GIS 120MVA
Jeddah Nahda Substation 110 KV GIS 120MVA Partial List of Electromechanical Projects
Nagah, Marwah, Bayah Substation 110 KV GIS 120KVA New Doha International Airport (NDIA) Utility Systems - Qatar
Dubah & Joubah Substation 110/13.8 KV 120MVA Al Habtour Grand Hotel – Beirut
Bayouniah & Al Khobar Al Sahiliah Substations 69/13.8 KV GIS 160MVA
Five (5) Substations at New Doha International Makkah Intercontinental Hotel
Airport (NDIA) – Qatar 66/11kV GIS 560 MVA Madinah Hotels Plot 131, 136, 141
Four Seasons Hotel – Jordan
Partial List of Industrial Projects
OIL & GAS PROJECTS Residential and Commercial Center - Makkah
ARAMCO’s Utility Upgrade at Juaymah Gas Plant Ras Tanura Laboratory
y – Saudi ARAMCO
ARAMCO’ N
ARAMCO’s North
th W
Westt Bulk
B lk Plants
Pl t (T(Traif,
if Al Jouf,
J f Tabouk
T b k and
d Duba)
D b )
ARAMCO’s South West Bulk Plants (Najran, Abha and Jizan) 300 Villas – Hafr Al Batin
ARAMCO’s Madinah Bulk Plant Project 510,000 Barrels of product storage Beirut Government Hospital (500 Bed) – Beirut
ARAMCO’s Two Grade Gasoline Hydrocarbon Storage Facilities
Conference Center Palace – Riyadh
Luberef Flare & Tank Project
King Fahad International Airport - Air Cargo Terminal - Dammam