Professional Documents
Culture Documents
DELIVERY REQUIREMENTS:
Place of
S. No. Description Size/Model Make/Mtrl. Qty. Mfg./
Proc.
Pressurization & Ventilation System of as per
Drg. No. Comprising Of :-
3. Filtration Area :-
i) Fine Filter holding frame of 40 M.M. Tee MS
ii) Pre Filter holding frame of 40 M.M. Tee GI
iii) Pre Filter 610 x 610 x 50 (M.M.) HDPE
iv) Fine Filter 610 x 610 x 150 (M.M.) HDPE
v) Auto Viscous Filter in Std. construction :- APC/MS
a) Direct unit (R.H.S.)
b) Indirect unit
Note : M.M. Stands for Milli Meters ; M Stands for Meters & R.M.T. Stands for Running Meters