Professional Documents
Culture Documents
of lndia
Ministryof Communications and lT
Department of Telecommunications
(Security-TERM Wing)
No,17-1l2010-St/1 Dated02""Nov2010
To,
All DDsc (TERM)Ce s
- l
5. A sitemaybecompliant or non-compliant
onthebasisof aboveevaluation.
A
compliantsitemay becomenon compliant at a laterdatedue to changein the
surroundingsllkea building
coming upintherangeof measurementfromtheBTSor
addition
of newsitesin theareaor anyotherreasons including
engineerjng
changes
by ServiceProvidersand if the suchcasescomesto the noticeof TERMCelibv
public
complaint or otherwise,
thesamemayalsobetested.
6. TERMcellsshallselectup to 10%of newBTSinstalled after08.0b.10
on
randombasisbutwitha largerproportion
of sharedsites.Additionally,
theBTSsites
whichtherearepubliccomplaints
against shallalsobetestedbyTERIVI Cells.
7. In orderto simplify
theprocess,
TSPSmaybe askedto deposit a testfeeof
Rs.250000/- (Rupees TwoLacandFiftyThousand onlyfor 25 BTS@ Rs.lOOOO/-
per BTSsjtes)in advance to TERMCells.Aftercompletion of testingof 2b BTS
sites,a testfeefor another25 sitesmaybe deposited to the respectiveTERI\ilcells
andso on.Thefee maybe deposited by Demand Draftin favorof Communication
Accounts officer,o/oCCAconcerned.TERN/cellswillkeepappropriate recordof no.
of sitestestedagainsteachroundof feedeposited.
-2-
11. Instrumentwhichwillbe provided
byTSPwillcarryvatidcalibration
certificate
from OEM (Original
EquipmentManufacturer) or any national/international
accredited
Lab.
12. TSPSwhohavenotsubmitted theselfcertified
testresultsto TERMCellsyet
maysubmitjt immediatelyandin anycase,notlaterthan1b,11.2010. TERMCells
shallstartthetesting
from16.11.2010.
13. ln caseof shared sitesor multiple
sitesin a prescribedarea,it is indivldual
as
wellas collectiveresponsibility
of allTSPSto keepsitealwaysEMRcompliant. For
shared siteseachTSPshallnotonlysubmit thetestresultsfor hisownBTSbutalso
provide thetestresults
of otherBTSonthatdateandoverall EMRcompliance result
dueto all BTStakentogether. CoordinationamongTSPSmay be madefor this
activity.TERMCellsare at liberiyto test the sharedsite uponreceiving the self
certification
of any one of the TSP or aftergettingselfcertifiedtest resultfromall
TSPS,
-3-
SNo. 1 2 3 5 6 7 8 I 10 11 IJ 14 '15
o o .g
o F ' J -J : J tr
c t LIJ
o F
Q)
E u
! =
f, E
o
=
€ C tr-
! '=g o E o (L z. F
g 't J (/) ! o), E T .g
P € o F g
O Y t^ J Cr- 'o6) >t r
.p> o- C' (t z -(\
irl
v d )
E m() -rv
E
TD
E 5> o:_ ()-o
-9
v;\ .8
t
C o)
!
o
O s O L
o-. o o (.) o)
.q
E o a
;
o
E
o o
9a n= !q)
oo)
LL O > a J F C) J a z a o(D F ( J <iJ mii <ii oo
21. TERM Cells shall issue El\4Rtest resultfor all the sites whetherEMR
in theformatas perAnnexure-1.
or non-complaint
compliant
\r 0,
ANY-
(Ha(s|1Kumar)
ADG(Securitf-TERM))
Copyto:
1. All CMTS/UASLLicensees
2. Sr.DDG(TEC)/Advisor(Fin.)
3. All CCAS
4. DDG(AS)
Govt. of lndia
Ministryof Communications&
lT
Departmentof Telecommunications
O/oDeputyDirectorceneral(TERM)
.I
Annexure
Performa
for EMRCompliance
Result
No Dated:
Dateof El\.4R
3. Measurements doneby
TERN4Cell
Name/ldentity&
Addressof the BTS
Longitude
& Latitude
of
5.
BTS
6.
ComplianceMethod ElRPth/
Software BroadBandMeasuremenv
Simulation/
Adoptedby TSP Freo.Selective
Measurement
7. ResultIndicatedby TSP
l\4easurement
Valueby
8.
TERMCell
9. SignageStatus Satisfaciorv/
Non-satisfactorv/
Absent
SiteComplianU
Non-
10.
Compliant
withreasons
Signature:
Name:
(Director/ADG):
Designation
Date:
To,
TSP(Name/ Address)