Session: 2008-2011
Getting a project ready requires the work and effort of many people. We would
like to pay my sincere gratitude and thanks to those people, who directed us at
every step in this project work. The present report is based on “DELHI
METRO RAIL CORPORATION”.
We extend our sincere thanks and gratitude to Ms. Shalu Tandon, internal faculty,
for her help and valuable support throughout the term of the project. It was a
learning experience to work under her guidance. We are thankful to Ms Shalu
who has given us the opportunity to do this project report. We are also thankful
to our parents, all our group members and other sources who gave us their
much needed support and inspiration in preparing this project report.
ii
CERTIFICATE
This is to certify that “SAURABHA SHARMA” has accomplished the project title
“DELHI METRO RAIL CORPORATION” under my guidance and supervision.
She has submitted this project in the partial fulfillment for the award of degree of
Bachelor of Business Administration (B.B.A) from Guru Gobind Singh Indraprastha
University.
The work has not been anywhere else for the award of degree. All source of information
have been duly mentioned.
Ms Shalu Tondon
(Faculty)
(TIPS)
iii
INTRODUCTION
Company Profile
Structure
Mission
• To cover the whole of Delhi with a Metro Network by the year 2021.
• Delhi Metro to be of world class standards in regard to safety, reliability,
punctuality, comfort and customer satisfaction.
• Metro to operate on sound commercial lines obviating the need for Government
support
Corporate Culture
• Our construction activities should not inconvenience or endanger public life nor
should lead to ecological or environmental degradation.
• All our structures should be aesthetically planned and well maintained.
• Safety of Metro users is our paramount responsibility.
• Our stations and trains should be spotlessly clean.
• Our staff should be smartly dressed, punctual, polite and helpful to the customers.
• Employees should discharge their responsibilities with pride, perfection and
dignity
SYSTEM ANALYSIS AND DESIGN
PROBLEM FORMULATION
In the existing program they had to maintain all the information on the paper. The details
are to be prepared on paper. All the work is very difficult. It need more time to solve the
query. Few of the problems are:-
The data cannot be easily available with anyone for the usage.
In solving the queries it will take more time to solve them out.
It will take more time to search a particular thing and to update that.
Paper work will be more.
Data duplication: The same data gets repeated over and over since the workers
find it hard to keep track of the documents, information and transactions
Lack of security: Since data is stored in filing cabinets it is freely available to
anyone if information falls into the wrong hands it can be used against the
company and customers and can blackmail them.
Common errors: When entering data customers might have accidentally
switched details and data since it is hand written.
Inconsistency of data: There will be an unavailability for future use, since data
might get misplaced during manual filing so data wont be preserved properly for
future use.
Repetition of work: If there are any changes to be made, the data will have to be
entered again at times the worker would forget to make the changes or forget that
they had already altered it and might redo it again, its again time consuming.
Too much paper work: Since everything and every detail are written down
manually in paper there will be too much paper work!
Space consuming: Since the data and paper is stored in filing cabinets it
consumes too much place, as the amount of work done on paper increases the
filing cabinets too increases.
Slow retrieval of data: The information of customers and details are stored in
different parts of the site and so takes a long time to retrieve the data it takes a
long time to find the information about a relevant person in case of a Delivery, the
delivery will be held back. This results in a sharp drop in sales, unhappy
Customers and a bad impression on the company.
• Proposed System
The proposed system is the automated system the business and activities of the DMRC. It
is a secured system whereby the software can be accessed only by the authenticated user
using the password protection mechanism.
SYSTEM ANALYSIS
• Identification of need
In this stage the project planner takes a qualified prospect through a series of question
and answer sessions in order to identify the requirements of the project. During this step,
the project planner will attempt to help, identify and quantify a business need or a "gap"
between where the organization is today and where they would like to be in the future.
Based on that gap, needs can be clarified to determine if the solution will fill all, or part
of the overall gap.
From this procedure the project planner is able to come up with a proposal suggesting
various products/services that will suffice the need as presented by the prospect.
• 1- preapproach
• 2 -approach
• 3 -need identification
• 4 -presentation
• 5 -handling objections
• 6 -closing the sale
• 7 -post-sale follow-up.
• Feasibility Analysis
1. Operational feasibility
Operational feasibility is a measure of how well a proposed system solves the problems,
and takes advantage of the opportunities identified during scope definition and how it
satisfies the requirements identified in the requirements analysis phase of system
development.
3. Economic feasibility
Economic analysis is the most frequently used method for evaluating the effectiveness of
a new system. More commonly known as cost/benefit analysis, the procedure is to
determine the benefits and savings that are expected from a candidate system and
compare them with costs. If benefits outweigh costs, then the decision is made to design
and implement the system. An entrepreneur must accurately weigh the cost versus
benefits before taking an action.
Cost-based study: It is important to identify cost and benefit factors, which can be
categorized as follows:
1. Development costs; and 2. Operating costs. This is an analysis of the costs
to be incurred in the system and the benefits derivable out of the system.
TRAINING
PROJECT
HOME ABOUT US SCHOOL CAREERS VIGILANCE
UPDATE
TRAVEL BY FUNCTIONS OF
STRUCTURE PROJECT COST
METRO CVO
WORLD CLASS
METRO STATION METRO
INFORMATION
FEEDER BUS
CITIZEN FORUM
DETAILS
The flow chart above shows the contents of the DMRC website. It contains the links
provided in the project.
These links are described as under:
HOME
In this section various facilities provide by the DMRC has been listed. These facitlies are:
• Travel by metro:
It contains the description of how a metro journey is done, right from entering the
DMRC premises to ending the journey .
• Metro timing:
This link gives the information about the timing of the metro when it starts its
services till it ends.
• Passenger information:
It tells us about the Do’s and Don’t that have to be followed in a metro staion and
inside a metro
• Metro station information:
This link describes the distance travelled by different metro trains on various
routes
• Feeder bus service:
This link tells about the fare that the feeder buses charge and the route followed.
• Citizen forum:
On the click of this link, we can get to know the step taken by DMRC to instill
better behavior, etiquettes and discipline among the Metro commuters.
9
ABOUT US
The link “ABOUT US” gives the picture of, DELHI METRO RAIL CORPORATION
LTD it mentions the history and present scenario of DMRC and various facilities provide
by DMRC.
PROJECT UPDATE
On the click of this link, customers will able to find the progress of DMRC at different
places. It also tells about the cost of the project till yet.
TRAINING SCHOOL
On the click of this link we can get to know about the training school for Metro
Operating and Maintenance Staff which has been set up at Shastri Park. Under an
agreement with the Hong Kong Metro Railway, 60 employees of DMRC have been
trained on their system. These employees after completing their training, have returned
and have trained the staff locally recruited for Delhi Metro.
CAREERS
This web page contains the basic requirments that are required to be a part of metro
family.
TENDERS
This web page contains the tenders given to various firms for the completion of work
VIGILANCE
On the click of this link we can get to know about the Vigilance Unit, Delhi Metro Rail
Corporation
CONTACT US
This web page contains the contact details of DMRC i.e., phone number, email address
etc.
Software System
Hardware System
RAM - 2 GB
HARDWARE - 250 GB
After designing the new system, the whole system is required to be converted into
computer understanding language. Coding the new system into computer programming
language does this. It is an important stage where the defined procedures are transformed
into control specifications by the help of a computer language. This is also called the
programming phase in which the programmer converts the program specifications into
computer instructions, which we refer as programs. The programs coordinate the data
movements and control the entire process in a system.
It is generally felt that the programs must be modular in nature. This helps in fast
development, maintenance and future change, if required.