Professional Documents
Culture Documents
Contents
Conlenls
Page
General Information 5
Scope 01 Oocument 5
Purpose of Inspeclion 5
Prerequisites 5
Safety Precautions 7
Instructions 10
Mechanical Portion Setvp 10
CleaninliElectrical COI'Inection Tightness Checks 10
Electrica\ Portion Setup 18
Eleclrical Checks 18
Spare Parts Kit Inventory 21
Wrap-up 21
Oiscrepancy log 21
Completion 21
Checklist 22
Requlted Parts
SMS-OCS
Item Oesgiotion part N umber
SAFETY PRECAUTlONS
Radiallon Haurd ih WARNING: RADIATlON HAZARO
Potentlal ra dlaUon exposure to saNlca per$onnel may oceur If lhe
doer Intertocks lall.
When operating ai hl9h power leveis, lhe klystron, Ihyratron, and lelroc:M
regulator can produce X rays, aven with lhe Ifljeclor and electron guri
disabled.
When lesting lhe microwave (AF) system ai high power levais. aari(
currenl can be generalad in lh e eccelerating waveguTda, aven if lhe
electron gun e.nd irljeelor are nol operating. "it becomes neeessary to
havo pef$()tlnel in the ecceleralor rcom wllh RF power In lhe wavegu.o. ••
Is done lor observing hlgh voItage arcing, modulalor testing, ate., II i5
Importan! lha! lhe l ollowing preeautions be taken to prevllllt radiation
exposure.
• When enlering lhe aocelere tor room , make SUfa lhe Jaw$ are cIosed
ali lhe way, and survey lhe machine, continuous1y monilorirlg lhe
radialion leveI wh~e lha machine is operaling (high voItage oondition).
11 lhe radiation levei ex ceeds 50 mradlhr (0.05 eGylhr), leave lt1e
accelerator room immedialely.
Vulnerablllty 01 Dual Wh(ln lhe dual pholon head is puOed OI replaced, it should firSI be
Ph oton Head positioned In lhe X·ray Lo moda. This aClion minimizes lhe ris k of damage
lo l he head.
Definlng Head DO NOT remove.01 head usemb~es OI lead without install!n" lhe ganlry
Maln tenance anti·rotalional pin o Damage l o equlpmerlt and !)perator can "sull 110m
attempling 10 rotale or work wilh an unbalanced ganiry.
Static Sensltive Oevk:es Observe ESQ precaulioos ai lU times. Use an extended groundstrap
Whenever possible l o provide adequale mobility. Use oIlhl exlended
groundsltap keaps you 110m hlvir,g lo constantly co/meti and discoonect
lha strap, wh ich wi lllead to l orgatting lhe groond strap. Any PCBs that are
removed must be pla ced on a properly grOundad antistatic mal. Do no! use
ESC equipment whlle working on OI near high vollage.
INSTRUCTIONS
4. Replael back cova r air fillers (S MS -OCS P/N 26 93 345 qly 4).
6. Visually inspect pulse tank oil lor impurilies (Le., such 8$ waler, carbon palhs, etc.)
through lron! view window.
Sfe mens MedicaI Sy5lems. Inc. 19 44 326 s003U Con ....nllonal MEVATRON
o. K:OIogy Care Syslems Rev.B 1MS System
16 MAINTENANCE 3-MONTH INSPECTION
Instructions
-
3517D
C. ZUTreatmen t labia
• Remove labia fIoor pi! covar.
• VacllUrn excess dus\ Irom ali areas 01 lhe lablelQ9.
• Chock transversa and longltudirlal irea floal connections. Inspecl for cabia
damage. OI' 8JfCess strain on cabia.
• Remove column covers.
• Vacuult, dus! Irom c:olumn assembly.
o Remove ell.cess grease rrom bearings anel ,ans.
• Inspecl bearing rails for excessive wear, damage, elc.
o Check lor excessive sag in lablelop ( lablelop rocks back anel lorth or side lo
side). Schedule replacement II necessary.
o Lubricate bearings afld raits.
o Check vertical safety chain lor damage, etc.
o Chock ALL Cllaelrieal eonneclions. Inclvding ground connections, l or lightnoss.
o Check vertical lift chain l or any damage, etc.
o Va cuum dus! Irom lable 11 00r pil.
• Check All electrical connections, Including grounel connections, lor tighlness.
o Install labia lloor pit caver.
,...,
Siemel"l$ MedicaI Sys!ems. Inc. 111 44 326 SOO3U Convt rlllonal MEVATRO N
Oncology cara System, Sytlem
18 MAINTENANCE 3-MONTH INSPECTlON
Instructions
Siemens Medicai Syslems. IrII:. 1\1 &4 326 SOO3U ConvenUonal MEVATRO!.l
Oncology caro Systems R,v.e ",.." Sy.t.m
20 MAINTENANCE 3-MONTH INSPECTION
Instructions
B. ZXTTreatmenlTabla
• Verify lha! All Oisplays ini tializa ai the inilialization points, or schadule re pair.
o Verify vertical heighl calibratlon aI isocenter, OI' schedule adjustment.
• Cheek ALl l unctions 01 lhe two remote handCOnlrols.
• Verify lripping 01 lhe mOlion deleetion Inlerlock circuit when lhe lable Is m oved and
mllliOo is nol enabled.
o Cheek l unction 01 lhe emerger.cy slop/reset push button.
C. ZU Treatment Tabla
• Verify vertical mechanical heigot indicatOt calibra~on ai isocenl er. Schedule
adjustme nl lf required.
• Verify proper lunctiorl 01 ali $witches and brakes.
'.0 Wrap-up ..
1. Cr ese anel reinstall ali chassis covars.
2. ReinstaJl anel dean ali machine cavem.
3. Program and run ALL energias to ve rify luoction bolOfe Ireatments re Stlme.
8.0 Completlon
I. Complete lhe Inspection completion ce rtilicate (Ias! paga 01 lhe theckJisl).
2. Send lhe certilicale lo your area manager.
CHECKLlST
2.3 Cleal'.lit1spect lha S7PS t magnetron litam enl powar supply M Class N/A O
Inll1.1. D.t. c omploto"
1
1n1t lS
1.l ID.t. C~~!
2.12 Cleanlinspecl lhe 513 ek! ctromagne t power supply M"'~ '. -N/A O
Inlll. 1. 0111 compll'td
2.18 Cleanlinspect lhe 515 miscellaneous inlerlocks and gantry shaft encoder
11II11I.r. Io.,. e llmp!oll'd I
2.19 Cl eanlinspect the K5 soIenoid powar supplies K Class N/AO
11'\111.1. D.'. complett<l
2.22 Clean/inspect lhe K4-T l hlgh voltage translormer assembly KCla ss N/AO
1"'ltI~. IDel. ço ....... 'K I
2.23 Cleanlinspecllhe K9 kJys l ron fdament power supply K Class N/AO
1nlll.I. 0.1. compl. t. "
2.24 Cleanlinspecl lhe K2 auxi li ary Interlock chassis assembly K Class N/AO
Ilnlll... IDat. co ....... '-4 I
2.25 Cleanflflspoct lhe K7 RF driver assemb/y KClass N/AO
Inlll.l. o.,. compl.t."
4.4 Tas! lhe SI0(M)lS I 8(K) bending magoeI, ma9lil, tens program a$sembIQ'~~1~~~~~
Lnltl.," 0111 ç0"'l'II.ad
Contents
Page
General Information 5
ScOpê of Document 5
Purpose of Inspeclion 5
Prerequisites 5
Sa fety Precautions 7
Instruclions 10
Mechanical Portion Selup 10
CleaninglElectrical Conneclion Tighlness Checks 10
Electncal Portion Setup 13
E lectrical Checks 14
Wrap-up 23
Oisc repancy l og 23
Comprarion 23
Checkllst 24
Flequlred Te sl Equlpment
Requlred Parta
SMS.QCS
rtem DesgiptTOI1 Part Number ~
S" mens M~I Systems, Inc:. li« 342 SOO3U Convenllonal MEVATRON
Rev. A 2/95 Sy,lem
10 MAINTENANCE 6-MONTH INSPECTION
Instructions
INSTRucnONS
7. Sector,lf applicable
• Rota!!! lhe gantsy lo 11 prohibited sectOl'.
• Relfacl lhe bea mshield.
• Verity lha! lhe SectOf lamp Is eKtinguished anel radia.1ion cal'V1Ot be Inltiated.
8. Motion Sslop
• Check lhe l unction of a~ motion stop switch es.
• Veri/y lha! no motion can be iniliated with lhe motlon stop Intel10ck activated.
• Verity lha! radiation cannot be lnll18led.
• Press 51 resel push bunon.
9. Arx fllad la ul! (acces.scwy read laull)
• Insert an accBssory jnto lhe ecx:essory holder.
• PartiaBy remove lhe accessory.
• Verity lha! lhe At;e read laul! lamp Is IIJ(tiflgUished.
• Verify lha! radialion cannol be Inltiated.
10. F.eld si:e
• Insert an electron applicator (100 em 10 x 10 c()fIe) Inlo lhe accesSOf)' hoIdel.
• Sei lhe fleId sizlI to 19 x 19 em.
• rleld S ize lamp 5h00!d be ijluminated.
• Reduco field sizo to 18.4 x 18.4 em.
• Field Size lamp should be extinguished,
• Il'\Crease fleld size l o 19 x 19 em.
• F.eld Size lamp should be 1Jluminated.
• Intrease field sile 10 19.6)( ' 9.6 tm.
• Field Size lamp should be extinllulshed.
• Verity uldiation canno! bo lnitia!ed with lhe field sÍZe lamp eru,guislled.
NOTE
The Inlerlotk wlndow Is normatly.;!:5 mm. Il ls no l untommon l o.te +6 Ind -4 mm
o r vltl!--ver$8.lIll ls outsld e Ih ls wl ndow, st hedule Interlotk w lndow .dj ultment.
Conlenls
pag e
General !"farmalian 5
Scope or Document 5
Purpose of Inspection 5
Prerequisites 5
Safety Precautions 7
Instructions 10
Mechanical Portion Setup 10
CleaninglElectrical Connection Tightness Checks 10
Electrical Portion Setup 18
"21"
Eleclrical Checks
Spare Parts Kit Invenlory
Wrap-up
Discrepancy Log 21
Completion 21
Checklist 23
SOe....... lAe 1kal Syst.ms. lne. 19« 367 s003U COI\venUonaJ MEVATRON
()nçoIggy c••• SY$t.... Rol". A 2195 5y.tem
6 MAINTENANCE 9-MONTH INSPECTION
Generallnformation
Requlred Parts
SMS-OCS
nem Description Part Number ~
INSTRUCTIONS
4. Replace back covar air fi llers (SMS-OCS PlN 28 93 345 qty 4).
8435893
U-&ackel
84 35919
La''''
3S 17838
IsoIation
~""
8435 901
Hinge pin 8344236
Hinge pin
W,_
3525714
3387768
L.ock washer 3343910
(qty 10) Sa_
B. ZXTTreatment l abia
• Remova labia flocr pit cover.
• Vacuum Ouse lrom ali areas 01 lhe tabJetop •
•' Check remota handcootrol con nections.
• Inspect vertical height sleel cabia lor physlcal damageJwear.
• Verify Ihal lhe 6\eel cabia bearing assemb/y rotates !reely.
o Check vertical eJectrical connection$.
• Greaso lhe Zer\!; littings 00 l he vertical ~h assembly.
• Inspect ali hydraulic valves lor oU lealts.
• Vacuum dus! Irom table f100r pij t.
• Check ALl e!ectrical COOIlBctions, lncludinlj ground cormectioos, for tighlnes$.
• Inspect hydraulic reserveir and pump l or oi! !eau.
• Install tabla Ilocr pit cover.
C. ZII TreatmentTable
• Remove ta ble IIoot pit cover.
• Vacuum dust Irom an areas of lhe tabletop.
• Check l1ansverse and Iongitudi nallrae float connectioos. Inspeel for cabia
damage, or excess strain an cabia.
• Remove column oovers.
• Vacuum dus! lrom coIumn 8ssemb/y.
• Remove eXCBSS greasa Irom bearlngs and rails.
• Inspect bearing rans Ior excessive wear, damage, etc.
• Check for excessiva sag in labletop (tabletop rocks back In<! forth or side to
$!de). Schedole bearing alignmenl jl nealssary.
• lobricate bearlngs and rails.
• Check vertical safety ct\afl for damage.
• Check verti cal lill cha ln for any damage.
• Vacuom dvst Irom lable fI()()( pit.
• Check ALl eleçtlical coonectioos, inctuding ground connections, for lightness.
• InslaUtablelloorpitcover.
4.4 SI0(Mys I 8{K) Beroding Magno t, Mag FlI, Leos Program Assembly
1. Verify cUlback operation for magnetroo fil ament power 5UPPIy.
2. Verify lens roil power 6Upply tums on when lhe push buttoo on 5 10PC21s depressed.
4.14 TraatmentTables
A. ZIV Treatment Tablo
• Verify mechanical vertical height &cale lndicator ca~bralion ai isoconter. Schedwlo
service i1 adjuslment Is required.
• Check ALL lunclions of ALL hand paddtes.
• Verily Ihat when emergeney hand crank is inSlalled, moIorized vertical lift is
disabled. lmmediately repalr i1 necessary.
• Verify lund ion oI omergency remoia handconlrol.
• Verify operation of graen lable Iock push button.
C. ZU Treatment l abia
• Verlly vertical mecharlical helght indicator calibration ai isocenter. Schedule
adjustment 11 require<!.
• Verify proper 'ul'\Ction 01an switche s and brakes.
6.0 Wrap Up
1. Close and relnslalt an chassis coven.
2. Reinslall arld elean In machine covers.
3. Pragram and run All er.ergles 10 verify lunction before treatmenls resume.
7.0 Ollcrepancy Lo ~
I . Log any discrspancies lound. In the lable provided In lhe cheddist.
• Indicale wh elher lhe discrepancy ls correcl ed or nol.
• 11 service Is 10 be scheduled, open an Incident number l or lU of lhe di:;crepar.cies (titled .
"discrepancies folK'od during PM1.
8.0 CompletJon
1. Complete l he Inspeclion complelion celtillca te (lasl page of lhe chcckfi$t).
2. Send lhe certificale to your afea manager.
Checklist
CHECKL1ST
·•
•
Il'1itiar,:~===
I ni~ a\s:
lnitials:
0"',;=,
Dale:
Oale:
== Time:
Time:
Time:
I I
2.1 CleatVínspecl the modulalor assembty M elass
I
tOA O
LnlU"I. o",. eompl.lood
1'"1tIo1I I tOA O
Dlt. compleled I
2.5 ClearVinspect lhe SI0[M)lS18(K) bending magnel, mag lil, lons program as.sembly
I "'1IlI1. ID• •• c~1ed I
2.6 Cleanfll1spect lhe S2 rotation drive cootrol
Ilnllttt. I0.'- compleltd I
2.23 Cleanlinspect lhe K9 klystron fil amen! powor eupptr K Cleu N/AO
Ilnlll.11 I
0111 ~Jet..s I
2.24 Cleanfln$pect lhe K2 audial)' inler\o(:!c; chassis a ssembly K Class N/AO
llnlll
... I
Dal. coml'i*ttd I
2.25 Cleanlinspect lhe K7 RF driver assemb/y K Cless N/AO
lniU,t, D,t. complel..!
I I
2.29 Cleanlinspect lhe control console
I lnlCla.. Oet. complt1ecl
Injlial~
tnitlalS'f===
!nitial$: 0""==
Oate:
Date:
Time removed:
TlITIe removed:
Time remove<!;
4.3 Test lhe S7PSl magnetron filamenl power sopply M Class N/A O
Ilnllllol' 10." ConIJ' leltd I
4 .4 Tes! lhe Sl O{M)/SI B{K) bending magne!, mag fil, tens program assembly
"
4.7 Tes! lhe S 12 p~pstand assembly
• Record water conduclivlty values in lhe blanks be low:
MWcm1 Malcm1
Systom water: Slored waler:
!lnllll.1 IIlat, ~omp"lo<ll
K Class
4.12 Tasl lhe 10 RF driver assembly
Ilftlll.l. I N/A O
Da'a comp\eted I
4 .13 Tn llhe contrai console
11n1l..1oI I
0... eompll'MII
Tesling Performed By
"'''
The pre scrlbed nine-rnol1tn preventive maintenanee Inspection 10r machine numbe,::::",,;:-
_ was pelformed by the abQve engineer(s)on tI1e date noted. Piease sigl1 anel retum lhis
101m 101 OU! records, .nd retain a copy 10r yours. The lwelYe-monlh preventive malnlenance
inspeetion for Ih!s machine is duo on ___ _ __
Contents
Page
Generallnlormation 5
Scope of Documenl 5
Purpose of Inspection 5
Prerequisites 5
Salely Precaulions 7
Inspectlon Instructions 10
Mechanical Portion Selup 10
CleaninglElectrical Comection Tightness Checks 10
Etectrical Portion Setup 12
Electrical Checks 13
Wrap-up 14
DiscrepallCy Log 14
CompIetion 14
Checklist 15
Requlred PartI
SMS-OC S
Item pe sçription Pa rt Numbor
º"
Filter, air. 16 x 16 x 1 in.
Pipa sealanl
2893345
79908 15
3
,,
Cartridge , deionizor 56 54 520
Lamp, 12V5QW
Lamp, 15V 150W
798899 1
9428517
•,
TubirIQ. la rgai wa ter line
Filting, feflUle aod nul
7989262
2851673 ,,'"
Temperature sensors
Sockel, lield lamp
7993 728
9413949 ,,
EP" grease
Lubricant, LP$-1
1953532
A4 00 010 ,,
Lubricanl, GE varsill.lbe
Cheddist, 12 -month inspection
9428229
1944383 ,
INSTRUCTIONS
4. Replace back COYer air lilIers (SMS-OCS PIN 28 93 34S qty 4).
2. t 5 12 Pumpstand Assembfy
1. Vacuum dust Irom pumpstand assembly.
2. Using clearllng solution and paper towals. clearl ali areas 01 lhe pumpstand assembly.
3. Check ALl electrical connections, IrlCluding ground coonectloos, Iof tighlness .
4. Change lhe deionizer cartridge (SMS-OCS P/N 56 54 520). lnilial and date lhe installed
cartridge.
• Press lhe treatment 100m omergency oH pJb. The 51 yellow rasei pi1:Ishould
extinguish.
• 11 li Shunt lrip cjrcuit breaker is usad, resel the circuit tNeaker.
• Pres$ lhe yellow resel plb on lhe SI panel. The button silould illuminate.
• Pres$ lhe cootrol area emergency of! pIb. l he 51 yellow resel p;b should
elClinguish.
• lIa shunt trip circuit bre aker is usad, resel the cifCUil breaker.
• Press lhe yellow resel pIb on lhe $ 1 panel. lhe button should iIIumlnate.
• Aepeatlhis tE/st/Cf aU emer geocy olt push buttons.
4. Tum lhe MEVATRON 011.
4.1 SI2PumpslandAssembty
1. Check ALl water connectioos l ar leaks.
2. Verity lhe water ftow Ihrough the deiooizer cartiridge .
3. Record pump pt'essUf8 on lhe parameter sheet.
4. Check Ihel lhe water temperatura ls aI 1 04' F (40'C) .lIer approximately 15 mir'llJl es.
Aecord temperatura after warm-up on parameter 6heet.
5. Check water conductivity. rBCOfd values in lhe blanks in lhe cheddist
5.0 Wrap-up
1. Reinslall ali chassis covars.
2. Ciosa ali chassis 8558mblies, etc.
3. Reinstan machine covers.
4. Clean AlL o)(!emal mactWle COV8fS,
5. Program 800 run ALl energ ias to veri1y Il,rIctiorI belore traatm ents resuma.
6.0 Olscrepancy l og
1. Log any discrepaneioslound, in lhe labia provided in th8 ehecIdisl
• tncica le whether lhe dserepancy is cotrected or not.
• 1I sarvica Is to be schodulad, opan an Incident number lor ali 01 lhe discrepancies
(~ded "discrepancies found during PM").
7.0 Completlon
1. Complete lhe inspeClion completion cerul icate (Iast pago 01 lhe chacklist) .
2. Sanei lho carulicate to your area managar.
CHECKlIST
1.0 Complete lhe Mechanlcal Portlon 5etup.
• Insta,a Iock-ootllag-out device and Iock. Initial, date, anel f~1 in lhe time lhe
Iock-Clllt device i5 inSlalled. 11 more Ihan one person will be working 00 lhe
equlpment, Ihen each eódilional worker shlll install lheir Iock,
IniIlaIS:==== Dale:====
In l~ als:
Irlitials:
Date:
Oale:
Tim,,=
Time:
Time:
' .7
I I
ClearJinspe<:t lhe H Iower defininç head (star.dard jaws) N/A O
111'1"11111 De" COftlple'~
InitiaJS:~.
Iflitials:
11'I111a1s:
=== 0"':.===
Data:
Date:
TIme removed:
TIme removed:
rwne removed:
Siem&ns Medicai Systems, lne. 19« 3&3 S./103U Connnllo nal MEVATRON
0nc0I0gy Care $ys!ems RIJV. A 21'95 Sy . t.m
MAINTENANCE 12-MONTH INSPECTION 17 .'
Checklist