You are on page 1of 9

1.

PROPOSED POSITION : BME SPECIALIST/SOCIO-ECONOMIST

2. NAME : KANAI DEB NATH

3. DATE OF BIRTH : July 09, 1954

4. NATIONALITY : Bangladeshi

5. QUALIFICATION : M.A. in Economics, Dhaka University , 1976.


B.A. (Honours.) in Economics, Dhaka
University, 1975.

6. OTHER TRAINING :

• Training on Management and Credit in Banking sector organized by


Bangladsh Krishi Bank (BKB);
• Training on Public Relation and Mass Communication in Training Center of
Bangladesh Biman;
• Short Courses on BME;
• Training on IGAs;
• Completed Highway Development and Management (HDM-4) Training at
Central Road Research Institute (CRRI), Delhi, India, in Sept.-Oct. Session,
2010.
• Computer Training in M.S. Words, Excel, SPSS,
Access; Data Processing.

7. LANGUAGE AND DEGREE


OF PROFICIENCY : English - Excellent
Bengali - Excellent
Russian - Very good

8. COUNTRIES OF WORK
EXPERIENCE : Bangladesh, Russia.

9. EMPLOYMENT RECORD

1st DECEMBER, 2010 TO


EMPLOYER: DATEt
Consortium of SNC Position: Economist ‘Water Management and
Lavalin, Engineering Improvement Project (WMIP), BWDB, funded
and Planning by World Bank”
Consultants Ltd., Responsibility: Conduction of field surveys on Socio-
DEVCON & AQUA economic aspect in the project, finding out water
Ltd. Dhaka, management problems, Conducting PRA in the
Bangladesh. project area, writing reports etc.

EMPLOYER: FROM 28th MARCH, 2009 TO 30th


Consortium of NOVEMBER, 2010

1 of 5
Engineering and Position: Socio-Economist cum Institutional
Planning Consultants Expert; ‘Preparing the Structure Plan, Master
Ltd.,& Sheltec Ltd. Plan and Detailed area Plan for the Extension
Dhaka, Bangladesh.
of the Khulna Master Plan area up to Mongla
Town’
Responsibility: Conduction of field surveys on Socio-
economic Survey, Slum Survey, Informal Economy
Survey, Industrial Survey including survey tools
formulation, providing guidelines, doing analysis of
these surveys and report writing etc. As an
institutional expert, the incumbent is to review the
prevailing institutional systems, finding out
loopholes, rearranging existing organogram where
necessary, and providing recommendations to attain
desired capabilities to provide better services
through reshuffling of the existing administrative
system. Moreover, cooperating Team Leader in
formulating Master Plan through forecasting
population growth in the project area and thus,
determine utility services and other infrastructure
required for the future inhabitants in the proposed
project area etc.

FROM 20TH FEBRUARY, 2009 TO 27th MARCH,


EMPLOYER: 2009
Engineering and Position: Team Leader cum Senior Social
Planning Consultants Expert; ‘Construction of 2800 Core Shelters for
Ltd. & CES India Pvt. SIDR affected Coastal areas of Bangladesh
Ltd., Dhaka, under GOI Scheme’
Bangladesh. Responsibility: Conduction of verification/validation
of the beneficiaries recommended by Sharonkhola &
Moralganj upazila office under Bagerhat district and
concerned union parishads through formulating
survey tools, deploying surveyors, collecting data &
information and finally submitting report on the
basis of the study conducted.

EMPLOYER: FROM 19th FEBRUARY, 2008 TO 18th


Consortium of FEBRUARY, 2009
Engineering and Position: Socio-Economist cum Institutional
Planning Consultants Expert; ‘Preparing the Structure Plan, Master
Ltd.,& Sheltec Ltd. Plan and Detailed area Plan for the Extension
Dhaka, Bangladesh.
of the Khulna Master Plan area up to Mongla
Town’
Responsibility: Conduction of field surveys on Socio-
economic Survey, Slum Survey, Informal Economy
Survey, Industrial Survey including survey tools
formulation, providing guidelines, doing analysis of
these surveys and report writing etc. As an
institutional expert, the incumbent is to review the

2 of 5
prevailing institutional systems, finding out
loopholes, rearranging existing organogram where
necessary, and providing recommendations to attain
desired capabilities to provide better services
through reshuffling of the existing administrative
system. Moreover, cooperating Team Leader in
formulating Master Plan through forecasting
population growth in the project area and thus,
determine utility services and other infrastructure
required for the future inhabitants in the proposed
project area etc.

EMPLOYER: FROM 19th DECEMBER, 2007 TO 18th


Consortium of FEBRUARY, 2008
Engineering and Position: Urban Development Economist cum
Planning Consultants Institutional Expert; ‘Preparation of the
Ltd.,& Sheltec Ltd. Structure Plan, Master Plan and Detailed area
Dhaka, Bangladesh.
Plan for Barisal Divisional Town’
Responsibility: Conduction of field surveys on Socio-
economic Survey, Slum Survey, Informal Economy
Survey, Industrial Survey including survey tools
formulation, providing guidelines, doing analysis of
these surveys and report writing etc. As an
institutional expert, the incumbent is to review the
prevailing institutional systems, finding out
loopholes, rearranging existing organogram where
necessary, and providing recommendations to attain
desired capabilities to provide better services
through reshuffling of the existing administrative
system. Moreover, cooperating Team Leader in
formulating Master Plan through forecasting
population growth in the project area and thus,
determine utility services and other infrastructure
required for the future inhabitants in the proposed
project area etc.

EMPLOYER: FROM 9th NOVEMBER, 2007


th
SNC Lavaline in JV TO 18 DECEMBER, 2007
with SAI consulting & Position: Transport Economist, Dhaka-
Engineering and Chittagong Expressway (PPP) RHD, Bangladesh
Planning Consultants Responsibility: Conduction of field survey on Traffic
Ltd., Dhaka, and other field relating Road users cost, accidents,
Bangladesh. etc. Compiling and analysis of data, doing economic
analysis of the project to find out EIRR, NPV and B/C
ratio to justify the economic feasibility of the project.

3 of 5
EMPLOYER: FROM 9th SEPTEMBER, 2007 TO 8TH
Consortium of NOVEMBER, 2007
Engineering and Position: Urban Development Economist;
Planning Consultants ‘Preparing Structure Plan, Master Plan and
Ltd.,& Sheltec Ltd. Detailed area Plan for the Extension of the
Dhaka, Bangladesh.
Khulna Master Plan area up to Mongla Town’
Responsibility: Conduction of field surveys on Socio-
economic Survey, Slum Survey, Informal Economy
Survey, Industrial Survey including survey tools
formulation, providing guidelines, doing analysis of
these surveys and report writing etc. Moreover,
cooperating Team Leader in formulating Master Plan
through forecasting population growth in the project
area and thus determine utility services and other
infrastructure required for the future inhabitants in
the proposed project area etc.

EMPLOYER: FROM 15th APRIL, 2007 TO


SNC Lavaline in JV 6th SEPTEMBER,2007
with SAI consulting & Position: Transport Economist, Dhaka-
Engineering and Chittagong Expressway (PPP) RHD, Bangladesh
Planning Consultants Responsibility: Conduction of field survey on Traffic
Ltd., Dhaka, and other field relating Road users cost, accidents,
Bangladesh. etc. Compiling and analysis of data, doing economic
analysis of the project to find out economic
feasibility of the project.

EMPLOYER: FROM OCTOBER 2006 TO FEBRUARY,


BETS 2007
Position: Statistician cum Project Co-
coordinator, Assessment of Procurement
Management Capacity and its
Institutionalization.
Responsibility: Preparation of part of technical proposal,
survey tools, recruitment and training of field researchers, co-
ordination of total survey works, organising and conducting
workshops, generation of tables for analytical purpose, writing
analytical part of the report etc.

FROM JUNE 2006 TO : SEPTEMBER 2006


BETS Consulting Position: Project Coordinator/Senior Socio-
Services Ltd. economist
“Impact Study of the Smallholder Livestock
Development Project (SLDP-2)” implemented in
5 coastal districts funded by DANIDA under
Department of Livestock. Carried out socio-economic
study and impact evaluation of the project
components on the small farm and landless family

4 of 5
with respect to income improvement and livelihood
pattern.

EMPLOYER: FROM JANUARY, 2006 TO MAY 2006


BETS Position: Senior Socio-economist, BETS
Responsibility: Being the Sr. Socio-economist
participated in the on going project of “the Informal
Sector of Employment in Bangladesh and how this
Sector could be Mobilized to Eliminate Worst Forms
of Child Labour and Increase Job Opportunity”
sponsored by ILO, Dhaka office.

EMPLOYER: FROM AUGUST, 2005 TO DECEMBER


BETS 2005
Position: Monitoring & Evaluation Specialist; Special
Assistance for Project Formation-II, Karnaphuli Water
Treatment Project, CWASA, Chittagong.
Responsibility: Participation in preparing and
monitoring the Short Term Action Plan (STAP). Assist
expatriate consultant for the STAP.

EMPLOYER: FROM 15th APRIL, 2005 TO JULY, 2005


BETS Position: Senior Socio-economist
Responsibility: As per requirements active
participation in tasks related to socio-economic
aspects under various on-going projects implemented
by the firm including proposal preparation, economic
analysis, report writing, coordination etc.

EMPLOYER: FROM May 2004 : TO 12th April 2005


Engineering & Sociologist, District Water Resources
Planning Consultants Assessment (DWRA), LGED, funded by Asian
Ltd., Dhaka, Development Bank. Development of
Bangladesh. questionnaires, collection of socio-economic and
productive data through Upazila Engineer’s office,
analyzing data, contributing to formulate water
resources development project plan, interaction with
LGED and BWD officials, local NGO representatives,
and people’s representatives, etc. Take part in
preparing the Draft DWRA Report in the context of
implementation of the National Water Policy and to
conduct District Consultation Meeting to review and
finalize the synthesized issues and options prepared
on the basis of the upazila consultation meetings
and to fill the gaps and work for approval of the
DWRA Report.

EMPLOYER: FROM AUGUST, 2002 TO APRIL 2004


Engineering & Socio-economist, Greater Faridpur
Planning Consultants Infrastructure (Road) Development Project
Ltd., Dhaka, (D&S Consultancy Services) funded by Japan
Bangladesh. Bank for International Co-operation (JBIC)

5 of 5
International Consultants: WSP International
(UK); DHV Consultants, The Netherlands).
Organizing and supervising the task of collecting
benchmark data on Socio-economic characteristic
including demography, employment, production,
income and expenditure, livelihood pattern, health
and education, etc. and Traffic volume related to (a)
Road traffic; AADTs, Traffic volume, Modal shift,
VOCs & TTCs, Per Pkm/Tkm cost etc. (b) Market data;
market visitors, turnover, auction and realize toll
amount, spoilage saving etc. Performing progress
monitoring (Input-Output), Economic and Financial
Analysis and Benefit Monitoring and Evaluation
(Output-Effect) and Impact Monitoring and
Evaluation (Effects-Impacts) as per Logical
Frame Work Approach (LFA) and Economic
forecast of the project that likely to be yield to
improve and enhance the economic profile in
the zone of influence of the project
components.

FROM AUGUST 2001 TO JULY 2002


Senior Community Organizer, Gazaria Hard
Protection Work (GHPW) under Kalni-Kushiyara
River Management Project (KKRMP), funded by
CIDA. Conducted field survey to collect socio-
economic data in the project area; compiling and
analyzing the data through computerized process.
Assessed inter-and-intra linkage relationship among
the social groups, and conflicts that hinder the
collective participation in the implementation of the
project. Assessed the positive and negative impact
of the project on the income and livelihood pattern.

FROM JANUARY 2001 TO JULY 2001


Associated Economist, South Comilla and North
Noakhali Comprehensive Drainage Project, Hold
the responsibility of conducting socio-economic
survey, analysis, and assessed the impact of the
project with respect to cost and benefits, income
distribution among the beneficiaries and social
structure, economic and financial analysis of the
project infrastructure with financial
forecasting for the economic life of the project
to carry out the cost recovery analysis, cash
flow and repayment analysis, preparation of
report.

FROM JULY 2000 TO DECEMBER 2000


Economist, Infrastructure Development
Project, Greater Sylhet District, LGED. Hold the
responsibility of organizing and supervising the
socio-economic field survey, traffic survey,
commodity transaction survey Also supervised the
task of collection of information related to economic
sectors that have direct/indirect influence of the

6 of 5
development of infra-structure including Markets and
Growth Centers. Economic analysis, and carried out
Benefit Monitoring and Evaluation (Output-Effect)
and Impact Monitoring and Evaluation (Effects-
Impacts) including assessment of impact of
infrastructure development on overall economy
including production, marketing, employment
opportunity, social sector, etc. The economic and
financial evaluation of the project was
submitted through forecasting of economic
and financial benefit and cost for a period of
20 years and calculated EIRR, B/C, NPV.

FROM APRIL 1997 TO JUNE 2000


Economist, Secondary Towns Integrated Flood
Protection Project, BWDB/LGED. The urban
infrastructure improvement in 5 towns
including Khulna. Hold the responsibility of
organizing and supervising the socio-economic field
survey, analysis of the socio-economic parameters,
Economic analysis, and carried out Benefit
Monitoring and Evaluation (Output-Effect) and
Impact Monitoring and Evaluation (Effects-Impacts)
including assessment of the capacity of the
Municipalities in resource generation and
mobilization for a projected period of 20 years;
assessment of impact of urban infrastructure
development on the civic life and environment,
and also overall economic activities in the 5
towns. The economic evaluation of the project
was submitted through estimating EIRR, B/C,
NPV.

EMPLOYER: FROM MARCH 1995 TO FEBRUARY 1997


Selkhoze Asstt. Economist, Pushkin Urban Development
Promexport; Project, Russia.
Moscow, Russia Assisted Sr. Economist in rendering services to
carryout traffic survey, market survey, (a) Road
traffic; AADTs, Traffic volume, Modal shift, VOCs &
TTCs, Per Pkm/Tkm cost etc. (b) Market transaction
study in thr proposed trading/market centers;
market visitors, turnover, auction and realize toll
amount, spoilage saving etc. Socio-economic
surveys, processing of data; forecasting of traffic
generation and economic activities. Also worked in
collaboration with Sr. economist in Cost analysis,
investment program, Economic and financial analysis
and carried out B/C ratio; NPV, IRR with sensitivity
analysis, cash flow, etc.

EMPLOYER: FROM APRIL 1994 TO FEBRUARY 1995


Selkhoze Asstt. Economist, Krasnador Urban
Promexport; Development Project, Russia. Assisted Sr.

7 of 5
Moscow, Russia Economist in in Conducting Socio-Economic Survey
in the project area; Traffic Survey on the Feeder
roads (a) Road traffic; AADTs, Traffic volume, Modal
shift, VOCs & TTCs, Per Pkm/Tkm cost etc. (b)
Transaction of goods in the Trading Centers/Markets;
Economic Impact Monitoring and Evaluation (Effects-
Impacts) of the urban infrastructure including
analysis of economic parameters with forecasting of
economic and financial viability of the project;
assessed the impact of the project on the nation and
community, and estimate FIRR, EIRR, B/C, N/K ratios,
and NPV, cash flow of the project.

EMPLOYER: FROM JULY 1993 TO MARCH 1994


Selkhoze Asstt. Economist, Tarasaivaiskaya Urban Road
Promexport, Project, Russia
Moscow, Russia Assisted Sr. Economist in Conducting Socio-Economic
Survey in the project area; Market data; Benefit
Monitoring and Impact analysis in the zone of
influence of the project components

EMPLOYER: FROM SEPTEMBER 1982 TO OCTOBER 1992


Local NGO’s Program Organizer/Coordinator: Organized
development programmes, meetings with group members,
conducted trainings on IGAs, HR developments etc.
assisting field staffs to launch micro-credit programmes and
also report writing on developmental activities.
EMPLOYER: FROM JUNE 1980 TO AUGUST 1982
Bangladesh Krishi Branch Manager. After successful completion of
Bank training worked as Branch Manager, Different
Branches in Barisal District Town. Carried out the
project investment analysis including financial
analysis, benefit/cost analysis, repayment capacity
of the project/scheme, fund generation capacity, etc.

EMPLOYER: FROM SEPTEMBER 1978 TO MAY 1980


Bangladesh Biman Sales Assistant. Marketing and sales division of
Bangladesh Biman; and served in Biman till joining
Krishi Bank.
Certification :

I, the undersigned, certify that to the best of my knowledge and belief, this information
correctly describe my qualifications, my experience, and me.

Signature:______________

Date : __________________
D / M / Year

8 of 5
9 of 5

You might also like