You are on page 1of 2

(/7 4/ -!+% ,5-"%2 7)4( 4(% !,!3+!. #(!).3!

7 -),, -+)))
'2!."%2' ).4%2.!4)/.!, s 0/ "OX  s 6ALLEJO #!   s 4/,,&2%%    s 4EL    s &AX   

 6/$%%,1*5$,/ 
31*

*8,'(5$,/
,6326,7,21('

*8,'(3/$1.6 *8,'(5$,/

6$:
;
/80%(5
$1*/(
,521
%/$'(

02%0!2).' '5)$% 2!), /2 '5)$% 0,!.+ 0,//326,7,21

!N ACCURATE DEPENDABLE GUIDE SYSTEM IS ABSOLUTELY


NECESSARY BEFORE ATTEMPTING TO OPERATE YOUR
h!,!3+!.v 3%44).' 50 &/2 4(% &)234 #54
'RANBERG )NTERNATIONAL RECOMMENDS THE USE OF OUR 0LACE THE GUIDE RAIL OR PLANK ON THE LOG AND SECURE 4HE
3,!"").' 2!), SYSTEM PART NUMBER '  )F YOU GUIDE RAIL MUST PROJECT AT LEAST SIX INCHES BEYOND THE ENDS
ARE NOT GOING TO ORDER A SET OF THESE BRACKETS VARIOUS OF THE LOG SO THAT THE SAW WILL LEAVE THE CUT LEVEL AND EVEN
ALTERNATIVES WILL WORK SUCH AS A GOOD STRAIGHT  X  WITH 4HIS BASIC OR lRST CUT DETERMINES THE ACCURACY OF ALL LATER
 X S OR ANGLE IRON SECURELY FASTENED TO THE PLANK EDGES CUTS -AKE SURE IT IS TRUE AND THAT WILL HELP PRODUCE THE
4HIS HELPS STABILIZE THE PLANK WHEN SECURED TO THE LOG MAXIMUM AMOUNT OF LUMBER FROM THE LOG

 &203/(7(' /,9(6$:,1* 
),567&87
*8,'(5$,/,6648$5('
:,7+&$53(17(5
6648$5(

6(&21' /,1(2)7+,5'&87
&87
0,//326,7,21

%/$'(

/,1(2)
6(&21'&87
6$:
0,//326,7,21

3%44).' 50 &/2 4(% 3%#/.$ #54 %/$'(


2EMOVE THE GUIDE RAIL AND lRST CUT SLAB )F YOU WISH TO
/2*+$6%((17851('
hLIVE SAWv THE LOG ADJUST THE MILL FOR THE DESIRED DEPTH OF R
29(5 5(%/2&.('
CUT AND SAW MILL THE LOG AS IT LIES 4O PRODUCE A LEVEL AND
STRAIGHT CUT KEEP THE RAILS OF THE MILL LEVEL AND IN CONTACT
WITH THE LOG 4O PRODUCE A h#!.4v FOR A SPECIlC DIMENSION
LOWER THE MILL TO MAKE YOUR SECOND CUT 7EDGE THIS CUT
OPEN AS THE SAW COMES OUT OF THE CUT TO PREVENT THE SAW 02%0!2).' 4/ -!+% 4(% 4()2$ #54
BAR FROM PINCHING THE CHAIN 4HIS SECOND CUT PRODUCES A .OW ROTATE THE LOG  DEGREES BRACE THE LOG lRMLY AND
SURFACE PARALLEL TO THE lRST CUT 2EMEMBER TO KEEP THE FASTEN THE GUIDE RAIL 5SE A CARPENTERS SQUARE TO INSURE
ON OFF GUIDE BAR IN THE MIDDLE OF THE LOG TO LEAD THE THAT THE THIRD SLABBING CUT WILL BE A RIGT ANGLE TO THE FACES
SAW IN AND OUT OF THE CUT OF THE lRST AND SECOND CUTS
 7+,5'&87 
&203/(7('

212))%$5

-!+).' $)-%.3)/. ,5-"%2 &2/- 3!7.


0,!.+3
2%!$9 4/ #/.6%24 #!.4 ).4/ ,5-"%2 7HEN YOU DESIRE TO MAKE DIMENSION LUMBER GATHER
9OU ARE NOW READY TO CONVERT THE CANT INTO LUMBER THE SAW PLANKS AS SHOWN AND CLAMP lRMLY .OW ADJUST
2EMOVE THE SLAB AND GUIDE RAIL $ETERMINE THE THICKNESS THE THICKNESS GAUGE AS REQUIRED SO AS TO CUT gg X gSg
OF THE PLANKS OR BOARDS TO BE PRODUCED AND SET THE GAUGE gg X ggS OR gg X ggS AS AN EXAMPLE +EEP IN MIND THAT
TO THE CORRECT THICKNESS 2EMEMBER THAT THE MILL SLIDES IF VARIOUS SIZES ARE PLANNED TO BE TAKEN FROM THE SAME
ON THE LEVEL SURFACE OF EACH PREVIOUS CUT SO BE SURE THAT LOG SUCH AS gg X ggX gg X gg gg X gg ETC THE VARIOUS
THE ON OFF GUIDE BAR IS CENTERED ON THE CANT TO ENSURE DIMENSIONS NEEDED MUST BE ALLOWED FOR WHEN MAKING
THE SAW ENTERS AND LEAVES THE CUT EVENLY THE PREVIOUS CUTS 3EE STEP FIVE

 

/,9(6$:,1*
$
/(9(/

34%03 4!+%. ). 4(% -!+).' /&


02%-)5- ,%.'4( "%!-3
352'8&7,212)+($9<%($06 7HEN CUTTING EXTRA LONG OR PREMIUM BEAMS WE
RECOMMEND THIS PROCEDURE FOR MAKING THE INITIAL CUT
"EFORE PLACING THE GUIDE BOARD gg X gg OR gg X gg DRIVE
4)-"%2ˆ#!.43ˆ"%!-3ˆ%4#  SPIKES AT EACH END LEVEL AND STRETCH A HEAVY CORD FROM
&2/- ,!2'% ,/'3 ONE END OF THE LOG TO THE OTHER $RIVE SPIKES OR LAGS TO THE
4O SPLIT LARGER LOGS INTO TWO OR MORE SECTIONS PROCEED AS HEIGHT OF THE CORD AS A MEANS OF KEEPING THE GUIDE RAIL
IN STEP TWO THROUGH STEP FOUR 4HE SIZES OF THESE HEAVY TRUE AND LEVEL !  0LACE GUIDE BOARD ON SPIKES AND CUT
PIECES ARE CONTROLLED BY THE SETTING OF THE THICKNESS ABOUT  OF THE LENGTH OF THE GUIDE RAIL RAISE THE MILL AND
FRAME 4HE GUIDE RAIL IS USED IN THE SAME MANNER AS SLIDE THE GUIDE RAIL AHEAD ALONG THE HEADS OF THE LAGS OR
PREVIOUSLY DESCRIBED 4HE CUTS MAY REQUIRE WEDGING DUE SPIKES "  #ONTINUE CUTTING IN THIS FASHION UNIL THE FIRST CUT
TO HEAVY WEIGHT IS COMPLETED

You might also like