You are on page 1of 13

Circle-KOLKATA

Key Performance Indicators 8-Dec-10 9-Dec-10 10-Dec-10 11-Dec-10 12-Dec-10


Availability
Network Availability (Core) (during 24hrs) 100.00 100.00 100.00 100.00 100.00
PDSN Availability 99.93 99.92 99.63 99.86 99.97
Network Availability (Radio) (during 24 hrs) 99.94 99.72 99.89 99.89 99.94
Voice
Network Accessibility (24 Hrs.)
Paging Success Ratio (%) 91.50 91.41 90.76 91.23 90.89
Network Accessibility (NBH)
Call Setup Success Rate (%) 98.84 98.83 98.70 98.60 98.53
Blocking (Excluding transmission failure) 0.00 0.00 0.00 0.00 0.00
Blocking (User Perceived) 0.00 0.00 0.00 0.00 0.00
Cell Wise Accessability (Cell BBH)
Call Setup Success Rate (%) (Target: 95%) 98.92 98.92 98.85 98.68 98.70
Voice Retainability
Network Wide Retainability (NBH)
Call Drop (%) 0.30 0.28 0.33 0.38 0.39
Call Drop (%) (excluding Abis failure) 0.29 0.28 0.33 0.38 0.39
Soft + Softer Handoff Success Rate (%) 99.69 99.72 99.70 99.65 99.70
Soft + Softer Handoff Success Rate (%) Monitoring 99.69 99.72 99.70 99.65 99.70
Hard Handoff Success Rate (%) 0.00 0.00 0.00 0.00 0.00
Soft + Softer Handoff Ratio (%) 50.40 50.56 50.44 50.10 50.15
Cell Wise Retainability (Cell BBH)
Call Drop (Target:≤2%) 96.67 97.10 96.57 93.23 92.16
Call Drop (%) (excluding Abis failure) 96.67 97.10 96.57 93.23 92.16
Handoff Success Rate (Target:≥90%)
100.00 100.00 100.00 100.00 100.00
Handoff Success Rate (Target:≥90%) Monitoring
100.00 100.00 100.00 100.00 100.00
Voice Quality (24 Hrs)
FER (Reverse) (Target < 3 % for each cell) 100.00 100.00 100.00 100.00 100.00
FER (Forward) (Target < 3% for each cell) 100.00 100.00 100.00 100.00 100.00
Data
Data Network Availability
PDP Activation Success Rate 94.67 96.31 96.19 96.30 95.77
Data Retanability ( Packet data Busy Hour)
PDC Drop (%) 2.72 2.37 2.18 2.24 2.17
PDC Drop (%) (excluding Abis failures) 2.72 2.37 2.18 2.24 2.17
EVDO Block Rate (%) 0.20 0.00 0.00 0.00 0.01
Data Quality
CDMA: 1X Data Quality
Round Trip Time (ms) 352.00 362.00 374.00 361.00
Average Reverse Link throughput (kbps) 135.40 134.10 133.60 134.50
Average Forward Link throughput (kbps) 140.10 136.70 140.60 141.50
EVDO Data Quality
Round Trip Time (ms) 116 124 119 134
Average Reverse Link throughput (kbps) 897 890.3 945 1100
Average Forward Link throughput (kbps) 1210 1180 1169 1225 1230
Core KPI
ASR (%) (Answer Seizure ratio) 39.58 38.66 39.82 39.23 38.19
CCR(%)(Call completion rate) 99.80 99.81 99.81 99.80 99.80
CDMA /
EVDO

Week Site ID Site Name sector ID CDR CSSR Blocking EVDO CDR
AVG of Three Days
05-Dec to 11-Dec
Worst performing s

Weekly Plan
Throughtput Alarm Visit Date Closing Issue
ree Days Date
Worst performing site

Weekly Plan
Field Visit Required Suggested Action Remark Date of Site visit Feedback from FLE
Plan team
Action Taken Remarks CDR CSSR Blocking EVDO CDR Throughtput
AVG of Three Days
Status
Title No.Of Site Details
Parameter Optimization 347 Target FER-2% & Eb/Nt-3 dB
Physical Optimization 0 NA
Ev-Do Drive Test 120 To check averge throughput
NBR Optimization(CDMA & EV-Do) 377 To reduce CDR
Remark
Overall CDR & CSSR improved
NA
Found no issue.Average throughput was >1.2Mbps
Overall CDR improved
CDMA /
EVDO

Week
Site ID Site Name sector ID Zone

1157 Chapadali Sector-4 North


1173 DHANEKHALI Sector-0 North
1286 NILGUNGE Sector-1 North
1121 Bansberia Sector-2 North
1155 chandan nagar Sector-0 North
1173 DHANEKHALI Sector-0 North
1428 Kakinara-2 Sector-1 North
11-Dec to 26-Dec

1428 Kakinara-2 Sector-2 North


1428 Kakinara-2 Sector-3 North
1477 Amdanga Sector-2 North
1330 Saltlake GP Sector-1 CBD
1377 Saltlake GP2 Sector-1 CBD
1441 Sonar Bangla Secror-1 CBD
1506 Bortala Sector-2 South
1307 RABINDRA NAGAR Sector-2 South
1333 Sankrail Chapatala TTL Sector-1 South
(own)
1453 Panchla Sector-1 South
Worst performing s

Weekly Plan
Suggested Action Plan Remark

Extra 4 Degree downtilt/Antenna height


Extra 2 Degree downtilt
Extra 2 Degree downtilt
Extra 2 deg downtilt & Eb/Nt to reduce to 2 dB
Extra 2 deg downtilt & Eb/Nt to reduce to 2 dB
Extra 2 deg downtilt & Eb/Nt to reduce to 2 dB
Critical Issue,need to be check hardware thoroughly & Eb/Nt to reduce to 2 dB
Critical Issue,need to be check hardware thoroughly & Eb/Nt to reduce to 2 dB
Critical Issue,need to be check hardware thoroughly & Eb/Nt to reduce to 2 dB
NBR Optimization
Extra 2 Degree downtilt
Extra 2 Degree downtilt
Extra 2 Degree downtilt
Azimuth to be changed to 340/90/180
Azimuth to be changed to 20/100/190
Azimuth to be changed to 20/180/270

NBR Optimization
Worst performing site

Weekly Plan
Date of Site visit Engineer Name Feedback from FLE Action Taken Remarks
team
16/12/2010 Sanshay Jha
15/12/2010 Sanshay Jha
16/12/2010 Sanshay Jha
15/12/2010 Sanshay Jha
15/12/2010 Sanshay Jha
15/12/2010 Sanshay Jha
17/12/2010 FLE
17/12/2010 FLE
17/12/2010 FLE
16/12/2010 Sanshay Jha
17/12/2010 Nikhil Tiwary
17/12/2010 Nikhil Tiwary
17/12/2010 Nikhil Tiwary
16/12/2010 Nikhil Tiwary
16/12/2010 Nikhil Tiwary
15/12/2010 Nikhil Tiwary

15/12/2010 Nikhil Tiwary


CDR CSSR Blocking EVDO CDR Throughtput Status
AVG of Three Days

You might also like