You are on page 1of 2

Project Matrix

A Snapshot

a. Existing Integrated Steel Plant comprising of:


Manufacturing • 2 x 100 TPD Sponge Iron – Popuri Technology
Facility
• 2 x 8 T Steel Melting Shop – Induction Furnace

• 350 TPD Rolling Mill, Size 8-20 MM

• 1.25 MW CPP

• Iron Ore and Coal Crushing - 75 TPH

• Fly ash bricks plant

• 1 x 100 TPH Crusher

• 2 x 7 T Induction Furnace

• 100 TPH iron ore Washery

• Coal Tippler
b. Product portfolio • Sponge Iron

• TMT Bars
• CTD Bars

• Wire Rods

• Structured Steel Products


c. Location with • Situated in Orissa
advantages • 15 Kms. from Iron Ore mines

• 60 Kms. from Mahanadi Coalfield Limited

• Located in the rich iron ore and coal belt of


Eastern India

• Near to Baitani River and has NOC from the


Govt. of Orissa for ground water use.
• Already has allocation from IDCO to acquire
about 100 acres for expansion
d. Area • Current unit is spread across 50 acres of land

• Further application for 100 acres has already been made to


the State Govt. of which 50% payment has been made.
e. Scope of Expansion Additional NOC/Environmental clearance obtained for:

• DRI – 2 x100

• CPP- 2 x 8 MW

• Induction Furnace – 2 x 8 MT

• Billet Caster/Structure Mill – 120000 MTPA

Note: infrastructure for the above configuration is already


developed
f. Coal Linkage, Details Coal linkage of 7000 tonne/month from Mahanadi Coalfield
of mining

1|Page
Project Matrix

application, if any Limited


g. Utilities Water: The unit has operative bore wells in the factory
premises

Power: The unit has 33KV (Independent Bay/feeder in Grid)


exclusive power line, which has been constructed on a stretch
of 13 Kms from the substation to the plant.

There is an exclusive power tie up with OPTCL–Orissa Power


Transmission Corporation Limited.

The company has a 1.25 MW waste heat power plant using the
waste heat of the first kiln. This can be increased to 2.5 MW by
using the waste heat of the second kiln.

The plant has standby D.G Sets –


• 1250 KVA

• 750 KVA

• 625 KVA

• 475 KVA

• 125 KVA

Raw Material : The 2 most important raw materials for


sponge iron production –coal and iron ore –are readily
available through effective and reliable linkages resulting in
operational efficiencies.

The plant is surrounded by iron ore mines within a radius of 15


kms.

The company has linkages with 5 different suppliers in the


open market for iron ore supply.

Being close to the NH 215 (12kms) and the Toll Highway (3


kms), road transport of iron ore is cost effective.

Statutory Compliance: The unit has complied with all


statutory requirements and has no compliance pending. All
permissions and licenses are in place and operative on current
date.
h. Bank Details Presently the unit has an outstanding of Rs. 35 crs, which is
regular

ASPIRE CAPITAL PVT LTD | FINANCIAL CONSULTANTS


“Shantiniketan Building” 8, Camac Street, 9th Floor
Room No. 14, Kolkata – 700 017
Mob: +91 9836107843, Fax: 91 33 3057 1302
2|Page

You might also like