You are on page 1of 9

Different Charges for LT Services to be Paid from

SL. I - A(Domestic) IB (Hut) II - A(St. Light)


NO III
Tariff I  Phase Phase I  Phase
New Service
Connection *
Registratio
1 n Fees 50 50 5 50
Service
Connection
2 Charges 250 500 NIL 250
Meter
caution
3 Deposit 700 2500 NIL 700

Developme
4 nt Charges 400/sc 1400/sc NIL 300 Per Location
Security
5 Deposit 200/sc 600/KW NIL 200/sc
EMD
6 Charges Nil NIL NIL Nil
Meter Board
shifting
Registratio
1 n Fees 50 50 NIL 50
Testing
2 Fees 75 75 NIL 75
Meter
Board
3 shifting 150 150 NIL 150

Disconnect
ion /
Reconnecti
on
(OH)/cut
4 out 60 60 NIL 60
Disconnect
ion /
Reconnecti
on UG
5 Cable 300 300 NIL 300

Changing
of meter at
the request
of the
consumer
not due to
increase in
consumpti
on or
6 demand  50 50 NIL 50

For
Testing of
meter, if it
is proved
to be
correct
within yhe
prescribed
limit
(Challenge
7 Test) 100 300 NIL 100
 Reduction of
Load
Registratio
1 n Fees 50 50 Exempted 50
Testing
2 Fees 75 75 Exempted 75
Additional Load
Registratio
1 n Fees 50 50 NIL 50
Testing
2 Fees 75 75 NIL 75

Developme
3 nt Charges Nil 400/sc NIL 300/Per Location
Security
4 Deposit Nil 600/KW NIL Nil
Tariff Change
Registrat
1 ion Fees 50 50 NIL 50
Testing
2 Fees 75 75 NIL 75
Dishonoured 
Cheque
Service
Charges/Se
1 rvice 250 250 NIL 250
Name Transfer
Fees

Legal
Succession
1 / Sale Deed 200 200 50 200

   *  Other variable charges like Labour charges,cable charges,road cut cha


TAMIL NADU ELECTRICITY BOARD

TAMIL
NADU
ELECTRICI
TY BOARD
ces to be Paid from  01.10.2004 as per TNERC Order No. 41/2003 

              II -
II - A(Over Head B(Recg.Educational II - C(Place of III - A1(Cottage
II - A(St. Light) Tank) Institutes) Worship) Industries) III - A2(Power Loom)
III III III III III
Phase I  Phase Phase I Phase Phase I  Phase Phase I  Phase Phase I  Phase

50 50 50 50 50 50 50 50 50 50

500 250 500 250 500 250 500 250 500 250

2500 700 2500 700 2500 700 2500 700 2500 700

300 Per Location 400/sc 200/KW 400/sc 200/KW 400/sc 200/KW 400/sc 200/KW 400/sc

600/KW 200/sc 600/KW 200/sc 600/KW 200/sc 600/KW 200/sc 600/KW 200/sc

NIL NIL NIL Nil NIL Nil N NIL NIL Nil

50 50 50 50 50 50 50 50 50 50

75 75 75 75 75 75 75 75 75 75

150 150 150 150 150 150 150 150 150 150

60 60 60 60 60 60 60 60 60 60
300 300 300 300 300 300 300 300 300 300

50 50 50 50 50 50 50 50 50 50

300 100 300 100 300 100 300 100 300 100

50 50 50 50 50 50 50 50 50 50

75 75 75 75 75 75 75 75 75 75

50 50 50 50 50 50 50 50 50 50

75 75 75 75 75 75 75 75 75 75

300/Per Location Nil 200/KW Nil 200/KW Nil 200/KW Nil 200/KW Nil

600/KW Nil 600/KW Nil 600/KW Nil 600/KW Nil 600/KW Nil

50 50 50 50 50 50 50 50 50 50

50 75 75 75 75 75 75 75 75 75
250 250 250 250 250 250 250 250 250 250

200 200 200 200 200 200 200 200 200 200

,cable charges,road cut charges etc will be caluculated depending on site condtions
 

IV(Agricul
III - A2(Power Loom) III - B(Industrial) ture) V(Commercial)
III III III III
Phase I  Phase Phase Phase I  Phase Phase

50 50 50 50 50 50

500 250 500 Nil 250 500

2500 700 2500 Nil 700 2500

200/KW NA 200/KW Nil 400/sc 200/KW

600/KW 200/sc 600/KW 125/HP 200/sc 600/KW

NIL NIL 600/kw Nil Nil Nil

50 50 50 Nil 50 50

75 75 75 Nil 75 75

150 150 150 Nil 150 150

60 60 60 60 60 60
300 300 300 300 300 300

50 50 50 Nil 50 50

300 100 300 Nil 100 300

50 50 50 Nil 50 50

75 75 75 Nil 75 75

50 50 50 50 50

75 75 75 75 75

200/KW Nil 200/KW Nil Nil 200/KW

600/KW Nil 600/KW 125/HP Nil 600/KW

50 50 50 Nil 50 50

75 75 75 Nil 75 75
250 250 250 250 250

200 200 200 200 200 200

You might also like