Professional Documents
Culture Documents
Developme
4 nt Charges 400/sc 1400/sc NIL 300 Per Location
Security
5 Deposit 200/sc 600/KW NIL 200/sc
EMD
6 Charges Nil NIL NIL Nil
Meter Board
shifting
Registratio
1 n Fees 50 50 NIL 50
Testing
2 Fees 75 75 NIL 75
Meter
Board
3 shifting 150 150 NIL 150
Disconnect
ion /
Reconnecti
on
(OH)/cut
4 out 60 60 NIL 60
Disconnect
ion /
Reconnecti
on UG
5 Cable 300 300 NIL 300
Changing
of meter at
the request
of the
consumer
not due to
increase in
consumpti
on or
6 demand 50 50 NIL 50
For
Testing of
meter, if it
is proved
to be
correct
within yhe
prescribed
limit
(Challenge
7 Test) 100 300 NIL 100
Reduction of
Load
Registratio
1 n Fees 50 50 Exempted 50
Testing
2 Fees 75 75 Exempted 75
Additional Load
Registratio
1 n Fees 50 50 NIL 50
Testing
2 Fees 75 75 NIL 75
Developme
3 nt Charges Nil 400/sc NIL 300/Per Location
Security
4 Deposit Nil 600/KW NIL Nil
Tariff Change
Registrat
1 ion Fees 50 50 NIL 50
Testing
2 Fees 75 75 NIL 75
Dishonoured
Cheque
Service
Charges/Se
1 rvice 250 250 NIL 250
Name Transfer
Fees
Legal
Succession
1 / Sale Deed 200 200 50 200
TAMIL
NADU
ELECTRICI
TY BOARD
ces to be Paid from 01.10.2004 as per TNERC Order No. 41/2003
II -
II - A(Over Head B(Recg.Educational II - C(Place of III - A1(Cottage
II - A(St. Light) Tank) Institutes) Worship) Industries) III - A2(Power Loom)
III III III III III
Phase I Phase Phase I Phase Phase I Phase Phase I Phase Phase I Phase
50 50 50 50 50 50 50 50 50 50
500 250 500 250 500 250 500 250 500 250
2500 700 2500 700 2500 700 2500 700 2500 700
300 Per Location 400/sc 200/KW 400/sc 200/KW 400/sc 200/KW 400/sc 200/KW 400/sc
600/KW 200/sc 600/KW 200/sc 600/KW 200/sc 600/KW 200/sc 600/KW 200/sc
50 50 50 50 50 50 50 50 50 50
75 75 75 75 75 75 75 75 75 75
150 150 150 150 150 150 150 150 150 150
60 60 60 60 60 60 60 60 60 60
300 300 300 300 300 300 300 300 300 300
50 50 50 50 50 50 50 50 50 50
300 100 300 100 300 100 300 100 300 100
50 50 50 50 50 50 50 50 50 50
75 75 75 75 75 75 75 75 75 75
50 50 50 50 50 50 50 50 50 50
75 75 75 75 75 75 75 75 75 75
300/Per Location Nil 200/KW Nil 200/KW Nil 200/KW Nil 200/KW Nil
600/KW Nil 600/KW Nil 600/KW Nil 600/KW Nil 600/KW Nil
50 50 50 50 50 50 50 50 50 50
50 75 75 75 75 75 75 75 75 75
250 250 250 250 250 250 250 250 250 250
200 200 200 200 200 200 200 200 200 200
,cable charges,road cut charges etc will be caluculated depending on site condtions
IV(Agricul
III - A2(Power Loom) III - B(Industrial) ture) V(Commercial)
III III III III
Phase I Phase Phase Phase I Phase Phase
50 50 50 50 50 50
50 50 50 Nil 50 50
75 75 75 Nil 75 75
60 60 60 60 60 60
300 300 300 300 300 300
50 50 50 Nil 50 50
50 50 50 Nil 50 50
75 75 75 Nil 75 75
50 50 50 50 50
75 75 75 75 75
50 50 50 Nil 50 50
75 75 75 Nil 75 75
250 250 250 250 250