SAN GABAN IV Ollachea hydropower plant consists of a run of river hydroelectric power plant of 225. MW and it will produce an average net annual generation of 1,381 GWh. It is located in the Macusani river, province of carabaya, Department of Puno in Peru. Estimated Annual Emission Reductions (tCO2 / year): an average of 9,962 tCO2-equivalent per year.
SAN GABAN IV Ollachea hydropower plant consists of a run of river hydroelectric power plant of 225. MW and it will produce an average net annual generation of 1,381 GWh. It is located in the Macusani river, province of carabaya, Department of Puno in Peru. Estimated Annual Emission Reductions (tCO2 / year): an average of 9,962 tCO2-equivalent per year.
SAN GABAN IV Ollachea hydropower plant consists of a run of river hydroelectric power plant of 225. MW and it will produce an average net annual generation of 1,381 GWh. It is located in the Macusani river, province of carabaya, Department of Puno in Peru. Estimated Annual Emission Reductions (tCO2 / year): an average of 9,962 tCO2-equivalent per year.
Description: It consists of a run of river hydroelectric power plant of 225.3 MW and it will produce an average net annual generation of 1,381 GWh. It is located in the Macusani river, province of Carabaya, Department of Puno in Peru.
Current Status: Projects Benefits:
Earliest project start date: 2010. Number of direct and indirect jobs generated: Operation start date: 2013. The project generates about 125 direct and 250 indirect new jobs. Project lifetime: 50 years. Sustainable development contribution: Replaces thermal power plants; Current status: Feasibility study finished (available). The EIA and ar- allows rural communities to improve their economic activities; creates chaeological impact studies under elaboration. Temporary concession new jobs; triggers economic growth of the country by supplying more for the water use was given 2008. PIN is finished. PDD under elabora- energy to the national grid. tion. CER´s negotiation: Estimated Annual Emission Reductions (tCO2/year): Open. An average of 746,000 tCO2-equivalent per year.
Project Participant and Financing
Total project cost: US$ 395,800,000 Contact Information: Project Manager CDM Management Sources of finance to be sought or already identified: Name: Dr. Thorsten F. Schulz Name: Richard Marohn Total equity: 35 % Company: Swiss Hydro S.A.C. Company: Swiss Hydro S.A.C. Secured equity: 15 % Phone: (51-1) 346 2030 Phone: (51-1) 346 2030 Additional equity: 20 % under negotiations with an interested Euro- Cellular: (51 -1) 994 566 521 Cellular: (51 -1) 994 566 525 pean investor. E-mail: stf@ch-pid.com E-mail: mr@ch-pid.com
MANCAHUARA Hydropower Plant H18
Description: It is a small project that consists in the rehabilitation of an old abandoned hydropower plant. Once the rehabilitation of the plant is finished, the total power will be 2.5 MW, and the expected energy generation would be 15 GWh. It is located in Apurimac Department in Peru.
Current Status: Projects Benefits:
Earliest project start date: 2006. Number of direct and indirect jobs generated: Operation start date: 2007. It generates 100 direct and 60 indirect jobs. Project lifetime: 20 years. Current Status: Feasibility study done. Definitive Concession is granted Sustainable development contribution: Marcahuara’s earnings will deriver by Ministry of Energy and Mines. Letter of Approval was obtained from to reforestation of vulnerable-to-erosion mountain areas. Increasing avai- the Peruvian DNA. Stakeholder consult has been developed by FONAM. lability and reliability of energy supply: Local nearby communities has now PDD is already finished. access to electric energy. Increase of taxes paid to Government.
An average of 9,962 tCO2-equivalent per year. Open.
Project Participant and Financing
Total project cost: US$ 2,366,247 Contact Information: Name: Luis Grajeda Puelles Sources of finance to be sought or already identified: Company: Electro Sur Este S.A.A. (ELSE) Equity: 100 % Title: Planning Manager Debt: 0 % Phone: (51-84) 226408 E-mail: lgrajeda@else.com.pe