The project will have an installed capacity of 9. MW and it will deliver 69. GWh to the National Grid annually. It is located in districts of condesuyos, Yanaquigua, department of Arequipa. It will contribute to the reduction of carbon dioxide emissions through displacing energy from thermoelectric plants.
The project will have an installed capacity of 9. MW and it will deliver 69. GWh to the National Grid annually. It is located in districts of condesuyos, Yanaquigua, department of Arequipa. It will contribute to the reduction of carbon dioxide emissions through displacing energy from thermoelectric plants.
The project will have an installed capacity of 9. MW and it will deliver 69. GWh to the National Grid annually. It is located in districts of condesuyos, Yanaquigua, department of Arequipa. It will contribute to the reduction of carbon dioxide emissions through displacing energy from thermoelectric plants.
Description: The Purpose of The Project is renewable electricity generation for the National Electric Grid (SEIN). The project will have an installed capacity of 9.9 MW and it will deliver 69.98 GWh to the National Grid annually. It is located in districts of Condesuyos, Yanaquigua, department of Arequipa.
Current Status: Projects Benefits:
Earliest project start date: 2011. Number of direct and indirect jobs generated: Operation start date: 2012. It generates 130 new direct and 230 indirect jobs. Project lifetime: 30 years. Sustainable development contribution: Current Status: Feasibility studies completed. Authorizations already Purification and cleaning of water for irrigation. granted Better electricity supply in the region. Local milling/grinding agricultu- ral based projects shall be benefited. Estimated Annual Emission Reductions (tCO2/year): An average of 37,000 tCO2-equivalent per year. CER´s negotiation: Project Participant and Financing Open. Total project cost: US$ 12,120,000
Sources of finance to be sought or already identified: Contact Information:
Description: The project will have an installed capacity of 9.6 MW and it will deliver 69.81 GWh to the National Grid annually. It is located in Condes- uyos, Rio Grande district, department of Arequipa.
Current Status: Projects Benefits:
Earliest project start date: 2011. Number of direct and indirect jobs generated: Operation start date: 2012. It generates 130 new direct and 230 indirect jobs. Project lifetime: 30 years. Sustainable development contribution: Current Status: Feasibility studies completed. Authorizations already The project will contribute to the reduction of carbon dioxide emissions granted through displacing energy from thermoelectric plants. Purification and cleaning of water for irrigation. Better electricity supply in the region. Estimated Annual Emission Reductions (tCO2/year): Local milling/grinding agricultural based projects shall be benefited An average of 37,000 tCO2-equivalent per year.
Project Participant and Financing CER´s negotiation:
Total project cost: US$ 12,000,000 Open
Sources of finance to be sought or already identified:
Contact Information: Equity: 10 % Name: Virginia de la Cuba Debt: 90 % Company: IMPRO SAC Title: Phone: (51-54) 288515 E-mail: vdelacuba@speedy.com.pe