MEETING AGENDA
(Architecture & Infrastructure works)
Time : Date: January 5th, 2011
Participants :
No Name Company
10
11
12
13
14
Agenda 1|Page
SUNCITY PROJECT
233B - 235 Nguyen Trai, Thanh Xuan District, Ha Noi
PROPOSED AGENDA
No Contents
A ARCHITECTURE
1 Masterplan And Infrastructure (Duration:1 hour)
- Master plan design (15 min)
- Infrastructure connection design (15 min)
- DTH recommendations
+ Master plan must be revised in line with updated
boundary (provided by UAV)- specify the construction
boundary of each zone (basement boundary, phase
boundary)
+ Distribution and supply system must be in
accordance with existing condition (commented by
MEP division)
2 Concept design - phase 1 (presentation duration:30
mins, Q&A: 1 hour)
-DPA’s design concept presentation (15 mins)
-DPC’s presentation (10 mins)
-DTH’s comment for design revision:
+ Basement design requirements (basement units
and boundaries)
+ Using efficiency of apartment units
3 In the meeting, DPA is required to peruse and propose
design scheme which meet following parameters:
-Sub-structures:
+ Phase 1 & Phase 2 : 03 basements
+ GFA (Phase 1 & 2): approximately 100,000m2
-Super-structures:
+ Phase 1 & 2: 2100 apartment units
+ Using co-efficiency of typical floors: at least 80 %
+ Area of type A unit: is required to be approximate
105 – 110 m2
B MEP
1 Electric supply
No Contents
1.1 Review of existing electrical system DPE
DPE should review the existing electrical system (based
on the data provided by Suncity PMU) in the proposed site
which serves as the basis for any improvements or new
design including the proposal of 22Kv medium voltage
supply for Suncity project (it is requested in the masterplan
report 1/500 because the 100kV/22kV transformer station
proposed by DPE is within the uncleared area).
No Contents
Asian big cities.
3 Earthwork
3.1 Site evaluation:
3.3 Drawings:
No Contents
routes (municipal drainage system) to which the project
discharging system is connected.