PROPOSED BOX CULVERTS

ITEM AMOUNT
DESCRIPTION UNIT QTY RATE KSH.
3.0 x 1.5m BOX CULVERT AT Km 28.
PRELIMINARIES

All quantities are provisional and subject to


remeasurement on site

1.01 Allow for the cost of mobilization of plant and


equiment related to the works including stores, SUM
workshops and operating yards at site of works and
demobilization after the works are over

1.02 Allow for provision of suitable rail cluster to span


across the opening and strong enough to allow trafficSUM
movement during constractor works. Client will
provide ONLY rails with all other material/fitting
being provided by the Contractor

EARTHWORKS (PROVISIONAL)

2.01 Bulk excavation not exceeding 1.50 m from formation


level including removal of existing culvert if any. SM 50

2.02 Bulk excavation exceeding 1.5m but not exceeding 3.0


m from formation level including removal of existingCM 60
culvert if any.
2.03
Extra over excavation in any position for
excavating in rock/concrete. CM 30

2.04 Return fill and ram selected excavated material. SM 20

Load and cart away surplus excavated material


2.05 and deposit away from site as directed. CM 40

2.06 Allow for keeping excavations free from water and


mud by pumping, bailing or otherwise. SUM

TOTAL CARRIED TO COLLECTION


CONCRETE WORKS

3.01 50 mm blinding in 1:4:8 concrete mix SM 35

Concrete mix (1:11/2:3)in:-

3.02 Box Cell CM 5

3.03 Deck CM 10

3.04 Aprons CM 7

3.05 Headwall and Endwall CM 5

3.06 Wing walls CM 5


Sawn Formwork to:-

3.07 Vertical external side of box culvert SM 30

3.08 Vertical inner faces of Headwall and end walls SM 5

3.09 Soffit of Deck SM 15

3.10 Vertical external sides of wingwall SM 35

High tensile steel reinforcement bars to BS4461

3.11 10 mm diameter (nominal) high tensile bars to BS 4461


Kg 150

3.12 12 mm diameter (nominal) high tensile bars to BS 4461


Kg 550

3.13 16 mm diameter (nominal) high tensile bars to BS 4461


Kg 360

3.14 No-A 283 BRC Fabric Mesh laid in slab SM 15

CHANNEL TRAINING

4.01 Clear, level and ram the water channel to the


natural slope. Load and cart away surplus
excavated material to an approved site. CM 60

4.02 100mm thick natural stone stonepitching bedded and


jointed in cement and sand (1:4) mortar along the
channel SM 50

TOTAL CARRIED TO COLLECTION


ITEM
NO DESCRIPTION UNIT QTY
B TWIN 2.5m x 1.5m BOX CULVERT AT Km 4.

1.01 Allow for the cost of mobilization of plant and


equiment related to the works including stores, SUM
workshops and operating yards at site of works and
demobilization after the works are over

1.02 Allow for provision of suitable rail cluster to span


across the opening and strong enough to allow traffic
movement during constractor works. Client will
provide ONLY rails with all other material being
provided by the Contractor SUM

EARTHWORKS (PROVISIONAL)
2.02 Bulk excavation not exceeding 1.50 m from formation
level including removal of existing culvert if any. CM 10

2.03 Bulk excavation exceeding 1.5m but not exceeding 3.0


m from formation level including removal of existing
culvert if any. CM 40

2.04 Extra over excavation in any position for


excavating in rock/concrete. CM 40

2.05 Return fill and ram selected excavated material. CM 20

2.06 Load and cart away surplus excavated material


and deposit away from site as directed. CM 30

2.07 Allow for keeping excavations free from water and


mud by pumping, bailing or otherwise. SUM

CONCRETE WORKS

3.01 50 mm blinding in 1:4:8 concrete mix SM 55

Concrete mix (1:11/2:3)in:-

3.02 Box Cell CM 10

3.03 Deck CM 10

3.04 Aprons CM 11

3.05 Headwall and Endwall CM 5

3.06 Wing walls CM 5


TOTAL CARRIED TO COLLECTION
Formwork to:-
3.07 Vertical external side of box culvert SM 75

3.08 Vertical inner faces of Headwall and end walls SM 10

3.09 Vertical internal sides deck SM 25

3.10 Vertical external sides of wingwall SM 20

High tensile steel reinforcement bars to BS4461

3.11 10 mm diameter (nominal) high tensile bars to BS 4461


KG 200

3.12 12 mm diameter (nominal) high tensile bars to BS 4461


KG 950

3.13 16 mm diameter (nominal) high tensile bars to BS 4461


KG 900

3.14 No-A 283 BRC Fabric Mesh laid in slab SM 15

CHANNEL TRAINING
4.01 Clear, level and ram the water channel to the
natural slope. Load and cart away surplus
excavated material to an approved site. CM 70

4.02 100mm thick natural stone stonepitching bedded and


jointed in cement and sand (1:4) mortar along the
channel SM 60
TOTAL CARRIED TO COLLECTION
Bridge column support at Km 31
PRELIMINARIES

All quantities are provisional and subject to


remeasurement on site

1.01 Allow for the cost of mobilization of plant and


equiment related to the works including stores, SUM
workshops and operating yards at site of works and
demobilization after the works are over
EARTHWORKS (PROVISIONAL)
2.02 Bulk excavation not exceeding 1.50 m from formation
level including removal of existing culvert if any. CM 5

2.03 Extra over excavation in any position for


excavating in rock/concrete. CM 5

2.04 Return fill and ram selected excavated material. CM 5

2.05 Load and cart away surplus excavated material


and deposit away from site as directed. CM 5

2.06 Allow for keeping excavations free from water and


mud by pumping, bailing or otherwise. SUM
TOTAL CARRIED TO COLLECTION
CONCRETE WORKS
3.01 Hack and expose the cracked, loose concrete on CM
the 1
vertical support

3.02 50 mm blinding in 1:4:8 concrete mix SM 2

Concrete mix (1:11/2:3)in:-

3.03 Base CM 5

3.04 Column CM 5
Formwork to:-

3.07 Sides of base and column including all necessary SM 25


support supports .

High tensile steel reinforcement bars to BS4461

4.01 10 mm diameter (nominal) high tensile bars to BS 4461


KG 45

4.02 12 mm diameter (nominal) high tensile bars to BS 4461


KG 65

4.03 16 mm diameter (nominal) high tensile bars to BS 4461


KG 50

TOTAL CARRIED TO COLLECTION

COLLECTION

Brought forward from page 1

Brought forward from page 2

Brought forward from page 3

Brought forward from page 4

Brought forward from page 4

Brought forward from page 5

TOTAL COLLECTION

Add: 10% Contingencies 10%

TOTAL CARRIED TO SUMMARY