Dates:-
Order Date
Date on which the sales order is entered. System proposes the current date by default.
The date on which the material must be available. On the material availability date, the vendor
must start the activities relevant for delivery, such as picking and packing the goods. The material
availability date must be sufficiently early enough so that the goods are prepared by the loading
date.
We must arrange transportation by this date, so that the delivery can be sent to the customer. The
date from which the organization of goods transport must begin. The transportation planning date
must be selected early enough so that the transport is available on the loading date to load the
goods.
Loading Date
Picking and packing must be completed by this date so that the goods are ready for loading.
Goods must physically leave the shipping point by this date. The date on which the goods must
leave the company to arrive at the customer location in time.
Delivery Date
Customer should receive delivery of the goods by this date. The date on which goods are to arrive at
the customer's premises. Example: The delivery date can be the delivery date requested by the
customer (desired delivery date) or the date confirmed in the vendor's order acknowledgment or
shipping confirmation (confirmed or acknowledged delivery date).
Times:-
Pick/Pack Time
Loading Time
Difference between loading date and goods issue date.
Transit Time
Number of days required for delivering an item from your company to the customer via a certain
route.
Enter Plant & Checking Rule, against which the Availability is to be checked. For Sales Order
Checking Rule = A, Delivery = B, Back Order = BO
Backwards Scheduling
Control of Availability Check
Forward Scheduling
Result of Availability Check: Some Sample Scenarios
Above is the Availability Screen as seen in Sales Order. It has following Buttons:
One-time delivery
In the results of Availability, we have 3 options to choose from. This is Case 1, when we can confirm
the Customer's Requested delivery Date. The details of this are visible in the first sub screen below.
Complete dlv.
This is Case 2, when we can confirm the Customer's Requested complete delivery at a future Date.
The details of this are visible in the second sub screen below.
Delivery proposal
This is Case 3, when we can confirm the Customer's Requested delivery in partial quantities at
future dates. The details of this are visible in the third sub screen below.
Continue
If we select one of the above options, the same gets saved in the ATP results. Otherwise, we can
select this button. In that case, system leaves the ATP screen without saving the ATP results.
The first screen shows the Availability (CO09) Overview. We have an incoming PO on 19 Jan.
!image034.jpg!In the second screen
We have created a SO (VA01) on 09 Feb, with requested Delivery date for 09 Feb.
The first screen shows the Availability (CO09) Overview. We have an incoming PO on 12 Feb. See
the new Cum ATP qty. date wise accordingly.
In the second scenario RLT is activated, but corresponding data in material master is not
maintained. Material is procured In-House (E), but In-house Production time (1st screenshot) & RLT
(2nd screenshot) are not maintained. The system assumes both these times as Zero. So, complete
500 are confirmed immediately. See MM01
In the third scenario RLT is activated, corresponding data in material master is maintained.
Material is procured In-House (E), In-house Production time (10 days) & RLT (not maintained). The
system confirms 21 on basis of incoming material. Rest 479 is confirmed after 14 days. This is
because 10 working days for in-house production + 4 holidays (Sat-Sun).
In the fourth scenario RLT is activated, corresponding data in material master is maintained.
Material is procured In-House (E), In-house Production time (10 days) & RLT (20 days). The system
confirms 21 on basis of incoming material. Rest 479 is confirmed after 14 days. This is because 20
working days for in-house production + 8 holidays (Sat-Sun).
Controlling Elements:-
Requirements Type
Requirements Class
Schedule Line Category
Checking Group
Checking Rule
Scope of Check
Strategy Group
Scheduling Data:-
Transit Time
Loading Time
Pick/Pack Time