The below production cycle explains the basic business flow in “Process Industry”. The flow is generally focusing
only on Production and Quality Management
Consider all Raw materials are available in plant and production process yet to start, the following stages are to be
followed
Here we are creating a process order based on the capacity of the equipments and resource availability
Once Process order created, it has to be released for production, means system will check the
scheduling, material availability, capacity planning, etc., and then release process takes place
Once PO got released, goods issue against the process order will takes place
4. Start processing
5. Confirmation Process
After production, the final out put confirmation from the process will be entered
Goods receipt process plays a major role in any business here we have to do 101 movement type and do
the postings. In goods issue process they will issue the goods against PO in 261 movement type.
Once GR from the production was made, the material will come to Quality control for approval. Here QC
person will check the material and they will do the result recording and usage decision
Once usage decision was made the material will automatically moved into unrestricted use. The FG is
ready for sale
By keeping above all points in mind, the following masters and transactions are required to proceed
S. Master Trans- T-code Description Where has to be used
No action
Scenario Explanation:
REQUIREMENTS:
For a leading Process Manufacturing Company ABC, they are selling the product “FG 1”, the raw materials and
resource requirements are listed below
We have selected basic information entries field. Fill the information and finally select the General plant / storage
data and give plant as 1100 and storage as 0001 in case of Raw material.
The same procedure has to be repeated for finished goods and Co-Products, in plant storage data we have to give
Plant 1100 and storage 0004.
In the recipe header we have to enter the status as “4” and Usage as “1” , go for Operations screen
Here we have to call the resource and the description details, for example in reactor CRC-001, the
operations like Heating and transfer process will be carried out the same has been explained in this
description field. As per standard value key we have to give the duration for the operation time and labor
time. Both will be taken for scheduling.
In the material tab, we have to enter the version for the BOM and usage details, after that we have to
enter the list of raw materials required for making 50 kg of the FG 1 product. Here co-product is
generating so we have to give the co-product “BP 1” 60 L as “Negative” producing after the process (NOT
as INPUT) and activate as Co-Product by selecting the line item and press items tab and select co-
product tab.
In the header level line item we have the base quantity i.e Finished goods quantity, give 50 and save
Then Go to operations and give control key as QM01, select the line item and go to inspection description
tab.
Enter the MIC details here. While entering system will ask the upper spec and lower spec limits. Enter
limits and save
Now, once the process is over check the master data, in that we can find the created recipe group for that
material “FG 1”
Now the PO stated us “Created”
Press the Flag button and ‘Release” the PO for production. After pressing flag button, actually system will
checks material availability, scheduling, capacity planning etc., Once it is over the status of the PO will be
changed to “Released mode”
Goods issue generally happens from store against the PO with the movement type 261
Once goods issue from the stores is over, the document number will be generated as below
Now go to process order and check the order status “GMPS” will appear, that means Goods Movement
Posted
Now Production process was started and completed. We are going to give confirmation using CORK
transaction
If you check this screen the outputs finished product 1 and co product 1 with the quantities viz., 50 and 60
will be there. We have activated QM view only for FG 1 and not for BP 1 material. So once GRN was
made the material FG 1 will be automatically moved to Quality inspection and BP 1 will be moved to
“unrestricted use”.
Here we are mentioning the storage location for the final products “0004”
Once GRN made the document number will be generated for Accounting updates
5. Quality Approval and Release
Now check the MMBE view, in that the material FG 1 appears in “Quality inspection”
And at the same time BP 1 in which QM was not activated, the stock appears in Unrestricted use
Result recording and Usage decision process for the Material FG 1 batch FG00000001
Go to QA32 and give the inspection lot origin as”04” and press enter
After entering the actual value the final screen will be like below
Now, go to Usage decision button in the same QA32 Transaction and do accept the batch
Once you save the inspection stock details will come
Enter the stock quantity “50” to unrestricted and check the MMBE view now
Material will be moved to unrestricted use . Now sales process will start.
The above cycle is simple production process generally carried out in “Process industries”