Units Quantity Rate
Particulars of work SSR
S.No 2004
Earth work in rough excavation, banking
excavated earth in layers not exceeding 20 cm
in depth, breaking clods, watering, rolling each
layer with ½ tone roller or wooden or steel
rammers, and rolling every 3rd. and top most
1 layer with power roller of minimum 8 tones and Cum 2452.87 100.50
dressing up in embankments for roads, flood
banks, marginal banks and guide banks or
filling up ground depressions lead upto 50 mts
and lift upto 1.5 mtr.all kinds of soil
Any material supplied by the department shall deduct as per stock issue rates lo
3 with incidental from contractors bills in first priority.
I have carefully read all the terms and conditions give in this tender docu
besides I solemnly affirm that all the terms and conditions contained in this t
document are accepted to me. Moreso, I have carefully quoted my rates in this
schedule.
Seal & Signature of Contractor /Firm
NG STATION
Rates to be
offered
20% ###
30% 343745.2
Est.cost ###
se he fail to
osen units)
ected
nt tap, failing to
hereof.
rates loaded
er document,
n this tender
n this price bid
Page 5
NOTE:-
1 Intending bidder shall have to quote his rates strictly in give units. In case
he fail to quote his rates in accordance with given units (quote his rates in
own chosen units) which may otherwise lead unfair comparison of rates his
offer shall be rejected straightway, without assigning any reason thereof.
2 The intending bidder shall have to cover his quoted rates with transparent
tap, failing to do so shall also lead to rejection of tender without assigning
any reason thereof.
3 Any material supplied by the department shall deduct as per stock issue
rates loaded with incidental from contractors bills in first priority.
I have carefully read all the terms and conditions give in this tender
document, besides I solemnly affirm that all the terms and conditions
contained in this tender document are accepted to me. Moreso, I have
carefully quoted my rates in this price bid schedule.
POSED RECEIVING
N LINK FENCING
Rates to
be offered
20% 14149
20% 2830
50% 7864
50% 50026
0
50% 157217
50% 7511
50% 414124
0
40% 14727
40% 69963
40% 2842
50% 107134
Page 9
Rates to
be offered
50% 10798
70% 95827
70% 26542
15 43380
40% 3974
40% 9189
55% 21642
55% 3198
0
0
0
Page 10
Rates to
be offered
30% 37137
30% 12474
30% 40218
30% 8631
70% 121734
70% 64876
Est.cost 1348007