QUANTITY SCHEDULE FOR DEVELOPMENT OF LAND FOR PROPOSED RECEIVING STA

AT MARHAMA
Units Quantity Rate
Particulars of work SSR
S.No 2004
Earth work in rough excavation, banking
excavated earth in layers not exceeding 20 cm
in depth, breaking clods, watering, rolling each
layer with ½ tone roller or wooden or steel
rammers, and rolling every 3rd. and top most
1 layer with power roller of minimum 8 tones and Cum 2452.87 100.50
dressing up in embankments for roads, flood
banks, marginal banks and guide banks or
filling up ground depressions lead upto 50 mts
and lift upto 1.5 mtr.all kinds of soil

Carriage of earth by mechanical transport from


2
excavation site to site of filling for an average
Cum 2452.87 107.8
10 Km’s lead.
NOTE:-
Intending bidder shall have to quote his rates strictly in give units. In case he fa
quote his rates in accordance with given units (quote his rates in own chosen un
1 which may otherwise lead unfair comparison of rates his offer shall be rejected
straightway, without assigning any reason thereof.
The intending bidder shall have to cover his quoted rates with transparent tap,
2 do so shall also lead to rejection of tender without assigning any reason thereof

Any material supplied by the department shall deduct as per stock issue rates lo
3 with incidental from contractors bills in first priority.

Tech.Officer Executive Engineer


STD Bijbehara

I have carefully read all the terms and conditions give in this tender docu
besides I solemnly affirm that all the terms and conditions contained in this t
document are accepted to me. Moreso, I have carefully quoted my rates in this
schedule.
Seal & Signature of Contractor /Firm
NG STATION

Rates to be
offered

20% ###

30% 343745.2

Est.cost ###

se he fail to
osen units)
ected

nt tap, failing to
hereof.

rates loaded

er document,
n this tender
n this price bid
Page 5

QUANTITY SCHEDULE FOR CONSTRUCTION OF FENCING AROUND PREMISES OF PROPOSED RECEIVING


STATION AT MARHAMA BY WAY OF CONSTRUCTION OF RETAINING WALL AND CHAIN LINK FENCING
OVER IT
S.No Items of work Units Rate Quantity
SSR2004

1 Earth work-in excavation in foundation


trenches or drains Not exceeding 1.5 mts
width and 10 SM on plan incl lift 1.5 mts Cum 73.25 160.97
and disposal of surplus excavated soil as
directed within a lead upto 50 mts .

2 Extra rate for quantities of work,


executed in or under water and / or Metre
14.65 160.97
liquid mud , including pumping out depth
water as required.
3 Providing & laying stone soling hand
packed on bed incl. Watering, ramming
with all leads lifts & carriages involved up Cum 122.15 42.92
to site completed.

4 Providing & laying in position cement


concrete 1:4:8 (1 cement: 4 coarse sand:
8 graded stone agg. 40 mm nominal /
Cum 1243.5 26.82
size) excluding the cost of centering &
shuttering. all work up to plinth level
(crushed)
5 Providing & laying in position reinforced
cement concrete 1:2:4 (1 cement:2 coarse
sand:4 graded stone agg. 20 mm nominal
size) excld.. The cost of centering
shuttering, finishing & reinforcement. all
work up to plinth level.

A Rafter : Cum 1928.1 54.36


B Gate pillars : ornamental as diected Cum 1971.35 2.54
6 Providing & laying in position cement
conc.1:3:6 mix with coarse sand and
crushedAgg.20 mm n/s Agg.(excld. Cost of Cum 1471.5 187.62
form work) all work upto plinth level.

7 Centering ,Shuttering, incl. centering ,propping etc. and removal of the


A Foundation, footings bases of the same SM 59.7 176.2
B columns
Walls anyetc.
thick ness plinth and string SM 109.15 457.84
C courses.
G, Columns, pillars posts struts SM 134.9 15.05
8 Dry random rubble masonry in foundation CM 582.85 122.54
and plinth using quarry stones with bond
or through stones.Dry bands :
Page 6

S.No Items of work Units Rate Quantity


SSR2004
9 Providing and laying of Damp Proof SM 108.5 66.35
Course 50 mm thick with cement
concrete 1:2:4 ( course sand ) and graded
stone aggregate crushed 20 mm nominal
size
10 Steel work welded in built up sections / Kg’s 35.45 1590.1
A framed work, including cutting hoisting
and fixing in position complete using
structural steel, with one coat of red
oxide steel priming coat, in stringers,
treads, landings etc. incl use of
chequerred plates
10 In gratings , frames, guard bar, ladders, Kg’s 34.85 448
B railings, brackets or gates etc.
11 Labour for fixing of Galvanized chain Sft Rates to 2892
link fencing ( 50 x 50 mm mesh ) to steel be
structures including drilling of holes at quoated
proper places and fixing with 8 mm G.I
nuts and bolts at reqd. places as directed
at site. ( Excluding cost of chain link _)

12 Applying priming coat with ready mixed SM 9.6 295.65


red oxide zinc chromate primer of
approved brand and manufacture on
galvanised steel surfaces :
13 Painting with aluminium paint of SM 22.2 295.65
approved brand and manufacture to give
an even shade , two or more coats on new
work:
14 Cement Plaster in single coat 15 mm SM 55.8 250.23
thicknesses with 1: 6 cement coarse Sand
mixes.
15 Rough cast plaster up to 10 mt. height
above ground level with a mixture of
washed pebble or crushed stone 6 mm to
10 mm nominal size dashed over and
including fresh plaster in two layers ,
under 12 mm cement plaster 1 : 4 and SM 137.1 15.05
top layer 10 mm cement plaster with
cement mortar 1 : 3 mixed with 10 %
finely grounded hydrated lime by volume
of cement. Ordinary cement finish.

16 Carriage of materials from source of supply up to site of work


by means of Mechanical transport.
Page 7

S.No Items of work Units Rate Quantity


SSR2004
A Stones from nearest source by average
Cum 172.65 165.46
lead of 20 kms .
B Sand from app. source by av lead 5 kms Cum 74.7 128.45
C Agg. / bajree from app. source by av lead
Cum 125.2 247.1
15 kms
D Cement and steel by M.Tpt. from Deptt.
M.T 98.2 67.61
Store for 18 km’s avg. lead.
17 Reinforcement for RCC work incl.
Straightening cutting, bending, placing in Kg’s 24.65 2905
position and binding all cold twisted bars.

Providing,fixing of holdfasts of angle


65x65x6mm,16mm dia pins of required Kg’s 24 1590.1
length dully welded and fixed in position
18 as directed

NOTE:-
1 Intending bidder shall have to quote his rates strictly in give units. In case
he fail to quote his rates in accordance with given units (quote his rates in
own chosen units) which may otherwise lead unfair comparison of rates his
offer shall be rejected straightway, without assigning any reason thereof.
2 The intending bidder shall have to cover his quoted rates with transparent
tap, failing to do so shall also lead to rejection of tender without assigning
any reason thereof.
3 Any material supplied by the department shall deduct as per stock issue
rates loaded with incidental from contractors bills in first priority.

Tech.Officer Executive Engineer


STD Bijbehara

I have carefully read all the terms and conditions give in this tender
document, besides I solemnly affirm that all the terms and conditions
contained in this tender document are accepted to me. Moreso, I have
carefully quoted my rates in this price bid schedule.

Seal & Signature of Contractor /Firm


Page 8

POSED RECEIVING
N LINK FENCING

Rates to
be offered

20% 14149

20% 2830

50% 7864

50% 50026

0
50% 157217
50% 7511

50% 414124
0
40% 14727
40% 69963
40% 2842

50% 107134
Page 9

Rates to
be offered

50% 10798

70% 95827

70% 26542

15 43380

40% 3974

40% 9189

55% 21642

55% 3198
0
0
0
Page 10

Rates to
be offered

30% 37137
30% 12474

30% 40218

30% 8631

70% 121734

70% 64876
Est.cost 1348007