Abstract
Correspondence: This paper discusses how the production principles of Lean Manufacturing
Eva Høy Engelund, The (Lean) can be applied in a large-scale meal production. Lean principles are
National Food Institute briefly presented, followed by a field study of how a kitchen at a Danish
Building 227,1.,
Technical University of
hospital has implemented Lean in the daily production. In the kitchen, the
Denmark, DK-2800 main purposes of implementing Lean were to rationalise internal procedures
Lyngby, Denmark. Tel: and to increase production efficiency following a change from cook-serve
+45 45255505; Fax: production to cook-chill, and a reduction in the number of employees. It was
+45 45939600; E-mail: also important that product quality and working environment should not be
ehe@food.dtu.dk
negatively affected by the rationalisation of production procedures. The field
Keywords: study shows that Lean principles can be applied in meal production and can
foodservice, Lean result in increased production efficiency and systematic improvement of
Manufacturing, meal product quality without negative effects on the working environment. The
production, meals, results show that Lean can be applied and used to manage the production of
optimisation, planning
meals in the kitchen.
volume-to-surface ratio and product time tem- high-volume repetitive manufacturing (Hines
perature history, are altered (Rodgers 2005c). et al. 2004) or mass production (James-Moore &
Internal production processes must change to Gibbons 1997), and the original version of Lean
reflect the demands for increased output, espe- focused on explaining the benefits in similar
cially when the number of employees is simul- operations. However, over the years, Lean has
taneously reduced. Hence, the rethinking of been adapted to fit a variety of industries, admin-
procedures and management of operations are istration and services with great success (Bowen
becoming increasingly necessary to maintain the & Youngdahl 1998; Bicheno 2004).
control of product quality when changing pro- Womack & Jones (2003) claim that Lean is a
duction systems (Rodgers 2005b). tool to ‘banish waste and create wealth in your
An industrial production principle, ‘Lean corporation’. Others characterise Lean as ‘an
Manufacturing’ (Lean), which originally stems intellectual approach consisting of a system of
from the mass production of automobiles, has measures and methods, which when brought all
successfully been applied to manage a variety of together have the potential to bring about a
production and service industries, and resulted “lean” and therefore particularly competitive
in both increased efficiency of procedures and state in a company’ (Warnecke & Hüser 1995).
improved product quality (Bowen & Youngdahl Yet others say that Lean is ‘giving people at all
1998; Bicheno 2004). As large-scale foodservice levels of an organisation the skills and shared
in general is facing demands for increased effi- means of thinking, to systematically drive out
ciency of production, the application of mana- waste by designing better ways of working,
gement principles in the foodservice sector is improving connections and easing flows within
becoming increasingly relevant. supply chains’ (Wood 2004). No matter what the
Applications of Lean in the food industry have definition is, the message is that a continuous
been described and discussed previously (Cox focus on value-adding activities through the elimi-
& Chicksand 2005; Lehtinen & Torkko 2005; nation of waste and connection of production
Stevenson & Jain 2005; Simons & Zokaei 2006; processes in a flow line will cut down costs of
Taylor 2006); however, this does not include the production and increase the competitiveness of a
applicability of Lean in the production of meals company.
for catering purposes.
This paper discusses the possibility of using
Value and waste in a production line
Lean Manufacturing principles in the manage-
ment of large-scale catering, and incorporates a Lean Manufacturing aims to increase customer-
field study with the practical implementation in a perceived value of products in every production
large kitchen. It commences with an introduction step. Value here is a characteristic that makes the
to Lean, followed by a presentation of the case product or service more valuable to the end cus-
kitchen and a description of the implementation tomer, for example, heat-treating components of
of Lean. a meal or mixing components in a culinary attrac-
tive way.
The contrast to value is waste, which is seen as
Lean Manufacturing
any activity that absorbs resources but creates no
Lean Manufacturing originally stemmed from the value (Wood 2004). Examples are excess heat
Japanese car producer Toyota. The production treatment of food or an increased number of han-
principle was later described and conceptualised dlings resulting from less than optimal planning
by Womack & Jones (2003) and Bicheno (2004), procedures. Originally, seven types of waste were
who found Toyota’s car production highly com- identified: waste from waiting, transporting, over-
petitive and superior to western production production, defects (rework products, paper-
systems, and made it their mission to spread the work errors and mistakes), unnecessary motion
knowledge of this production principle. To reflect (moving of people), inventories (overstocking),
the fitness of the system, they gave it the name and finally from unnecessary processing (packag-
‘Lean’. Car production can be characterised as ing, wrong equipment for job). Later, two more
types of waste have been added: design of goods dures, as seen in mass production, and aims to
and services, which does not meet customer reduce the amount of resources locked up in
needs, and untapped human potential. inventories. It implies that production must be
This categorisation implies that waste is not just-in-time, both internally between processes
only assigned to products but also to activities. and externally when delivering products to the
Wasteful activities must be avoided as they end-user.
increase the overall production time, reduce effi- The fifth principle is about pursuing perfection
ciency of the line, and absorb resources. Hence, through a continuous improvement. This is not
waste increases the costs of production (Womack only about creating a product that the customer
& Jones 2003), and eliminating this category of requires with a minimum of defects, but also
activities is the means to increase the efficiency of includes the perfection of every action in connec-
the production line (Simons & Zokaei 2006). But tion with the production process. It involves all
actually, Lean, as a production philosophy, is employees as they know procedures the most and
about preventing waste more than eliminating it are closest to make suggestions for improvement.
(Wood 2004). The involvement of everyone in the continuous
To facilitate the process of preventing waste in improvement is what makes Lean a philosophy –
production, Womack & Jones (2003) have sum- improving working processes is integrated in job
marised the essence of Lean in five principles that routines (Womack & Jones 2003; Bicheno 2004).
can be introduced into a production line using
Lean management tools. These Lean principles
The Lean management tools applied
and tools are described singly by Womack &
in the field study
Jones (2003) but work together systemwise in a
Lean setting. In the following section, Lean prin-
Value stream mapping
ciples and the tools relevant for this study are
presented. The tool ‘value stream mapping’ refers to the
identification and mapping of the processing of a
product or product group. It is used to get an
The five Lean principles
overview of existing production and activities as
The critical starting point when changing a con- it identifies all procedures from product design to
ventional production line into a Lean process is production and distribution of end products. The
the determination of value from the customers’ mapping (a real map is drawn) shows the location
points of view, which is important as the goal of of production equipment in use, and from the
the Lean process is a line where every activity map, the production process can be seen. With
adds a specified customer value to the product. the customers’ requirements for product charac-
Having identified the value of products, the teristics in mind, the map is used to characterise
second step is to identify and map the value activities as ‘value-creating’ or ‘nonvalue-
stream in the production line. Value stream creating’, the latter being eliminated in order to
mapping refers to the mapping of a product’s obtain an efficient and customer-oriented produc-
route and is explained in more detail further. tion line consisting of value-creating activities.
The third principle is the connection of value-
creating activities in a continuous flow process.
The housekeeping tool ‘5S’
Every bottleneck or ‘batch and queue’ process
must be avoided to obtain an uninterrupted flow Organisation of raw materials and utensils is also
throughout the production. The ‘ideal’ produc- a way to prevent wasteful production activities.
tion flow is drawn on a map, and existing proce- The ‘housekeeping’ tool 5S, which stands for sort
dures changed and equipment relocated to reflect (equipment, remove what is not used), simplify
this. (equipment and tools must be in the right place),
The fourth principle is not to produce anything sweep (tidiness, but also routine checking of
‘upstream’ unless it is needed ‘downstream’. The equipment for defects), standardise (working pro-
principle is in contrast to batch and queue proce- cedures) and sustain (housekeeping is an ongoing
all items were prepared, processed and kept tion of the exact number of meals ordered. This
warm until service. Initially, when changing to procedure contradicted the ‘pull’ principle in
cook-chill production, the separation of produc- Lean, which dictates that products should only be
tion according to meal was maintained with pro- processed when orders are received in order to
cessed meal components being assembled into minimise waste. As the routine of storing prod-
meals, packed and stored for up to 3 days before ucts for 3 days did not add value to the meals, it
final distribution to hospital wards. The packag- was categorised as waste and should be avoided,
ing was standardised in two, five or seven por- thereby increasing efficiency.
tions per pack, and the wards received the Kaizen Blitz activities were performed in
portion sizes equal to or the closest number selected areas of production. ‘Cold production’
above their actual orders. This practice of stan- was the first to have its routines observed, dis-
dardizing packaging was accepted by the man- cussed and optimised as procedures were found to
agement as a pragmatic practice of cook-chill include considerable excesses in the handling of
production. products. Next in line were the packing facilities
The kitchen staff are very international as and transport equipment.
employees come from 12 different nationalities, The housekeeping system 5S was first applied
which in turn complicates conversations. The in the storage facilities and in separate areas of the
manager chose to overcome this problem by using kitchen. The purpose was to minimise the time
both visual effects and written words in her daily used to locate ingredients and equipment needed
communication. in the production by systematically increasing the
organisation of the facilities.
Application of Lean in the kitchen
Evaluation and improvement of
The kitchen had three areas of focus during the
product quality
change to Lean, namely, improved efficiency to
reduce costs, improved product quality and To improve product quality, the Lean tool of mea-
maintenance of a pleasant working environment surable or visual parameters to express the state
in the kitchen. The following describes how of processes and to facilitate communication
Lean was applied in these areas and the results among groups of employees was used. The imple-
achieved. mentation of cook-chill production procedures
called for a systematic evaluation of product
quality. A graph on display in the production
Improving efficiency of production processes in
facility showing the daily number of comments on
the kitchen
food quality was chosen as an expression of cus-
The challenges in becoming Lean are to increase tomer satisfaction with product quality. The
the production efficiency through a reduction of number of complaints for each meal component,
product waste and an increased process flow. based on feedback received from wards and
Selected Lean tools were applied in the produc- patients, was totalled and each day marked on the
tion to establish how existing procedures could be graph. This procedure was chosen as a way to
optimised, namely, value stream, Kaizen Blitz and ensure communication of customer product satis-
the housekeeping discipline 5S. faction to all employees.
Value stream mapping of a single product was An internal quality control system was devel-
the first tool used to visualise the flow in existing oped to reflect the need for adjusting recipes to
processes, and the experience from this was sub- improve meal quality after the change from cook-
sequently used to identify the flow in other pro- serve to cook-chill production. It consisted of a
cesses. Value stream mapping highlighted the three-colour gradation of product acceptability
procedures of packing and storing meals for up to where red refers to ‘not acceptable’; yellow,
3 days before use. Meals were prepared, por- ‘acceptable’; and green, ‘good’. The testing of
tioned and packed before actual orders were product quality was performed internally in the
received, and the routine often hindered distribu- kitchen, and the products had to obtain a yellow
former procedure of finishing one meal at a time. suggestions were actioned, an increasing number
The new practice reduced change-over times in of staff took an interest. Team spirit across
processing, and was extremely advantageous in existing teams has been improved with the
cook-chill production. This is because the distri- establishment of three daily status meetings. As
bution must be timely and separated from the information of workloads and time pressures was
processing of meals to show an effect of gathering shared among teams, they increasingly helped
production of similar products. each other finish the production tasks.
The focus on the reduction of overtime caused a
more flexible approach to the planning and perfor-
Evaluation and improvement of product quality
mance of production. As a reduction in the staff
The use of measurable parameters (the number of numbers, because of illnesses and holidays, was a
customer complaints and the colour system for reoccurring event, a general procedure to minimise
recipe acceptability) provided the staff with production tasks during these periods was estab-
benchmarks for product quality. The systematic lished. This involved a change in the menu so that
evaluation of product quality clarified where less work-intensive meals were substituted for the
improvements were needed, and facilitated the more demanding menus during these periods, and
communication between managers and respon- in this way, overtime was reduced.
sible employees. Combined with the use of cook- Another outcome of the focus on working envi-
chill technology, the systematic evaluation of ronment and reduction of overtime was the estab-
product quality has made the kitchen less liable to lishment of more flexible job tasks. An employee
distribute meal products of a questionable quality. with, for example, an aching back was offered a
It has also changed the culture in the kitchen as it part-time job or a change in job tasks to reduce
is now generally acceptable to ‘re-do’ products in the amount of absence because of illness and to
order to improve product quality. The additional minimise the loss of resources. This caused a
waste that this may cause is considered part of the change in attitude among the staff when they were
costs of training and adhering to processes in a too ill to go to work, and was part of the solution
new production system. to the problem of reducing overtime in the
kitchen.
The field study showed how Lean principles
Maintaining focus on the working environment
and tools can be successfully applied in a meal
The involvement of staff in the continuous production in a hospital kitchen. The implemen-
improvement of working processes and the estab- tation of Lean is a continuous change process,
lishment of ways to collect suggestions increased and thus it is difficult to quantify all results.
the number of ideas for changes. The actual Instead, progress can be expressed by qualitative
number of suggestions before and after the imple- evaluation of the effects of the principles imple-
mentation of Lean was not collected, but the mented, actions taken and changes made to the
manager’s clear impression was that the number organisation to achieve an improved performance
has risen. The suggestions cover everything from (Karlsson & Åhlström 1996). Following this pro-
the relocation of process equipment and raw cedure, the results can be summarised as follows:
materials in storage facilities, to changes in pro- 1 Increased flow as a result of optimizing han-
duction procedures. dling routines in selected areas and better plan-
The weekly follow-up meetings have made ning of the daily production;
more people interested in taking part in action to 2 reduced product waste resulting from changed
improve the working processes. It is the manag- storage and portioning routines;
er’s opinion that before the introduction of Lean, 3 improved efficiency in storage, transporting
a limited number of staff commented on pro- and packing procedures;
duction procedures, and process improvements 4 a common system involving all employees in
were seen as the management’s responsibility. improving/evaluating product quality;
However, as the new processes became more 5 increased team spirit; and
established and employees could see that their 6 reduction of overtime.
These results show that implementing Lean meals served and maintaining the costs within
principles and tools have caused positive changes what might be a low budget. The use of cook-
to the focus areas ‘efficiency’ (1–3), ‘product chill systems has made the large-scale cooking of
quality’ (4) and ‘working environment’ (5–6). meals comparable to the larger scale industrial
Hence, the Lean tools have proven to be appli- production, and this has brought about a need
cable in meal production although the success has to review the planning procedures and the
varied. Value stream mapping, use of measure- management of operations. Lean Manufacturing
ment and visual presentation of key parameters, theoretically fits the special characteristics of
5S, Kaizen Blitz, and increased involvement of meal production as improved product quality,
staff in the process improvement have brought through optimised production planning and
visible results to the kitchen. The efforts to strict control with the process parameters, is its
increase efficiency did not result in the achieve- main objective.
ment of just-in-time production and consistent A field study in a hospital central kitchen shows
pull production as this required a dedicated cook- that the Lean tools, value stream mapping, use
serve production. Still, the principles challenged of measurement and visual presentation of key
the managers to change portioning procedures parameters, 5S, Kaizen Blitz, and increased
towards just-in-time, and portioning of more involvement of staff in the improvement of pro-
expensive meal components now reflects actual cesses (Kaizen), have led to an increased efficiency
orders. in the kitchen. The implementation of Lean has
In meal production, the management and staff also resulted in continuous evaluation of product
are forced to consider special routines and the quality and of the visual presentation of daily
unique characteristics of food, and to take into customer satisfaction. From the continuous col-
account legal temperature requirements. This lection of customer feedback, systematic efforts to
may cause handling procedures that in the Lean improve product quality were established. In the
terminology are categorised as waste. An example kitchen, Lean tools have also shown to be useful
of this was seen in the ‘cold kitchen’ area where to increase employee involvement in the improve-
optimised procedures still contained nonvalue- ment of production and in increasing team spirit.
added handling to ensure the adequate cooling of The field study also shows that Lean Manufactur-
products. In addition, the meal distribution ing principles can improve the efficiency of meal
system at the hospital limited the successful production, but that the resulting effect is depen-
reduction of product waste, because of internal dent on the particular production system and
organisational barriers. Thus, the successful external conditions.
application of Lean in meal production depends
not only on the internal production planning and References
performance, but is also influenced by the choice
Andersson R, Eriksson H, Torstensson H (2006). Simi-
of system, official requirements and work organi-
larities and differences between TQM, Six Sigma and
sation in surrounding systems. Lean. The TQM Magazine 18:282–96.
It should finally be noted that a production Benner M et al. (2003). A chain information model for
principle like Lean can never be a substitute for structured knowledge management: towards effec-
‘good’ management in meal production. Lean can tive and efficient food product improvement. Trends
supply tools to plan and manage the production in Food Science and Technology 14:469–77.
Bicheno J (2004). The New Lean Toolbox. PICSIE
line, but for the success of the foodservice, good Books: Buckingham.
communication, care and attention in the process- Bowen DE, Youngdahl WE (1998). [‘Lean’ service: in
ing of food is still the basis on which the service defence of a production-line approach. International
relies. Journal of Service Industry Management 9:207–25.
Clark JR (1997). Improving catering productivity.
Food Service Management December:60–7.
Conclusions Cox A, Chicksand D (2005). The limits of lean man-
agement thinking: multiple retailers and food and
Traditional large-scale meal production often farming supply chains. European Management
has problems obtaining the desired quality of Journal 23:648–62.
Dahlgaard JJ, Dahlgaard-Park SM (2006). Lean pro- Rodgers S (2005a). Food safety research underpinning
duction, Six Sigma, quality, TQM and company food service systems – a review. Food Service Tech-
culture. The TQM Magazine 18:263–81. nology 5:67–76.
Engelund EH, Lassen A, Mikkelsen BE (2007). The Rodgers S (2005b). Selecting a food service system: a
modernization of hospital foodservice – findings review. International Journal of Contemporary Hos-
from a longitudinal study of technology trends in pitality Management 17:157–69.
Danish hospitals. Nutrition and Food Science 37:90– Rodgers S (2005c). Technological development and the
100. need for technical competencies in food services. The
Hines P, Holweg M, Rich N (2004). Learning to evolve Journal of the Royal Society for the Promotion of
– a review of contemporary lean thinking. Interna- Health 125:117–23.
tional Journal of Operations and Production Man- Rother M, Shook J (1999). Learning to See, 12th edn.
agement 24:994–1011. The Lean Enterprise Institute: Brookline.
Hwang JL-J, Terry D, Eves A, Kipps M (1999). An Silverman MR, Gregoire MB, Lafferty LJ, Dowling RA
analysis of catering options within NHS acute hos- (2000). Current and future practices in hospital
pitals. International Journal of Health Care Quality foodservice. Journal of the American Dietetic Asso-
Assurance 12:293–305. ciation 100:76–80.
James-Moore SM, Gibbons A (1997). Is Lean Manu- Simons D, Zokaei K (2006). Application of Lean para-
facturing universally relevant? An investigative meth- digm in red meat processing. British Food Journal
odology. International Journal of Operations and 107:192–211.
Production Management 17:899–911. Stevenson L, Jain R (2005). Lean manufacturing in
Karlsson C, Åhlström P (1996). Assessing changes the food industry. Food Science and Technology
towards Lean production. International Journal of 19:32–4.
Operations and Production Management 16:24–41. Taylor DH (2006). Strategic considerations in the
Lehtinen U, Torkko M (2005). The Lean concept in the development of Lean agri-food supply chains: a case
food industry: a case study of a contract manufac- study of the UK pork sector. Supply Chain Manage-
turer. Journal of Food Distribution Research 36:57– ment 11:271–80.
67. Warnecke HJ, Hüser M (1995). Lean production. Inter-
McClelland A, Williams P (2003). Trends to better national Journal of Production Economics 41:37–
nutrition on Australian hospital menus 1986–2001 43.
and the impact of cook-chill food service systems. Womack JP, Jones DT (2003). Lean Thinking: Banish
Journal of Human Nutrition and Dietetics 16:245– Waste and Create Wealth in Your Corporation.
56. Simon & Schuster UK Ltd: London.
Mibey R, Williams P (2002). Food services trends in Wood N (2004). Lean thinking: what it is and what it
New South Wales hospitals, 1993–2001. Food isn’t. Management Services 48:8–10.
Service Technology 2:95–103.