IATA Operational Safety Audit


(IOSA)

Module 10
IOSA on-site phase
p

IOSA familiarization course By M. Shahbazi 1


July, 01, 2010
On-Site Audit
5.2.5 The AO shall have a process to ensure an
Audit of a single Operator is planned for a
minimum usage of thirty (30) auditor days, which
includes twentyy five ((25)) auditor days
y for the
conduct of the on-site phase of the Audit and five
(5) auditor days for preparation and IAR quality
control.
A proposal for planned usage of less than 30
auditor
dit ddays ffor any AAudit
dit shall
h ll require
i written
itt
approval from IATA.

IOSA familiarization course By M. Shahbazi 2


July, 01, 2010
Observers and trainees

 IATA may send audit observer


 AO may send auditor trainees
 Auditor trainees participate under direct
supervision of an approved IOSA Auditor
 Trainee auditors must not develop audit
findings or observations!
 Costs for auditor trainees are with AO
=> Identifyy location in IAH!
IOSA familiarization course By M. Shahbazi 3
July, 01, 2010
Opening Meeting

 No audit activities prior to opening meeting;


 Conference
C f room;
 Approx. 30 minutes;
 Participants: audit team and airline
representatives;
p ;
=> Identify location in IPM + IAH!

IOSA familiarization course By M. Shahbazi 4


July, 01, 2010
Opening Meeting

IOSA familiarization course By M. Shahbazi 5


July, 01, 2010
Audit team meetings

 Lead auditor holds internal audit team


meetings
ti every evening
i ((private
i t setting)
tti )
 Auditors exchange information,
synchronize databases and produce daily
report
 Discussion of potential findings and/or
observations
 Need to adjust audit schedule
=> Identify location in IAH!
IOSA familiarization course By M. Shahbazi 6
July, 01, 2010
Daily management briefings

 Lead auditor holds daily management


briefing every morning (approx. 30 minutes)
 Audit team reports results of previous days
 Reports about overall progress
 Clears potential ambiguities
 Adjusts audit schedule (if required)
 Operational managers invited to attend
=> Identify location in IAH!
IOSA familiarization course By M. Shahbazi 7
July, 01, 2010
Operational Assessments

 Observations of actual events


 Site visits
 Includes staff interviews
 Should be scheduled during on-site audit
=> Identify location in IPM + IAH!

IOSA familiarization course By M. Shahbazi 8


July, 01, 2010
FLT Operational
p Assessments

 Line flight cockpit observation (one sector,


sector
any aircraft type, including crew briefing)
 Flight simulator session (standard crew
complement, only recurrent/proficiency
check no type conversion or upgrade
check,
training)
 Advance planning recommended!

IOSA familiarization course By M. Shahbazi 9


July, 01, 2010
CAB Operational
p Assessment

 Line flight cabin observation (one sector,


sector
any passenger aircraft type)

 Commonly combined with cockpit


assessment (return flight)

IOSA familiarization course By M. Shahbazi 10


July, 01, 2010
DSP Operational
p Assessment

 Demonstration of one actual flight planning


and flight following process

IOSA familiarization course By M. Shahbazi 11


July, 01, 2010
MNT Operational
p Assessment

 Scheduled maintenance events


(line/base)

 Examples:
E l see IPM Table
T bl 55.2
2

IOSA familiarization course By M. Shahbazi 12


July, 01, 2010
GRH Operational
p Assessment

 Mass and Balance Calculation

 Observation of aircraft ramp handling


activities
i ii

 Usually observed on one arrival and one


departure (during aircraft turn-around)

 Airport ramp access required

IOSA familiarization course By M. Shahbazi 13


July, 01, 2010
CGO Operational Assessment

 Observation of aircraft loading/unloading


activities (may be combined with GRH
Assessment)

 Visit of cargo acceptance area and cargo


warehouse

IOSA familiarization course By M. Shahbazi 14


July, 01, 2010
SEC Operational
p Assessment

 Passenger check
check-in
in and security screening
screening,
baggage screening (may be combined with GRH
Assessment)

 Cargo security control measures (may be


combined with CGO Assessment)

 Ob
Observation
ti off passenger/baggage
/b reconciliation
ili ti
procedure (at departure gate for one departing
flight)
IOSA familiarization course By M. Shahbazi 15
July, 01, 2010
SEC Operational
p Assessment

 Passenger check-in
check in and security screening,
baggage screening (may be combined with
GRH Assessment)

 Cargo security control measures (may be


combined with CGO Assessment)

 Observation of passenger/baggage
reconciliation
ili i procedure
d (at
( departure
d gate for
f
one departing flight)

IOSA familiarization course By M. Shahbazi 16


July, 01, 2010
P
Possible
ibl audit
dit results
lt

Conformity: Documented: Yes


Implemented: Yes No action required

Nonconformity:
“The Operator Closure at discretion
Observation should…” of Airline

“The Operator Must be corrected


Finding shall…” prior to IOSA registry

IOSA familiarization course By M. Shahbazi 17


July, 01, 2010
Closing Meeting
 General overview
 S
Summary off Fi
Findings
di andd Observations
Ob ti
 Explanation of follow-up process
 Description
i i of IAR
 Confidentiality
 IOSA Feedback Programme (under
development by IATA)
 Hand-over of draft Preliminary IAR

IOSA familiarization course By M. Shahbazi 18


July, 01, 2010
Closing Meeting

IOSA familiarization course By M. Shahbazi 19


July, 01, 2010
A typical IOSA day…

IOSA familiarization course By M. Shahbazi 20


July, 01, 2010
IPM -5.7.6 The AO shall have a process to ensure the
Operator is appropriately informed when any of
the following exist:
i)) a Findingg or Observation is verified;;

ii) there is objective evidence indicating a potential


Finding or Observation;

iii) audit objectives are not attainable


attainable.

IOSA familiarization course By M. Shahbazi 21


July, 01, 2010
5.7.9 If the Operator attempts to address non-
conformity
f it with
ith any IOSA provision
i i through
th h
implementation of immediate corrective action during
the on
on-site
site phase of the Audit,
Audit the AO shall
have a process for acceptance of such on-site action
when the Audit Team is able to verify, prior to
the Closing Meeting, that the corrective action
implemented is comprehensive and permanent, and
results
l in
i theh Operator
O being
b i ini conformity
f i with
i h the
h
IOSA provision. When on-site corrective action
is accepted
accepted, the Audit Team shall ensure a description of
the non-conformance and associated corrective action is
documented in the Record of On-site Findings g and
Observations Corrected during the Audit.
IOSA familiarization course By M. Shahbazi 22
July, 01, 2010
IPM- 5.7.10 The Lead Auditor shall ensure the Operator
understands that Findings and Observations presented on draft
documents during the on-site Closing Meeting:
i)) shall not be revised or withdrawn,, except
p in accordance with
IPM 5.11.4;
ii) are to be used by the Operator to begin development of the
Corrective Action Plan (CAP);
iii)will subsequently be incorporated in final form into a
preliminary IAR, which will be forwarded to the Operator
within thirty (30) calendar days following the date of
adjournment of the on-site Closing Meeting;
iv)may
) y not represent
p the total number of Findings
g and
Observations; additional areas of nonconformity could be
identified if further assessment is required to resolve
discrepancies identified during quality control reviews of the
preliminary issuance of the IAR.
IOSA familiarization course By M. Shahbazi 23
July, 01, 2010
IOSA familiarization course By M. Shahbazi 24
July, 01, 2010
A dit
Audit

1. Opening meeting
2
2. A dit
Audit
3. Closing meeting
4. …..
5. Findingg closing
g

IOSA familiarization course By M. Shahbazi 25


July, 01, 2010
Questions

IOSA familiarization course By M. Shahbazi 26