Kalyan Grandhi

E-mail: grakalyan@yahoo.co.in
Phone: +91 9033517456

Education
B. Tech., Mechanical Engineering, JNT University (1998-2002 passed with 72.78% without any backlogs)
Gas Turbine Experience
• Installation, Commissioning, Operation & Maintenance of PGT25+DLE+LM2500 Gas Turbine (3 x 31MW
ISO rating, 10500 rpm).

• Operation & Maintenance of ABB make GT 8C Gas Turbine (3 x 52.8 MW ISO rating, 6250 rpm).

• Commissioning and Preservation of ALSTOM make GT 13E2 Gas Turbine (1 x 148 MW ISO rating, 3000
rpm).

• Manufacture and Assembly of the turbine blades of Sukhoi-30 engine.

Power Plant Experience


• Operation of 3 x 52.8 MW ABB make 8C type Gas Turbine power generator and all its Auxiliaries.
• Operation of dual pressure water tube, horizontal, bottom supported 60ton/hr HP, 25 ton/hr LP HRSG
with boilers.
• Operations of ABBSTAL make 1 x 77 MW dual pressure steam turbines, single generator STG with
cross-over pipe and all its auxiliaries.
• Getting through the daily routine activities like scheduled operational trials, changeovers, isolations,
normalizations and condition monitoring of all the systems.
• Actively involving in the startup, dual – fuel operation, fuel change overs, shutdown and synchronizing
of GTG with the grid.
• Actively involving in the startup, hook-up, rolling and synchronizing of STG and adding HRSGs to
increase the power output of the STG.
• Operation of 220 kV switchyard and its LT/HT switchgear.
• Operation of BOP station of 600m³/hr and its auxiliaries.
• Equipment Changeovers, Isolations, Normalizations as per work permit systems,
• Following up the activities of PM schedule & scheduled maintenances,
• Handling emergencies and following safety procedures.
• Preservation of 1 x 148 MW ALSTOM make 13E2 type GTG, its triple pressure HRSG and 1 x ST and all
of its related auxiliaries.
Gas Pipeline Experience
• Inspected & documented all the stages of the 48”pipeline construction like Stringing, Welding, Joint
coating, Lowering, Tie-ins, Pre-Pigging, Gauge pigging, Pre-Hydro testing, Golden tie-ins, back filling,
Swabbing, Caliper pigging, Rectifications & Hydro testing.
• Quality Monitored the stages of construction of the Natural Gas compressor station comprising of GE
Nuovo Pignone make Gas compression system with 3 x 13 MW Gas Compressors (16000 ACM/hr at 98
barg) each coupled to Individual High speed power turbine driven by an aero derivative 31 MW ISO Gas
Turbine (PGT25+DLE+LM2500+PCL803), GEA BTT Gas after cooler system with 30x7m diameter motor
driven fans, 3 x 1 MW Power generation system with GE Jenbacher Gas Engine (20 cylinder V Type
Microprocessor controller cam & ignition timing) driven Generators, Fire water system with ABB make
jockey pumps and Main pump and 2 x 820 m3 Pioneer water tanks, Emergency system comprising of
Kirloskar make diesel engine driven fire water pump & Cummins make 600 kVA diesel engine driven
generator, Instrument & Utility air system by Kaesar make 2 x 160 m3/hr @ 16 bar screw compressors
with dryers generating -50oC dew point instrument air, RO plant for generating 400 l/hr for plant utility
& drinking water supply by Hrishikesh Systems, Raw water system for catering the needs of Green belt
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and the fire water system.
• Coordinated with HSE&F and conducted Mock drills, safety trainings, Tool box talks, Audits.
• Handled & resolved major operational issues by key parameter analysis, root cause and discussion.
• Maintained the plant’s healthiness and ensured plant’s high availability by close condition monitoring
and initiating planned maintenance for all the critical equipment before actual failure.
• Prepared technical quotations for AMC for machinery and other utility services.
• Dealt with the statutory bodies and vendors for compliance to the statutory norms of Indian
Government.
• Developed SOP and SMP for the plant commissioning and regular operations s per the vendors
specifications.
• Monitored the installation of Main line valves in the main line valve station.
• Monitored the quality of installation of TCP and then PCP stations and anode beds.
• Taken-over the inspected pipeline for pre-commissioning from the contractor following the HOTO
procedures and conducting quality audits.
• Commissioned 48” pipeline by cleaning, swabbing, intelligent pigging & Vacuum drying following
breaking the vacuum by Natural Gas followed by the stage wise pressurization till MOAP.
• Quality monitored the installation of station piping of Process gas, Power Gas, Fuel gas, Instrument air,
Utility air, Fire water, Utility water, Drinking water, Oily water, Condensate system by inspection from
the stages of edge preparations, alignments, welding, radiography, card board blasting and hydro
testing till Drying with dry air.
• HOTO of the station piping along with associated systems for pre-commissioning & commissioning from
the construction contractor.
• Commissioned the station along with all the equipment including fool proofing of logics.
• Interface checked the station process parameters and controls with RTU for successful Remote control
of the station through SCADA from POC.
• Remote and Local logic functional checks of the process variables and the equipment.
• Local control operation of all the station equipment through LPD, GENP MARK VI HMI, CCC and
Monitoring through Bentley Nevada System 1, during emergencies of SCADA.
Troubleshooting Experience
Photographer, Blue & White, August 2001-03 Photo published, Cellar Door, August 2001 Series of
watercolors, painted in Essex, NY
Skills
Experienced with QuarkXPress, Adobe Illustrator, Adobe Photoshop, Font Reserve, Microsoft Office
Professional
Activities
Carolina Pediatric Attention Love and Support (CPALS), August 2001-present Historian, 2002 Special
Interest Chair, 2003 This organization pairs students with a child with a chronic illness. My pal is a 15-
monthold undergoing the last three months of his treatment for leukemia.
Present Employment
Associate Manager- Asset Integrity, Gujarat Gas Company Limited, A BG Group business, Gujarat, January
2010 -Till date.
Address
D11, First floor, Jan Kalyan society, 1-184/1, Plot 23, Gayatri Nivas,
Palanpurpatia, Rander road, Opposite alimelumanga temple,
Surat – 395009 Saptagirinagar, Sujathanagar PO,
Gujarat, India Visakhapatnam – 530051,
Andhra Pradesh, India

You might also like