You are on page 1of 8

ATCR

Report
Goals & Progress

Name Student:
Nume Prenume
ATCR Prenume NUME

Name Student : Prenume Nume


Location: Galati/Iasi/Brasov IASI
Start date : 15 November 2010

Results 0 – measuring
Adrian
- prompt;
- sociable;
- conscientious;
- well organized;
Strong points - hard working (everytime she finishes her tasks)
from the student
Cosmin

- responsible;
-enthusiastic to work;
-prompt;

Arthur
-prompt;
-sociable;
-conscientious
- excited about new informations;
- open to learn every detail;
- winning character;
- good memory.

Dorin

Simona

Jan

Hans

ATCR 2
ATCR Prenume NUME

Adrian
Improvement points - initiative;
for the student - technical knowledge;
- more optimistic;
during ATCR
- more self-confidance;

Cosmin
- efficience;
- developing technical skills;
- adaptability in teamwork;

Artur

- attention;
- developing technical skills;
- calm, patience, more analysis.

Dorin

Simona

Jan (February 2011):

Hans

ATCR 3
ATCR Prenume NUME

Improvement goals & planning


Period: 15 November – 20 February

Specialization during this period: Electrical Equipments

Coach: Adrian PLEŞCA

Date evaluation: 20 February


Developing goals :
Relays, Contactors, Ship Knowledge, electrical apparatus

Activities and action points (by Adrian and finished before 20 February):
Relays (fundaments, main components, functionality, differences among type relays:
current, voltage, solid-state relays, protection etc.), Contactors (main components, differences
between relays and contactors, functionality, electric diagrams, power and auxiliary contacts),
ship knowledge, electrical apparatus (interpact, compact series).
Switch-disconnectors, circuit breakers type COMPACT and MASTERPACT

Developing results, improvement and progress:

ATCR 4
ATCR Prenume NUME

Period: 15 November - 20 February

Specialization during this period: Electrical and PLC Equipments

Coach: COSMIN PINTILIE /ARTUR GROSULEAC

Date evaluation: 20 February

Developing goals :

Activities and action points (by Arthur – finished before 1st February):

Activities and action points (by Cosmin – finished after 1st February):

Activities and action points (by Arthur – finished before 12th April):

Activities and action points (by Arthur – finished before 14th September):

Developing results, improvement and progress:

ATCR 5
ATCR Prenume NUME

Period: 15 November – 20 February

Specialization during this period: Electrical Motors, AutoCAD, ,


Electrical circuits, Designing,Lights,Easy relay

Coach: Cosmin Pintilie

Date evaluation: 20 February

Developing goals :

Activities and action points (by Cosmin– finished before 12th April):

Activities and action points (by Cosmin and finished before 14th September):

Developing results, improvement and progress:

ATCR 6
ATCR Prenume NUME

Monitoring period: Adrian (A)/Cosmin (C)-


Arthur(Ar)

insufficient average good very good

Interested in program

Motivation

Capacity

Contacts with colleagues

Contacts with teachers/coach

Team spirit

Time pressure

Independence

Self reflection

Open for changes

Balance developing/progress

General view from student during this period (fill in by Dorin):

- .
- .
- .
- .
- .
- .
- .
- .

ATCR 7
ATCR Prenume NUME

End evaluation ATCR (after 1 year)

ATCR 8

You might also like