Professional Documents
Culture Documents
to
AL AIN DAIRY FARM
P. O. Box 15571 Dubai
United Arab Emirates
for
Prepared by
Alliott Management Consulting LLC
P. O. Box 13617 Dubai
United Arab Emirates
Tel: +971-4-2227355 Fax: +971-4-2228916
Email: alliotdb@emirates.net.ae
Contents Page
Introduction 2
Services 3
1.1 ISO 9000 Awareness
1.2 Documentation Training / Workshop
1.3 Assessment of present Management System
1.4 Review, Prepare, approval and issue of Quality Management Documents
1.5 Internal Quality Auditor Training
1.6 Implementation Assistance
1.7 Pre Audit
2. Duration 4
3. Consultants Responsibility 5
4. Clients Responsibility 5
6. Confidentiality 6
2
1. Introduction
Users of services not only require assurance that products or services will be
delivered on time and will be fit for purpose, but that the supplier can
provide evidence that they have complied with the specification
requirements. The implementation of a recognised Quality Management
System must provide that assurance and give your company that vital
competitive edge.
The effects of sub-standard quality within the service sector can be even
more devastating but is much harder to evaluate. Normally it results in the
loss of future business, but the business is lost before the non-conformance
causing the problem is recognised.
2. Services
3
2.1 ISO 9000 Awareness Training
ISO 9000, the international standard for quality systems, specifies to suppliers,
manufacturers, and service companies what is required of a quality oriented system
of management. The standard establishes a requirement for "a documented
system". This involves a quality manual, quality assurance procedures and work
instructions.
Interactive learning techniques and case studies will be used to emphasise key
features of the subject.
Evaluation of your existing Quality Management System will be made against the
requirement of ISO 9000. The assessment will identify areas of control considered
to be deficient and also any existing practices, which are over elaborate and could
be simplified.
4
This assessment will form the basis for the design and developments of a formal
Quality Management System, which will fully comply with the requirements of the
standard. A detailed report will be prepared and submitted to the client.
Our Consultants will identify and prepare the necessary Quality Management
System documents (Quality Manual, Operating Procedures) in Co-ordination with
the selected Management Representative of your organization in order to meet the
requirements of ISO 9002. These documents will be reviewed and approved by the
concerned personnel.
Our consultant will provide support and advice during the implementation phase of
your Quality Management System
Our Consultant will conduct a pre audit to verify the readiness for final audit.
3. Duration
4. Consultant’s Responsibility
5
The Consultant’s work shall lead to a successful certification by any accredited
certification body within the specified period (see clause 3 above).
In case the Client does not pass the Final Certification Audit, the consultant will
only be responsible for failures caused by documentation but not their
implementation or any other reasons.
If the Consultant is responsible for the failure of documentation all following costs
for getting up to the level of final certification will be borne by the Consultant. In
all other cases the Client has to bear these expenses.
5. Client’s Responsibility
The Client commits adequately to quality assurance and its implementation into the
company as per the direction of the “Consultant” and provides the “Consultant” its
full co-operation necessary to achieve and fulfill the target as described above in
clauses 2 and 3.
6
Client will pay for consultancy, training and implementation assistance charges at
Al Ain Dairy Farm’s single site in Al Ain the fee of:
(Refer clause 3)
7. Confidentiality
The “Consultant” shall not at any time during or after the engagement, divulge or
allow to be divulged to any person any information relating to the business or
affairs of the client without their permission.