863013-VPS-PQM-E-DS-0002
This document is the property of Saipem.; all rights reserved. Violators will be pursued under civil and criminal law
SUMMARY OF REVISION
KARIMUN YARD CONSTRUCTION PROJECT
CONTENTS …………………………………………………………………....…………………….3
INTRODUCTION.....................................................................................................................4
SYSTEM DESCRIPTION........................................................................................................5
PURPOSE ………………………………………………………………………………….……..….5
1. PARTICULARS …………………………………………………………………….……….6
3. STARTING TEST...………………………………………………………………………...8
7. APPENDICE ………………………………………………………………………….…...15
7.1 Functional Checklist VFD Control Panel Fan 3608 – VPS 01 …………….……..16
7.2 Functional Checklist VFD Control Panel Fan 3608 – VPS 01 ……………..….…17
ACCEPTANCE ………………………………………………………………………………..22
SYSTEM DESCRIPTION
The ventilation requirements of a space will be largest air flow of the three quantities determined by:
The requirement of rate of outside air change for all specs, and allowable temperature rise are given in table in
table 7.0 at appendices rise as general guideline.
PURPOSE
1. To ensure proper installation of fans, short duct, flexible duct, discharge attenuator, silencer box.
EQUIPMENT REQUIRED
1. Ammeter.
2. Voltmeter.
3. Anemometer.
4. Megger Tester
5. Thermometer
6. Sound meter
COMMISSIONING METHODE
1. Particulars
Fan
Power Output : 37 kw
Fan
Power Output : 55 kw
C/w Variable frequency drive Altivar 61 to control speed motor fan include
temperature sensor, will be install on inside enclosure and outlet air on room .
C/w Variable frequency drive Altivar 61 to control speed motor fan include
temperature sensor, will be install on inside enclosure and outlet air on room .
After each mechanical ventilation system having been finished fan installation, power feeder termination
and louver, silencer box, wire mash, short duct, flexible duct and discharge attenuator, pre-commissioning
shall be performed clamp skid fan, fan rotation etc.
f) Temperature
Before the ventilation test shall be proceed, to confirm the integrity of duct installation, inlet louver and
discharge attenuator ventilating unit installation.
During the above start up, air inlet louver, discharge attenuator to be kept fully open. After the supply fan
start up, the supply air quantity to supply engine /generator. The air flow to be taken record air flow on
outlet enclosure fan, the air flow obtained shall not be less than 90% of the design data.
3. STARTING TEST
Preparation of test: Before Start the ventilation fan check power voltage, 400AC must be
powered up to the panel.
Ventilation fan control Panel is Controlled by Schneider Electric Altivar 61, VFD Altivar 61 comes
along with a display unit.
The display unit with start/ stop buttons, but were disabled due to requirement of the Main
Generator and Emergency Generator override control.
Nevertheless, should there is requirement to stop of the fan in case Emergency. The Emergency
push button can be use.
1 35°C 25°C
2 34°C 24°C
3 33°C 23°C
4 32°C 22°C
5 31°C 21°C
9 27°C 20°C
The fan speed will remain at 50Hz at all condition till the above required temperature is
achieved. Once the internal temperature is achieved, the fan will run at 30Hz.
ITEM DESCRIPTION CHECK
The following checks and inspections shall be carried out by vendor or service
engineer
4.4.1 All the mechanical components of the system are installed to vendors
specification
4.4.2 All the electrical components of the system are installed to vendor
specification
4.3.3 Vendors service engineer or technical representative to verified that the system
is ready and safe to be start-up and commissioning
ITEM DESCRIPTION CHECK
5.1.2 Check air inlet louver connection mounting bolt should be fix and tight
5.3 ELECTRICAL CONTROL PANEL
5.1.3 Check perforated plate cover insulation enclosure should be fix
5.3.1 Check termination cable on panel control, fans and accessories should
5.1.4 be tight
Check silencer box connection should be fix and tight
5.3.25.1.5 LineCheck
check discharge attenuator
cable termination connection
from should
control panel to be fixand
fans andaccessories
tight
5.3.45.2 Fanscable line from control panel to motor fans after termination
Megger
5.3.55.2.1 Cleaning
Checkinside
and confirm
control installation
panel of fans.
5.3.65.2.2 Functional
Verify nameplate for fans.
check list VFD control panel VPS 01 (see table 9.1)
5.3.75.2.3 Functional
Check fan housing
check andControl
list VFD duct grounded
panel VPSshould betable
02 (see properly,
9.2) fix and tight.
5.2.4 The fans and the other duct work accessories have been correctly/properly
ITEM DESCRIPTION
By referring to the table 7.3 - 7.4 carry out the following procedures and record data.
6.2.2 Energize and check operation fans (see table 7.3.1, 7.3.2 and 7.4.1, 7.4.2…)
6.2.4 The reading to be recorded after 1 hours of continuous operating the system.
7.0 APPENDICES
7.1 Functional Check list VFD Control Panel VPS 01 .
1 Power Supply:
5 Output Test for all points including trip and alarm lights:
Light and Indication.
Motor speed test for High and Low Speed with simulated
input current.
Yes / No
OK.
1 Power Supply:
5 Output Test for all points including trip and alarm lights:
Motor speed test for High and Low Speed with simulated
input current.
Yes / No
8 Total number of point tested
OK.
Start
2 Key Button & Operation Stop
Main Gen Stop.
Emergency Gen.
Stop
Overload
Motor O/C
Thermistor
7.3.1 Commissioning Record Fan 3608 - VPS 01 Open/High(3KΩ)
Thermistor
Item Description Short/tooInsulation
low(50Ω) Resistant Remarks
External Sensor 33 33 33
3 Each Point function test with signalDesign
injection
Data Internal Sensor
Measured MΩ 24 Ω 23 22
Motor Speed
Fan Motor Power (Kw) 37.0 External Sensor
30 30 30
Internal Sensor 21 20 19
Fan Motor Power supply Motor Speed
400/3/50
(V/ph/Hz) 29
29
29
External Sensor
Fan Motor Current (A) 66.8 Internal Sensor
20 19 18
Motor Speed
7.3.2 Running Record Fan 3608 - VPS 01
INSPECTION RESULT
Name & Signature Date & Stamp Name & Signature Date & Stamp
ACCEPTANCE
The Equipments/ system covered under this commissioning procedure has been tested and found to be
working satisfactory manner in accordance with the test and inspection herein.