I. Region: WR-II
Make : MEHRU
A Between terminals 1a – 1n OK
B Between terminals 2a – 1n OK
C Between terminals 3a – 1n OK
Core Phase
R- Phase Y- Phase B-Phase
GΩ Primary – Core – I 2.1 4.2 3.1
GΩ Primary – Core – II 3.5 3.6 3.7
GΩ Primary – Core – III 2.2 2.9 4.0
GΩ Primary – Earth 3.1 2.7 4.3
Core Phase
R- Phase Y- Phase B-Phase
GΩ Secondary Core I - Earth 1 1 1
GΩ Secondary Core II - Earth 1 1 1
GΩ Secondary Core III - Earth 1 1 1
GΩ Core I- Core II 1 1 1
GΩ Core I – Core III 1 1 1
GΩ. Core II – Core III 1 1 1
Page 3 of 6
Apply 415 Volts, 3 Phase across line capacitor (Top flange) to earth tank. Ensure all earthing
leads connected.
XIV. All terminal blocks closed in the secondary after all testing
Yes
XV. Phasing of CVT by measuring voltage between R-Phase, Y-Phase and B-Phase at
incoming terminal in control cubicle for one circuit of the checked CVT and output
terminals R-Phase, Y-Phase and B-Phase of a reference circuit (Existing CVT) with
known phasing
Factory Values
CAPACITANCE TAN DELTA
R-Phase Y-Phase B-Phase R-Phase Y-Phase B-
Phase
ALL STACK (2kV) NA NA NA NA NA NA
ALL STACK NA NA NA NA NA NA
(10kV)
Signature: Signature:
Name : Name:
Designation: Designation:
Page 5 of 6
Organisation:
(Testing Agency) (Power Grid Commissioning Team)
Page 6 of 6