You are on page 1of 62

Item no.: 1001816.

R3 Date 2007-07-23
Issued by: Technology Class: II
Replacement of Gearbox with Fixture, V82 – 1.65MW
Type: Work Instruction Page 1 of 62

Replacement of Gearbox with


Fixture, V82 – 1.65 MW
Prepared by: Approved by: Reference/Drawing Work-place Business Unit
TKB FSA See the section Service Technology
Required
Documentation

History of this Document

Rev. no.: Date: Description of changes


1 2006-10-24 First edition
2 2007-01-12 Extra history and table of contents removed
Page 58: Benzene changed to Benzine
3 2007-07-23 Update of Item no for Safety Railing in tools list

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Table of Contents Page 2 of 62

Table of Contents

1 Safety.......................................................................................................................................................3
2 Educational Requirements of Technician............................................................................................3
3 Required Documentation.......................................................................................................................3
4 Purpose ...................................................................................................................................................3
5 Risk Assessment....................................................................................................................................3
6 Note..........................................................................................................................................................5
7 Tools ........................................................................................................................................................5
8 Spare Parts..............................................................................................................................................8
9 Weights....................................................................................................................................................8
10 Estimated Time Use ...............................................................................................................................8
11 Procedure................................................................................................................................................9
11.1 Preparing of rotor lock ..............................................................................................................................9
11.2 Preparing of fixture ...................................................................................................................................9
11.3 Lifting equipment for the Gearbox and adjustment to the right angle ...................................................14
11.4 Various preparing in the nacelle............................................................................................................15
11.5 Stripping of gearbox ...............................................................................................................................23
11.6 Slip ring unit and rotating union..............................................................................................................29
11.7 Rotor lock ...............................................................................................................................................31
11.8 Centa Link Coupling ...............................................................................................................................36
11.9 Moving the generator .............................................................................................................................39
11.10 Preparing in the hub ...............................................................................................................................39
11.11 Hoses to the coolers on the roof ............................................................................................................42
11.12 Cables and wires....................................................................................................................................44
11.13 Shrink disc ..............................................................................................................................................45
11.14 Torque arms ...........................................................................................................................................48
11.15 Nacelle cover..........................................................................................................................................49
11.16 Mounting the main shaft fixture ..............................................................................................................53
11.17 Preparing the new gearbox ....................................................................................................................58
11.18 Switching gearboxes ..............................................................................................................................61
11.19 Installing the nacelle cover .....................................................................................................................62
11.20 Tightening the shrink disc.......................................................................................................................62
12 Reinstalling the nacelle and hub components..................................................................................62
12.1 Dismounting the rotor lock......................................................................................................................62
13 Alignment of gearbox and generator .................................................................................................62
14 Preparation of the old gearbox ...........................................................................................................62
15 Check points .........................................................................................................................................62
16 Start up ..................................................................................................................................................62

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Safety Page 3 of 62

1 Safety

Vestas safety rules must be followed. See the Health and Safety Manual:
1000711. See also Risk Assessment.
Maximum wind speed when using an external crane: 10m/s.
Maximum wind speed at alignment of the generator: 8m/s.
Wear protective glasses, hearing protector, hand protection (heat
resistant gloves), safety helmet and safety shoes.

2 Educational Requirements of Technician

It is preferred to have at least one service technician with knowledge of


gearbox replacement in this actual turbine type. At least 4 service
technicians are required to do the gearbox replacement.

3 Required Documentation

1000711 Health and Safety Manual


5001097 Installation and Service Data
Service Manual:
1001818: Check List for Replacement of gearbox
Supplier drawing of Centa Link Coupling

4 Purpose

To replace a damaged gearbox on site.

5 Risk Assessment

Risk of falling to the ground from the nacelle


Danger to life due to the risk of falling out of the nacelle while working with the
upper nacelle cover / roof dismantled.
: Never work without being hooked or without a safety rail.
X Make sure to be hooked onto two safe hooking points with two tackle ropes.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Risk Assessment Page 4 of 62

Crushing by falling load


Danger to life due to a falling load if e.g. a lifting chain brakes.
: Never stand under a suspended load.
X Use only lifting equipment designed for the task. If replacing spare parts for
lifting equipment, use only original parts authorised by Vestas.
X Always wear safety helmets with chain straps when the overhead crane is in
operation.

Slipping and falling


Risk of person injury due to slipping and falling in the nacelle, e.g. stepping in
spilled oil.
: Do not slip or fall in the nacelle.
X Make sure to wipe away spilled oil, use rags to suck up dripping oil or cooling
water.

Electric shock
Risk of death or severe injury when touching wires with power.
: Do not touch wires unless you are sure that the power supply is off.
X Switch off power and check with a voltmeter that there is no power supply to
the wires.

Risk of fingers or other body parts getting caught or crushed


Risk of getting fingers or other body parts caught or crushed when handling the
gearbox or other parts.
X Be careful when working with gearboxes or other parts.

Hearing damages
Risk of hearing damages when using an electric impact wrench or similar tools.
X Use hearing protector when working with very noisy tools.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Note Page 5 of 62

6 Note

Z Before starting the job, read this work instruction carefully and prepare all
the things you can do in advance, like packing/ordering the necessary
tools and spare parts
Z This instruction is on the basis of a V82-1.65MW turbine. For
NM64/NM72/NM82 turbines there are some differences.
Z It is recommended that the rotor is not locked for more than 48 hours;
otherwise there is a risk of stand still marks on the main bearing.
Z It is recommended to use a safety railing as described in this instruction.
It is however allowed to carry out the work without safety railing if the
technicians in the open nacelle are properly hooked onto approved
anchor points.

7 Tools

Item no.: Quantity Text


T2198900 1 Live working gloves
T2191200 1 Electronic spirit level
T2191300 Bag for electronic spirit level
1 Lifting tool for shrink disc
VT742277 1 Safety railing NM 82
VT310241 1 Lift-nacelle roof/ cooler
301166 1 Fixture
301111 1 Rotor lock
T3699900 1 Bayonet saw
T3695100 1 Blade for bayonet saw 150mm
301248 1 Blade for bayonet saw 225mm
T3274600 2 Hydraulic torque wrench heads MXT 10
3 Hydraulic torque wrench heads MXT 3
3 Hytorc pump with hoses
1 Service crane
2 70 mm wrench
2 50mm wrench
2 46mm wrench
2 41mm wrench
2 36mm wrench
2 32mm wrench
2 30mm wrench
2 27mm wrench

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Tools Page 6 of 62

Item no.: Quantity Text


2 24mm wrench
2 22mm wrench
4 19mm wrench
4 17mm wrench
4 13mm wrench
4 10mm wrench
T2092400 2 8” adjustable wrench
T2092600 2 12” adjustable wrench
T2092800 2 18” adjustable s wrench
2 Medium multigrips
2 Large multigrips
4 90mm short, ring impact wrench
T3275800 2 90mm impact socket1 ½”
T3515800 2 50mm impact socket 1 ½”
T3689200 2 55mm impact socket 1 ½”
2 55mm 1” short impact socket
2 50mm 1” short impact socket
2 46mm 1” short impact socket
2 41mm 1” short impact socket
2 41mm 1” long impact socket
2 55mm 3/4 ” short impact socket
2 50 3/4 ” short impact socket
2 46 3/4 ” short impact socket
2 41 3/4 ” short impact socket
2 36 3/4 ” short impact socket
2 32 3/4 ” short impact socket
2 30 3/4 ” short impact socket
2 41mm ¾” long impact socket
2 6mm ½” , 8mm ½” allen sockets
2 22, 27, 30mm 3/4” impact allen sockets
4 10, 13, 17, 19, 22, 24mm ½” sockets
T2173000 1 ¾” torque wrench up to 140-760 Nm
T2175100 1 ½” torque wrench up to 75-400 Nm
1 30mm ring spanner for ½” torque wrench
300350 2 ½” electric impact , cordless if possible
2 ¾” electrical impact wrench
8 Pairs of sidecutters
4 Small flat and Phillips screwdrivers

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Tools Page 7 of 62

Item no.: Quantity Text


4 Medium flat and Phillips screwdrivers
4 Large flat and Phillips screwdrivers
T3848200 2 Multimeters Fluke
2 Allen key set
4 Medium size crowbars
4 Hobby knifes with blades
6 Extension cords with 3 sockets on the end, 5m
long
T2183400 2 Work lamps
10 Large lifting bags
10 Small lifting bags
6 Lifting buckets
4 250 kg chain hoist
2 3T chain hoist with 1.5m chain
4 2m purple straps 1 T
8 6m green straps 2T
10 Carbine clips
T3170200 8 Walkie talkies
T3170100 8 Charger for walkie talkie
T3923100 2 Gas burner, big , for the hollow shaft
4 12mm eye bolts
VT730482 1 Lifting chain F, gear V80/V82
VT730760 1 Shackle 8.5T for the right bag side, Hansen EH
803
Small gas burner set to be used in the nacelle
1 Chisel to screw out the 2 plugs in the shrink disc,
(see Figure 11-55, p. 47)
2 Ratchet lever hoists 250 Kg
301133 2 Hose clamp
1 Angle grinder with discs
1 Die grinder (fast rotating grinder)
T2124500 1 Sledge hammer
1 Generator alignment equipment

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Spare Parts Page 8 of 62

8 Spare Parts

Item no.: Quantity Text

Site 1 Oil filter


specific
60060119 1 Blue paint RAL 5010
1 Black paint for the main shaft
1 White paint for the nacelle cover
226631 Universal cloth/rags
Oil Rags
115517 Cable ties
Solid plastic bags for blacking off the oil hoses and
fittings
198004 Cleaning paper Tork Multi
096189 1 Benzine
213619 1 Never Seez grease
149752 2 Sikaflex Adhesive RAL 9010
Emery cloth for the main shaft / hollow shaft
233843 1 Scotch Brite 3M
60072154 4 M60 Washer

9 Weights

Gearbox: approx. 17 T

10 Estimated Time Use

The time use is dependent on the number of service technicians and how
experienced they are. The time use is also dependent of the weather, and
situations like if the shrink disc and the brake disc have to be swapped
over to the new gearbox or if these components are pre mounted.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 9 of 62

11 Procedure

11.1 Preparing of Rotor Lock

1. Prepare the rotor lock on the ground, and lift it up to the nacelle.

11.2 Preparing of Fixture

Figure 11-1: Fixture overview and parts


1 Crescent shaped flange against 4 Upper part of fixture body
main bearing housing
2 Hydraulic cylinders 5 Crescent shaped flange against
gearbox
3 Distance pieces depending on 6 Distance block for second
turbine type gearbox push
7 Lower part of fixture body

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 10 of 62

Figure 11-2: Parts in the gear pusher system


1 Two round rods 4 Hydraulic cylinders
2 Distance pieces depending on 5 Distance blocks for second
turbine type hydraulic stroke
3 Crescent shaped flange against 6 Crescent shaped flange against
gearbox main bearing housing
7 Connection tubes

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 11 of 62

Figure 11-3: Pusher system configuration for NM82/1650 & V82-1.65 MW

Figure 11-4: Pusher system configuration for NM72/1500 & NM64/1500

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 12 of 62

Figure 11-5: Distance blocks

2. Prepare the fixture so it fits the main shaft (Figure 11-5, p. 12). For a V82 or
a NM 72/82 Artic model, use the medium thick plates. For a NM 64 1.5 MW
use the thick plates.

Figure 11-6: Mounting the distance plates Figure 11-7: Crescent shaped flange against the
gearbox side

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 13 of 62

NOTE Do not mount the bottom distance plates until the fixture is up on the main shaft.
Pack relevant set of bolts in a tool bag, ready to be lifted up with the fixture, and
the bottom distance plates.

3. Mount the lifting eyes and straps on the fixture.

Figure 11-8: Lifting equipment

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 14 of 62

Figure 11-9: Fixture ready to lift up in the nacelle


1 Crescent shaped flange on the rotor side 3 Bolts are fastened together with cable ties
2 Hydraulic cylinders for pushing of the gearbox

11.3 Lifting Equipment for the Gearbox and


Adjustment to the Right Angle

4. Stop the turbine and switch to “Service mode” .Yaw the nacelle into position
for the mobile crane.

5. Measure the angle of the gearbox in the nacelle. It must be approx. 0°


sideways and 4.5° to 5.0° in longitudinal direction. Use a digital spirit level
(see Figure 11-10, p. 15).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 15 of 62

Figure 11-10: Measuring the angle in the longitudinal direction

6. Prepare the lifting equipment on the ground. Let the crane lift the lifting
equipment onto the new gearbox and mount the equipment.
7. Let the crane lift the gearbox free from the ground and adjust the angle of the
gearbox in the chain hoists according to the angle measured on the old
gearbox.
8. Get the total weight of the gearbox from the crane driver. If the new gearbox
comes without shrink disc and brake disc, do not perform the test lift to get
the weight until the shrink disc and the brake arrangement have been
swapped over.

11.4 Various Preparations in the Nacelle

9. Dismantle the shielding on the main shaft and hang it on the generator as
shown (see Figure 11-11, p. 16). Tighten it with cable ties to the generator.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 16 of 62

Figure 11-11: Main shaft shielding

10. Disconnect the main power at the main disconnectors and the circuit breaker
(see Figure 11-12, p. 17) and (see Figure 11-13, p. 17).

NOTE There is still 230 V power on in the turbine.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 17 of 62

Figure 11-12:Main power disconnections Figure 11-13: Circuit breaker

11. Cut off the power to the slip ring unit in the top controller and in general for all
the electrical parts which are to be dismantled. Check with a multi-meter that
the power supply is off.
12. Cut off the power to the AN6 cabinet and the big fan that the service
technician is holding in the picture (see Figure 11-14, p. 18). Check with a
Fluke that there is no power.
13. Dismantle the fan/heater in the right side of the main shaft and put it away
(The fan is not mounted in all turbines, only in Artic models) (see Figure
11-14, p. 18)

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 18 of 62

2
1

Figure 11-14: Fan mounted in Artic models


1 Fan
2 AN6 cabinet

14. Dismantle the AN6 cabinet and put it away e.g. at the yaw gears (The
cabinet is not mounted in all turbines, only in Artic models).

NOTE The AN6 cabinet is heavy and two service technicians must lift it together and
place it out of the way.

15. Dismantle a yaw motor in each side next to the two front yaw gear motors, to
make room for the fixture (see Figure 11-15, p. 19).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 19 of 62

Figure 11-15: Yaw motor dismantled

16. Dismantle the oil hose to the main bearing. Dismantle the fitting on the main
bearing.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 20 of 62

Figure 11-16: Oil hose to main bearing


1 Oil hose 3 Shielding at the main bearing
2 Fitting that must be dismantled

17. Dismantle the shielding at the main bearing around the main shaft (see
Figure 11-16, p. 20).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 21 of 62

18. Dismantle the thread rods for the main bearing shielding (because the fixture
is to face the edge of the main shaft.

Figure 11-17: Thread rods for shielding

19. Dismantle the lightning conductor (see Figure 11-18, p. 22).

20. Dismantle the inductive sensors for rotor rpm (see Figure 11-19, p. 22).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 22 of 62

Figure 11-18: Lightning conductor Figure 11-19: Inductive sensor for rotor RPM

21. Dismantle the 230V / 110 V, CE sockets at the yaw gears (in the right side of
the nacelle). Loosen the cable trays in both sides over the yaw gears and let
them hang loosely (to get room for the fixture) (see Figure 11-20, p. 23).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 23 of 62

Figure 11-20: Cable tray and CE sockets loosened

22. Loosen the shrink disc: The 8 bolts in the top and the 11 bolts in the bottom.
Put off loosening the bolts in the sides. Use a Hytorc with a 50mm socket
and an electrical impact wrench.

11.5 Stripping of Gearbox

23. Dismantle the wiring to the AN 12 junction box on the gearbox. Dismantle the
box.

NOTE Note down where the wires are placed.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 24 of 62

Figure 11-21: AN12 junction box Figure 11-22: Dismantling wires in the AN12 box

24. Dismantle the wires to the PT 100 sensors in the gearbox. Some are placed
on top of the gearbox and some in the bag end of the gearbox (see Figure
11-24, p. 25). Make sure that there is no power!

25. Dismantle the plug for the oil level sensor (see Figure 11-23, p. 25).

26. Dismantle the heating elements in the bag end of the gearbox (see Figure
11-23, p. 25). Make sure that there is no power!
27. Dismantle the cable tray and cables in the bag end of the gearbox (see
Figure 11-23, p. 25).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 25 of 62

1
2

Figure 11-23: Heating elements, PT 100, and cable tray


1 Heating element 3 Cable tray
2 PT 100 sensor 4 Oil level sensor

Figure 11-24: Wiring to one of the heating elements in gearbox

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 26 of 62

28. Dismantle the gear oil hoses (70mm fork spanner) (see note below) and the
off line filter hoses (if the turbine is equipped with an off-line filter).

NOTE Suction hose is placed on the bottom of the gearbox and pressure hose at the
left side of the gearbox.

NOTE Oil will drip out when dismantling the hoses. Place a waste tray or a bucket under
the hose fittings and blank off the hoses with plugs or twisted rags with a plastic
bag around tied up with a cable tie (see Figure 11-25, p. 26).

Figure 11-25: Gear oil hose blanked off.

29. Dismantle the oil pump from the base frame and move it as much as possible
back against the generator (see Figure 11-29, p. 28).

NOTE Use straps, service crane, and a small ratchet lever hoist to lift the oil pump. Put
a strap between the pump, and the service crane. Mount a ratchet lever hoist in
the big generator lifting eye and to the strap (see Figure 11-27, p. 28).
Loosen the SAE flanges on the pump and turn the two hoses a bit up, in order
not to have the pump standing on the hoses on the bottom of the nacelle floor
(see Figure 11-26, p. 27).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 27 of 62

Figure 11-26: Gear oil pump


1 Lifting strap 2 SAE flanges

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 28 of 62

Figure 11-27: Lifting the oil pump Figure 11-28: Lifting point for ratchet lever hoist

Figure 11-29: Gear oil pump drawn back against the generator.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 29 of 62

11.6 Slip Ring Unit and Rotating Union

30. Switch off the power to the slip ring unit (see Figure 11-30, p. 29).
31. Remove the plastic cover over the slip ring unit and measure with a Fluke
Multi meter, that the power is off (see Figure 11-31, p. 30).
32. Dismantle the grille “3” and the bracket “5” (see Figure 11-30, p. 29).

33. Dismantle the plugs / cables to the slip ring unit and the two safety
disconnectors on the gearbox and place them away in a safe place (see
Figure 11-30, p. 29).
34. Dismantle the rotating union and hoses (see Figure 11-33, p. 31).

NOTE The hoses and pipes must be blanked off or closed with a plastic bag secured
with cable ties.

Figure 11-30: Slip ring unit


1 Safety disconnectors for the slip ring unit 4 Cables with plugs* to the slip ring unit
2 Plastic cover * In some turbines there are no plugs. The wires
have to be screwed off in the slip ring unit.
3 Grille 5 Bracket for rotating union and shielding

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 30 of 62

35. Dismantle the pipe holders (see Figure 11-32, p. 30).

36. Dismantle the wires going into the hub.

NOTE Note down how the wires are placed, for correct remounting.

Electric shock
Risk of death or severe injury when touching wires with power.
: Do not touch wires unless you are sure that the power supply is off.
X Switch off power and check with a voltmeter that there is no power supply to
the wires.

Figure 11-31: Check that the power is off. Use Live Figure 11-32: Dismantling the pipe holders
working gloves!! (not gloves as in the
picture !)
37. Dismantle the slip ring unit.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 31 of 62

Figure 11-33: Rotating union

11.7 Rotor Lock

38. Cut out the necessary piece of the nacelle cover to get room for the rotor
lock. Afterwards, the two cut off pieces must be mounted again with
aluminium plates and be put on with pop rivets and sealant, and finally
painted (see Figure 11-34, p. 32) (see Figure 11-35, p. 32).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 32 of 62

Figure 11-34: Make a cut out in the nacelle cover with a bayonet saw

Figure 11-35: Cut out following the yellow line in this figure
39. Position the rotor with 2 blades up (“bunny ears”), so that the yellow rotor
hooking point is pointing up. Check through the hatch that it is positioned
correctly.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 33 of 62

40. Dismantle the necessary bolts on the main shaft/hub connection to mount the
rotor lock flange pieces (55mm socket): Counting from the upper middle bolt
and 4 bolts down, so there are 9 bolts between the 2 flange pieces,
dismantle the following 8 bolts. Turn the rotor for access and mount the first
flange piece. Do the same in the other side for mounting the other flange
piece.

Figure 11-36: Rotor lock flange piece mounted

41. Turn the rotor back to “bunny ears” / V position, position with the yellow
hooking point upwards.

42. Loosen and dismantle the 4 M60 nuts and washers on the main bearing
pedestal (90 mm socket).

43. Loosen and dismantle the 4 M60 stud bolts for the main bearing pedestal. It
may be necessary to mount two nuts counter tightened with two 90mm
impact wrenches or even with the Hytorc and the MXT 3 (see Figure 11-37,
p. 34).

NOTE If it is impossible to loosen the bolts, make a special tool of a M60 nut with a
10mm plate welded on with two M12 holes in it. Then mount the nut, mark up
through the M12 holes, take it off, drill 11.5 mm holes in the stud and make a
M12 thread. Mount the nut again and screw in the M12 bolts in the stud. Then
you are able to loosen the stud bolt (see Figure 11-38, p. 34).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 34 of 62

Figure 11-37: Loosening the stud bolts.

Figure 11-38: Special nut for dismantling the stud bolts

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 35 of 62

44. Mount the rotor lock frames. They must turn with the thread holes in the ends
to the back.

Figure 11-39: Right rotor lock


1 Rotor lock frame, right hand side
2 Lock pin
3 Thread holes in the end of the frame

45. Mount the new long stud bolts, and screw them down so that 50mm thread is
sticking up.

46. Mount the M60 nuts and new washers. Tighten them up with the hytorc and
the MXT3 or MXT10 to 2000Nm.

47. Mount the rotor lock pins (see Figure 11-40, p. 36).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 36 of 62

Figure 11-40: Mounting the rotor lock pins

NOTE When the first lock pin is inserted, turn the rotor a little bit to centre the other
flange piece and the lock frame before inserting the other lock pin.

48. Lock the lock pins with the bolts in the end of the blocks and with the pins
going through the block and lock pins

11.8 Centa Link Coupling

49. Mount the lock pin in the brake disc.

50. Dismount the bolts going through the brake disc to the distance tube for the
coupling (See Figure 11-41, p. 37).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 37 of 62

Figure 11-41: Brake disc at gearbox side

51. Dismantle the bolts from the distance tube to the rubber element.

52. Dismantle the link arms (see Figure 11-42, p. 38).

53. Take down the distance tube. Make room for this by lifting the element in
over the generator shrink disc temporary. Use a service crane to hold the
element. The service crane is hung up in a strap in the skylight around a big
torque wrench key or similar. One can also hang the crane up in a long strap
fastened at the cooler arrangement on the roof or on one of the rails (see
Figure 11-43, p. 38).

54. Lift down the coupling element.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 38 of 62

3
2

5
4

Figure 11-42: Coupling with Centa link element


1 Lock Pin 4 Generator shrink disc
2 Rubber element 5 Distance tube
3 Link Arm

Figure 11-43: Service crane to lift the coupling

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 39 of 62

55. Mark the generator shrink disc inner and outer elements to be sure to be able
to mount it correctly again. Dismantle it by manoeuvring it out with a crowbar
when the bolts are dismantled.

NOTE When mounting the coupling again, lift the element up over the generator shrink
disc, mount the distance tube to the brake disc. Lift the element in place and
tighten it to the distance tube. Mount the link elements first at the generator, then
at the coupling. Never do it in the top, first in the sides and bottom.

NOTE If a link element is damaged and has to be replaced, all the link elements must
be replaced at the same time, because they are balanced together.

11.9 Moving the Generator

56. In some of the turbines (twin speed) there is not much room to get the
gearbox out; therefore the generator has to be pushed backwards as far as
possible. Loosen the generator and push it with the hydraulic jacks from the
fixture.

NOTE Secure the generator with bolts, to prevent it from falling out of the nacelle.

11.10 Preparation in the Hub

57. Relief the hydraulic pressure in the hub on the 4 needle valves for the pitch.

58. Dismount the pipes at the pitch distributor block, and plug up the block and
pipes with blind plugs or small rags

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 40 of 62

Figure 11-44: Hub


1 Pipes to be dismantled 3 Hub controller
2 Pitch distributor block

59. Mount a little ratchet lever hoist around the distributor block to lift it away
(see Figure 11-45, p. 41).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 41 of 62

Figure 11-45: Ratchet lever hoist to lift the distributor block


60. Dismantle the distributor block and put a plastic bag around it, in order to
prevent oil from dripping out. Let it hang in the ratchet lever hoist (see Figure
11-45, p. 41).

Figure 11-46: Distributor block dismantled


1 Saw off the plate as shown with the
red dotted line.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 42 of 62

61. Use a bayonet saw to saw off plate behind the distributor block as shown in
the picture, to get room for pulling out the pitch pipe in the hub (see Figure
11-45, p. 41),(see Figure 11-46, p. 41).

62. Pull out the pitch pipes in the hub and at the same time another service
technician is guiding it in from the gearbox back (communicating by walkie
talkies).

Figure 11-47: Pitch pipes drawn out in the hub


1 Plate sawn of here

11.11 Hoses to the Coolers on the Roof

63. Make sure that there is no pressure in the cooling water system.

64. Mount hose clamps on the two cooling water hoses as shown in the picture
(see Figure 11-48, p. 43).
65. Dismantle the other hoses which will be necessary for lifting off the nacelle
cover and blank them off with blanking plugs or with rags and plastic bags.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 43 of 62

Figure 11-48: Hose clamps mounted

66. Loosen and dismantle the water hose under the water pump and hold a
bucket underneath to collect approx. 5L of coolant.

Figure 11-49: Hose at water pump

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 44 of 62

11.12 Cables and Wires

67. Dismantle the right rear fluorescent lamp and the necessary cables.

Figure 11-50: Dismantled cables / wires

68. Disconnect W541 and W543 switches in the top controller.

69. Dismantle the wires at the US sensor.

70. Dismantle the wires at the aviation light.

71. Dismantle the wires at the ice sensors (see Figure 11-51, p. 45).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 45 of 62

Figure 11-51: Ice sensors

11.13 Shrink Disc

72. Loosen the bolts in the shrink disc in the following way: Loosen the bolts one
by one ¼-½ revolutions at a time (3-5 times on the Hytorc). It is
advantageous that two service technicians carry out the work. A service
technician on each side of the shrink disc with a Hytorc each (50mm
sockets).

Breaking bolts
If a shrink disc bolt is loosened entirely one at a time, the big tension on this bolt
will cause it to break and be shot out like a missile.
X Keep your body away from the bolts.
X Loosen the bolts one by one a little at the time as described above in point
72.

NOTE Make sure that the shrink disc is totally loosened and there is no more tension
inside the shrink disc!

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 46 of 62

Figure 11-52: Loosening shrink disc bolts

NOTE The next 3 steps can be carried out when the nacelle cover has been dismantled
and the mobile crane has lifted up the small torch set.

73. Warm up the two plugs (one in each side of the shrink disc) for the thread
rods with a torch and dismantle them with a proper chisel and a wrench (see
Figure 11-54, p. 46) (see Figure 11-55, p. 47).
74. Tap the threads with a 27mm or 30mm tap, depending of the shrink disc
model (see Figure 11-56, p. 47).

Figure 11-53: Plug Figure 11-54: Warming up one of the plugs

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 47 of 62

Figure 11-55: Plug is screwed out. Figure 11-56: Thread is tapped.

75. Screw in a bolt or a threaded rod with a nut welded on, or as shown in the
picture with a counter nut. The bolts are screwed in to secure, that the shrink
disc is completely loosened.

Figure 11-57: 27 mm bolt or 30mm bolt / threaded rod is screwed in

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 48 of 62

11.14 Torque Arms

76. Loosen and remove the stops on the rubber bushings

77. Loosen and remove the nuts, upper parts of the rear torque arms and stay
bolts. Use a Hytorc to loosen it enough before using an electric impact
wrench. Only loosen the front torque arms. It is not necessary to remove the
upper parts on those.

Figure 11-58: Torque arm


78. In older models, NM64, NM72 or NM82 the torque arms are in one piece. Do
the following with these types of torque arms: Loosen and remove the stops
on the torque arm bushings (see Figure 11-59, p. 48) (see Figure 11-60,
p. 48).

Figure 11-59: Stop on bushing Figure 11-60: Stop on bushing

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 49 of 62

79. Mount lock nuts on the stay bolts in order to loosen the whole stay bolt (see
Figure 11-61, p. 49).

80. Loosen the stay bolts with a hytorc (hydraulic wrench) just enough to screw it
completely off with an electrical impact wrench (see Figure 11-61, p. 49).

Figure 11-61: Loosening torque arm

Figure 11-62: Torque arm (old models)

11.15 Nacelle Cover

81. Dismantle the bolts for the upper part of nacelle cover (nacelle roof) (see
Figure 11-63, p. 50).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 50 of 62

Figure 11-63: Dismantle the bolts for the nacelle cover

82. Dismantle the bolts in the edges.

Figure 11-64: Bolt to be dismantled

83. Mount the safety rail in the nacelle. It can be done before or after lifting off
the nacelle cover / roof (see Figure 11-65, p. 51).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 51 of 62

Figure 11-65: Safety railing mounted

Crushing by falling load


Danger to life due to a falling load if e.g. a lifting chain brakes.
: Never stand under a suspended load.
X Use only lifting equipment designed for the task. If replacing spare parts for
lifting equipment, use only original parts authorised by Vestas.
X Always wear safety helmets with chain straps when the overhead crane is in
operation.

84. Hook on the lifting yoke for the nacelle cover.

Figure 11-66: Lifting the nacelle cover in the radiators

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 52 of 62

85. Let the crane lift the roof free and down. It is necessary to use crowbars and
knives to help releasing the roof where it is stock in the Sikaflex. Start
releasing from the middle of the nacelle and move forward.

Figure 11-67: Releasing the nacelle cover

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 53 of 62

Figure 11-68: Lifting yoke for nacelle cover

NOTE For more information, see WKI 1001821: Dismantling and lifting Nacelle Cover -
V82-1.65MW

11.16 Mounting the Main Shaft Fixture

Falling to the ground from the nacelle


Danger to life due to the risk of falling out of the nacelle while working with the
upper nacelle cover / roof dismantled.
: Never work without being hooked or without a safety rail.
X Make sure to be hooked onto one or two safe hooking points with two tackle
ropes.
X Make sure to have that the approved safety rail mounted.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 54 of 62

86. When the crane has lifted up the fixture, loosen the bolts for the lower parts
of the fixture body from beneath and turn the two parts out 90° (see Figure
11-70, p. 54)
87. Make sure that the right top and side and bottom distance blocks are
mounted.

Figure 11-69: Loosening bolts Figure 11-70: Lower parts turned out

88. Turn the lower parts in under the main shaft and tighten it together with the
upper part loosely.

NOTE On some turbines it is necessary to put a distance block between the base frame
and the fixture to get it mounted properly. The distance blocks come with the
fixture (see Figure 11-71, p. 55).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 55 of 62

5 2

Figure 11-71: Bolts that must be tightened


1 To be tightened from beneath 4 Bolts for the bottom distance
blocks
2 Can be tightened from above 5 Distance block is to be mounted
here on some turbines
3 Vertical adjustment screw

89. Hook the lifting equipment onto the gearbox and lift up the gearbox and main
shaft with fixture a little just until the gearbox is clear of the base frame
(otherwise it can not get out).
90. Tighten the bolts for the fixture properly, first the bolts no. 1, then bolts no. 2
and then bolts no. 4 (see Figure 11-71, p. 55).
91. Tighten the four bolts in the sides for sideways fixation and support against
the base frame (see Figure 11-73, p. 56).

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 56 of 62

Figure 11-72: Fixture seen from below Figure 11-73: Bolt for sideways adjustment fixation
(seen from above)

92. Let the crane hold the weight of the gearbox


93. Push the gearbox off with the pusher system against the main bearing
pedestal nice and easy. (see Figure 11-74, p. 57). Let the crane follow the
movement.

Getting squeezed between gearbox and generator


If a person stands between the gearbox and generator when the gearbox is lifted
out, the gearbox can swing bag against the generator and squeeze the person
standing there.
: Do not stand behind the gearbox.
X Stand in the side of the nacelle.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 57 of 62

Figure 11-74: The Pusher system

94. When it is clear of the main shaft, base frame and generator, the crane can
lift it out of the nacelle and down to the ground.

NOTE Before the gearbox is out of the nacelle, tighten a couple of bolts in each side of
the shrink disc to secure it from falling off.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 58 of 62

11.17 Preparing the New Gearbox

95. Clean the rust protected surfaces with benzine, rags and possibly Scotch
Brite 3M.

Figure 11-75: Cleaning the shafts and the contact faces.

96. If the new gearbox comes without a shrink disc, swap the shrink disc over
from the old gearbox. Use the special lifting tool for this (see Figure 11-76,
p. 59).

NOTE The shrink disc must go straight on; otherwise it is impossible to mount it!

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 59 of 62

Figure 11-76: Shrink disc being mounted

97. Mount the shrink element for the brake disc and the brake disc if the new
gearbox is not with premounted brake disc. Tighten to the right torque setting
according to I&S data.
98. Mount the anchor plate with the brake calibre arrangement.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 60 of 62

Figure 11-77: Brake calibre arrangement is mounted.

Figure 11-78: Warming up the hollow shaft

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Procedure Page 61 of 62

99. Warm up the hollow shaft evenly all over with a gas burner for at least half
an hour (see Figure 11-78, p. 60).
100. Mount the lifting equipment for the gearbox.

11.18 Switching Gearboxes

101. Let the crane lift the new gearbox from the ground, and check with a digital
spirit level that the gearbox is hanging in the right angle. If not, adjust it.
102. Lift the gearbox to the nacelle and guide it carefully over the main shaft
and draw it into place with two ratchet lever hoists mounted via straps in
the eyes on the main bearing pedestal and around the torque arms. It is
crucial, to draw evenly in both lever hoists and at the same time be rotating
the brake disc. If the brake disc is hard to turn, it is because of an oblique
angle (see Figure 11-79, p. 61).

Figure 11-79: Drawing the new gearbox in place with two ratchet lever hoists

103. Let the gearbox rest on the torque arms and mount the rubber bushings,
the stop plates and the upper parts. Tighten loosely by hand.
104. Dismantle the lifting equipment from the gearbox.
105. Loosen the fixture and lift it down.
106. Torque tighten the torque arms to the specified setting in the I&S data.

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com


Item no.: 1001816.R3 Date 2007-07-23
Issued by: Technology Replacement of Gearbox with Fixture, V82 – 1.65 MW Class: II
Type: Work Instruction Reinstalling the Nacelle and Hub Components Page 62 of 62

11.19 Installing the Nacelle Cover

107. Lift the nacelle cover up and secure it with bolts in both ends and
sides of the nacelle.
108. Take off the lifting equipment from the nacelle roof and let the crane go
down.
109. Tighten all the bolts and seal the nacelle cover with Sikaflex or similar
where it was sealed before.

11.20 Tightening the Shrink Disc

110. Tighten the shrink disc to the specified torque setting depending on the
kind of element:
– MSD 720-81-1, M33, 12.9, See label: 2650 Nm
– MSD 720-22-7, M33, 10.9, See label: 1985 Nm
– TAS 317,1-720, M33, 12.9, See label: 2150 NM
– FSD 720, M30, 10.9, See label: 1500 Nm
Z Take 4 bolts in each side of the element, then up to eight in each side
and so on until all the bolts have been tightened. Use the MXT3 or the
MXT10 if the MX3 can not do the work.

12 Reinstalling the Nacelle and Hub Components

111. Reinstall the nacelle components in the reverse order.

12.1 Dismantling the Rotor Lock

112. Dismantle the rotor lock when it is possible to have the brake activated.

13 Alignment of Gearbox and Generator

113. Check the alignment of the generator and adjust it if necessary. See
instruction in Service and Maintenance Manual.

14 Preparation of the Old Gearbox

114. The old gearbox must be rust protected with Eli sol or a similar product
on all bare surfaces (E.g.: in the hollow shaft, torque arm surface).

15 Check Points

115. Before starting up the turbine, check that all the points in the check list
1001818 that are possible to do before start-up have been carried out.

16 Start up

116. During start-up, check the remaining points in the IRF: 1001818

Vestas Wind Systems A/S · Alsvej 21 · 8900 Randers · Denmark · www.vestas.com