Mold Basic Information


Part
Mold No. M - Part No.
Name

Plastic Type Maker Model Supplier


Material Cust. M.M.

Color Shrinkage /1000 Recom. Inj. Pressure kg/cm2


No. cavity Projected Area mm2 Injection Machine Ton

Hot Runner 3 Plate Side Action Standard Other


Structure

Steel Hardness Treatment


Mold Base
HRc

Steel Hardness Treatment


Inserts
HRc

Direct Sprue Point Subgate Edge Other Gate Dim. Runner Dim.
Gate Hot Tip
mm mm

Ejector Sleeve Stripper Air


Ejection Other

Length Width Height Weight


Mold Size
mm mm mm kg

Maker Layout Completed Customer App.


Mold Base
Design Trial Date
Completed
Unit
Original
Final CAD File Sample Prototype Other Received
Drawing mm inch
Product

Remarks:

Engineer Director of engineering Dept Manager


Date Signature Date Signature Date Signature
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 2 of 10
The date of checking
Mold Layout (completed in 7 days after order steels)

1. Design of layouts based on DME or Hasco Standard.

2. Do layouts use Moly-Mold standard frame and information?

Are necessary information written in the material list for all the
3.
components?

Are screws positions and quantities on the layouts in accordance with


4.
the material list?

Are dimensions shown on the layouts in accordance with material list,


5.
and been checked with toolmakers?

Are parting line design and cavity configuration on the inserts in


6.
accordance with customer’s requirements?

Are pry slots designed on the layouts with dimensions of 30x30 and
7.
deep 6?

8. Do layouts show plate chamfer of 3mm?

9. Do layouts show interlock (taper lock, or straight lock)?

Do layouts show correct locating ring diameter as per customer’s


10.
requirements?

11. Do layouts show and mark the correct eyebolt sizes?

Do layouts show position of name plate (Easton) and safety strap


12.
sub-flushed?

Do layouts show correct sprue radius as per customer’s machine


13.
specification?

14. Are venting dimensions shown on the layouts?

15. Are venting shown on the layouts for the Guide Pillar and Bushes?

16. How is the design for the sprue puller?

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 3 of 10
The date of checking
Mold Layout (completed in 7 days after order steels)

17. Does electrical connector for hot runner shown on the layouts?

Are hardness, steel types, and heat treatment for slides shown on the
18.
material list?

19. Are K.O. holes in accordance with customer’s specification?

Are wear plates for sliding parts shown on the layouts, and marked with
20.
hardness in the material list?

21. Does Guide Pillar length enough (20 mm longer than inserts)?

22. Are water connector’s specification shown on the layouts?

Are o-ring grooves design correctly and in accordance with customer’s


23.
specifications?

Do layouts show water connector’s housing sub-flush with deep 28x


24.
dia.30mm and I mm below mold surface?

25. Do layouts show water lines in the slides?

26. Are water lines uniform and 5mm away from the ejectors?

Are water lines “IN” and “OUT” shown and numbered on the layouts and
27.
designed in the opposite side of operator or bottom side of mold?

Do push-back coupling designed in accordance with customer’s


28.
specification?

29. Does gate details has an enlarged view?

30. Are water connectors interfere the eyebolts or clamping slots?

31. Do layouts show the water manifold and dimensions?

Are mold spacers higher than 80mm? It allows enough space to put the
32.
Moly-Mold’s name plate.

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 4 of 10
The date of checking
Mold Base (before first mold trial)

1. Is mold been manufactured with DME or Hasco standard?

2. Do pry slots been made with 30x30 mm and deep 6mm?


3. Do all plates made with 3mm chamfer?
Are spacer blocks and bottom clamping plate secured with screws and
4.
dowl pins?
5. Use of the interlock to improve alignment of core and cavity?

6. Are clamping slots made according to the machine specification?

7. Eyebolt size, and stamped nearby it.

8. Does mold lift square?

9. All the mold components are identified for assembly and disassembly?

10. Does channel made for hot runner cables?

11. Does Easton’s name plate been put in the correct position?

12. Does safety strap position sub-flushed?

Does “Made in Taiwan R.O.C.” stamped on bottom clamping plate and


13.
both operator and opposite sides?

14. Does lifting strap made and put in the top of the mold?

15. Are stamps made according to the specification?

16. Does hot runner connector put on the top of fixing half?

R X mm
T Y mm
Y
17. Z mm

T mm
X
Z R Φ mm

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 5 of 10
The date of checking
Inserts (before first mold trial)

1. Do inserts steel have steel certificates?

2. Is insert’s hardness correct?

3. Is any heat treatment to be made?

Is insert’s hardness after the treatment according to customer’s


4.
requirements?

5. Is polishing of core inserts according to customer’s requirements?

6. Is polishing of cavity inserts according to customer’s requirements?

7. Are cavities numbers for multi-cavity mold?

Is (are) insert(s) been made with correct engraving, texture, spark


8.
finishing? (As per customer’s requirements?)

9. Is (are) inserts been made with date stamps and recycle symbols?

10. Is insert 0,5mm higher than the parting line surface?

11. Is insert welded? If yes, is any photo been taken?

12. Does welding affect the product surface, or mold function?

Is insert stamped on the reference corner the steel type, hardness? Is


13.
there steel certificate?

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 6 of 10
The date of checking
Gate (before first mold trial)

1. Sprue type.

2. Sprue radius with 3mm deep. DME or Hasco standard?

3. Is sprue hardened?

4. Is sprue held by locating ring or mold plate?

Are venting made according to the layouts? Is there venting around the
5.
parting line?

Is there venting at the ends of runners? Is there venting made for Guide
6.
Pillar and Bushing?

7. Requirement for sprue. Free fall Robot Trimmed

INCOE
8. Hot runner system Other
MOLD-MASTERS

9. Are hot runner zone numbers stamped on the fixing half at operator side?

10. Is connector installed in the proper location?

11. Is gate profile spherical?

12. Is sprue puller standard?

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 7 of 10
The date of checking
Side Action (before first trial)

1. Are wear plated installed at bottom and back of the slide?

2. Is any treatment been made to the wear plates?

3. Are wear plates stamped with steel type, hardness? Is there certificate?

4. Are grease grooves made on the wear plates?

5. Is slide stroke enough?

6. Are tapped holes added to the tight fitting mold components?

7 Is slide retainer or spring ball to installed under the slide?

Is it necessary to disassemble the hydraulic cylinder(s) in order to install


8.
the mold on the machine?

9. Are wear plates and oil inlet installed for unscrewing mechanism?

10. Is there any movement, or rotation problem with the angle pin?

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 8 of 10
The date of checking
Ejection (before first trial)

1. Use 2 steps ejector pins for diameter smaller than 3mm (1/8”).

2. Are formed ejector pins keyed?

3. Are ejector pins installed in the proper positions?

4. Ejector pins standard.

5. Are K.O. positions in accordance with the layouts?

6. Are limit switches installed in the ejector plate?

7. Is push-back system used for ejectors under the slides?

T V mm

H mm
V EJECTOR PLATE
8.
B B ψ mm

H
T M

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 9 of 10
The date of checking
Cooling (before first trial)

1. Are diameters of water lines made according to the layouts?

2. Threads of water plugs are PT NPT Other

3. Water plug are D-M-E HASCO Other

Water plugs are made sub-flushed deep 28mm dia. 30mm and 1 mm below
4.
surface.

5. Are water plugs interfere the eyebolt holes, or clamping slot?

6. Are o-ring grooves made according to the layouts?

7. Are water inlet out outlets on the opposite side of operator?

8. Are water lines in the slides made according to the layouts?

9. Are water lines 5mm away from the ejector pins?

10. Are water lines inlets and outlets numbered and stamped with IN and OUT?

11. Are water lines tested with 150 psi pressures with duration of 15 min?

12. Is water manifold made according to the layouts?

Engineer

Director of
Engineering
Dept

Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 10 of 10
Remarks:

Engineer

Director of
Engineering
Dept

Manager