Mold Check List LTD
Date:
Page: 1 of 10
Direct Sprue Point Subgate Edge Other Gate Dim. Runner Dim.
Gate Hot Tip
mm mm
Remarks:
Are necessary information written in the material list for all the
3.
components?
Are pry slots designed on the layouts with dimensions of 30x30 and
7.
deep 6?
15. Are venting shown on the layouts for the Guide Pillar and Bushes?
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 3 of 10
The date of checking
Mold Layout (completed in 7 days after order steels)
17. Does electrical connector for hot runner shown on the layouts?
Are hardness, steel types, and heat treatment for slides shown on the
18.
material list?
Are wear plates for sliding parts shown on the layouts, and marked with
20.
hardness in the material list?
21. Does Guide Pillar length enough (20 mm longer than inserts)?
26. Are water lines uniform and 5mm away from the ejectors?
Are water lines “IN” and “OUT” shown and numbered on the layouts and
27.
designed in the opposite side of operator or bottom side of mold?
Are mold spacers higher than 80mm? It allows enough space to put the
32.
Moly-Mold’s name plate.
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 4 of 10
The date of checking
Mold Base (before first mold trial)
9. All the mold components are identified for assembly and disassembly?
11. Does Easton’s name plate been put in the correct position?
14. Does lifting strap made and put in the top of the mold?
16. Does hot runner connector put on the top of fixing half?
R X mm
T Y mm
Y
17. Z mm
T mm
X
Z R Φ mm
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 5 of 10
The date of checking
Inserts (before first mold trial)
9. Is (are) inserts been made with date stamps and recycle symbols?
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 6 of 10
The date of checking
Gate (before first mold trial)
1. Sprue type.
3. Is sprue hardened?
Are venting made according to the layouts? Is there venting around the
5.
parting line?
Is there venting at the ends of runners? Is there venting made for Guide
6.
Pillar and Bushing?
INCOE
8. Hot runner system Other
MOLD-MASTERS
9. Are hot runner zone numbers stamped on the fixing half at operator side?
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 7 of 10
The date of checking
Side Action (before first trial)
3. Are wear plates stamped with steel type, hardness? Is there certificate?
9. Are wear plates and oil inlet installed for unscrewing mechanism?
10. Is there any movement, or rotation problem with the angle pin?
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 8 of 10
The date of checking
Ejection (before first trial)
1. Use 2 steps ejector pins for diameter smaller than 3mm (1/8”).
T V mm
H mm
V EJECTOR PLATE
8.
B B ψ mm
H
T M
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 9 of 10
The date of checking
Cooling (before first trial)
Water plugs are made sub-flushed deep 28mm dia. 30mm and 1 mm below
4.
surface.
10. Are water lines inlets and outlets numbered and stamped with IN and OUT?
11. Are water lines tested with 150 psi pressures with duration of 15 min?
Engineer
Director of
Engineering
Dept
Manager
Moly-Mold International
Co., LTD
Mold Check List Date:
Page: 10 of 10
Remarks:
Engineer
Director of
Engineering
Dept