DBS3900 Installation
RF part Installation
Site mode
a IBBS+APM30+DBS3900(900M+1800M)
b BBC+APM30+DBS3900(900M Only)
Layout
IBSS Installation
IBSS installation
According to the Space Requirements of the IBBS, determine the position of the cabinet on the
concrete floor.
Use a Ф16 drill bit to drill holes at the marked positions. Ensure that the depth of the
holes ranges from 52 mm to 60 mm.
Use a cleaner to clean the dust inside and around the holes.
Measure the spacing between the holes. If the spacing has an error, relocate and drill
another hole before installing the expansion bolt assembly.
Align the expansion bolt assemblies with the holes and then use a rubber hammer to
strike each assembly until the expansion tube is completely buried into the hole.
b Fixing the base
Use a level bar to measure the levelness of each section of the base. If necessary, level the base
by adding one or more adjusting pads.
7
c Installing the IBBS cabinet
8
d Cable connections of the batteries
e Installing TEC AC power cable
The power cables for the TEC cooler and the fans
share the LOAD2 terminal on the PDU.
No smoke sensor
in Phase G
g Connect the monitoring cable to APM30
Remove the short-circuiting cable from the terminal of the door control cable in the
APM30 main cabinet. Connect the cold end terminal on the door control cable (white
and green) to the cable terminal.
1. Connect the 2-pin connector on the temperature sensor cable (white and orange) to
the Bat 1_Tmp socket of the APMI inside APM30 (Temperature Monitor)
2. Connect the white TEC alarm cable to the E2 port;
3. Connect the blue TEC alarm cable to the E1 port ( TEC monitor)
11
APM30 Installation
APM30 Installation
a Determining the anchor points and installing the expansion bolt assembly
(unit: mm)
According to the Space Requirements of the APM30, determine the position of the cabinet on the
concrete floor.
b Fixing the base
You should test the levelness in both directions. Check whether the
level vial stays in the center of the level, if not, add adjusting pads
under the cabinet base to ensure that the cabinet base is kept level
after adjustment.
7
d Installing the APM30
e Installing the PMU/PSUs
Place the PMU or PSUs in the corresponding slot or slots, and then loosen the
screws on the handle of the PMU or PSU panel by using a straight screwdriver.
Slide the PSU along the guide rails into the slot and then push the handle
in position , Fasten the screws on the handle.
f Installing the Batteries for the APM30
Before installation, set the MCB labeled Bat under the rectifier to
OFF to avoid a high current.
Connect the cables to wiring terminals BAT(-) and BAT(+)
on the power supply subrack respectively.
14
h Installing the Environment/ PMU-HEUM Monitoring Signal Cable
From “RS232/RS422”
RS232/RS422” port on PMU panel to “COM OUT”
OUT” port on HEUA panel.
“COM IN”
IN” port on the HEUA panel and the other end to the “MON1”
MON1” port on the BBU.
NOTE
The mapping between the cables and the cable holes at the bottom of the cabinet
for IBBS.
Power Cable
1、Power cable between IBBS and APM30 ------------------35mm^2
2、PGND cable for IBBS ------------------------------------------25mm^2
3、Power cable for TEC -------------------------------------------2.5mm^2
4、PGND cable for APM30----------------------------------------16mm^2
Installing the BBU in the APM30
Installing the BBU in the APM30
a Installing the BBU Case
Slide the BBU case along the guide rails into the 2 U space closely under the PDU. Then,
fasten the four M6 screws.
PDU
E1cable
Alarm cable
Monitoring
signal cable
Power cable
BSC
6
b Installing the BBU Cables
Install the power cable. Connect the OT terminal of the power cable to the LOAD
terminal on the APM30H, and then fix the 3W3 connector of the power cable to the
PWR port on the BBU.
Connect the BBU power cable to the 12 A LOAD terminal.
Connect the RRU power cable to one of the LOAD4 to LOAD9 terminals.
Install the CPRI optical cable. Connect one end of the optical cable to the CPRI0, CPRI1,
or CPRI2 port on the GTMU panel of the BBU and the other end to the CPRI_W port on the
RRU.
a. Insert the optical module
into the CPRI0, CPRI1, or
CPRI2 port, and then turn
outwards the puller on the
optical module.
Puller
b. Insert one end of the Optical module
CPRI optical cable into the
optical module, and then
lead the CPRI optical cable
out of the cabinet along the
right side of the cabinet.
Winding pipe
The TX port on the BBU is connected to the RX port on the RRU ; the RX port
on the BBU is connected to the TX port on the RRU.
7
b ground the shielding layer of the RRU power cable
OT terminals
GND wire
Shielding layer
The assembling of OT terminals to the power cable must be complete before the RRU is installed on a
metal pole.
41
Reference
Angle steel
Top view
Main
fixture Dual-nut bolt assembly
Fixture assembly for installing the RRU Front of the Back of the
RRU RRU
Installing the DC RRU3008
b Installing the RRU on the Pole
1. Install the main fixture.
Contact piece
It is recommended that the bottom of the
highest main fixture be 1200 mm to 1600
mm above the ground for easy
maintenance.
Arrow
2. Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main
fixture.
TIP: You may fit one end of the auxiliary fixture on one dual-nut bolt assembly and then
the other end on the other dual-nut bolt assembly during the installation.
Installing the DC RRU3008
3. Use an adjustable wrench to tighten the nut until the fastening torque is 35 N•m to 40 N•m.
In this way, the main and auxiliary fixtures are secured on the pole.
4. Install the RRU on the main bracket. When you hear a click, you can infer that the RRU
is in position.
The RF port at the bottom of the RRU does not have load bearing capacity. Do not place the
RRU on the ground on its bottom during the installation.
Installing the DC RRU3008
n Installing the RRU Cables
Cabling Cavity of the RRU Cable trough for the power cable
Cabling cavity
Waterproof filler
Cover plate of
the cabling cavity
14kgf•cm
17
Installing the DC RRU3008
n Installing the RRU Cables
CPRI optical
cable
Grounding bolt
OT terminal
PGND cable
The RRU power cable is connected to 20A LOAD terminals of PDU in APM30.
RF Part Installation
1 Assemble the Antenna
Wrap three layers of Wrap three layers of Fix the cable ties Finished
waterproof tape insulation tape
1. When wrapping the tape, ensure that the upper layer covers more
than 50% of the lower layer.
2. Before wrapping the waterproof tape, stretch the tape till the width
of the tape becomes 1/2 of the original. Stretch each layer of the
waterproof tape and wrap each layer around the jumpers tightly.
3 Lift the Antenna
1. Installers A and B climb onto the tower. Installer B fixes the fixed pulley onto the
support of the tower platform and puts the lifting rope through the fixed pulley.
2. Installer D uses plastic bags or tape to wrap the jumper connectors and then
coils the jumpers. Fasten the lifting rope to the upper support of the antenna
and the traction rope to the lower support.
3. Installer C pulls down the lifting rope, and installer D pulls the traction rope
outwards to prevent the antenna from hitting the tower.
5. After three antennas are lifted onto the platform, do not remove the fixed pulley,
because the feeder needs to be lifted later.
4 Install the Antenna
a Install the antenna on a pole
Method 3: Rotating the gear wheel on the antenna (only for the RET antenna)
Distinguishing Cables & Cables fixing