Phase G.

2 Quick Installation Guide


-IBSS+APM30+DBS3900

Sudatel Phase G.2


Li Shichuang
Date: 2010-01-06
HUAWEI TECHNOLOGIES Co., Ltd.
IBBS Cabinet Installation

APM30 Cabinet Installation

DBS3900 Installation

RF part Installation
Site mode
a IBBS+APM30+DBS3900(900M+1800M)

b BBC+APM30+DBS3900(900M Only)
Layout
IBSS Installation
IBSS installation

a Determining the anchor points and installing the expansion bolt


assembly (unit: mm)

According to the Space Requirements of the IBBS, determine the position of the cabinet on the
concrete floor.

Use a Ф16 drill bit to drill holes at the marked positions. Ensure that the depth of the
holes ranges from 52 mm to 60 mm.
Use a cleaner to clean the dust inside and around the holes.
Measure the spacing between the holes. If the spacing has an error, relocate and drill
another hole before installing the expansion bolt assembly.
Align the expansion bolt assemblies with the holes and then use a rubber hammer to
strike each assembly until the expansion tube is completely buried into the hole.
b Fixing the base
Use a level bar to measure the levelness of each section of the base. If necessary, level the base
by adding one or more adjusting pads.

7
c Installing the IBBS cabinet

8
d Cable connections of the batteries
e Installing TEC AC power cable

The power cables for the TEC cooler and the fans
share the LOAD2 terminal on the PDU.

The red color cable is already connected


12 during the manufacture.
f Installing the IBBS External Cables

No smoke sensor
in Phase G
g Connect the monitoring cable to APM30

Door control cable

Remove the short-circuiting cable from the terminal of the door control cable in the
APM30 main cabinet. Connect the cold end terminal on the door control cable (white
and green) to the cable terminal.

1. Connect the 2-pin connector on the temperature sensor cable (white and orange) to
the Bat 1_Tmp socket of the APMI inside APM30 (Temperature Monitor)
2. Connect the white TEC alarm cable to the E2 port;
3. Connect the blue TEC alarm cable to the E1 port ( TEC monitor)
11
APM30 Installation
APM30 Installation

a Determining the anchor points and installing the expansion bolt assembly
(unit: mm)

According to the Space Requirements of the APM30, determine the position of the cabinet on the
concrete floor.
b Fixing the base

c Adjusting the levelness of the base

You should test the levelness in both directions. Check whether the
level vial stays in the center of the level, if not, add adjusting pads
under the cabinet base to ensure that the cabinet base is kept level
after adjustment.

7
d Installing the APM30
e Installing the PMU/PSUs

Determine the position for installing


the PMU and PSUs . Setting the DIP switch on the PMU
(1100).

Place the PMU or PSUs in the corresponding slot or slots, and then loosen the
screws on the handle of the PMU or PSU panel by using a straight screwdriver.

Slide the PSU along the guide rails into the slot and then push the handle
in position , Fasten the screws on the handle.
f Installing the Batteries for the APM30
Before installation, set the MCB labeled Bat under the rectifier to
OFF to avoid a high current.
Connect the cables to wiring terminals BAT(-) and BAT(+)
on the power supply subrack respectively.

g Installing the Input Power Cable of the APM30 Power Cabinet

Remove the short-circuiting bars .(Attention)


Connect the OT terminals to the AC input wiring terminals labeled L1, L2, L3,
and N on the PDU.

14
h Installing the Environment/ PMU-HEUM Monitoring Signal Cable

From “RS232/RS422”
RS232/RS422” port on PMU panel to “COM OUT”
OUT” port on HEUA panel.

i Installing the Monitoring Signal Cable Between the HPMI and


PMU

From port “COM”


COM” on PMU panel to port “COM”
COM” on HPMI panel .
j Installing the BBU Monitoring Signal Cable

“COM IN”
IN” port on the HEUA panel and the other end to the “MON1”
MON1” port on the BBU.
NOTE
The mapping between the cables and the cable holes at the bottom of the cabinet
for IBBS.

Power Cable
1、Power cable between IBBS and APM30 ------------------35mm^2
2、PGND cable for IBBS ------------------------------------------25mm^2
3、Power cable for TEC -------------------------------------------2.5mm^2
4、PGND cable for APM30----------------------------------------16mm^2
Installing the BBU in the APM30
Installing the BBU in the APM30
a Installing the BBU Case
Slide the BBU case along the guide rails into the 2 U space closely under the PDU. Then,
fasten the four M6 screws.
PDU

b Installing the BBU Cables


Cable connections of the BBU

External power supply

External monitoring device


E1 transfer
External alarm device
cable

E1cable

Alarm cable

Monitoring
signal cable

Power cable

CPRI signal cable

BSC

6
b Installing the BBU Cables
Install the power cable. Connect the OT terminal of the power cable to the LOAD
terminal on the APM30H, and then fix the 3W3 connector of the power cable to the
PWR port on the BBU.
Connect the BBU power cable to the 12 A LOAD terminal.

Connect the RRU power cable to one of the LOAD4 to LOAD9 terminals.
Install the CPRI optical cable. Connect one end of the optical cable to the CPRI0, CPRI1,
or CPRI2 port on the GTMU panel of the BBU and the other end to the CPRI_W port on the
RRU.
a. Insert the optical module
into the CPRI0, CPRI1, or
CPRI2 port, and then turn
outwards the puller on the
optical module.
Puller
b. Insert one end of the Optical module
CPRI optical cable into the
optical module, and then
lead the CPRI optical cable
out of the cabinet along the
right side of the cabinet.

c. Wrap the fiber tail with


the winding pipe.

Winding pipe

The TX port on the BBU is connected to the RX port on the RRU ; the RX port
on the BBU is connected to the TX port on the RRU.

7
b ground the shielding layer of the RRU power cable

Use the grounding clip to ground the


shielding layer of the RRU cable
inside the APM30.
Reference

Making OT Terminals by Using a Cable Peeler (Recommended)


Add two OT terminals to the end of the power cable connecting to the RRU.

-48V DC power wire


-48V DC power cable

OT terminals

GND wire
Shielding layer

Determine lengths of power cables for different


operations according to the scales on the inner
side of the cover plate of the cabling cavity.

Based on the determined length, remove the


jacket and shielding layer off the power cable.

Remove the jacket from each wire.

Add an OT terminal to each wire.

Strip a 15 mm jacket off the power cable to


reveal the shielding layer of the power cable

The assembling of OT terminals to the power cable must be complete before the RRU is installed on a
metal pole.

41
Reference

Making OT Terminals at the Input End of the Power Cable


by Using a Knife

Wrap the PVC insulating tape


Lead the wires with OT terminal on the
at the conjunction where the
shielding layers through shielding layer
three wires meet
heat-shrinkable tubes

Warning: Do not damage the shielding layer of the power cable


when cutting around the jacket.
RRU Installation
Installing the DC RRU3008

Angle steel

Top view

a Preparing for the Installation


Auxiliary
Cover
fixture plate
Attachment
plate

Main
fixture Dual-nut bolt assembly

Fixture assembly for installing the RRU Front of the Back of the
RRU RRU
Installing the DC RRU3008
b Installing the RRU on the Pole
1. Install the main fixture.

1. When installing the main fixture,


ensure that the arrow on the main
fixture is upward.
2. When installing the main fixture,
ensure that the contact piece on the
fixture is fixed.

Contact piece
It is recommended that the bottom of the
highest main fixture be 1200 mm to 1600
mm above the ground for easy
maintenance.
Arrow

2. Install the auxiliary fixture between the nuts of the dual-nut bolt assembly on the main
fixture.

Ensure that the arrow


on the auxiliary fixture
is upward.

Installation position for


the auxiliary fixture

TIP: You may fit one end of the auxiliary fixture on one dual-nut bolt assembly and then
the other end on the other dual-nut bolt assembly during the installation.
Installing the DC RRU3008
3. Use an adjustable wrench to tighten the nut until the fastening torque is 35 N•m to 40 N•m.
In this way, the main and auxiliary fixtures are secured on the pole.

Fasten the two dual-nut bolt assemblies


alternatively. After the brackets are secure, use a
tape to measure the spacing between the main
bracket and the auxiliary bracket at the two sides
and ensure that the spacing is the same.

4. Install the RRU on the main bracket. When you hear a click, you can infer that the RRU
is in position.

The screw is a non-fixed one and can be


neglected during the installation.
It is only used when the RRU is removed.

The RF port at the bottom of the RRU does not have load bearing capacity. Do not place the
RRU on the ground on its bottom during the installation.
Installing the DC RRU3008
n Installing the RRU Cables

Cabling Cavity of the RRU Cable trough for the power cable

Cable trough for the optical cable


Cable trough for alarm cable

Cabling cavity

Waterproof filler

Cover plate of
the cabling cavity

Opening and Closing the Cover Plate of


the RRU Cabling Cavity ② Close the cover plated of the RRU
cabling cavity.

① Open the cover plate of the RRU cabling


cavity.

14kgf•cm

1. The screw on the cover plate is tightened until


the fastening torque is 14 kgf•cm.
2. The screws on the cover plate are tightened in
the order shown in the preceding figure.

17
Installing the DC RRU3008
n Installing the RRU Cables

Cable Connections of RRU

CPRI optical
cable

Grounding bolt
OT terminal
PGND cable

Power cable Shielding layer of


the power cable

First wrap the joint with the


waterproof tape, and then wrap
the joint with the PVC insulating
RF jumper tape.

The RRU power cable is connected to 20A LOAD terminals of PDU in APM30.
RF Part Installation
1 Assemble the Antenna

1. The antenna described in this guide is an 800MHz directional antenna of Huawei.


For installation of other antennas, see the relative manuals.
2. The assembly of three antennas is complete on the ground.

a Assemble the support

b Fix the support onto the antenna

Fix the upper support

Fix the lower support Finished


2 Connect Jumpers to the Antenna
a Connect jumpers

1. Use six jumpers with fixed length.


2. (Optional) If no jumper with a fixed
length is available, cut a jumper into
proper lengths and fix DIN male
connectors to both ends of the jumpers.
Optional

b Stick color rings

1. Ensure that the color rings are in the


correct direction and positions. Wrap the
jumpers with 2 or 3 layers of tape to
make the color rings. The distance
between neighboring color rings is 10
mm to 15 mm.
2. Stick the first color ring at the position
200 mm away from the jumper connector.

c Seal the connectors

Wrap three layers of Wrap three layers of Fix the cable ties Finished
waterproof tape insulation tape

1. When wrapping the tape, ensure that the upper layer covers more
than 50% of the lower layer.
2. Before wrapping the waterproof tape, stretch the tape till the width
of the tape becomes 1/2 of the original. Stretch each layer of the
waterproof tape and wrap each layer around the jumpers tightly.
3 Lift the Antenna

1. Installers A and B climb onto the tower. Installer B fixes the fixed pulley onto the
support of the tower platform and puts the lifting rope through the fixed pulley.

2. Installer D uses plastic bags or tape to wrap the jumper connectors and then
coils the jumpers. Fasten the lifting rope to the upper support of the antenna
and the traction rope to the lower support.

3. Installer C pulls down the lifting rope, and installer D pulls the traction rope
outwards to prevent the antenna from hitting the tower.

4. Installers A and B hold the antenna and unfasten the ropes.

5. After three antennas are lifted onto the platform, do not remove the fixed pulley,
because the feeder needs to be lifted later.
4 Install the Antenna
a Install the antenna on a pole

b Make the waterproof curve of jumpers

c Adjust the antenna azimuth


4 Install the Antenna
d Adjust the tilt angle of the antenna

Method 1: Using the scale on the upper support

Method 2: Using the inclinometer

Method 3: Rotating the gear wheel on the antenna (only for the RET antenna)
Distinguishing Cables & Cables fixing

Sector 900M Power Cable/Fiber 1800M Power cable/Fiber

1 Red, one ring Red, two rings


2 Yellow, one ring Yellow, two rings
3 Blue, one ring Blue, two rings

1. Use the cable fixing clip to fix the RRU power


cable and fiber cable
2. 1 M fix one time
Note

Seal the APM30 and IBBS holes to protect the water and dust.
Sudatel Phase G
Li shichuang
lishichuang@huawei.com