left wall
right wall
front of school
right wall
front of school
left wall
room partition
chalkboard
left wall
veranda
front of school
right wall
removed
depressed
area
in concrete
in veranda
veranda
midline of house
veranda
front of
school 16 feet
14 inches 14 inches
depressed
area in
concrete 2 inches off-
16 inches 12 inches
midline of
house
14 inches 14 inches 14 inches
5 feet 17 feet
Placement of the grooves in concrete to support the “wall” bamboo poles
These grooves (in yellow) should be 1.5 inches wide and 1.5 inches deep
12 inches 12 inches
10 inches 14 inches
midline of house
veranda
front of
school 16 feet
12 inches 12 inches
depressed
area in
concrete
14 inches 10 inches
12 inches 12 inches
5 feet 17 feet
Placement of the grooves in concrete to support wall partitions and easels
All measurements are from the center of the poles
midline of house
veranda
grooves in concrete
1 inch wide, 3 inches deep
front of
school 16 feet
depressed
area in
concrete
5 feet 17 feet
Placement of the holes in concrete into which thin bamboo poles can be inserted
to reinforce the wall partitions and easels
midline of house
veranda
holes in concrete
1 inch diameter, 3 inches deep
front of
school 16 feet
depressed
area in
concrete
5 feet 17 feet
Placement of the holes in concrete into which thin bamboo poles can be inserted
to create frame of fence for the veranda
midline of house
veranda
holes in concrete
1 inch diameter, 3 inches deep
front of
school 16 feet
depressed
area in
concrete
5 feet 17 feet
Placement of large hooks whose base should be imbedded in the concrete in the
perimeter of the concrete, with their “eyes” exposed and protruding above the surface of the concrete.
Useful for tying down tarps.
midline of house
veranda
holes in concrete
1 inch diameter, 3 inches deep
front of
school 16 feet
depressed
area in
concrete
5 feet 17 feet
Insert a PVC segment that is
approximately 1 inch in diameter
larger than the bamboo pole for Make sure that the
the frame of the school into the PVC segments point
concrete foundation, a few minutes straight up. Use a
after the concrete is poured. This “builder’s level” to do PVC segment is 14
should be done for each of the 12 this. inches in height. 10
large “frame” bamboo poles. inches of it should
be buried in the
concrete
foundation.
It may be helpful
to shake (rock back
and forth) the
poles as they are
filled with sand.
Do this for each of
the 12 “frame”
bamboo poles.
Then build the rest of the MIE school