Roughton International in JV with Consulting Engineers Group Ltd.

CURRICULUM VITAE

Proposed Position: Survey Engineer

Name of Firm: Consulting Engineers Group Ltd.

Name of Staff: SATISH KUMAR VERMA

Profession: Civil Engineer

Date of Birth: 8th June 1968

Years with Firm/Entity: Contract to join Nationality: Indian

Membership in Professional Societies: -

Detailed Tasks Assigned:

Layout of Centerline, Curves, Levels, Profiles, monitoring the construction of Sub-grade, GSB, WMM, BC,
and working out the quantities for preparation of bills.

Key Qualifications:

Mr. Satish Kumar Verma has about 16 years of relevant professional experience in the field of supervision
of 4 laning of NH, 2/4 laning of SH, preparation of Detailed Project report of 4-laning of NH projects &
other infrastructure projects. Has completed 4 nos projects funded by World Bank for National Highway
Projects. Has rich experience in conducting topographic survey of roads, Highways, Bridges projects,
preparation of strip plan and final survey, fixing of alignment, setting of curves, contour survey, and
traversing, leveling, horizontal and vertical alignment for various Highways projects. He has good
experience in Establishment of Horizontal and Vertical control points, carrying out Bench marks shifting,
Leveling, traversing ,DTM ,Stakeout & fixing of alignment. He Has well acquainted with latest Survey
equipments viz. Total station (Sokkia power set, Leica 702, Leica1102, Topcon GTS-701,Topcon
GPT3002LN, Pantex ,etc) Auto level (Sokkia ,Leica Topcan, pantex ) electronic field book-TDS-500., His
spectrum of expertise also covers transferring and processing of data on personal computers for creating
Digital Terrain Model, preparation of X-sections & L- sections, assisting Q.S for bill checking etc. Is well
acquainted with computers and has completed certificate course on Auto Cadd 2004.

Education:

Diploma in Civil Engineering, Board of Technical Education, U.P, Lucknow, in 1992 with first division

Publications/ Training: -

Certificate course on Auto Cad from Cadd Centre training services, Hauz Khas, New Delhi

Computer skills:
MS-Office, Auto Cadd 2004

Employment Record:

Aug. 2007 to till date Quest Engineers Consultant Pvt. Ltd.

Construction & supervision of 2-laning of SH-50 of length 44.9


kms from Hathgamaria to Karo crossing in the state of
Jharkhand, Client: PWD, Jharkhand, Cost of the project : INR
1500.0 million.
Survey Engineer

Construction Supervision for Lucknow-Muzaffarpur National Highway Project-LMNHP-EW/II (WB) - Page 1


Supervision Consultancy Package No. LMNHP/EW-11(WB)/SC-11 (km 135.0 to km 251.70
Roughton International in JV with Consulting Engineers Group Ltd.

Was responsible for checking of center line, TBM, preparation of


X-sections & L- sections, recording of OGL, checking
horizontal and vertical alignment, checking the vertical profile
and making corrections in gradients as per the ground conditions,
checking of line & levels of pavement layers of the construction
works, monitoring the construction of Sub-grade, GSB, WMM, BC,
and working out the quantities for preparation of bills, layout of
structures like bridges, culverts, retaining walls, checking
cross section in Auto Cad etc.
Aug. 2006 to Aug. 2007 - Span consultants Pvt. Ltd.

Survey Engineer
Construction of Four Laning and strengthening of existing
single/intermediate lane carriageway of NH-57 section from
km. 267.500 to Km. 230.00 Araria town from Forbesganj side)
(Running Ch.42.500 to Ch.79.210) in the state of Bihar on
East-West corridor under NHDP Phase-II Package no. C-
II/BR-2, including 2 No. Major junction,. 1 No. Bypass of 3.00
km length, 1No.Railway Over Bridge, 6 No. Minor Bridge, 7 No.
Under Pass & 52 No Culvert. Total length of Project 36.710
KM, CLIENT: NHAI, Cost of Project: INR 3530.00 million.
Responsible for Fixing of TBM, Setting out the centre line of road
,fixing of ROW and take level, preparation of cross section fixing of
alignment of Highway includes alignment of vertical and Horizontal
curve, fixing alignment of culverts.(Hume pipe culvert, Box
culverts ), calculation of co-ordinates of horizontal alignment,
Calculation of FRL and maintaining documents in respect of road &
structures survey, monitoring the construction of Sub-grade, GSB,
WMM, BC, and working out the quantities for preparation of bills.
Responsible for Lay out of Toll Plaza and estimation of quantities
June 2004 to July 2006 - Inter Continental consultant and Technocrats Pvt Ltd.
Asst. Manager (Survey).
Feasibility study and DPR for rehabilitation of existing 2 lane
roads to 4 lane divided carriageway configuration of Kannur to
Kuttipuram Under NHDP phaseIII, programme on BOT basis
section of NH-17 in the state of Kerala. CLIENT: NHAI.
Responsible for Detailed Survey and Preliminary Survey of Road
Project, Topographic Survey, collecting and recording of Site
Topographic Data in Computers using 3-D co-ordinates, Setting out
of road alignment in all types of terrains and fixing the station
points with reference to GPS pillars using design co-ordinates and
taking levels with sophisticated survey instruments for setting of
Horizontal, Vertical Alignment and establishment of
benchmarks with reference to GTS benchmarks, setting out
alignment for major, minor junctions including layout of
structures, preparation of cross section & L-sections,
calculation of FRL and maintaining documents in respect of road &
structures survey etc.

- Feasibility study and DPR for rehabilitation of existing 2 lane


roads to 4 lane divided carriageway configuration of Chandi
Khole to Duburi, Duburi to Talchar, Under NHDP phaseIII.
Package NHDP-111/DLS section NH-200, programme on BOT
basis, and Bhubaneshwar to Puri section of NH 203 in the
state of Orissa. CLIENT: NHAI
Responsible for Control point survey by GPS and subsidiary control
point survey by Total Station traverse. Topographical survey &
setting out of centre line by Total Station. Establishment of
traverse station & using auto level, connecting level with GTS
benchmarks. Fixing centerline and taking cross section for strip
plan by Total station, processing of data through Digital Terrain
Modeling (DTM), setting out alignment for major, minor
junctions including layout of structures, preparation of cross
Construction Supervision for Lucknow-Muzaffarpur National Highway Project-LMNHP-EW/II (WB) - Page 2
Supervision Consultancy Package No. LMNHP/EW-11(WB)/SC-11 (km 135.0 to km 251.70
Roughton International in JV with Consulting Engineers Group Ltd.

section & L-sections etc.

- Feasibility study and DPR for rehabilitation of existing 2-lane


road to 4-lane divided carriageway configuration of Cherthalli
to Kazha Kottam of NH-47, in state of Kerala. Total length 184
Km. CLIENT: NHAI

Responsible for connecting level with GTS benchmarks &


preparation of strip plan, Control point survey by GPS and
subsidiary control point survey by Total Station traverse,
Topographical survey by Total Station, carrying out detail
survey using electronic Total Station with data collector,
transferring and processing of data on personal computers for
creating Digital Terrain Model, Fixing centerline and taking
cross section for strip plan by Total station, Establishment of
traverse station using auto level, setting out alignment for major,
minor junctions including layout of structures, preparation of
cross section & L-sections etc.

- Feasibility study and DPR for rehabilitation and up grading


carriageway configuration of section for Punjab state road
improvement project, World Bank funded, Total length 400
KM. CLIENT: PWD, Punjab.
Responsible for preparation of strip plan, Control point survey by
GPS and subsidiary control point survey by Total Station traverse,
Topographical survey by Total Station, carrying out detail survey
using electronic Total Station with data collector, transferring and
processing of data on personal computers for creating Digital Terrain
Model, setting out alignment for major, minor junctions
including layout of structures, preparation of cross section &
L-sections, Fixing centerline and taking cross section Total
station, Establishment of traverse station using auto level etc.

- Feasibility study and DPR for rehabilitation and up grading


carriageway configuration of section for Utranchal state road
improvement project. Total length 450KM. Client: Public works
Department (Uttranchal). Asian Development Bank Funded.
Executed under FIDIC condition of contract.

Responsible for Establishment of traverse station, leveling using


auto level, connecting level with GTS benchmarks & preparation of
strip plan, Staking out of centre line & fixing alignment and
setting out. Control point survey by GPS and subsidiary control
point survey by Total Station traverse. Topographical survey by Total
Station, taking cross section for strip plan by Total station, setting
out alignment for major, minor junctions including layout of
structures, preparation of cross section & L-sections etc.

- Feasibility study and DPR for rehabilitation of existing 2 lane


roads to 4 lane divided carriageway configuration of section
from east west corridor (NH-44) Jowai to Assam Meghalaya
Border. CLIENT: NHAI

Responsible for preparation of strip plan, Control point survey


by GPS and subsidiary control point survey by Total Station traverse,
Topographical survey by Total Station, carrying out detail survey
using electronic Total Station with data collector, transferring and
processing of data on personal computers for creating Digital Terrain
Model, Fixing centerline and taking cross section for strip plan
by Total station, Establishment of traverse station using auto level,
setting out alignment for major, minor junctions including
layout of structures, preparation of cross section & L-sections
etc.

Construction Supervision for Lucknow-Muzaffarpur National Highway Project-LMNHP-EW/II (WB) - Page 3


Supervision Consultancy Package No. LMNHP/EW-11(WB)/SC-11 (km 135.0 to km 251.70
Roughton International in JV with Consulting Engineers Group Ltd.

- Feasibility study and DPR for rehabilitation of existing 2 lane


roads to 4 lane divided carriageway configuration of section
from east west corridor (NH-54) Kollasib to Aizwal in
Mizoram. CLIENT: NHAI

Responsible for Establishment of traverse station, leveling using


auto level, connecting level with GTS benchmarks & preparation of
strip plan, Staking out of centre line & fixing alignment and
setting out. Control point survey by GPS and subsidiary control
point survey by Total Station traverse. Topographical survey by Total
Station, taking cross section for strip plan by Total station, setting
out alignment for major, minor junctions including layout of
structures, preparation of cross section & L-sections etc.

- GIS Survey of electrical Network South Delhi.


CLIENT: Reliance Energy Limited.

Responsible for Fixing th11KV, 33KV, 66KV, Line route and position in
GIS Mapping. Fixing Position of DTS, FSS and internal layout of FSS
and DTS. Data collection within the facility like EHV Station, FSS,
DTS.

- Construction of Four Laning and strengthening of existing


single/intermediate lane carriageway of NH-2 section from
Makhanpur to Etawah KM. 250.500 to KM 307.500 including 4
nos. major junction, a bypass of 11 KM length and railway
over bridge (ROB) section in Uttar Pradesh Funded by World
Bank, Executed under FIDIC condition of contract. CLIENT:
NHAI, Cost of Project INR 3530.00 million.

Was responsible for topographic survey. collecting and Recording of


site Topographic in Computers using three-dimensional co-
ordinate geometry data down load from Total station to Computer,
Setting out of road Alignment in all type of terrain and fixing the
station points with reference to GPS pillars using design co-ordinates
and taking levels with sophisticated survey instruments for fixing of
Horizontal, Vertical Alignment and establishment of
benchmarks with reference to GTS benchmarks, monitoring the
construction of Sub-grade, GSB, WMM, BC, and working out the
quantities for preparation of bills, setting out Alignment for major,
minor junctions and, taking cross - section levels using the
sophisticated auto levels for Proposed Carriage, alignment fixing
for Bridges, layout of Bridge Abutments, Piers Position,
Bearings position, Pedestals position, and Culvert Abutments, wing
wall, Layout of all Structures PCC, Raft, Wall vertical face points,
Checking levels on top of Foundation, PCC, Abutment top, Deck
Slab, etc.

June 2002 to June 2004 - China Coal Construction Group Corporation.


Multinational Construction Firm Beijing, China
Survey Engineer
Construction of Four Laning and strengthening of existing
single/intermediate lane carriageway of NH-2 section from
Makhanpur to Etawah, KM. 250.500 to KM, 307.500 in Uttar
Pradesh, World Bank Funded, Executed under FIDIC condition
of contract. CLIENT: NHAI, Cost of the project: INR 2520.0
million.
Was responsible for setting out centre line alignment with total
station, calculate co-ordinate as per drawing, calculate curve
co-ordinate as per drawing and design, set out curve in a field,
fixing new TBM & RL, taking levels as per layer. (O.G.L. to B.C.),
preparing X- Section and L-section, road camber, super elevation
Construction Supervision for Lucknow-Muzaffarpur National Highway Project-LMNHP-EW/II (WB) - Page 4
Supervision Consultancy Package No. LMNHP/EW-11(WB)/SC-11 (km 135.0 to km 251.70
Roughton International in JV with Consulting Engineers Group Ltd.

of curve, checking different type of levels with in tolerance,


monitoring the construction of Sub-grade, GSB, WMM, BC, and
working out the quantities for preparation of bills, layout of
bridges, junction, diversion, traversing and layout for pile point
marking for bridge with total station, assist Quantity Surveyor in
checking & preparation of invoices, fixing daily work program etc.

July 2000 to June 2002 - NHAI, P.I.U., Agra (U.P)


Site supervisor (Civil).
Construction for widening and strengthening of 2-laning to 4-
laning of NH-2 (km. 200.0 to km. 290.0) Agra to Etawah
section, World Bank Funded, CLIENT: NHAI, Cost of the
project: INR 2180.0 million.
Was responsible for study of DPR drawings, Alignment, L-
Section, Typical Cross Section, Drainage Drawing etc. marking
centerline at site as per DPR and any change if required by higher
officer of NHAI. Fixing R.O.W. Pillars both side @ 100m. interval.
comparing the DPR Drawing of design consultant with respect
to site, monitoring the construction of pavement layers, and working
out the quantities for preparation of bills Preparation of obstruction
list with in R.O.W. Co-ordinate with NGO, land owner and
Revenue Department for land acquisition. Supervision for the
maintenance work of existing two lane section (Pot Hole Patch Work &
SDBC )
Nov. 1996 to June 2000 - M /S Construction & Design Services U.P. Jal Nigam
Surveyor
Construction of Community Health Center (C.H.C.) including
internal roads for length of 7 kms Sahasvan, Badaun (U.P.)
CLIENT: Public Health Department U.P. Lucknow.

Responsible for Fixing layout of Community Health Center


Building as per drawing with the health of Theodelite. Fixing level
of each important component like foundation, marking layout
and FRL of approach road and internal roads, Fixing of
alignment and invert level of storm water drainage, sewer line and
other service lines.

- Construction of Sewerage, Pumping Station. Dllupura, Delhi.


CLIENT: Delhi Development Authority (D.D.A.), Delhi.
Responsible for Marking of detail layout for sewerage Pumping
Station and level of each foundation and each chamber like Bar
Screen Chamber, PH correction Chamber, Sedimentation tank,
Primary Clarifier, Secondary Clarifier, Sludge drying bed etc .

Aug. 1992 to Nov. 1996 - PNC Construction CO. ltd, Agra.


Surveyor
Construction of Road of Kalindi Vihar Yojna, of length 12 kms
at Agra.
Responsible for topographic survey, establishment of horizontal
and vertical control, setting out curve in a field, checking X-
section and L-section, road camber, super elevation at curve,
taking levels as per layer. (O.G.L. to bituminous course) etc.

Construction Supervision for Lucknow-Muzaffarpur National Highway Project-LMNHP-EW/II (WB) - Page 5


Supervision Consultancy Package No. LMNHP/EW-11(WB)/SC-11 (km 135.0 to km 251.70
Roughton International in JV with Consulting Engineers Group Ltd.

Languages:

Speaking Reading Writing

English Excellent Excellent Excellent


Hindi Excellent Excellent Excellent

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these bio data correctly describe
me, my qualifications and my experience.

____________________________________________________ Date: 11th August 2008


Signatures of staff member and authorized representative of the firm Day/Month/Year

Full name of staff member: Satish Kumar Verma

Full name of authorized representative: Vishwas Jain

Construction Supervision for Lucknow-Muzaffarpur National Highway Project-LMNHP-EW/II (WB) - Page 6


Supervision Consultancy Package No. LMNHP/EW-11(WB)/SC-11 (km 135.0 to km 251.70