Professional Documents
Culture Documents
CURRICULUM VITAE
Layout of Centerline, Curves, Levels, Profiles, monitoring the construction of Sub-grade, GSB, WMM, BC,
and working out the quantities for preparation of bills.
Key Qualifications:
Mr. Satish Kumar Verma has about 16 years of relevant professional experience in the field of supervision
of 4 laning of NH, 2/4 laning of SH, preparation of Detailed Project report of 4-laning of NH projects &
other infrastructure projects. Has completed 4 nos projects funded by World Bank for National Highway
Projects. Has rich experience in conducting topographic survey of roads, Highways, Bridges projects,
preparation of strip plan and final survey, fixing of alignment, setting of curves, contour survey, and
traversing, leveling, horizontal and vertical alignment for various Highways projects. He has good
experience in Establishment of Horizontal and Vertical control points, carrying out Bench marks shifting,
Leveling, traversing ,DTM ,Stakeout & fixing of alignment. He Has well acquainted with latest Survey
equipments viz. Total station (Sokkia power set, Leica 702, Leica1102, Topcon GTS-701,Topcon
GPT3002LN, Pantex ,etc) Auto level (Sokkia ,Leica Topcan, pantex ) electronic field book-TDS-500., His
spectrum of expertise also covers transferring and processing of data on personal computers for creating
Digital Terrain Model, preparation of X-sections & L- sections, assisting Q.S for bill checking etc. Is well
acquainted with computers and has completed certificate course on Auto Cadd 2004.
Education:
Diploma in Civil Engineering, Board of Technical Education, U.P, Lucknow, in 1992 with first division
Publications/ Training: -
Certificate course on Auto Cad from Cadd Centre training services, Hauz Khas, New Delhi
Computer skills:
MS-Office, Auto Cadd 2004
Employment Record:
Survey Engineer
Construction of Four Laning and strengthening of existing
single/intermediate lane carriageway of NH-57 section from
km. 267.500 to Km. 230.00 Araria town from Forbesganj side)
(Running Ch.42.500 to Ch.79.210) in the state of Bihar on
East-West corridor under NHDP Phase-II Package no. C-
II/BR-2, including 2 No. Major junction,. 1 No. Bypass of 3.00
km length, 1No.Railway Over Bridge, 6 No. Minor Bridge, 7 No.
Under Pass & 52 No Culvert. Total length of Project 36.710
KM, CLIENT: NHAI, Cost of Project: INR 3530.00 million.
Responsible for Fixing of TBM, Setting out the centre line of road
,fixing of ROW and take level, preparation of cross section fixing of
alignment of Highway includes alignment of vertical and Horizontal
curve, fixing alignment of culverts.(Hume pipe culvert, Box
culverts ), calculation of co-ordinates of horizontal alignment,
Calculation of FRL and maintaining documents in respect of road &
structures survey, monitoring the construction of Sub-grade, GSB,
WMM, BC, and working out the quantities for preparation of bills.
Responsible for Lay out of Toll Plaza and estimation of quantities
June 2004 to July 2006 - Inter Continental consultant and Technocrats Pvt Ltd.
Asst. Manager (Survey).
Feasibility study and DPR for rehabilitation of existing 2 lane
roads to 4 lane divided carriageway configuration of Kannur to
Kuttipuram Under NHDP phaseIII, programme on BOT basis
section of NH-17 in the state of Kerala. CLIENT: NHAI.
Responsible for Detailed Survey and Preliminary Survey of Road
Project, Topographic Survey, collecting and recording of Site
Topographic Data in Computers using 3-D co-ordinates, Setting out
of road alignment in all types of terrains and fixing the station
points with reference to GPS pillars using design co-ordinates and
taking levels with sophisticated survey instruments for setting of
Horizontal, Vertical Alignment and establishment of
benchmarks with reference to GTS benchmarks, setting out
alignment for major, minor junctions including layout of
structures, preparation of cross section & L-sections,
calculation of FRL and maintaining documents in respect of road &
structures survey etc.
Responsible for Fixing th11KV, 33KV, 66KV, Line route and position in
GIS Mapping. Fixing Position of DTS, FSS and internal layout of FSS
and DTS. Data collection within the facility like EHV Station, FSS,
DTS.
Languages:
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, these bio data correctly describe
me, my qualifications and my experience.