You are on page 1of 2

EXPERIENCE SUMMARY:

- Stress analysis Static & Dynamic (Slug flow) using CAESAR-II version 5.0 & 5.1
- Identifying the Stress critical lines from the P&ID and line list as per the Stress Specification.
- Preparing the Stress Critical Line list.
- Preparing the Nozzle Loads calculations.
- Preparing the Flange Leakage calculations.
- Preparing the Pressure Relief valve Reaction force calculations.
- Preparing the Wind Load calculations.
- Preparing the Vibration analysis.
- Preparing the Buried pipe analysis.
- Preparing the Stress Analysis Design Basis.
- Submitting Stress Analysis Reports to the Client and getting their approval.
- Preparation of Support Load Data and passing the same to Civil.
- Pipe support calculations.
- Co-ordination with the other Engineering Departments.

Shall have knowledge in International codes and Practices.

Static Stress Analysis

Flange Leak checking

Calculation of Initial equipment nozzle displacements

Evaluation of nozzle loads as per WRC 107/WRC 297/ API 610/ API 617 etc.,

Preparation of critical line list

Relief Valve analysis

Occasional analysis like wind, seismic etc.,

Preparation of Spring/ Expansion Joint data sheet

Preparation and issue of Piping loads to Civil & Structural

Review of Vendor drawings

Support Design and mark-up on Piping drawings

Checking of ISO’s as per stress analysis/ support design

Muddssar Syed's Experience

Piping Stress analysis Engineer

Becrel Engineering Pvt Ltd, Mumbai (A joint Venture of Bectel France & Reliance group of
companies)

Privately Held; Design industry

August 2007 – Present (3 years 8 months)

• Critical Line List preparation & system formation.


• Modeling & analysis of lines connected to equipment like Pumps, Air fan coolers, Heat
exchangers, Turbine; Knock out Drums, Storage tanks, Steam Drum using CAESAR-II (Ver-4.4,
4.5, 5.0).
• Analysis Of lines running on Pipe rack & sleepers
• Analysis of GRP lines.
• Support type selection & Preparation, Checking of Special Support Sketches
• Visual support selection for small bore (< 3”) high temp line
• PSV analysis.
• Flange Leakage Checking with Equivalent Pressure Method
• Static equivalent wind & seismic analysis
• Trunnion calculation check
• Preparation of spring data sheets.
• Preparation of expansion joint data sheets.
• Checking of ISO's as per stress analysis/ support design
• Preparation and issue of piping loads to Civil.
• Supporting of lines as per availability of structure (data from SPR) and getting the best possible
optimum solution for minimum stresses in piping system and loads on the structure.
• Document management and data sharing with different departments in the project taskforce

You might also like