Professional Documents
Culture Documents
SUBSTRUCTURE
Excavation
Concrete works
To collection 1
31,112.00
ITEM DESCRIPTION QTY UNIT GH ¢ RATE AMOUNT
Sundry
Formwork
Block work
Reinforcement
SUPER STRUCTURE
Concrete works
Reinforcement
C 12mm ø bars in tie beams, beams and lintel 795 kg 4.00 3,180.00
Formwork
Block work
ROOFING WORKS
J Roof sheeting with two corrugated side lap 465 m² 35.00 16,275.00
fixed to hardwood purling
WOODWORK
CARPENTRY
Sundry
WOODWORK
Joinery
Joinery (Cont.)
Metal Works
Finishing's
External works
ELECTRICAL INSTALLATIONS
Provide and install the following for the
lighting circuits
Fitting Outlets:
B Circular Boxes 100 pcs 2.00 200.00
C 75 x 75 mm Boxes 16 pcs 3.00 48.00
D 75 x 150 mm Boxes 32 pcs 4.00 128.00
Earth cable
L 16.0 mm² 1 roll 450.00 450.00
Mains Supply
Coded red
A 16.0 mm² 2 roll 450.00 900.00
Coded black
B 16.0 mm² 2 roll 450.00 900.00
SWITCHES
Lighting Circuit Switches surface or flush
mounted as appropriate, ivory white finish
6A rating
A/C SWITCHES
D A/C switches 12 pcs 5.00 60.00
SOCKETS
socket outlets, doubl ,13A square pin,
F British Standard, ivory/white finish, 28 pcs 8.00 224.00
surface mounted
LIGHTING FITTINGS
H 2" florecent Fitting 24 no 55.00 1,320.00
J 4" fluorescent Fitting 6 no 50.00 300.00
To collection 8
4,048.00
DISTRIBUTION BOARD
Distribution Board - CRABTREE 3 phse
A 12Way with Main switch and MCBs 1 pcs 800.00 800.00
(Hager)
CEILING FAN
PLUMBING APPLIANCES
Provide and install the following Sanitary
Appliances including assembling and
jointing together:
Pipe Work
Bill 1
To collection 1 31,112.00
To collection 2 13,454.00
To collection 3 55,178.50
To collection 4 17,362.50
To collection 5 66,356.00
To collection 6 11,368.00
To collection 7 4,166.00
To collection 8 4,048.00
To collection 9 37,500.00
To collection 10 11,140.00
251,685.00
GRAND SUMMARY
BILL 1 251,685.00
COST ESTIMATE
AT
AYANFURI
ITEM DESCRIPTION QTY UNIT GH¢ RATE GH¢AMOUNT
BILL 2
Concrete works
D Concrete floor bed (1:3:6-19mm agg) 3 M3 258.50 775.50
Reinforcement
F 12mm diameter rod in slab 175 KG 4.00 700.00
Block work
Solid sandcrete block in cement mortar
(1:4) as described
H 150mm walls 62 M2 25.00 1,550.00
Plastering
25mm cement and sand rendering as
describe
on block or concrete.(1:4)
I Wall 73 M2 13.00 949.00
Plumbing works
Provide and fix:
J 100mm diameter PVC vent pipes, soil item l.sum 300.00
lines and waste water lines (100 metres
length) and PVC bends and caps including
provisional sum for plumbing work
Total carried to collection 1 6,053.00
Concrete works
D 150mm thick concrete floor bed (1:3:6- 1 M3 258.50 258.50
19mm agg)
Reinforcement
F 12mm diameter rod in slab 80 KG 4.00 320.00
Formwork to:
G Edges of slab 25 M 4.00 100.00
Block work
Solid sandcrete block in cement mortar
(1:4) as described
H 125mm walls 19 M2 25.00 475.00
Plastering
25mm cement and sand rendering as
describe
on block or concrete.(1:4)
SUMMARY
collection 1 6,053.00
collection 2 8,109.50
collection 3 1,992.00
Bill 2 To Collection GH ¢ 16,154.50
US$ 11,141.03
COST ESTIMATE
AT
AYANFURI