Project No. Double Cell Box Culvert, 12m × 6m, Fill Depth 2.35m
10.02.2011
0
0
0 Rev. 0
As per cl. 15.4.2.1.2 of the IRS Concrete Bridge Code (CBC), the axial load in beams can be
ignored if the axial load is less than 0.1 fck times the cross sectional area.
Grade of concrete used fck = M 40
0.1 fck b D = 0.1×40×1000×1000 4000 kN
2
Area of 25mm dia. at 95mm c/c, Fe 500 grade steel = 5150 mm
Lever arm = z
z 1.1fy Ast
=1-
d fck b d
MuR = 0.87 fy Ast z = 0.87 × 500 × 5150 × 0.95×1425 3033 kN-m, > Demand
2
Shear stress v = V / b d = 1717.463 × 1000 / 1000 × 1425 1.205 N/mm
2
As per cl. 15.4.3.1 of CBC, v should not exceed 0.75 sqrt(fck) 4.743416 N/mm
or 4.75 N/mm2, whichever is less.
b s v ( τ + 0.4 -sτc )
Asv > Note: Maximum value of fsv = 415 N/mm2
0.87 f sv
2
As > 1000×150 (1.205+0.4-0.77×0.526) / (0.87×415) = 500 mm per m
2
As per leg = 500 / (1000 / 125) 62 mm
Hence, 10mm dia. hooked links are provided at the above mentioned spacing
32mm diameter bars are provided at 110mm centres and 25mm diameter bars are provided at 220mm
centres in 2nd layer
2
Area of Fe 500 grade steel provided = 9500 mm
Lever arm = z
z 1.1fy Ast
=1-
d fck b d
2
Shear stress v = V / b d = 1969.198 × 1000 / 1000 × 1425 1.382 N/mm
2
As per cl. 15.4.3.1 of CBC, v should not exceed 0.75 sqrt(fck) 4.74 N/mm
or 4.75 N/mm2, whichever is less.
b s v ( τ + 0.4 -sτc )
Asv > Note: Maximum value of fsv = 415 N/mm2
0.87 f sv
2
As > 1000×150 (1.382+0.4-0.77×0.645) / (0.87×500) = 536 mm per m
2
As per leg = 536 / (1000 / 125) 67 mm
Hence, 10mm dia. hooked links are provided at the above mentioned spacing
Lever arm = z
z 1.1fy Ast
=1-
d fck b d
Date
Project No. Double Cell Box Culvert, 12m × 6m, Fill Depth 2.35m
10.02.2011
0
0z 1.1fy Ast
=1- 0 Rev. 0
d fck b d
As per cl
cl. 15 4 2 1 2 of the IRS Concrete Bridge Code (CBC)
15.4.2.1.2 (CBC), the axial load in beams can be
ignored if the axial load is less than 0.1 fck times the cross sectional area.
Grade of concrete used fck = 40
0.1 fck b D = 0.1×40×1000×1000 4000 kN
2
Area of 25 mm dia. 100 mm c/c, Fe 500 grade steel = 4908.739 mm
Lever arm = z
z 1.1fy Ast
=1-
d fck b d
The actual area of steel provided is greater than the minimum required.
2
Shear stress v = V / b d = 731 × 1000 / 1000 × 1425 0.513 N/mm
2
As per cl. 15.4.3.1 of CBC, v should not exceed 0.75 sqrt(fck) 4.743416 N/mm
or 4.75 N/mm2, whichever is less.
1/4
s = (500/d) or 0.7, which ever is greater (cl. 15.4.3.3 of CBC)
s = (500/1425) ^ 0.25 = 0.77
b s v ( τ + 0.4 -sτc )
Asv > Note: Maximum value of fsv = 415 N/mm2
0.87 f sv
2
As > 1000×150 (0.513+0.4-0.77×0.518) / (0.87×415) = 214 mm per m
2
As per leg = 214 / (1000 / 125) 27 mm
Hence, 10mm dia. hooked links are provided at the above mentioned spacing
mm diameter bars are provided at mm centres and mm diameter bars are provided at mm centres in
2nd layer
Date
Project No. Double Cell Box Culvert, 12m × 6m, Fill Depth 2.35m
10.02.2011
0
0
0 Rev. 0
2
Area of Fe 500 grade steel provided = 4908.739 mm
Lever arm = z
z 1.1fy Ast
=1-
d fck b d
2
Sh
Shear stress v = V / b d = 763
63 × 1000 / 1000 × 142
1425 0 N/
3 N/mm
0.535
2
As per cl. 15.4.3.1 of CBC, v should not exceed 0.75 sqrt(fck) 4.74 N/mm
or 4.75 N/mm2, whichever is less.
b s v ( τ + 0.4 -sτc )
Asv > Note: Maximum value of fsv = 415 N/mm2
0.87 f sv
2
As > 1000×150 (0.535+0.4-0.77×0.518) / (0.87×500) = 223 mm per m
2
As per leg = 223 / (1000 / 125) 28 mm
Hence, 10mm dia. hooked links are provided at the above mentioned spacing
Date
Project No. Double Cell Box Culvert, 12m × 6m, Fill Depth 2.35m
10.02.2011
0
0
0 Rev. 0
Lever arm = z
z 1.1fy Ast
=1-
d fck b d
DESIGN OF WALLS
Outer Walls
Thickness of the wall 1000 mm
Effective depth 925 mm
C/C length of the wall 7000 mm
Effective length of the wall = 0.7 × 7000 mm 4900 mm
Slenderness ratio = L / d = 4900 / 925 5.30 < 12, not slender
2
Minimum steel reinf. for Walls = 0.4 % (cl. 15.9.4.1 of CBC) 4000 mm
The wall is reinforced with 25mm dia. bars at 95mm c/c
2
Area of steel provided on each face 5150 mm
z / d = 1 – (1.1×500×5150)/(40×1000×925) = 0.923 (limited to 0.95)
MuR = 0.87 fy Ast z = 0.87 × 500 × 5150 × 0.923×925 1914 kN-m, > Demand
Inner Wall
Date
Project No. Double Cell Box Culvert, 12m × 6m, Fill Depth 2.35m
10.02.2011
0
0
0 Rev. 0
Distribution Steel
Minimum % of distribution steel = 0.12% of concrete area
2
As = 0.12/100 ×1000 × 1000 1200 mm
16mm diameter bars are provided at 110mm centres