Texas Commission on Environmental Quality

Chapter 217/317 - Design Criteria For Sewerage System


Rule Log No. 95100-317-WT

The Texas Commission on Environmental Quality (commission) proposes new Subchapter A,

§§217.1- 217.19; Subchapter B, 217.31-217.37; Subchapter C, 217.51-217.71; Subchapter D, 217.91­

217.100; Subchapter E, 217.121-217.138; Subchapter F, 217.150-217.164; Subchapter G, 217.180­

217.192; Subchapter H, 217.200-217.210; Subchapter J, 217.240-217.252; Subchapter K, 217.270­

217.278; and Subchapter L, 217.290-217.307, concerning the design criteria for sewerage systems.

EXPLANATION OF PROPOSED RULE

The proposed rule package has three major goals: implementing the Commission’s goal of having all

water related rules under the 200 series by repealing Chapters 317 and 323 and incorporating its

provisions into new proposed Chapter 217; bringing the standards and criteria for wastewater treatment

systems up-to-date with current engineering practices and technology; and, updating the rules to better

reflect the current Commission’s permitting practices.

Chapter 317 was last comprehensively revised in 1986. Since then, minor revisions in 1988, 1990, and

1994, have addressed specific concerns, but have not sought to bring the rules in line with advances in

wastewater treatment technologies. Revisions are also needed to address requirements in other chapters

that are not referenced in Chapter 317, and to address requirements in current wastewater treatment

system discharge permits that are not addressed by current Chapter 317 requirements.

The proposed rule also includes the repeal of Chapter 323, which was last revised in 1978. This repeal

will incorporate provisions in Chapter 323 into Chapter 217 to bring the rule’s requirements in line with
Texas Commission on Environmental Quality Page 2
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

current advances in wastewater treatment technologies. Revisions are also needed to address

requirements in other chapters that are not referenced in Chapter 323, and to address requirements in

current wastewater treatment system discharge permits that are not addressed by current Chapter 323.

These new rules will ease the administrative burden on the commission by providing specific criteria by

which wastewater treatment systems must be built. These criteria must be used by licensed engineers in

designing the systems. Facility plans must be prepared by and have the seal of a licensed professional

engineer, ensuring that the system was designed in accordance with commission rules. The proposed rules

have been written to provide the engineering community with minimum standards for wastewater

treatment that the commission finds acceptable.

Variances

The rules as proposed will also provide some flexibility in allowing variances for innovative technology

that are approved on a case-by-case basis by the executive director. The objectives of these rules are

that wastewater treatment systems designed using these requirements will be a cost effective and

protective of human health and the environment. The proposed rules provide a mechanism for the

executive director to approve innovative technologies to treat domestic wastewater. Approvals of the

innovative technology may include the requirement for pilot studies, demonstration projects or

performance bonds. Performance bonds--to be used to pay for replacement of innovative technology

equipment or processes–may be required in some instances where a design engineer receives conditional

approval to use innovative technology and after a reasonable amount of time, the commission recognizes

that the technology does function correctly to meet the minimum design standards. The proposed rule also
Texas Commission on Environmental Quality Page 3
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

provides flexibility for the approval of nonconforming technology, that is, technology that is not addressed

in or conforms to the design criteria, but is known to perform or produce results that meet design criteria

standards. The rule also establishes criteria for a wastewater treatment facility and design criteria for

effluent re-use as authorized under 30 TAC Chapter 210.

Subchapter A

Proposed new §217.1, relating to Applicability, establishes that Chapter 217 applies to any individual who

proposes to construct facilities which will collect, transport, treat or dispose of domestic wastewater. The

chapter also provides the administrative processes governing implementation.

Proposed new §217.3, relating to Definitions, defines terms as used in this chapter. No definitions were

defined previously, except as otherwise noted in a subchapter.

Proposed new §217.4, relating to Purpose, clarifies that these design criteria are the minimum guidelines

which shall be used for the comprehensive consideration of domestic sewage collection, treatment or

disposal systems necessary to meet state water quality standards.

Proposed new §217.5, relating to Variances, clarifies current commission practices and procedures for

requesting a variance from the requirements of this chapter.


Texas Commission on Environmental Quality Page 4
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.6, relating to Relationship between Plans and Specifications Approval and

Wastewater discharge permits, clarifies that approved plans and specifications shall correspond to the

flow and effluent limitations set forth in the discharge permit. The rule also clarifies that approval of plans

and specifications does not relieve the facility of the responsibility to obtain a wastewater discharge

permit, nor does the approval of a wastewater discharge permit relieve the facility of the responsibility to

obtain approval of plans and specifications.

Proposed new §217.7, relating to Construction of Approved Facilities, establishes commission practices

and procedures that approval of plans and specifications alone does not imply that construction of the

facility may begin, until a wastewater discharge permit has been issued by the commission, as noted in

§26.027(c) of the Texas Water Code.

Proposed new §217.8, relating to Pre-existing Facilities, establishes commission practices and procedures

for determining the requirements for existing facilities approved prior to the effective date of these rules.

This section also specifies that these rules apply to modifications of existing facilities and to new facilities.

Proposed new §217.9, relating to Submittal Requirements, previously contained in §317.1(a), clarifies that

all proposed wastewater projects must submit a summary transmittal packet, and specifies the content and

process for submittal. This section also clarifies which plans need to be submitted for review by the

executive director and factors used to determine if a review is required.


Texas Commission on Environmental Quality Page 5
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.10, relating to Types of Approvals, previously contained in §317.1(a), clarifies the

type of approvals given plans and specifications and the conditions set with the specific approval. This

section also clarifies that approval of a facility does not relieve the owner or engineer of any

responsibilities. This section establishes criteria for approval of standard construction, as well as non­

conforming and innovative technology. This section also establishes the requirements for approval of non­

conforming or innovative technologies, including conditional approval with conditions, stipulations or

restrictions.

Proposed new §217.11, relating to Municipality Reviews, previously contained in §317.1(a), clarifies the

authority of municipalities to perform technical reviews of sanitary sewer collection systems within their

boundaries, and incorporates requirements of Texas Water Code 26.034(d) and (e).

Proposed new §217.12, relating to Change Orders, previously contained in §317.1(e), establishes

procedures for the submission of substantial design changes to a project after approval has been granted,

and clarifies commission policy relating to design changes.

Proposed new §217.13, relating to Completion Notification, previously contained in §317.1(e), establishes

the requirement that upon completion of construction, notice shall be provided to the executive director or

the review authority that the completed work substantially complies with this chapter. This also clarifies

commission policy relating to design changes.


Texas Commission on Environmental Quality Page 6
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.14, relating to Inspection, previously contained in §317.1(e), explains that at any time

during construction, any wastewater project is subject to inspection by the executive director or review

authority to determine compliance. This also clarifies commission policy relating to design changes.

Proposed new §217.15, relating to Operation and Maintenance Manual, previously contained in

§317.1(e), clarifies the requirement of developing an operations and maintenance (O&M) manual for any

proposed wastewater facility being constructed that promotes efficient and safe operations and

maintenance, monitoring, and reporting by the operators of the facility. This rule explains more thoroughly

commission requirements for O&M manuals.

Proposed new §217.16, relating to Cooperation Between Engineers and Operations Staff, previously

contained in 317.1(e), encourages discussions of the design elements between the engineers designing the

project and the staff that will be operating the system to maintain good engineering practices.

Proposed new §217.17, relating to Final Engineering Design Report, previously contained in §317.1(c),

clarifies the rule to establish the minimum requirements that should be included in a final engineering

design report.

Proposed new §217.18, relating to Final Construction Drawings and Technical Specifications, previously

contained in 317.1(d), clarifies the requirements for developing the final constructing drawings and

technical specifications for the project.


Texas Commission on Environmental Quality Page 7
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.19, relating to Compliance With Other Regulations, explains existing commission

policies and practices that the rules in this chapter do not supersede or replace any other state statutes or

local or federal requirements.

Subchapter B

Proposed new §217.31, relating to Applicability, explains that Subchapter B applies to all wastewater

treatment designs and details the design values which shall be utilized by the design engineer when

determining the sizes of wastewater treatment system components.

Proposed new §217.32, relating to Design of New Systems - Organic Loadings and Flows, explains the

organic loadings and flow values that must be used for new systems. This section clarifies and updates

commission practices and procedures, incorporates new procedures requested by the regulated

community, and adds new requirements in Chapter 319, relating to General Regulations Incorporated into

Permits.

Proposed new §217.33, relating to Design of Existing Systems - Organic Loadings and Flow, explains that

existing systems which are being modified or re-rated to meet new permit conditions may use historical

data as the design basis for justifying the sizing of existing or proposed wastewater treatment system

components. This section clarifies and updates commission practices and procedures, incorporates new

procedures requested by the regulated community, and adds new requirements in Chapter 319, relating to

General Regulations Incorporated into Permits.


Texas Commission on Environmental Quality Page 8
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.34, relating to One Hundred Year Flood Plain Requirements, previously contained in

§309.13, clarifies the requirement for showing 100-year flood plain limits on plans and the necessary

acceptable measures for locating a unit within the 100-year flood-plain, and incorporates requirements

relating to Federal Emergency Management Act Flood Plain Insurance Study.

Proposed new §217.35, relating to Backup Power Requirements, previously contained in §317.3(e),

clarifies the requirements for back-up power supply for system components.

Proposed new §217.36, relating to Buffer Zone and Design of Odor Abatement Facilities, explains that

construction of wastewater treatment facilities shall be done in accordance with the commission’s buffer

zone restrictions, contained in §309.13 (relating to Domestic Wastewater Effluent Limitations and Plant

Siting, Unsuitable Site Characteristics).

Proposed new §217.37, relating to Effluent Reuse, provides for the use of reclaimed water in place of

potable water whenever practical as designed by the engineer to encourage the recycling of effluent.

Proposed new §217.38, relating to Rating Systems, previously contained in §323.21

Proposed new §217.39, relating to Approved Ratings, previously contained in §323.22


Texas Commission on Environmental Quality Page 9
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.40, relating to Rating Procedures, previously contained in §323.23

Subchapter C

Proposed new §217.51, relating to Applicability, covers the design, construction, and testing standards that

are applicable to conventional sewer collection systems, as well as sewage lift stations, force mains and

reclaimed water conveyance systems.

Proposed new §217.52, relating to Edwards Aquifer, explains that collection systems built over the

Edwards Aquifer shall be designed in accordance with Chapter 213 of this title, relating to Edwards

Aquifer, in addition to the rules in this subchapter.

Proposed new §217.53, relating to Pipe Design, previously contained in §317.2(a), establishes the

requirements for all pipe designs, including but not limited to flow design basis and gravity pipe material.

This section clarifies requirements for separation distances between wastewater lines and water lines,

laterals and traps, odor/corrosion control, and structural analysis of flexible and rigid pipe. This section

incorporates provisions in Chapter 290 (relating to Public Drinking Water). Wastewater collection

facilities shall be designed to transport the peak dry weather flow from the service area. The choice of

sewer pipe shall be based on the type of waste conveyed. The materials used and methods to be applied

in making joints shall be included in the technical specifications. Separation distances between

wastewater lines and water lines, and between manholes and water lines, and other installation

requirements are specified. The horizontal distance between wastewater lines is specified. The vertical
Texas Commission on Environmental Quality Page 10
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

separation between wastewater lines and water lines, and other installation requirements are specified.

Requirements for laterals and taps are specified. Corrosive liners to reduce odor are described, with

requirements for the design report. Engineering specifications for systems located in active geological

faults are described. Capacity analysis and requirements are specified. Design requirements for the

sizing of new sewers are specified. Requirements for the structural analysis are specified. Engineering

requirements for flexible and rigid pipe are provided. The maximum and minimum slope for sewer

design is specified. Alignment of sewers is specified. Construction methods which utilize flexure of the

pipe joint are prohibited, and engineering requirements for horizontal pipe curvature are specified.

Maximum allowable manhole spacing is provided. Design requirements for inverted siphons and sag

pipes are specified. The requirements for bridged sections for pipes with restrained joints or monolithic

pipe are specified.

Proposed new §217.54, relating to Pipe Bedding, previously contained in §317.2(a)(5), establishes the

requirements for pipe bedding material, bedding compaction, envelope size and excavated trench width

and incorporates current industry standards for pipe bedding.

Proposed new §217.55, relating to Manholes and Related Structures, previously contained in

§317.2(c)(5), explains the placement, size, types and spacing of manholes, and increases manhole cover

size for worker safety. Manholes shall be placed at all points of change in alignment, grade or size of

sewer, with specific design requirements. Manholes shall consist of monolithic cast-in-place materials.

Spacing is specified for straight alignment and uniform grade, with modifications in areas subject to
Texas Commission on Environmental Quality Page 11
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

flooding. Inside diameters of manholes is specified, as well as size of manhole covers and design

requirements for manholes in the 100-year floodplain. Design specifications for manhole inverts are

provided. Manhole steps are prohibited. Design specifications are provided for connections for pipe to

manholes, venting and cleanouts.

Proposed new §217.56, relating to Rehabilitation/Maintenance of Collection Systems, explains that this

section does not apply to rehabilitation and maintenance projects and that these activities must be done in

accordance with local authority guidelines.

Proposed new §217.57, relating to Trenchless Design for Collection Systems, explains that pipe

installations using trenchless design shall be considered nonconforming technology and shall be subject to

review and approval of the reviewing authority prior to construction.

Proposed new §217.58, relating to Testing Requirements for Installed Gravity Collection Lines, previously

contained in §317.2(a)(4), establishes the criteria for infiltration, exfiltration, or low-pressure air tests for

gravity collection lines. Low pressure air tests are described for pipes based on size of pipe, utilizing

pressure loss or leakage within specified times. Criteria for infiltration and exfiltration tests are described

based on hydrostatic head test per 24 hours. Specific requirements for construction within the 25-year

floodplain are described. Deflection testing is required for all flexible pipe, with specific testing

requirements based on size of pipe. This section incorporates current engineering practices for the sizing
Texas Commission on Environmental Quality Page 12
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

of rigid mandrel. Design requirements and construction of the rigid mandrel are described. Adjustable or

flexible mandrels are prohibited.

Proposed new §217.59, relating to Testing Requirements for Manholes, previously contained in

§317.2(c)(5), explains that manholes shall be tested for leakage separately and independently of the

wastewater lines by hydrostatic exfiltration testing, vacuum testing or other methods acceptable to the

Executive Director or the designated Review Authority. Maximum leakage for hydrostatic testing is

specified. Alternative test methods and hydrostatic exfiltration tests are described. The option of vacuum

testing was added and requirements for vacuum testing are specified.

Proposed new §217.60, relating to Lift Station Site Selection, previously contained in §317.3(a),

establishes the criteria for selecting lift station sites. Specific site access, security, flood protection and

odor control are specified.

Proposed new §217.61, relating to Lift Station Wet Well/Dry Well Design Considerations, previously

contained in §317.3(b), establishes criteria for pump controls, flood protection, wet wells, lift station

ventilation and dry well sump pumps. This section also proposes a new equation for calculating minimum

wetwell volume. Lift station pump controls are described, electrical equipment shall be protected during a

100-year flood event, design criteria for wet wells and dry wells are specified. Dry well access is

specified. Design criteria for lift station ventilation are specified, including passive ventilation for wet

wells, and mechanical ventilation in lift stations. Design criteria for both wet wells and dry wells are
Texas Commission on Environmental Quality Page 13
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

provided for mechanical ventilation. Wet well slopes are specified. Requirements for hoisting equipment

are described, as well as dry well valve vault drains and dry well sump pumps. Design criteria for sump

pumps are provided, including pump capacity and piping.

Proposed new §217.62, relating to Pumps for Lift Stations, previously contained in §317.3(c), establishes

general requirements for the pumps that may be used in the design of lift stations. the rule was

reorganized and updated to incorporate current engineering practices. General design criteria for pumps

are provided. Lift station requirements including pumping capacity, pump head calculations and flow

control are provided. Design criteria for self-priming pumps and vacuum priming pumps are provided.

Vertical positioning of pumps is specified. Design of grinder pumps is specified.

Proposed new §217.63, relating to Lift Station Piping, previously contained in §317.3(d), establishes

requirements for pump suctions, valves and piping that shall be used in the design of lift stations. Design

criteria for horizontal pump suctions are specified. Requirements for check valves and piping are

specified.

Proposed new §217.64, relating to Emergency Provisions for Lift Stations, previously contained in

§317.3(e), establishes the provisions, such as retention capacity, reliability of portable generators, and spill

containment structures for emergency situations should a lift station fail. The rule was reorganized and

updated to incorporate current engineering practices. Lift stations shall be designed to prevent stream

pollution in the event of an overflow or surcharge of raw sewage. Alarm systems and service reliability
Texas Commission on Environmental Quality Page 14
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

are required for lift stations. Retention capacity design criteria are specified. Emergency electrical

power using dual-fed electrical power is described. On-site generators may be used as emergency

power. Design criteria for portable generators or pumps are specified. Spill containment structures may

be used in addition to one of the service reliability options with specified requirements.

Proposed new §217.65, relating to Materials For Force Main Piping, previously contained in §317.2(d),

was reorganized and establishes that force main piping material shall be designed to withstand all working

pressures, plus surge stresses generated by instantaneous pump stoppage due to power failure.

Proposed new §217.66, relating to Force Main Joints, incorporates current engineering practices for joints

of force mains in buried service. Joints shall be either push-on rubber gaskets or mechanical joints with a

pressure rating equal to or greater than the force main pipe material.

Proposed new §217.67, relating to Force Main Pipe Bedding, explains that bedding for force mains shall

comply with §217.54 of this title (relating to Pipe Bedding).

Proposed new §217.68, relating to Identification of Force Main Piping, incorporates safety requirements

that detector tape, on which is printed in a minimum of 1½ inch tall letters the words "pressurized

wastewater" continuously along the tape, shall be laid in the same trench, above and parallel to the force

main.
Texas Commission on Environmental Quality Page 15
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.69, relating to Force Main Design, previously contained in §317.2(d), clarifies and

updates the requirements for velocities, detention time, water hammer from surges, gravity main

connection, vertical alignment, pipe separation, odor control and air release valves for force main design.

Proposed new §217.70, relating to Force Main Testing, incorporates portions of previous §317.2(d)(4),

and explains the required pressure testing procedures for force mains.

Proposed new §217.71, relating to Reclaimed Water and Irrigation Facilities, incorporates provisions in

Chapter 210 (relating to Use of Reclaimed Water), explains the requirements for the design of distribution

systems that will convey reclaimed water to a user. Designs shall be reviewed and approved by the

executive director. Design criteria for gravity piping are specified, including testing requirements, flow

velocities, solid deposition, appurtenances identification and cross-connection controls. Site selection

criteria are specified. Design criteria for reclaimed water pump stations are provided, including pump

controls, pumps and lift station valving. Design criteria for force main piping are provided, including color

identification and isolation valve specifications..

Subchapter D

Proposed new §217.91, relating to Applicability, establishes that Subchapter D is applicable to the design

criteria for alternative sewer collection systems. Design criteria for component sizing are provided.

Design criteria for both on-site and off-site components are specified.

Texas Commission on Environmental Quality Page 16


Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.92, relating to Design of Alternative Collection Systems - Component Sizing,

previously contained in §317.2(d), updates current engineering practices and establishes that components

shall be sized based on existing flow data from similar types of systems and service areas, whenever such

data is available.

Proposed new §217.93, relating to Gravity Lines, Force Mains and Lift Stations in Alternative Collection

Systems, §317.2(d), clarifies existing regulations for discharge into alternative systems. The rule explains

that, except where specifically modified in this subchapter, designs for alternative sewer collection

systems shall comply with the applicable requirements of subchapter C in addition to the requirements of

this subchapter. The engineer shall provide an operations and maintenance manual. Requirements for the

manual are specified. Requirements for the holder of the wastewater permit are described.

Management of the alternative collection system may be wither private or public service provider.

Grinder pumps and effluent pumps are not required.

Proposed new §217.94, relating to Management, previously contained in §317.2(d), clarifies the

management structure for alternative wastewater collection systems. The rule explains that due to

alternative wastewater collection systems being constructed of mechanical parts and equipment, a staffing

management structure shall be established to insure that requirements for the operation and maintenance

of the system are maintained. Requirements of the sewer service agreement are specified.

Requirements for existing alternative sewer system components are specified. The manager/operator of

the collection system shall have final approval for materials and equipment. The manager/operator shall
Texas Commission on Environmental Quality Page 17
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

also inspect and approve installation of the collection system, shall be granted access for inspection at all

reasonable times, and shall have the right to make emergency repairs. The service agreement shall

delineate costs.

Proposed new §217.95, relating to Sewer Service Agreements, previously contained in §317.2(d),

clarifies current agency practice for sewer service agreements and establishes that a sewer service

agreement shall be executed between the manager/operator of the alternative wastewater collection

system and the property owner that allows for the placement and maintenance of alternative system

components located on private property, and lists the times for which the manager/operator shall be

responsible. This section also specifies provisions which must be included in the sewer service

agreement.

Proposed new §217.96, relating to Design of Small Diameter Effluent Sewers (SDES), previously

contained in §317.2(d), clarifies and establishes the criteria for components of a Small Diameter Effluent

Sewer, including interceptor tank design, pre-treatment units, service line design and collection system

design.

Proposed new §217.97, relating to Design of Pressure Sewers, previously contained in §317.2(d),

clarifies the requirements for pressure sewer systems, including grinder pump sewer systems and septic

tank effluent pump systems. Design criteria include service line requirements, on-site pressure sewer

system mechanical equipment requirements, discharge piping requirements, and collection system design.
Texas Commission on Environmental Quality Page 18
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.98, relating to Vacuum Sewer Systems, previously contained in §317.2(d),

establishes the design requirements for vacuum sewers which are non-conforming technology.

Proposed new §217.99, relating to Testing Requirements for Alternative Sewer Collection Systems,

establishes testing methods and requirements for all components of alternative wastewater collection

systems.

Proposed new §217.100, relating to Termination Facilities for Alternative Sewer Collection Facilities,

describes the requirements for the termination of an alternative wastewater collection system at treatment

facilities or into an existing conventional sewer, that are in close proximity to human habitation.

Wastewater collection systems shall be designed to minimize the potential for odors.

Subchapter E

Proposed new §217.121, relating to Applicability, establishes that Subchapter E applies to preliminary and

primary treatment systems used at wastewater treatment systems.

Proposed new §217.122, relating to Coarse Screening Devices, previously contained in §317.4(b),

explains which systems require the installation of a coarse screening device, such as a bar screen.

Proposed new §217.123, relating to Coarse Screening Devices - Redundancy Requirements, previously

contained in §317.4(b), more thoroughly and specifically explains the requirement of providing bypass
Texas Commission on Environmental Quality Page 19
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

channels, sized to handle the two-hour peak flow of the facility, to bypass flow around any coarse

screening device.

Proposed new §217.124, relating to Design of Coarse Screening Devices, incorporates new safety

requirements and the design requirements for coarse screening devices located in an enclosed area, such

as location, screen openings, hydraulics and corrosion resistance of coarse screening devices.

Proposed new §217.125, relating to Coarse Screening Devices - Screenings and Debris Handling,

previously contained in §317.4(b), explains new requirements that facilities shall be provided for the

storage of a minimum of one-day of screenings and debris. This section also provides requirements for

screenings and debris handling including container covers, runoff control, drainage and disposal of debris.

Proposed new §217.126, relating to Fine Screens, previously contained in §317.4(b), explains that

although not required, fine screens may be used in lieu of coarse screening devices.

Proposed new §217.127, relating to Fine Screens - BOD5 Removal, previously contained in §317.4(b),

clarifies and explains that fine screens shall not be considered equivalent to primary sedimentation for the

removal of BOD5 . Engineering design requirements for the use of fine screens are provided.
Texas Commission on Environmental Quality Page 20
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.128, relating to Fine Screens - Redundancy Requirements, previously contained in

§317.4(b), explains that where BOD5 reduction is credited through the fine screen, dual fine screen

treatment trains shall be provided.

Proposed new §217.129, relating to Fine Screen Design Parameters, sets the design parameters if fine

screens are to be installed according to manufacturer’s recommendations for removal of oil and grease,

cleaning devices, automatic conveyance of materials, and construction details.

Proposed new §217.130, relating to Fine Screens - Screenings and Debris Handling, previously contained

in §317.4(b) clarifies the management and disposal of screenings and debris from fine screens shall be

managed and disposed of in accordance with §217.125 of this title (relating to Coarse Screening Devices

- Screenings and Debris Handling).

Proposed new §217.131, relating to Grit Removal Facilities establishes that grit removal facilities capable

of removing inert biodegradable particles larger than 0.2 mm in size are required for all wastewater

treatment systems for proper operation of anaerobic digesters.

Proposed new §217.132, relating to Grit Removal Chambers - Redundancy Requirements, previously

contained in §317.4(b), explains that dual grit removal processes shall be provided whenever grit removal

is required.
Texas Commission on Environmental Quality Page 21
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.133, relating to Design Requirements for Various Types of Grit Chambers, previously

contained in §317.4(b), establishes updated and adds new design criteria for horizontal flow grit

chambers, aerated grit chambers, mechanical grit chambers, cyclonic degritters, and vortex chambers.

Proposed new §217.134, relating to Grit Handling, previously contained in §317.4(b), explains the

requirements for grit washing, drainage for grit washing facilities and grit storage areas, grit chambers and

grit storage.

Proposed new §217.135, relating to Preaeration Facilities, previously contained in §317.4(b), provides

flexibility for preaeration facilities in sizing and design based on the use of preaeration.

Proposed new §217.136, relating to Flow Measurement, previously contained in §317.4(b), provides the

requirement that all wastewater treatment facilities have a means of accurate effluent flow measurement.

Also provides the requirements for primary, including weirs and flumes, and secondary measuring

devices.

Proposed new §217.137, relating to Flow Equalization Basins, previously contained in §317.4(b), explains

new design requirements for the use of flow equalization basins, and the mixing, aeration, volume and

pumped flow requirements of equalization basins.


Texas Commission on Environmental Quality Page 22
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.138, relating to Primary Clarifiers - Design Basis, previously contained in §317.4(d)

establishes the design criteria for primary clarifiers, including the requirements for inlets, scum removal,

effluent weirs, basin sizing, sidewater depth, freeboard, drains, operator protection, primary clarifiers for

BOD5 removal and primary clarifiers for sludge pumping and piping.

Subchapter F

Proposed new §217.150, relating to Applicability, explains that Subchapter F provides the design

requirements for activated sludge systems and is applicable to these systems.

Proposed new §217.151, relating to General Requirements for Activated Sludge Aeration Basins,

previously contained in §317.4(g) provides the requirements for minimum dissolved oxygen concentration

in aeration basins and alternate aeration volume. The rule also adds new prohibitions of contact

stabilization systems for nitrification to ensure compliance with permit requirements under Chapter 305

(relating to Consolidated Permits).

Proposed new §217.152, relating to General Requirements for Activated Sludge Clarifiers, previously

contained in §317.4(d), provides the requirements for activated sludge clarifier components such as inlets,

scum removal, effluent weirs, sludge lines, sludge collection equipment, pumped inflow, and side water

depth. This section also provides restrictions on hopper bottom clarifiers, prevents short circuiting of

influent and effluent weirs, and specifies the calculations which are required to determine return sludge

pumping capacity.
Texas Commission on Environmental Quality Page 23
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.153, relating to General Requirements Which Apply to both Aeration Basins and

Clarifiers, previously contained in §317.4(d) and (g), establishes requirements such as construction

material, freeboard, and flow splitting that pertain to both aeration basins and clarifiers. The rule also

adds new design requirements for flow splitting to maximize facility operations during emergency repairs.

Proposed new §217.154, relating to Aeration Basin and Clarifier Sizing - Traditional Design Approach,

previously contained in §317.4(d) and (g) provides the standard design values which shall be used to size

aeration basins and clarifiers when using traditional design approaches.

Proposed new §217.155, relating to Aeration Basin and Clarifier Sizing - Volume-Flux Design Approach,

provides new designs integrating advanced technology for the sizing of aeration basins and clarifiers when

using the volume-flux design method as an alternative to the traditional design method.

Proposed new §217.156, relating to Aeration Equipment Sizing, previously contained in §317.4(g),

updates and explains the methods for achieving the proper oxygen requirements of the wastewater by

mechanical or diffused aeration systems.

Proposed new §217.157, relating to Sequencing Batch Reactors (SBR), explains the requirements for the

new design criteria for technological advances requirements in using SBRs, including the number of

basins/tanks, aeration requirements, utilization of duplicate controllers, measures for flow variation and

decanting devices.
Texas Commission on Environmental Quality Page 24
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.158, relating to Solids Management, previously contained in §317.4(d) and §317.5(a),

more thoroughly and specifically provides the requirements for properly handling sludge within the

wastewater system, including solids recycling and monitoring, solids wasting and solids blanket, return

activated sludge pump design, waste activated sludge pump design and piping.

Proposed new §217.159, relating to Process Control, previously contained in §317.5(a), provides the

criteria for implementing solids retention time control and aeration system control.

Proposed new §217.160, relating to Operability and Maintenance Considerations, previously contained in

§317.5(a), clarifies and explains more thoroughly and specifically, the requirements of having equipment

operate at the temperature extremes of the plant location and having equipment housed in facilities with

adequate room for removal, repair and installation of equipment.

Proposed new §217.161, relating to Electrical and Instrumentation Systems, previously contained in

§317.7, explains electrical power supply requirements for plant equipment and establishes safety

requirements for protection of equipment.

Proposed new §217.162, relating to Flow Measurement, previously contained in §317.4, establishes new

requirements for adding process control measurements for plants with a design flow greater than 400,000

gallons per day.


Texas Commission on Environmental Quality Page 25
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.163, relating to Advanced Nutrient Removal, previously contained in §317.4(h), adds

more flexibility for advanced nutrient removal which shall be considered innovative and/or nonconforming

technology and will be subject to the requirements of §217.10(b) (relating to Types of Approvals) of this

title.

Proposed new §217.164, relating to Appendix I, Volume-Flux Design Approach, provides new

requirements for alternative volume-flux design approach, aeration basin sizing, and clarifier sizing.

Subchapter G

Proposed new §217.180, relating to Applicability, provides the requirements in Subchapter G for trickling

filters, rotating biological contactors, submerged biological contactors and filtration systems.

Proposed new §217.181, relating to Trickling Filters - General Requirements, previously contained in

§317.4(e), clarifies the general requirements for the use of trickling filters which are secondary aerobic

biological processes used for treatment of sewage. This section also provides requirements for

determining process applicability and pretreatment.

Proposed new §217.182, relating to Nitrifying Trickling Filters - Additional Requirements, provides new

requirements for using trickling filters to provide nitrification sufficient to meet the new requirements of a

discharge permit, including ventilation, temperature, pH, predation, hydraulic application rates, media,
Texas Commission on Environmental Quality Page 26
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

tertiary nitrificaton filter, and combined BOD/nitrification filters and to update the rules to comply with

engineering design advances.

Proposed new §217.183, relating to Dual Treatment Systems Utilizing Trickling Filters, explains new

requirements and processes for use of trickling filters or other attached growth units in series with

suspended growth processes to update the rules to comply with engineering design advances. This

section includes classification of dual treatment processes, design criteria for attached and suspended

growth processes, and treatment unit design criteria.

Proposed new §217.184, relating to Rotating Biological Contactors (RBC) - General Requirements,

previously contained in §317.4(f), provides the requirements and provisions for the use of improved

rotating biological contactors (RBC) units, including pretreatment, enclosures and ventilation, media

design, design flexibility, tank configuration, control of unwanted growth in the initial stages, downtime

maintenance provisions, bearing maintenance, organic loading design requirements, hydraulic loading

design requirements, stages of RBC units, drive systems, and dissolved oxygen to update the rules to

comply with engineering design advances.

Proposed new §217.185, relating to Nitrifying Rotating Biological Contactors (RBC) - Additional

Requirements, previously contained in §317.4(g), provides additional requirements for RBCs used for

BOD5 removal and nitrification of domestic wastewater.


Texas Commission on Environmental Quality Page 27
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.186, relating to Dual Treatment Systems Utilizing Rotating Biological Contactors

(RBC), explains the new requirements for allowing RBC units to be used in conjunction with other

systems to take advantage of the strengths of both systems and to update the rules to comply with

engineering design advances.

Proposed new §217.187, relating to Submerged Biological Contactors (SBC) - General Requirements,

explains the new process for designing submerged biological contactors (SBC) under the same criteria as

RBCs except that two air headers will be required for each SBC unit, and any submerged bearings shall

be sealed to update the rules to comply with engineering design advances.

Proposed new §217.188, relating to Dual Treatment Systems Utilizing Submerged Biological Contactors

(SBC), explains the new process for designing SBC units to be used in conjunction with other systems to

take advantage of the strengths of both systems as long as the design engineer submits information

describing how the proposed system will provide the required treatment levels.

Proposed new §217.189, relating to Filtration - General Requirements, previously contained in §317.4(l),

updates and clarifies the general requirements for filtration systems such as permit water quality

requirements, water quality requirements, redundancy, source of backwash water, disposition of

backwash water, place in sequence of treatment units, overload conditions and control of slime growth.
Texas Commission on Environmental Quality Page 28
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.190, relating to Additional Specific Design Requirements for Deep Bed, Intermittently

Backwashed, Granular Media Filters, previously contained in §317.4(l), updates and clarifies additional

design criteria for deep bed, intermittently backwashed, granular media filters including application rates,

media design, backwash system, underdrain system, tank design and controls.

Proposed new §217.191, relating to Additional Specific Design Requirements for Multi-Compartmented,

Low Head, Automatically Backwashed Filters, previously contained in §317.4(l), updates and clarifies

additional design criteria for multi-compartmented, low head, automatic backwash filters including

application rates, media design, backwash system and traveling bridge.

Proposed new §217.192, relating to Alternative Designs for Effluent Polishing, explains that the use of

other processes for tertiary suspended solids removal, such as microscreens or countercurrent, continuous

filtrate and backwash flow filters, will be considered nonconforming technologies and shall be subject to

the requirements of §217.10(b) of this title (relating to Approvals of Innovative and Nonconforming

Technologies.)

Subchapter H

Proposed new §217.200, relating to Applicability, explains that Subchapter H applies to the minimum

design requirements for Imhoff tanks, constructed wetlands, facultative ponds, aerated and partially-

aerated ponds, stabilization ponds, treated effluent storage ponds, evaporative pond systems and overland

flow processes.
Texas Commission on Environmental Quality Page 29
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.201, relating to Primary and Secondary Treatment Units, previously contained in

§317.4, clarifies commission policy on the requirements for primary and secondary treatment units as they

pertain to this chapter.

Proposed new §217.202, relating to General Design Considerations for Natural Systems, previously

contained in §317.4 and §317.15, updates requirements which apply to one or more of the natural

systems covered by this subchapter including specific references to the natural treatment systems or units

for which the design criteria in the subsection apply. Natural systems include flow distribution,

windbreaks and screening, maximum liner permeability, embankment design and construction, disinfection,

sampling point significance, and storm water drainage.

Proposed new §217.203, relating to Imhoff Tanks, provides new updated design criteria which shall be

utilized when constructing Imhoff tanks including settling compartment, surface loading, scum baffles, gas

vents, digestion compartment loading, Imhoff tank dimensions, sludge removal, odor management,

treatment efficiency, and material and construction.

Proposed new §217.204, relating to Facultative Ponds, previously contained in §317.4, provides the

design criteria for facultative ponds, including configuration of inlets and outlets, depth, organic loading,

odor control, and removal efficiency.


Texas Commission on Environmental Quality Page 30
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.205, relating to Aerated Ponds, previously contained in §317.4, provides updated

requirements for complete mix aerated ponds, which are those which have adequate mixing to maintain all

biological solids in suspension and provide uniform oxygen concentrations in the pond. This section also

provides requirements for partially mixed aerated ponds which allow for settling and anaerobic

composition of a portion of the influent suspended solids as well as the biological solids generated in the

system.

Proposed new §217.206, relating to Wastewater Stabilization Ponds, previously contained in §317.4,

provides the requirements for ponds which are designed as secondary treatment units to treat suspended

and dissolved organic matter in wastewater, including odor management, number of wastewater

stabilization ponds, pond dimensions and water level considerations, hydraulic and piping considerations,

maximum organic loading on stabilization ponds, and inlet and outlet structures.

Proposed new §217.207, relating to Evaporative Ponds, previously contained in §317.4, establishes

existing commission practices for general requirements for the use of evaporative ponds, including size

and number, odor management, liners, and configuration of depth and loading, embankment, and inlet and

outlet structures of the pond.

Proposed new §217.208, relating to Constructed Wetlands, previously contained in §317.15, updates and

clarifies the general requirements for these artificially constructed complexes of saturated substrates,

emergent and submergent vegetation, animal life, and water designed to simulate natural wetland ecologic
Texas Commission on Environmental Quality Page 31
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

conditions based on advances in engineering design. This section includes general design considerations,

free water surface systems, and subsurface flow systems.

Proposed new §217.209, relating to Overland Flow Process, previously contained in §317.40, updates and

clarifies the requirements for the use of the overland flow process (O.F.) as a treatment of wastewater

including nitrification, design constraints, hydraulic loading rate, climate for wastewater storage, storage

basin design, storage basin construction, nuisance odor prevention, soil testing, distribution systems,

terraces, vegetation selection, buffer zone and sampling.

Proposed new §217.210, relating to Integrated Facultative Ponds, explains new engineering design for

integrated facultative ponds which shall be considered nonconforming technology. The section provides

design criteria for integrated facultative ponds including configuration of inlets and outlets, depth, organic

loading, odor control, and removal efficiency.

Subchapter J

Proposed new §217.240, relating to Applicability, explains that Subchapter J applies to the minimum

design requirements for sewage sludge treatment processes and treatment units including thickening,

stabilization, and dewatering.

Proposed new §217.241, relating to Control of Sludge and Supernatant Volumes, previously contained in

§317.5(a)(2), establishes that wastewater treatment facilities shall provide for the return of supernatant, or

Texas Commission on Environmental Quality Page 32


Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

centrate, resulting from sludge processing activities to the head of the treatment works, discharged at a

point preceding the aeration system, or preceding the secondary treatment units if no aeration exists at the

plant.

Proposed new §217.242, relating to Sludge Piping, previously contained in §317.5(a)(3), provides

requirements for piping used in the treatment of sludge, including verifying that any sludge piping included

as part of the sludge processing facilities has sufficient gradient to insure the flow of sludge.

Proposed new §217.243, relating to Sludge Pumps, previously contained in §317.5(a), explains the

requirements for the design of sludge transfer pumps, with design based on both the quantity and

character of the anticipated solids load to be handled by the pumps.

Proposed new §217.244, relating to Exclusion of Grit and Grease from Sludge Treatment Units,

incorporates agency practices contained in provisions of Chapter 312 of this title (relating to Sludge Use,

Proposal, and Transportation) and explains the requirement that the design of the wastewater facility shall

minimize to the greatest extent deemed possible by the design engineer, the discharge of grit, debris, oil or

grease to the sewage sludge treatment units.

Proposed new §217.245, relating to Ventilation, provides new safety requirements that any sludge

treatment or processing areas, where the presence of fumes or gases of a level sufficient to constitute a
Texas Commission on Environmental Quality Page 33
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

public health hazard or a threat to air quality, shall be provided with sufficient ventilation to eliminate these

dangers.

Proposed new §217.246, relating to Odor Control, explains that the engineer shall design all sewage

sludge process units to minimize or eliminate nuisance odors.

Proposed new §217.247, relating to Chemical Pretreatment of Residuals, establishes criteria

incorporating new state and federal requirements in 40 CFR 503 and Texas Health and Safety Code,

Chapter 361, for the use and handling of chemicals and equipment that can be added to enhance solids

removal, necessary for many sludge treatment or processing units. This section includes chemical

selection, safety provisions for storage of chemicals, minimum chemical supply, chemical handling,

housing of chemicals, feed equipment, solution tanks, and requirements for chemical application.

Proposed new §217.248, relating to Sludge Thickening, establishes minimum criteria for sludge thickening

for use in volume reduction and conditioning of sludge prior to sludge treatment. The section establishes

commission practices including general requirements for thickeners, specific requirements for mechanical

(gravity) thickeners, specific requirements for dissolved air flotation thickeners, and specific requirements

for centrifugal thickeners.

Proposed new §217.249, relating to Sludge Stabilization, previously contained in §317.5, updates new

design requirements incorporating new state and federal requirements in 40 CFR 503 and Texas Health
Texas Commission on Environmental Quality Page 34
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

and Safety Code, Chapter 361, for the stabilization processes including anaerobic digestion, aerobic sludge

digestion, heat stabilization, and alkaline addition.

Proposed new §217.250, relating to Sludge Dewatering, updates and clarifies previous §317.5(e) and

incorporates new minimum design criteria for comprehensive consideration of sewage sludge dewatering

unit processes, including general requirements, sludge conditioning, sludge drying beds, modified drying

beds, rotary vacuum filtration, centrifugal dewatering, plate and frame presses, and belt presses.

Proposed new §217.251, relating to Sludge Storage, specifies new criteria for the storage of residuals

after processing and prior to final disposal or removal from the site, including general criteria, solids

storage, dewatered solids storage, and dried solids storage to protect water quality.

Proposed new §217.252, relating to Final Use or Disposal of Sludge, explains the new design criteria and

requirement that the engineer shall include the final use or disposal of sewage sludge in the design of the

wastewater treatment facility, including quantities of solids, pollutants, pathogens, vector attraction,

emergency provisions and weather factors. ???40 CFR 503 and H&SC

Subchapter K

Proposed new §217.270, relating to Applicability, explains that Subchapter K applies to the requirements

for disinfection, dechlorination, post aeration, and sampling point locations.


Texas Commission on Environmental Quality Page 35
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.271, relating to Chlorine and Sulfur Dioxide Disinfection and Dechlorination Systems,

previously contained in §317.6, incorporates the requirements for chlorine, sulfur dioxide disinfection, and

dechlorination systems, including redundancy, capacity and sizing, dosage control, handling of chemicals,

and equipment and materials. The section also adds new dechlorination requirements under Chapter 307

(relating to Surface Water Quality Standards) and Texas Water Code, §26.023.

Proposed new §217.272, relating to Design of Sodium Hypochlorite and Sodium Bisulfite Systems,

incorporates new design criteria and specifies general requirements for sodium hypochlorite and sodium

bisulfite systems including capacity and sizing, dosage control, handling of chemicals, equipment and

materials, and safety.

Proposed new §217.273, relating to Application of Disinfection and Dechlorination Chemicals, previously

contained in §317.6, explains the criteria for chlorine mixing requirements and disinfection contact basins

and adds new dechlorination contact time based on new water quality standards under Chapter 307

(relating to Surface Water Quality Standards) and Texas Water Code, §26.023.

Proposed new §217.274, relating to Other Chemical Disinfection and Dechlorination Systems, explains

that all other chemical disinfection or dechlorination systems such as chlorine dioxide, ozone, all tablet or

powder disinfection and dechlorination systems, and liquid solution disinfection and dechlorination systems

other than sodium hypochlorite and sodium bisulfite shall be subject to the requirements of §217.10(b) of

this title (relating to Innovative and Nonconforming Technologies).


Texas Commission on Environmental Quality Page 36
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.275, relating to Ultraviolet Light Disinfection Systems, updates previous §317.6 to

incorporate new design criteria and explains the permit requirements including redundancy, monitoring and

alarms, hydraulics, dosage and system sizing, reactor design and safety, for the use of ultraviolet (UV)

disinfection systems.

Proposed new §217.276, relating to Power Reliability, previously contained in §317.3, explains the safety

requirement that all disinfection systems shall include backup power provisions which are capable of

providing sufficient power to operate all power dependant components of the disinfection system during

any power outage.

Proposed new §217.277, relating to Post Aeration, explains that post aeration shall be provided as needed

to ensure compliance with dissolved oxygen (DO) requirements of permits based on water quality

standards under Chapter 307 (relating to Surface Water Quality Standards) and Texas Water Code,

§26.023.

Proposed new §217.278, relating to Sampling Points, specifies and clarifies required sampling points,

which can be safely accessed by the wastewater treatment system operators.

Subchapter L
Texas Commission on Environmental Quality Page 37
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.290, relating to Applicability, explains that Subchapter L details the general safety

requirements which shall be followed in the design, construction, and installation of wastewater treatment

facilities.

Proposed new §217.291, relating to General Policy, explains that the design engineer shall consider

occupational safety, health hazards, and risks to the workers, other persons, and the public as part of

treatment process, disinfection, and chemical selection in preliminary and final designs.

Proposed new §217.292, relating to Safety Audit, requires, for existing facilities being modified or

expanded, the conducting of a safety audit of the facility for the prior three-year period in order to

determine the locations, causes, types of injuries, and jobs being performed when the injuries occurred.

Proposed new §217.293, relating to Job Hazard Analysis and Protective Equipment Lists, updates and

expands previous §317.7(e) and (f) requiring for increased safety that an analysis of hazardous operation

and maintenance tasks for new, expanded, or modified facilities shall be performed by the engineer in

order to develop layouts that will result in the easiest, safest, and most cost-effective way to accomplish

potentially hazardous tasks and the development of protective equipment lists.

Proposed new §217.294, relating to Railings, Ladders, Walkways, and Stairways, specifies criteria for the

use of railings, ladders, walkways, and stairways contained in safety requirements of the Occupational

Safety and Health Act, §1910.23.


Texas Commission on Environmental Quality Page 38
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.295, relating to Electrical Code, previously contained in §317.7(c), establishes that

electrical design shall conform to local electrical codes or, where there are no local electrical codes, the

design shall conform to the National Electrical Code.

Proposed new §217.296, relating to Unsafe Water, previously contained in §317.7(d), explains that when

non-potable water is made available to any part of the plant, all yard hydrants and outlets shall be properly

marked "Unsafe Water," and all underground and exposed piping shall be identified as specified in ­

§217.298 of this subchapter.

Proposed new §217.297, relating to Plant Protection, previously contained in §317.7(e), requires that the

plant area, including open clarifiers, aeration basins, and other open tanks, be completely fenced and have

lockable gates at all access points.

Proposed new §217.298, relating to Color Coding of Piping, previously contained in §317.7(g), is

expanded to include piping for reclaimed water and explains that all piping for new facilities shall be color

coded and provides the specified color codes.

Proposed new §217.299, relating to Portable Ventilators and Gas Detection Equipment, previously

contained in §317.7(h), requires portable, gasoline-operated ventilators to be provided for ventilating

manholes.
Texas Commission on Environmental Quality Page 39
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.300, relating to Potable Water, previously contained in §317.7(i), requires that potable

water be provided to the plant site.

Proposed new §217.301, relating to Freeze Protection, previously contained in §317.7(j), explains that all

surfaces subject to freezing shall be adequately sloped to prevent standing water.

Proposed new §217.302, relating to Noise Levels, previously contained in §317.7(k), explains that noise

levels in all working areas shall be kept below standards established by the Occupational Safety and

Health Act.

Proposed new §217.303, relating to Safety Training, clarifies previous §317.7(l) and requires that safety

training be provided annually to all employees.

Proposed new §217.304, relating to Confined Space, maintains that the design engineer shall avoid

designing or otherwise providing areas that can be considered confined spaces as described in 29 CFR

§1910.146.

Proposed new §217.305, relating to Plans and Specification Safety Review, explains new safety

requirements that the design engineer shall review the design plans and specifications to ensure

reasonable and adequate safeguards exist to eliminate and minimize worker exposure to workplace

hazards.
Texas Commission on Environmental Quality Page 40
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Proposed new §217.306, relating to Emergency Evacuation, previously contained in §317.?? ,

incorporates Occupational Safety and Health Act requirements for emergency evacuation procedures to

be established where chlorine cylinders weighing one ton or more are located within 1/4 mile of residential

or other high density developments.

Proposed new §217.307, relating to Other Safety Design Guidelines, explains that for additional safety

design guidelines, the engineer shall refer to latest edition of Design of Municipal Treatment Plants, WEF

Manual of Practice No.8, published by the Water Environment Federation or other authoritative

documents.

RULE REVIEW

Concurrently, the commission proposes the reveiw of 30 TAC § 317, in accordance with Texas

Government Code §2001.039, and is publishing the proposed notice of review in the Rule Review Section

of the Texas Register.

Concurrently, the commission proposes the reveiw of 30 TAC § 323, in accordance with Texas

Government Code §2001.039, and is publishing the proposed notice of review in the Rule Review Section

of the Texas Register.


Texas Commission on Environmental Quality Page 41
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

FISCAL NOTE
Texas Commission on Environmental Quality Page 42
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Stephen Minick, Strategic Planning and Appropriations Division, has determined that for the first five

years these sections as proposed are in effect, there will be fiscal implication as a result of enforcement

and administration of the sections. There are no significant implications anticipated for state government.

Local governments affected by the provisions could potentially realize cost savings as a result of adoption

of the proposed rules. The cost savings for local governments will result from better guidance on

acceptable sewage system designs and clearer flexibility for innovative technology (equipment). Local

governments may also realize a cost savings from more efficient systems built using these new criteria.

PUBLIC BENEFIT

Mr. Minick has also determined that for the first five years these sections as proposed are in effect, the

public benefit anticipated as a result of enforcement of and compliance with these sections will be

wastewater system design criteria that is clearer and more consistent with current engineering practices

and that should lead to better designed and more efficiently functioning wastewater treatment facilities.

The public should also benefit from better managed facilities and a more cost-effective regulation of

wastewater facility design and operations. There are no additional economic costs anticipated for any

person, including small business, required to comply with the sections as proposed.

DRAFT REGULATORY IMPACT ANALYSIS

The commission has reviewed the proposed rulemaking in light of the regulatory analysis requirements of

Texas Government Code, §2001.0225, and has determined that the rulemaking is not subject to

§2001.0225 because it does not meet the full applicability of a major environmental rule as defined in the
Texas Commission on Environmental Quality Page 43
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

act. The intent of the rulemaking is to update the current design criteria for wastewater facilities and is

consistent with the requirements of Texas Water Code §26.043(c). There is not a relevant standard set

by federal law. The proposed rulemaking updates existing rules and do not exceed an express

requirement of state law. There is no delegation agreement or contract directly applicable to the

proposed rulemaking.

TAKINGS IMPACT ASSESSMENT

The commission has prepared a Takings Impact Assessment for these rules pursuant to Texas

Government Code Annotated, §2007.043. The following is a summary of that assessment. The specific

purpose of the rule is to ease the burden on the commission and those regulated by the rule by revising

and updating the current design criteria for wastewater facilities. The proposed revisions will provide

clarity, flexibility, and update standards to current engineering practices. Promulgation and enforcement

of these proposed amendments will not affect private real property which is the subject of the rules.

PUBLIC HEARING

A public hearing on the proposal will be held ________________at ___________ a.m. in Room _____

of the commission Building __, located at 12100 Park 35 Circle, Austin. The hearing is structured to

receive oral or written comments by interested persons. Individuals may present oral statements, when

called upon, in the order of registration. Open discussion will not occur during the hearing; however, a

commission staff member will be available to discuss the proposal 30 minutes prior to the hearing and will

answer questions before and after the hearing.


Texas Commission on Environmental Quality Page 44
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBMITTAL OF COMMENTS

Written comments on the proposal should refer to Rule Log No. 95100-317-WT and may be submitted to

Betty Bell, Texas Natural Resource Conservation Commission, Office of Environmental Policy, Analysis

and Assessment, MC 205, P.O. Box 13087, Austin, Texas 78711-3087, (512) 239-6087. Comments may

be faxed to (512) 239-5687, but must be followed up with the submission and receipt of the written

comments within three working days of when they were faxed. Written comments must be received by

5:00 p.m., ______________. The executive director is especially requesting comment as to the types

of appropriate Safety Training courses as provided by §217.303. For further information concerning this

proposal, please contact Louis C. Herrin, III, Texas Natural Resource Conservation Commission, Water

Permits and Resource Management Division, (512) 239-4552.

COASTAL MANAGEMENT PLAN

The executive director has reviewed the proposed rulemaking and found that the rule is neither identified

in Coastal Coordination Act Implementation Rules, 31 TAC §505.11, relating to Actions and Rules

Subject to the Coastal Management Program, nor will affect any action/authorization identified in Coastal

Coordination Act Implementation Rules, 31 TAC §505.11. Therefore, the proposed rule is not subject to

the CMP.

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as
Texas Commission on Environmental Quality Page 45
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code.

Proposed new §217.2, relating to Authority, establishes that the Texas Water Code prescribes the duties

of the commission relating to the control of pollution including the review and approval of plans and

specifications for sewage disposal systems in §§5.013, 12.081-12.083, 15.104, 15.114, 26.023, 26.034,

26.041, 49.181-49.182, 51.333, and 54.024.

There are no other rules, codes or statutes that will be affected by this proposal.
Texas Commission on Environmental Quality Page 46
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER A : ADMINISTRATIVE PROVISIONS

§§217.1-217.19

§217.1. Applicability.

Chapter 217 applies to any person or individual who proposes to construct facilities which will

collect, transport, treat, or dispose of domestic wastewater. This subchapter details the administrative

processes which will govern the implementation of this chapter. This chapter is not applicable to facilities

constructed for the purposes of complying with a commission-issued non-domestic wastewater discharge

permit.

§217.2. Authority.

The Texas Water Code prescribes the duties of the commission relating to the control of pollution

including the review and approval of plans and specifications for sewage disposal systems. This authority

is found in Texas Water Code §§5.013, 12.081-12.083, 15.104, 15.114, 26.023, 26.034, 26.041, 49.181­

49.182, 51.333, and 54.024.

§217.3. Definitions.
Texas Commission on Environmental Quality Page 47
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

The following words and terms when used in this chapter shall have the following meanings

unless the context clearly indicates otherwise.

(1) Alternative wastewater collection systems - alternative wastewater collection

systems include the categories of pressure sewers, small diameter gravity sewers, vacuum sewers, and

combinations thereof. Alternative wastewater collection systems are comprised of both on-site and

off-site components.

(2) Anaerobic biological reactor (ABR unit) - a secondary treatment unit consisting

of a mass of clean large gravel or similar media into which the primary treatment effluent is introduced in

such a manner that the media remains submerged. The treated liquid passes through the media and out of

the unit by gravity. Travel direction is usually upward from the bottom of the media mass.

(3) Annual average flow - the arithmetic average of all daily flow determinations taken

within a period of 12 consecutive months.

(4) ANSI - American National Standard Institute

(5) ASCE - American Society of Civil Engineers

(6) ASTM - American Standard Testing Material


Texas Commission on Environmental Quality Page 48
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(7) AWWA - American Water Works Association

(8) Buffer tanks - on-site components that are used to house vacuum valves in

situations where flow quantity requires flow attenuation and/or as transition structures between

non-vacuum and vacuum systems. A buffer tank may also be used as an appurtenance with an off-site

component.

(9) Building lateral - line work that exclusively conveys raw wastewater and connects

the plumbing of a structure to an on-site component. The building lateral is not a part of the alternative

wastewater collection system.

(10) Buried filter - a filter that is constructed with a sand or soil cover. Since such

filters lose the ability for removal/replacement of filter media, the loading must be limited to rates that will

preclude media plugging.

(11) By-Pass­

(12) Design flow - the permitted flow rate.

(13) Diurnal Flows ­


Texas Commission on Environmental Quality Page 49
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(14) Drip irrigation - as used in this chapter, refers to the disposal of wastewater by

subsurface irrigation into soil to support vegetative growth.

(15) Drip irrigation line - a line with small emitters or applicators which is used to

dispose of wastewater at an agronomic rate by drip irrigation into the soil zone for plants for agronomic

uptake.

(16) Effective size - if a sample of filter media is examined, and the grain size plotted as

a semi-log grain size curve with the ordinates representing the percent P, by weight, of grains is smaller

than the size denoted by the abscissa, then the effective size of the sample is the diameter D10 which

corresponds to P = 10%. In other words, 10% of the sample particles are finer and 90% are larger than

the effective size.

(17) Effluent pump unit - an on-site component that provides the motive force that

conveys the effluent from an interceptor tank to either of the following:

(A) the collection system in Small Diameter Effluent Sewer (SDES) systems; or

(B) the terminus of the collection system, in pressure systems.


Texas Commission on Environmental Quality Page 50
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(18) Engineer - the design engineer who is licensed by the Texas Board of Professional

Engineers.

(19) Equivalent dwelling unit (EDU) - a single, private residence, or a commercial

establishment which produces wastewater of a composition and quantity comparable to that discharged by

a single, private residence.

(20) Facility – a wastewater treatment system.

(21) Filter media - the material placed in the filter containment structure to perform the

filtering action. Materials used as filter media include natural or manmade sand, bottom ash, crushed slag,

fine gravel, etc.

(22) Firm Pumping Capacity - the maximum flowrate under design conditions with the

largest pumping unit out of service.

(23) Force main - a pressure-rated conduit which conveys wastewater from a pump

station to a discharge point.

(24) fps - feet per second


Texas Commission on Environmental Quality Page 51
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(25) Grinder pump unit - an on-site component that receives raw wastewater by a

building lateral, grinds the solids present in the raw wastewater into a slurry, and provides the motive

force for transporting the raw wastewater to the terminus of the collection system.

(26) Innovative technology - a process not addressed in this chapter, or a process

specifically identified as innovative by this chapter.

(27) Interceptor tank - an on-site component that receives raw wastewater by a

building lateral, and provides removal of floatable and settleable solids, storage of the removed solids, and

flow attenuation.

(28) Intermittent or single pass filter - a filter through which the water being filtered

passes one time.

(29) Lateral sewer - a sewer running laterally down a street, alley, or easement which

receives only the flow from the abutting properties.

(30) Lift Station ­

(31) Manager/Operator of the alternative wastewater collection system - a

political subdivision of the State, water supply or sewer service corporation, or other legal entity under the
Texas Commission on Environmental Quality Page 52
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

regulatory jurisdiction of the commission that is authorized to own, operate, and/or maintain a wastewater

system as a public utility.

(32) mgd - million gallons per day.

(33) Multiple equivalent dwelling unit (MEDU) - is either a group of single, private

residences served by a common on-site component, or a commercial, industrial, institutional, or other

non-residential establishment that produces wastewater in excess of 1500 gallons per day and/or

wastewater of a composition not comparable to that discharged by a single, private residence.

(34) Nonconforming technology - technology or a process that does not conform to the

design criteria of this chapter, or a technology or process specifically identified as nonconforming by this

chapter.

(35) Off-site components - include collection system lines and related appurtenances,

forcemains, pump stations, lift stations, and vacuum stations.

(36) On-site component - interceptor tanks, effluent pump and grinder pump units,

vacuum valve pits and buffer tanks, and their service lines.

(37) Overflows ­
Texas Commission on Environmental Quality Page 53
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(38) Peak flow - the highest two-hour flow expected to be encountered under any

operational conditions, including times of high rainfall (generally the two-year 24-hour storm is assumed)

and prolonged periods of wet weather.

(39) Person - an individual, association, partnership, corporation, municipality, state, or

federal agency, or an agent or employee thereof.

(40) Point of application - point at which wastewater enters native soil except in the

case of mound systems where it is the point where wastewater enters engineered soil material.

(41) Pressure sewers - a sewer that is entirely pressurized by pumps at each service

connection. It is differentiated into grinder pump and septic tank effluent pump (STEP) sewers. A grinder

pump pressure sewer receives raw wastewater in which the solids have been ground by a grinder pump.

A STEP pressure sewer receives the effluent from an interceptor tank.

(42) Private sewer - a closed conduit which conveys wastewater flow and is

constructed and maintained by a private entity(ies) such as a homeowner's association. Private sewers

may be located in areas such as a private street or common area.


Texas Commission on Environmental Quality Page 54
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(43) Public sewer - a closed conduit which conveys wastewater flow and which is

located within the public right-of-way or dedicated public easement. A public sewer (or public sewer

system) is intended to serve more than one (1) owner.

(44) Recirculating filter - a filter that is loaded by a mixture of unfiltered and

previously filtered water.

(45) REACT - a step in the Sequencing Batch Reactor (SBR) process where the

influent in the SBR basin is aerated.

(46) Sand filter - a contained mass of sand or other equivalent media to which water

may be applied such that the water will pass through the sand resulting in the removal of water borne

materials such as organic debris, bacteria, or grit, and reduction of the amounts of dissolved nutrients.

The sand filter consists of the containment structure, an underdrain piping network, the underdrain media,

the filter media, and a liquid distribution mechanism to spread the load over the filter surface.

(47) Sequencing Batch Reactor (SBR) - a fill and draw activated sludge treatment

system, identical to conventional activated sludge systems, except the processes are carried out

sequentially in the same tank. SBR systems have the following five steps carried out in sequence.

(A) Fill - The basin is filled with the influent;


Texas Commission on Environmental Quality Page 55
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) React - The influent in the basin is aerated;

(C) Settle - The mixed liquor within the basin is settled (clarification);

(D) Draw - The basin is decanted; and,

(E) Idle - The sludge is wasted from the basin.

(48) Service connection - a private sewer from a single source to the main or lateral

sewer in the street, alley, or adjacent easement.

(49) Service lead - a sewer which branches off a public sewer and extends to the

limits of the public right-of-way. From a main or lateral sewer, the service lead would serve one or more

houses, single-family lots, or other types of small land tracts situated in the same block with the main or

lateral sewer, but not directly adjacent thereto. Such a line, shall never exceed 150 feet in length. If the

sewer is designed to serve more than two houses, or the equivalent of two single-family residences along

a street, a lateral sewer as defined above shall be constructed.

(50) Service line - the service line is the line work that hydraulically connects an on-site

component to the off-site components and is a part of the alternative wastewater collection system.
Texas Commission on Environmental Quality Page 56
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(51) Sewer main - a sewer which receives the flow from one or more lateral sewers.

(52) Small diameter effluent sewers (SDES) - sewers that receive effluent from an

interceptor tank and transport the flow by gravity. SDES are differentiated into minimum grade effluent

sewers (MGES) and variable grade effluent sewers (VGES). MGES are designed with a constant

downward slope. A VGES has no slope restrictions except that effluent should shall not flow back into

any service connection.

(53) Uni-Bell -

(54) Uniformity coefficient - the uniformity coefficient (U) is equal to the ratio

D60/D10: D60 is the grain size corresponding to P = 60% on the plot of sample grain size, and D10 is the

grain size corresponding to P = 10% on the plot of sample grain size. A low uniformity coefficient

indicates a uniform grain size in a sample, while a high value indicates a wide variation in grain size.

(55) Vacuum valve pit - a vacuum valve pit is an on-site component that receives raw

sewage by a building lateral and provides detention until accumulation of such volume to instigate

operation of the vacuum valve. For EDUs as defined above, the vacuum valve pit and vacuum valve shall

be an integral unit.

(56) Variance - a deviation from a specific requirement of this chapter.


Texas Commission on Environmental Quality Page 57
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(57) Wastewater treatment system - all on site treatment components including but not

limited to lift stations; treatment facilities; primary, secondary, tertiary treatment; and sludge treatment.

(58) WEF – Water Environment Federation

§217.4. Purpose.

These design criteria are minimum requirements which shall be used for the comprehensive

design of domestic sewage collection, treatment, or disposal systems. This chapter establishes the

minimum design criteria pertaining to effluent quality necessary to meet state water quality standards.

These minimum criteria may not be appropriate for certain design situations. The design engineer shall

use best professional engineering judgement to determine whether the criteria set forth in this chapter are

sufficient to meet the public health and water quality requirements as established by the commission.

The executive director may require more stringent criteria where, in the executive director’s judgement,

the use is necessary to meet public health and water quality goals. Plans, specifications, and final

engineering design reports for a proposed project shall conform to the requirements of this chapter.

§217.5. Variances.

A variance is a deviation from a specific requirement of this chapter. An example of a variance

is the use of a slightly flatter slope for a pipe than the minimum slope prescribed by this chapter in order to
Texas Commission on Environmental Quality Page 58
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

maintain the minimum separation distance between the proposed wastewater line and an existing water

line. All known variances from the requirements of this chapter shall be disclosed to the executive

director or appropriate review authority at the time that project related materials are submitted. Variances

which are incorporated into the project after construction begins, shall be disclosed to the executive

director or appropriate review authority in the completion certification required by §217.13 of this title

(relating to Completion Notification). All variance disclosures shall be made under the seal of a

professional engineer licensed in the State of Texas and shall state that based on the best professional

engineering judgement of the engineer, the variance will not result in a risk to public health or water

quality. A technical justification for any variances shall also be included under the professional engineer’s

seal. The executive director may request further information regarding any variance disclosures. If, as

determined by the executive director, the variance would result in a situation which would contradict the

state public health and water quality requirements, the executive director may deny the variance, or,

require further measures to be taken by the owner. If the executive director does not, within ten working

days of receiving a signed, dated, and sealed variance disclosure, notify the engineer by fax or letter, that

further information is requested, or, that the variance is denied, the variance shall be considered to be

approved. A variance shall not be granted or approved from any prohibition included within this chapter.

§217.6. Relationship between Plans and Specifications Approval and Wastewater Discharge

Permits.
Texas Commission on Environmental Quality Page 59
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(a) Plans and specifications approvals shall correspond precisely to the flow and effluent

limitations set forth in the associated discharge permit. A plans and specifications approval may

correspond to any of the existing permit phases. If plans and specifications approval at an interim phase

is obtained, an additional plans and specifications approval shall be requested before the

facility may begin operating at the next permit phase.

(b) Approval of plans and specifications in accordance with this chapter does not relieve the

owner of a wastewater treatment facility of the responsibility to obtain a wastewater discharge permit or

other authorization in accordance with Chapter 26 of the Texas Water Code. In no case shall bypassing

of partially treated wastewater be authorized during construction without an order for such discharge.

(c) Commission approval of a wastewater discharge permit does not relieve the owner of a

wastewater treatment facility of the responsibility to obtain plans and specifications approval of that

facility, in accordance with this chapter, prior to discharge.

§217.7. Construction of Approved Facilities.

(a) Approval of plans and specifications by the Executive Director does not imply that

construction of the facilities may begin. Construction shall not begin on any approved wastewater

treatment facility until a wastewater discharge permit has been issued by the commission, unless the
Texas Commission on Environmental Quality Page 60
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

commission authorized the applicant to construct prior to permit issuance, pursuant to Texas Water Code,

§26.027.

(b) Phased construction of wastewater treatment facilities shall correspond to phases included in

the associated wastewater discharge permit. If other types of phased construction are desired, the

engineer shall disclose this phased construction and request a variance from this subsection through

§217.5 of this title (relating to Variance Clause).

§217.8. Pre-existing Facilities.

(a) Any facilities which were constructed in accordance with a plans and specifications approval

granted prior to the effective date of these rules, which are not being modified in any way, and for which

no design related permit changes have been made, or, are proposed, shall not be required to comply with

the requirements of this chapter. These facilities are required to meet the standards and criteria

established at the time of the original plans and specifications approval, along with any wastewater

discharge permit requirements.

(b) New facilities or any modifications to existing facilities shall comply with the requirements of

the chapter which is effective on the date the plans and specifications are submitted.
Texas Commission on Environmental Quality Page 61
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) New facilities which are proposed for construction shall comply with the requirements of this

chapter.

(d) Existing facilities, which have never received a plans and specifications approval, shall

comply with the requirements of this chapter.

§217.9. Submittal Requirements.

(a) All proposed wastewater projects shall submit a summary transmittal letter, which conforms

to the requirements found in subsection (c) of this section to the TNRCC Water Permits and Resource

Management Division, except as provided by §217.11(b) of this title (relating to Municipality Reviews)

(b) Wastewater projects which receive a technical review for compliance with this chapter and

approval from a state agency other than the TNRCC need not be submitted to the agency for review, if

under the following conditions:

(1) the review is performed under the supervision of a professional engineer licensed in

the State of Texas, and the review ensures that the project substantially complies with this chapter, and

(2) the state agency has been granted authority in lieu of the commission under state

law.
Texas Commission on Environmental Quality Page 62
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) A summary transmittal letter shall be submitted, by certified mail, to the Commission’s

Wastewater Permitting Section, and to the TNRCC Regional Office in which the project will be located,

for all other wastewater projects constructed in the State of Texas. If the executive director does not

notify the person who submitted the summary within 10 working days of receipt of submittal that a review

will occur, under subsection (d) of this section, the project is deemed approved. The information in the

summary shall be signed, dated, and sealed by a professional engineer licensed in the State of Texas. All

summaries shall include, at a minimum:

(1) the name and address of the design firm;

(2) the name, phone number, and facsimile number of the engineer;

(3) the county(s) in which the project will be located with an identifying name for the

project;

(4) the name of the entity which proposes to own, operate, and maintain the project

through its design life;

(5) the permit name and permit number of the relevant wastewater treatment facility;
Texas Commission on Environmental Quality Page 63
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(6) a statement verifying that the plans and specifications are in substantial compliance

with all the requirements of this chapter and which states that any deviations from the requirements are

based on the best professional judgement of the licensed professional engineer who prepared the final

engineering design report and the project plans and specifications;

(7) a brief description of the project scope which includes the specifics of the project, a

description of deviations variances from the requirements of this chapter, including the use of non­

conforming or innovative technology, and an explanation of the reasons for such deviations which is

sufficient to satisfy the requirements of §217.5 of this title (relating to Variance Clause).

(d) Any project is subject to review by the executive director. Factors to be used to determine

whether a review will be performed include, but are not limited to, the following: whether or not a

nonconforming or innovative technology is being proposed; the stream segment in which the project is

located; and the applicant’s compliance record. If the executive director chooses to review a project, the

engineer or project owner shall be notified in writing, or by facsimile, of the executive director’s intent to

review the project within ten days of receipt of the summary. Upon receipt of the notification of intent to

review, the engineer shall submit to the executive director a complete set of plans and specifications and a

complete final engineering design report. These submitted materials shall be sufficient to satisfy the

executive director that the project is in substantial compliance with this chapter. If the executive director

reviews a project, approval may be granted in accordance with §217.10 of this title (relating to Types of

Approvals).
Texas Commission on Environmental Quality Page 64
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(e) A complete set of plans and specifications, the final version of such plans and specifications

with engineer's certification, a complete engineering design report, all change orders and test results, a

copy of the written summary submitted to the executive director, and any written approvals granted by the

executive director, a municipality, or another state agency shall be maintained and kept by the permittee,

or person(s) responsible for management of a collection system if not the permittee, for at least three

years from the date the engineer certifies to the executive director that the project is complete. Any or all

of this material shall be submitted to the executive director, another state agency, or municipality upon

request. Such materials shall be readily available for inspection by executive director staff upon request

during regular business hours.

§217.10. Types of Approvals.

Approval given by the executive director, or a participating municipality or state agency with

review authority as provided for in §217.9 of this title (relating to Submittal Requirements), shall not

relieve the sewerage system owner or the engineer of any liabilities or responsibilities with respect to the

proper design, construction, or authorized operation of the project in accordance with applicable

commission rules. Regardless of the type of approval, constructed facilities when in operation are required

to produce the quality of effluent specified in the facilities discharge permit(s). The types of approvals

described in paragraphs (1)-(3) of this section may be utilized by the executive director or any other

review authority.
Texas Commission on Environmental Quality Page 65
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Standard approval. Plans and specifications found to comply with all applicable parts

of these criteria shall be approved for construction.

(2) Approvals of innovative and nonconforming technologies.

(A) Technologies considered to be nonconforming or innovative include, but are

not limited to, those technologies not conforming to or addressed in the design criteria of this chapter.

Innovative technology is technology or a process not addressed the design criteria of this chapter, or a

technology or process specifically identified as innovative by this chapter. Nonconforming technology is a

technology or process that does not conform to the design criteria of this chapter, or a technology or

process specifically identified as nonconforming by this chapter. An example of a nonconforming

technology is the use of a trickling filter as a once-through roughing filter.

(B) If an approval for nonconforming or innovative technologies is requested,

engineering proposals for processes, equipment, or construction materials shall be fully described in the

summary transmittal letter submitted in accordance with §217.9(c) of this title, and the reasons for their

selection clearly outlined. The requestor shall wait for written approval from the executive director prior

to proceeding with any innovative or nonconforming technology. Prior to approval or disapproving of the

request the executive director may request a full review of a project which contains innovative or

nonconforming technology. Approval of processes, equipment, or construction materials which are

considered to be innovative or nonconforming shall be granted only in cases where the executive director
Texas Commission on Environmental Quality Page 66
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

or review authority determines, after an engineering evaluation of the supporting information provided in

the submitting engineer’s design report, that the technology will not result in a threat to public health or the

environment. The executive director may require processes considered to be nonconforming or

innovative to be supported by results of pilot or demonstration studies. Where similarly designed full scale

processes exist and are known to have operated for a reasonable period of time under conditions similar

to those suggested for the proposed design, performance data from these existing full scale facilities shall

be submitted at the executive director’s request in addition to, or in lieu of, pilot or small scale

demonstration studies. Any warranties or performance bond agreements offered by the process,

equipment, or material manufacturers shall be fully described in the summary transmittal letter.

(C) The executive director or review authority may require the manufacturer or

supplier to obtain and furnish evidence of an acceptable two-year performance bond from an approved

surety which insures the performance of the innovative or nonconforming technology. The two-year

period shall commence upon substantial completion. Determination of substantial completion will be by a

licensed professional engineer designated by the owners. The executive director will consider as an

acceptable performance bond one which covers the full cost of removal or abandonment of the innovative

or nonconforming facility and equipment, the replacement with previously agreed upon facilities or

equipment conforming to these rules, and all associated engineering fees necessary for the removal and

replacement.
Texas Commission on Environmental Quality Page 67
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(D) Approval of innovative and nonconforming technologies may include a

condition which states that, after some predetermined period of time after the installation and startup of

the innovative or nonconforming technology, an engineering report detailing the performance of the

nonconforming or innovative technology shall be submitted. The engineering report shall include objective

calculations and data detailing the technology's performance, and written submittals from the engineer and

the permittee which state that the nonconforming or innovative technology has satisfied the

manufacturer's claims.

(3) Conditional approval. The executive director may grant approvals which contain detailed

conditions, stipulations, or restrictions. Examples of such conditions and stipulations include, but are not

limited to, testing requirements, reporting requirements, operational requirements, and additional installation

and design requirements which may be necessary to ensure compliance with this chapter. Any

conditional approval granted may be issued for a specific set of flow situations, wastewater

characteristics, and/or required effluent quality. If a conditional approval is granted, both the sewage

system owner and engineer, as appropriate, shall be responsible for ensuring that the approval conditions

outlined by the executive director have been met.

§217.11. Municipality Reviews.

(a) Municipalities may perform technical reviews of sanitary sewer collection systems under

Texas Water Code, §26,034. If a municipality decides to perform technical reviews of sanitary sewer
Texas Commission on Environmental Quality Page 68
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

collection systems after the effective date of this rule, the municipality shall submit 30 days prior to

commencing review to the executive director maps clearly delineating the jurisdictional boundary of the

municipality for the area for which they will be responsible for review of plans and specifications. Within

90 days of a change in the boundary of the municipality, the review authority shall submit maps to the

executive director detailing the boundaries of the review authority. If at any time a municipality, which

has chosen to implement this review authority, decides to cease review of sanitary sewer collection

system plans and specifications, the municipality shall provide written notice to the executive director at

least 30 days prior to the date on which cessation of the final plans and specifications review is expected

to occur. Municipalities shall incorporate the items detailed in paragraphs (1)-(5) of this subsection into

their review programs.

(1) The municipality’s review and approval process shall ensure substantial compliance

with the rules of this Chapter.

(2) All reviews performed by an employee of the municipality shall be conducted by a

professional engineer, licensed in the State of Texas, or the employee conducting the review shall be

under the direct supervision of a professional engineer, licensed in the State of Texas, who is ultimately

responsible for the review and approval of each collection system submitted and installed in the

municipality’s jurisdiction.
Texas Commission on Environmental Quality Page 69
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(3) The responsible review engineer shall be either an employee of the reviewing

municipality, or a consultant to the municipality, separate from the private consulting firm charged with the

design work under review. For purposes of this section, the term "separate" means that the responsible

review engineer is not employed by and does not receive any compensation from the private consulting

firm or from any parent companies, subsidiaries, or affiliates charged with the design. The municipality

shall provide the executive director, on request, documentation of agreements with private consultants

sufficient to allow the agency to audit the municipality’s compliance with this subsection.

(4) A participating municipality may review and approve engineering reports, plans, and

specifications only for projects which transport primarily domestic waste within the boundaries of

jurisdiction of that municipality. For each project approved for construction, the municipality shall issue an

approval letter or other indication of the approval which clearly details the project being approved.

(5) The municipality shall maintain complete files of all review and approval activities

carried out under its authority and shall make any existing project files available to the executive director

upon request and/or during audits performed in accordance with subsection (b) of this section.

(b) The executive director may perform periodic audits of the review and approval process of

municipalities, which perform technical reviews of sanitary sewer collection systems in lieu of the

executive director, to ensure that the projects approved by the municipalities are in substantial compliance

with this chapter. If the executive director decides to perform an audit of a municipality's review and
Texas Commission on Environmental Quality Page 70
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

approval process, the executive director will provide the municipality with a minimum of five working days

advance notice of the pending audit. The executive director may, for auditing purposes only, review

specific projects which have previously been approved by the review authority. The municipality shall

provide to the executive director, on request, documentation of all agreements between the private

consultants and the municipality which relate to the wastewater collection system review program. If the

executive director finds through reviews of specific projects or through audits of the municipality's review

and approval process that a municipality's review and approval process does not provide for compliance

with the minimum design and installation requirements detailed in this chapter, the review and approval

authority shall address these findings within a time established by the executive director. If compliance

cannot be achieved, the review authority shall be voided for that municipality. If such authority is voided

for a municipality, the executive director shall notify the municipality in writing and shall include the

justification for voiding the authority of the municipality. If the authority of a municipality is voided, all

new projects proposed to be constructed within that municipality’s jurisdiction shall be submitted to the

executive director in accordance with §217.9(c) of this title (relating to Submittal Requirements). If the

authority of a municipality is voided, then the municipality shall inform all new projects of the requirement

to seek approval from the commission.


Texas Commission on Environmental Quality Page 71
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.12. Substantial Design Changes.

If substantial design change occur for a project after an approval has been granted, the engineer

shall notify the executive director or review authority with a written description of the extent of the

changes. The notification shall have the signed and dated seal of a professional engineer licensed in the

State of Texas. The determination of what constitutes a substantial design change shall be made by the

engineer based on best professional judgement. The executive director or review authority may request

additional information regarding the project design change. The executive director or review authority

may perform a technical review of these changes to ensure that the changes will meet its public health

and water quality requirements. If the executive director or review authority does not request information

from the engineer by mail or facsimile within 10 working days of receiving a signed, dated, and sealed

notification, the changes shall be considered to be approved.

§217.13. Completion Notification.

Upon completion of construction of any wastewater facility constructed in the State of Texas, the

design engineer, or other engineer appointed by the owner, shall provide a notice to the executive director

or the review authority which is signed, sealed, and dated by a professional engineer licensed in the State

of Texas, and which attests that the completed work substantially complies with the approved plans,

specifications, and any approved substantial design changes, and the O & M Manual has been prepared

and delivered.
Texas Commission on Environmental Quality Page 72
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.14. Inspection.

During construction, any wastewater project is subject to inspection by the executive director or

the review authority during normal working hours to determine compliance with this chapter, the project

plans and specifications, the final engineering design report, and any approval letters.

§217.15. Operation and Maintenance Manual.

An operations and maintenance (O&M) manual shall be developed by the engineer for any

wastewater facility. The O&M manual shall include information specific to the designed project

necessary to promote efficient and safe operations and maintenance, monitoring, and reporting by the

operators. The engineer shall provide the owner of the proposed facility, and the operator who will be

responsible for operation and maintenance of the wastewater treatment facility, the opportunity to make

comments and recommendations to the O&M manual before the manual is finalized. A copy of the final

version of the O&M manual shall be kept by the owner of the facility and at the wastewater treatment

facility, and shall be submitted to the executive director upon request. If during the course of operations it

is determined that the original O&M manual is in error or requires updating, copies of any amendments to

the O&M manual shall also be kept by the owner at the treatment plant site. The following items shall be

considered to be included in the O&M manual:


Texas Commission on Environmental Quality Page 73
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Administrative and record keeping items such as a table of contents showing the

location of the contents within the manual; a copy of the wastewater discharge permit; names and

telephone numbers for pertinent contacts within the appropriate state and federal regulatory agencies; a

sample of a typical Monthly Effluent Report applicable for the size and type of facility proposed; a sample

daily activity report that contains spaces for the results of any internal monitoring done in association with

internal process control, such as flow rates from the various units, dissolved oxygen levels, pH, solids

concentrations, settling test results, clarifier sludge blanket depths, sludge age or retention time and

disinfection residuals; and, a description of the quality assurance/quality control record keeping

requirements for all laboratory analyses performed. This daily activity report may be modified by the

operators to include additional necessary information;

(2) Operation and maintenance requirements such as a section describing the typical

flow pattern within the facility, including the size and capacity of all units; the typical start-up procedures,

routine operational procedures and shut-down procedures for all units; a description of the manner in

which solids are returned to aeration or wasted and the expected volumes under various flow conditions;

expected solids concentrations in all units; expected clarifier overflow rates; expected disinfectant and

dechlorination usage and dosage amounts during normal and emergency operating conditions; descriptions

and frequencies of routine in-situ and laboratory analyses to be performed, including a list of references to

standard testing procedures literature; descriptions of routine maintenance activities to be performed,

including lubrication and inspection schedules for all pumps, motors, and other equipment; and a
Texas Commission on Environmental Quality Page 74
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

recommended spare parts inventory with the names and telephone numbers of manufacturers and

suppliers; and,

(3) Safety items such as a discussion of all known or reasonably anticipated safety

hazards within the facility and a description of the location and the method of use for all personal safety

equipment; and a discussion of emergency evacuation plans including appropriate contact names and

phone numbers of entities or individuals to be contacted during emergency situations including chemical

releases.

§217.16. Operational Considerations.

The engineer shall consult with the relevant operations staff during the design of the project. The

design shall include design elements which are desired by the operations staff when, in the best

professional judgement of the engineer, such design elements are practical. When construction, startup,

and shutdown situations threaten a facility’s ability to remain in compliance with its discharge permit,

engineering staff and operational staff shall communicate sufficiently to minimize danger to public health

and water quality during these periods.

§217.17. Final Engineering Design Report.


Texas Commission on Environmental Quality Page 75
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

A final engineering design report shall be developed for any wastewater facilities constructed in

the State of Texas. This report shall bear the signed and dated seal of a professional engineer licensed in

the State of Texas who is responsible for the design. The final engineering design report shall include any

calculations, analyses, graphs, formulas, constants, tables, geologic information, hydraulic and hydrological

information, historical data, and technical assumptions which are needed to show compliance with this

chapter, or, to justify variances from this chapter in accordance with §217.5 of this title (relating to

Variance Clause). At a minimum the following items, as determined to be applicable to the project by the

engineer, shall be included in the final engineering design reports.

(1) Collection Systems (if applicable) shall include the following:

(A) a map which shows the existing service area and the area proposed for

service;

(B) terrain data in sufficient detail to establish general topographical features of

present and future areas to be served;

(C) details which explain how the design flow for the system was determined;
Texas Commission on Environmental Quality Page 76
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(D) minimum and maximum grades for each size and type of pipe and

calculations which show the expected minimum and maximum velocities in the piping system for each size

and type of pipe;

(E) the effect of any proposed system expansions on the existing system

capacity for both lift stations and piping;

(F) amount of existing and anticipated inflow/infiltration, its hydraulic effect on

the proposed and existing system, and, if needed, flow monitoring and inflow/infiltration abatement

measures which will be taken to help ensure a properly functioning system;

(G) the capability of the existing trunk and interceptor sewers and lift stations to

handle the peak flow under anticipated conditions and the capability of existing treatment facilities to

receive and adequately treat the anticipated peak flows;

(H) engineering analyses which show compliance with the pipe design

requirements of §217.53 of this title (relating to Manholes and Related Structures), regarding structural

design and minimization of odorous conditions;


Texas Commission on Environmental Quality Page 77
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(I) a description of the areas not served by the present proposed project, and the

projected means of providing service to these areas, including special provisions incorporated in the

present plans for future expansion;

(J) calculations and curves which show the operating characteristics of any

system lift stations at minimum, maximum and design flows during both present and future conditions; and,

(K) the safety considerations which have been incorporated into the project

design such as ventilation, entrances, working areas and prevention of explosions.

(2) Wastewater Treatment Facilities (if applicable) shall include the following:

(A) Quantity and characteristics of existing wastewater influent and changes in

characteristics anticipated in the future. If adequate records are not available, analyses shall be made for

the existing conditions and such information included in the report;

(B) Facility siting information which includes: a map and/or sketch with the

location of the proposed wastewater treatment facility, the area included in the facility site, the area that

makes up the dedicated buffer zone and the area surrounding the wastewater treatment facility; a

description of the surrounding area that discloses present and future housing developments, industrial sites,

prevailing winds, highways and/or public thoroughfares, water treatment facilities, water supply wells and
Texas Commission on Environmental Quality Page 78
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

intakes, parks, schools, recreational areas, and shopping centers; the location of the wastewater discharge

which includes the immediate receiving stream, canal, major water course, or other waters in the state

which will receive the wastewater; or the acreage which will be used for disposal of effluent if not by

discharge to waters in the state. Additionally, the siting information shall include:

(i) All documentation necessary to show full compliance with the buffer

zone criteria specified in §309.13 of this title (relating to Unsuitable Site Characteristics); and

(ii) All documentation necessary to show full compliance with the 100­

year flood plain restrictions specified in §309.13 of this title.

(C) A sewage sludge management plan which includes the estimated quantity of

sewage sludge that will be handled, including future sewage sludge loads based on flow projections; the

quality and sewage sludge treatment requirements for ultimate disposal, the sewage sludge storage

requirements for each alternative; the method of sewage sludge transport, the method of sewage sludge

use, storage and disposal; and what alternatives, contingencies and mitigation plans exist to ensure reliable

capacity and operational flexibility;

(D) Methods to address control of bypassing such as information and data

describing features (such as auxiliary power, standby and duplicate units, holding tanks, storm water

clarifiers or flow equalization basins) and operational arrangements (such as flexibility of piping and valves
Texas Commission on Environmental Quality Page 79
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

to control flow through the treatment units, reliability of power sources) to prevent unauthorized

discharges of untreated or partially treated wastewater during construction; and,

(E) All information and calculations to show that the wastewater treatment

facility design complies with the requirements of this chapter such as the types of units proposed and their

capacities; the detention times, surface loadings, and weir loadings as pertinent to the wastewater

treatment units; and hydraulic profiles for wastewater and sewage sludge which includes a plot of the

hydraulic gradient at peak flow conditions for all gravity lines, the anticipated operation mode of the

treatment facility, organic and volumetric loadings as pertinent to specific units, aeration demands and

how those demands will be supplied, and any other calculations deemed necessary by the engineer, or the

executive director, to show compliance with the requirements of this chapter.

§217.18. Final Construction Drawings and Technical Specifications.

Construction drawings and technical specifications shall be prepared for any wastewater

treatment facility constructed in the State of Texas. The drawings shall include the signed and dated seal

of a professional engineer licensed in the State of Texas, who is responsible for the wastewater treatment

facility design, on each sheet which contains items relevant to the rules of this chapter. The technical

specifications for the project shall be bound together and shall include the signed and dated seal of a

professional engineer licensed in the State of Texas, who is responsible for the wastewater treatment

facility design, on the title page. The final construction drawings and technical specifications shall include,
Texas Commission on Environmental Quality Page 80
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

at a minimum, all of the items in paragraphs (1)-(3) of this section, which the engineer determines is

applicable to the project. The executive director or review authority may request more information as

needed to allow a review of the project to be performed.

(1) The construction drawings for wastewater collection systems shall include plan and

profile drawings for both gravity lines and pressure piping. Each sheet of the drawings shall be prepared

using a vertical and horizontal scale which is clearly identified on the drawings. The construction

drawings shall specify the size, grade, and type of pipe materials, the location of any structural features of

the collection system, including manholes to be installed, waterway crossings, bridge crossings, siphons, lift

station locations, and air release valves. The construction drawings shall show the location of all potable

water distribution lines which are 9 feet or closer to any portion of the wastewater collection system, and

indicate the separation distances between such lines and the wastewater collection system. The drawings

shall include dimension section details of manholes, manhole covers, and any other collection piping

appurtenances the engineer deems necessary. The drawings for any lift stations shall show the location

of all pumps, valves, pumping control equipment, safety and ventilation equipment; access operator points;

hatches and hoisting equipment for installing; and removing equipment, slope and location of any wet well

floor grouting, valve vaults, valve vault piping and gas migration prevention measures used between the

wet well and the valve vault; location of piping entrances and exits; location of sump pumps; levels of float

switches; and any other lift station related appurtenances the engineer deems necessary.
Texas Commission on Environmental Quality Page 81
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) The construction drawings for the wastewater treatment facility shall include plan

and profile drawings of all piping and treatment units applicable to the project. Each sheet of the

drawings shall be prepared using a vertical and horizontal scale which is clearly identified on the

drawings. The construction drawings shall include the dimensions of all wastewater treatment units

applicable to the project. The construction drawings shall include all mechanical, electrical, and

construction details applicable to the project. Details of piping systems which the engineer determines to

be complex may be clarified by inclusion of an isometric flow diagram as part of the construction

drawings. The construction drawings shall include a hydraulic profile of the treatment facility at both

design and peak flows. The engineer shall consider including provisions for future expansion of the plant.

(3) As applicable, the specifications for the collection system and the wastewater

treatment facility shall include technical descriptions of all equipment including the quantity and sizes of

the equipment. The specifications shall also include any applicable materials specifications, installation

procedures, construction, and installation safety measures, testing requirements, and national standards

citations.

§217.19. Compliance With Other Regulations.

The rules in this chapter constitute the design criteria promulgated to implement the state statutes

detailed in §217.2 of this title (relating to Authority). These rules do not supersede or replace any other
Texas Commission on Environmental Quality Page 82
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

state statutes or local or federal requirements such as EPA requirements, OSHA requirements, or the

requirements of the Uniform Fire Code. It shall be noted, however, that the agency shall not be

responsible for interpreting, reviewing, or enforcing these rules and regulations, or any other rules and

regulations which are not implemented under the authority provided to the agency by the Texas Water

Code or other legislative directives.


Texas Commission on Environmental Quality Page 83
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER B : DESIGN REQUIREMENTS

§§217.31-217.37

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.31. Applicability.

This subchapter details the design values which shall be utilized by the engineer when determining

the sizes of the wastewater treatment system components. This subchapter applies to all wastewater

treatment system designs including new facilities, upgrades of existing facilities, and re-ratings of existing

facilities.
Texas Commission on Environmental Quality Page 84
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.32. Design of New Systems - Organic Loadings and Flows.

For new systems being constructed to serve the same service area as an existing plant, §217.33

of this title (relating to Design of Existing Systems - Organic Loadings and Flow) may be utilized for

design, provided sufficient data exists. In the absence of sufficient data, new systems shall be designed

using the flows and loadings in paragraphs (1)-(3) of this section. These values are permitted flows and

loading concentrations which include an allowance for some infiltration.

(1) Design flow. The design flow is the permitted flow. Permitted flow is the average

annual flow value, determined by multiplying the per capita flow in Table B.1 by the number of people in

the service area, for facilities equal to or greater than one million gallons per day (mgd). For facilities less

than one mgd, the permitted flow is the maximum 30-day average flow. The maximum 30-day average

flow may be estimated by be multiplying the average annual flow by a factor of 1.5 or greater.

(2) Two-hour peak flow. The instantaneous two-hour peak flow shall be estimated by

multiplying the permitted flow by a factor of 5 for flows less than 0.5 mgd, and by a factor of 4 for flows

of greater than or equal to 0.5 mgd; unless, the system experiences unusual diurnal and/or seasonal

variations, in which case a higher ratio may be needed, as determined by the engineer. In certain regions

or systems with flow equalization, the facility may be designed for a lower ratio if the engineer provides

supporting data. The supporting data in case of region justification should include flow data from at least

three similar wastewater treatment systems from the region. All treatment units, pipes, weirs, flumes,
Texas Commission on Environmental Quality Page 85
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

disinfection units or any other treatment unit which is flow limited shall be sized to transport and/or treat

this estimated two-hour peak flow. The treatment facility shall utilize a totalizing flow meter for flow

measurement regardless of size of the facility.

(3) Design Organic Loading. The design organic loading shall be used in design, when

data is not available. The design organic load shall be determined by multiplying the projected uses by

annual average flow determined from Table B.1. of this section and by using the appropriate influent

concentration found in Table B.1. This design organic load is the load which shall be used to determine

the size of any treatment units which are intended to provide treatment of organic wastes. (Figure 1:

§217.32 (3))
Texas Commission on Environmental Quality Page 86
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table B.1 - Design Organic Loadings and Flows for New Wastewater Treatment Systems

Source Remarks Daily Wastewater Flow Wastewater Strength Duration of Flow

(Gallons Per Person) (mg/L BOD5 ) (Hours)

Municipality Residential 100 200 24

Subdivision Residential 100 200 24

Trailer Park 2½ Persons per 50 300 16

(Transient) Trailer

Mobile Home 3 Persons per Trailer 75 300 24

Park

School with With Showers 20 300 8 - 12

Cafeteria Without Showers 15 300 8 - 12

Recreational Overnight User 30 200 16

Parks Day User 5 100 16

Office Building or --- 20 300 Length of Shift

Factory NOTE: The facility

shall be designed for

largest shift.

Motel --- 50 300 12

Restaurant Per Meal 5 1000* 12

Hospital Per Bed 200 300 12 - 24

Nursing Home Per Bed 100 300 12 - 24

Alternative Per Capita 75 N/A 24

Collection

Systems

(Subchapter D)
Texas Commission on Environmental Quality Page 87
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

*Based on restaurant with grease trap


Texas Commission on Environmental Quality Page 88
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.33. Design of Existing Systems - Organic Loadings and Flows.

Existing systems which are being modified or re-rated to meet new permit conditions shall use

historical data as the design basis for justifying the sizing of existing or proposed wastewater treatment

system components. The compiled data must meet the criteria outlined in paragraphs (1) and (2) of this

section.

(1) Flows. When an existing treatment plant is to be re-rated, expanded, or upgraded,

the volume of existing flow shall be determined. At a minimum, the existing plant’s past five years of data

shall be reviewed, and the engineer shall include the calculations and assumptions which were used to

determine the annual average flow, the maximum monthly 30-day average flow, the peak 2-hour flow, the

ratio of maximum monthly 30-day average flow to annual average flow, and the ratio of the peak 2-hour

flow to the annual average flow in the engineering design report. The analysis for the 2-hour peak flow

shall be based on a frequency distribution analysis based on one of the methodologies outlined in

paragraphs (A), (B), or (C) of this section. The flow data for these analyses shall be collected by a

totalizing meter regardless of plant size. The engineering design report shall note the service area of

existing development and future development.

(A) The flow charts for the individual day shall be examined to determine the

maximum sustained flow rate over any 2-hour period.


Texas Commission on Environmental Quality Page 89
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Instantaneous flow rates at one hour intervals shall be utilized to calculate

progressive 2 hour interval volumes in order to determine maximum volume for any 2-hour interval for

each day. Based on individual 2-hour peak flow values, a frequency distribution shall be utilized with the

2-hour peak flow not exceeded 98% of the time to be used to determine the ratio of 2-hour peak flow to

the annual average flow. Utilizing this historical ratio, the 2-hour peak flow for the proposed facility may

be predicted. This prediction is based on no major flow changes within the service area.

(C) The projected 2-hour peak flow shall be the result of collection system

monitoring and/or modeling based on the design storm event for the service area. The design storm event

is generally associated with a 2-year, 24-hour storm event.

(2) Organic loadings. When an existing treatment plant is to be re-rated, expanded, or

upgraded, the design organic loading shall be based on the average daily organic load which the facility is

required to treat during the design life of the facility, based on historical data, plus one standard deviation.

The future organic load may be different from the existing historical base and the engineer shall

characterize the future loading and flow. The engineers report shall serve as the basis for the

development of the design organic loading. The determination shall take into account both dry weather

and wet weather conditions. The historical data base shall conform at a minimum to the protocol outlined

in subparagraphs (A) and (B) of this paragraph. This design organic load is the load which shall be used

to determine the size of any treatment units which are intended to provide treatment of organic wastes.
Texas Commission on Environmental Quality Page 90
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) In order to utilize the existing data for a re-rating, expansion, or upgrade, the

historical data shall have been taken for a minimum of one year consisting of three samples per week

taken during weekdays. The samples shall, at a minimum, consist of a three-part grab sample taken at

10:00 a.m., noon, and 2:00 p.m. If the system experiences a peak load during another period of the day,

the sampling times may be adjusted as the engineer deems necessary to characterize the treatment plant’s

design organic loading. If a sampling program is recommended by the engineer for a frequency less than

3 times per week or less than a three-part grab sample, then the engineer must show that the proposed

sampling program was representative.

(B) Sampling data shall consist of a minimum of CBOD5 or BOD5, TSS, and

NH3 -N unless the engineer justifies a different program because of specific treatment requirements.

(C) The engineering analysis utilizing the minimum sampling period shall consist

of a summary of the monthly data, annual-average monthly load, and standard deviation of the monthly

data. The use of a linear regression or other appropriate statistical method may be utilized for the

prediction of the design organic load when significant data exists.


Texas Commission on Environmental Quality Page 91
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.34. One Hundred Year Flood Plain Requirements.

(a) 100-Year Flood Plain Shown on Plans. The limits of the 100-year flood plain shall be clearly

indicated on the site plan for the proposed wastewater facility based on the current effective FEMA Flood

Insurance Study (FIS). Flood elevations shall be taken from the appropriate Flood Insurance Rate Map or

FIS profile adjusted to the project’s vertical datum. The limits of the flood plain shall be based on the

superposition of the above- mentioned flood elevations on the most accurate, available topography and

elevations of the proposed site. If the proposed site is adjacent to an “approximate” FEMA 100-year

flood delineation (no flood elevation published), a 100-year flood elevation may be determined by

overlaying the effective FEMA delineation over a United States Geological Survey (USGS) Quadrangle

Map and interpolating a flood elevation. If the flood plain information is not available, the engineer shall

provide a 100-year flood elevation based on the best information available.

(b) 100-Year Flood Plain Shown on Profile. The FEMA 100-year water surface elevation,

determined as indicated in subsection (a) of this section, shall be indicated clearly on the hydraulic profile

of the wastewater facility and located in accordance with the vertical scale of the drawing. When the

proposed plant will occupy less than 1,000 feet of shoreline along the flood plain, a single line coincident

with the elevation of the centerline of the outfall pipe shall be sufficient for 1,000 feet or more of

shoreline, the water surface elevation at both the upstream and downstream limits of any protective

structure for the proposed plant shall be shown on the profile.


Texas Commission on Environmental Quality Page 92
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) Requirements for Plant Site Protection. Proposed treatment units, which are to be located

within the 100-year flood plain, will not be approved unless satisfactory measures to protect all open

process tanks and electric units are provided as part of the proposed wastewater facility design.

§217.35. Backup Power Requirements.

The executive director may review the engineer’s determination of reliability of the existing

commercial power service. Such determinations shall be based on power outage records obtained from

the appropriate power company and presented to the executive director. When requesting outage records

for submittal to the executive director, the records shall be in writing, bear the signature of an authorized

utility employee, identify the location of the wastewater treatment facilities or off-site lift station(s) being

served, list the total number of outages that have occurred during the past 24 months, and indicate the

duration of each recorded outage. If the executive director judges the power supply unreliable, then an

on-site, automatically-starting generator, which can provide sufficient power to ensure continuous

operation of all critical wastewater treatment system units for a duration equal to the longest power

outage in the power records, shall be provided. Off-site lift stations shall also be provided with an on-site,

automatically-starting generator which provides sufficient power to ensure continuous operation of the lift

station for a duration equivalent to the longest power outage on record for the past 24 months. Exceptions

to the auxiliary power generator requirements for wastewater treatment facilities and outlined in the

following paragraphs, and in the off-site lift stations are detailed in Section 217.64.
Texas Commission on Environmental Quality Page 93
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Off-Site Lift Stations. Auxiliary generators will not be required for off-site lift

stations in the following cases:

(A) Reliable electrical service from two separate commercial power companies

and automatic switch over capabilities exist;

(B) Reliable electrical service from two independent feeder lines or substations

of the same electric utility and automatic switch over capabilities exist;

(C) Portable generators or pumps, in combination with collection system storage,

may substitute for on-site generators only in cases where the following criteria exist: the firm capacity of

the lift station is less than 100 gallons per minute; the station includes an autodialer or telemetry system;

operators knowledgeable in acquisition and startup of the portable units are on 24-hour call; the station is

accessible during a 25-year flood event; reasonable assurances exist as to the timely availability and

accessibility of the proper portable equipment; and, the station is equipped with properly designed and

tested quick connection facilities; or

(D) Collection system storage may be utilized in lieu of on-site generators where

calculations included in the engineering design report, show that sufficient volume exists in the lift stations,

upstream gravity sewer lines, and manholes to store the volume of wastewater which would be received

during a peak diurnal event of a duration equal to the longest outage in the power records. If storage is
Texas Commission on Environmental Quality Page 94
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

utilized in lieu of backup power generators, the design report shall also clearly show that the hydraulic

grade line of the collection system is such that in no case will wastewater be allowed to overflow from the

collection system during a peak diurnal event of a duration equal to the longest outage in the power

records. Spill containment structures are prohibited for use as a means of preventing lift station

discharges during a power outage.

(2) Wastewater Treatment Facilities. The requirements for on-site, automatically-

starting generators may be reduced for wastewater treatment facilities as follows:

(A) If reliable electrical service from two separate commercial power

companies exists which ensures a power supply sufficient to power the entire facility continuously, on-site

generators are not required provided automatic switch over capabilities exist;

(B) If reliable electrical service from two independent feeder lines or substations

of the same electric utility exists which ensures a power supply sufficient to power the entire facility

continuously, on-site generators are not required provided automatic switch over capabilities are in effect;

or

(C) Plant lift stations and collection systems may be utilized to store wastewater

in lieu of on-site generators where calculations included in the engineering design report, show that

sufficient volume exists in the lift stations, upstream gravity sewer lines, and manholes to store the volume
Texas Commission on Environmental Quality Page 95
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

of wastewater which would be received during a peak diurnal event of a duration equal to the longest

outage in the power records. If storage is utilized in lieu of backup power generators, the design report

shall also clearly show that the hydraulic grade line of the collection system is such that in no case will

wastewater be allowed to bypass the treatment plant during a peak diurnal event of a duration equal to the

longest outage in the power records. The protocol, which shall be followed when upstream storage is

used as a means of ensuring complete treatment of the influent wastewater, is detailed in clauses (i)-(iii)

of this subparagraph.

(i) Storage is prohibited as a substitute for on-site generators if any of

the flow to the treatment plant is gravity flow.

(ii) If the influent storage is between 0 and 2 hours and power outage

records indicate a maximum outage of less than 2 hours, the on-site, automatically- starting generators

need only provide sufficient power to operate all components of the disinfection system.

(iii) If the influent storage is between 2 and 4 hours and the power

outage records indicate an outage between 2 and 4 hours, the on-site, automatically-starting generator

need only supply sufficient power to operate all or components of the disinfection system and return

activated sludge pumps. Auxiliary generators are not required to supply power for return activated sludge

pumps where calculation are included in the engineering design report which show that sufficient volume

exists in the clarifiers for storage of sludge.


Texas Commission on Environmental Quality Page 96
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.36. Buffer Zone and Design of Odor Abatement Facilities.

All construction of wastewater treatment facilities shall be done in accordance with the buffer

zone restrictions detailed in §309.13 of this title (relating to Unsuitable Site Characteristics). Designs for

odor abatement facilities intended to attain compliance with permit buffer zone requirements shall be

detailed in the engineering design report, and the proposed odor abatement measures shall be summarized

in the summary transmittal letter required by §217.9(c) of this title (relating to Submittal Requirements).

All odor abatement facilities will be considered nonconforming or innovative technologies and will be

reviewed on a case-by-case basis by the executive director.

§217.37. Effluent Reuse.

The engineer shall provide for the utilization of reclaimed water in place of potable water

whenever practical. Typical uses include, but are not limited to: wash down water, water used for the

disinfection system operation, water used for chemical mixing, and water for irrigating the plant grounds.

Reclaimed water shall be taken after disinfection. The system shall provide for screening or filtration,

pumping backup with controls, and a pressure sustaining device such as a hydro-pneumatic tank. This

requirement only applies when Type II water is reclaimed as defined in Chapter 210 of this title (relating

to the Use of Reclaimed Water). If reclaimed water is not used when it is available, a justification for the

use of potable water shall be included in the final engineering design report.
Texas Commission on Environmental Quality Page 97
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER C : CONVENTIONAL COLLECTION SYSTEMS

§§217.51-217.71

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.51. Applicability.

This subchapter covers the design, construction, and testing standards for conventional gravity

sewer collection systems, and conventional sewage lift stations, force mains, and reclaimed water

conveyance system.
Texas Commission on Environmental Quality Page 98
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.52. Edwards Aquifer.

All collection systems to be located over the recharge zone of the Edwards Aquifer shall be

designed and installed in accordance with Chapter 213 of this title (relating to Edwards Aquifer Rules) in

addition to these rules.

§217.53. Pipe Design.

(a) Flow Design Basis. Wastewater collection facilities shall be designed to transport the peak

dry weather flow from the service area, plus infiltration and inflow. The engineer shall prepare

calculations detailing the average dry weather flow, the dry weather flow peaking factor and the

infiltration and inflow. The flow calculations shall include the flow expected in the facilities immediately

upon completion of construction and at the end of its 20-year life.

(b) Gravity Pipe Materials. The choice of sewer pipe shall be based on the characteristics of the

wastewater conveyed, the character of industrial wastes, the possibilities of septic, the exclusion of inflow

and infiltration, the external forces, groundwater, internal pressures, abrasion, and corrosion resistance.

The sewer pipe to be used shall be identified in the plans and technical specifications with its appropriate

ASTM, ANSI or AWWA standard numbers for both quality control (dimensions, tolerances, etc.) and

installation (bedding, backfill, etc.).


Texas Commission on Environmental Quality Page 99
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) Joints for Gravity Pipe. The materials used and methods to be applied in making joints shall

be included in the technical specifications. Materials used for sewer joints shall have a satisfactory

record of preventing infiltration and root entrance. Rubber gaskets, PVC compression joints, high

compression polyurethane, welded, heat fused, or other types of factory made joints are required. ASTM,

AWWA or other appropriate national reference standards for the joints shall be included in the project

specifications.

(d) Separation Distances Between Wastewater Lines and Water Lines; and Manholes and

Water Lines. Where new wastewater lines or manholes are installed in compliance with the requirements

of this subchapter, they shall be installed no closer than nine feet, in any direction, from any water lines,

measured from the outside of the wastewater line or manhole to the outside of the water line.

Wastewater lines shall be installed in separate trenches from water lines. Where nine feet of separation

cannot be achieved, the project shall comply with the requirements in paragraphs (1)-(4) of this

subsection.

(1) New Wastewater Lines - Parallel Lines. Where new wastewater lines are installed

parallel to an existing water line, the horizontal separation distance shall be no less than four feet and the

vertical separation shall be no less than 2 feet (outside to outside), with the water line above the

wastewater line. The wastewater line shall be constructed of pipe material and joints having a minimum

pressure rating of 150 psi.


Texas Commission on Environmental Quality Page 100
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) New Wastewater Lines - Wastewater Lines Crossing Water Lines. Where new

wastewater lines are installed crossing an existing waterline, the vertical separation shall be no less than

two feet or more below a water line, at a crossing angle between 75 degrees and 90 degrees, with pipe

segment lengths of 18 feet or greater. With these types of installations, one segment of the wastewater

pipe shall be centered under the potable water line such that the joints of the wastewater pipe are

equidistant from the center line of the potable water line. Whenever possible, the crossing shall be

centered between the joints of the potable water line. All wastewater pipe within a distance of 9 feet

from the water line, in every direction as measured perpendicularly from any point on the water pipe to

the wastewater pipe, shall have either a pressure rating for both joints and pipe of 150 psi.

(3) New Wastewater Lines - Other Crossings. Any wastewater line crossing which is

not installed two feet or more below the water line, installed at a crossing angle of less than 75 degrees, or

which uses pipe segment lengths less than 18 feet in length, shall be installed with the same requirements

as those detailed in paragraph (2) of this subsection, with the addition that the minimum distance between

the outside of any wastewater line and the outside of any water line shall be 6 inches and that all portions

of wastewater pipe, which are not rated at a minimum pressure of 150 psi for both joints and pipe, which

are within 9 feet of the water line, as measured perpendicularly from any point on the water pipe to the

wastewater pipe, shall be embedded in cement stabilized sand. Where cement stabilized sand is used, the

sand shall have a minimum of 10 percent cement per cubic yard of cement stabilized sand mixture, based

on loose dry weight volume (at least 2.5 bags of cement per cubic yard of mixture. The cement stabilized
Texas Commission on Environmental Quality Page 101
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

sand bedding shall be a minimum of 6 inches above and one quarter of the pipe diameter on either side

and below the sewer pipe.

(4) Manholes and Water Lines. If a manhole is to be placed at a distance of less than 9

feet from a water line, the water line shall be encased in a new encasement, a minimum of 18 feet long,

with a pressure rating of at least 150 psi with a nominal diameter of at least two sizes larger than the

existing or proposed water line. The space around the carrier pipe shall be supported at 5 foot intervals

with spacers or be filled to the spring line with washed sand. The encasement pipe shall be centered on

the crossing and both ends sealed with cement grout or manufactured seal.

(e) Laterals and taps. Lateral and taps on all new installations shall be made with a

manufactured fitting that will limit infiltration, prevent protruding service lines, and protect the mechanical

and structural integrity of the sewer system.

(f) Bore/Tunnel For Crossings. Supports for carrier pipe through casings shall be spaced and

designed to ensure that adequate grade, slope, and structural integrity is maintained.

(g) Corrosion Potential. For all installations, if a pipe as a whole or an integral structural

component of the pipe will deteriorate when subjected to corrosive internal conditions, a corrosive

resistant liner shall be installed at the pipe manufacturing facility unless the final engineering design report,

including calculations and data submitted by the engineer, demonstrates that the design and operational
Texas Commission on Environmental Quality Page 102
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

characteristics of the system will maintain the structural integrity of the system during the minimum 50­

year design life cycle. If the corrosion analysis indicates that corrosion will reduce the facility life to less

than 50 years, then appropriate linings shall be incorporated into the design of the facility.

(h) Odor Control. The designer, based upon the hydrogen sulfide generation potential of the

collection system facility, shall determine if odor control measures are necessary to prevent the

wastewater collection system from becoming a nuisance to the public adjacent to the collection facility.

The odor potential shall be determined for flows immediately following construction, at the end of its 50­

year life, and for periods between these points, as appropriate.

(i) Active Geologic Faults. For systems to be located in areas of known active geologic faults,

the engineer shall locate any faults within the area of the collection system, and the system shall be laid

out to minimize the number of sewers crossing faults. Where crossings are unavoidable, the engineering

report shall specify design features to protect the integrity of the sewer. Consideration shall be given to

joints providing maximum deflection and to providing manholes on each side of the fault so that a portable

pump may be used in the event of sewer failures. Service connections within 50 feet of an active fault

shall be prohibited.

(j) Capacity Analysis. Sewer lines shall be designed for the estimated future population to be

served plus adequate allowance for institutional and commercial flows. The peak flow of domestic

sewage, peak flow of waste from industrial plants, and maximum infiltration rates shall be considered in
Texas Commission on Environmental Quality Page 103
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

determining the hydraulic capacity of sanitary sewers. Systems shall be designed to preclude surcharge

at the expected peak flow. All gravity pipes shall have a minimum diameter of 6-inches. combined

sewers are prohibited. connection of roof, street, or other types of drains to sanitary sewer systems is

prohibited.

(1) Existing Systems. When available, the design of extensions to sanitary sewers shall

be based on the data from the existing system. In the absence of existing data, the design shall be based

on data from similar systems or as described in paragraph (2) of this subsection.

(2) New Systems. New sewers shall be sized using an appropriate engineering analysis

of existing and future flow data. The review authority shall have the authority to determine the reliability

and appropriateness of the data utilized for sizing the system. In the absence of local, reliable flow data

and engineering analysis, new sewer systems shall be designed on the basis of an estimated daily sewage

flow contribution as shown in the Table B.1 in §217.32 of this title (relating to Design of New Systems ­

Organic Loadings and Flows). Minor sewers shall be designed such that when flowing full they will

transport wastewater at a rate approximately four times the system design daily average flow. Minor

Sewers shall be defined as all sewer lines 8" in diameter and less. All other sewer lines shall be designed

to convey the maximum possible flow contributed from any connected minor sewers.

(k) Structural Analysis. The collection system design shall provide a minimum structural life

cycle of 50 years. The owner of the collection system shall provide inspection under the direction of a
Texas Commission on Environmental Quality Page 104
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Texas Licensed Professional Engineer during the construction and testing phases of the project. A

flexible pipe is defined as one that will deflect at least 2 percent without structural distress. Materials that

do not meet this criteria are considered to be rigid. Pipe designs shall ensure that the specified pipes are

appropriate for the proposed installations. The flexible pipe design analysis detailed in paragraph (1) of

this subsection shall be performed for flexible pipe installations, and the rigid pipe design analysis detailed

in paragraph (2) of this subsection shall be performed for rigid pipe installations. Open trench designs,

using flexible pipe with a pipe stiffness of 46 psi or greater, a burial depth of 17 feet or less, a pipe

diameter of 12-inches or less, a modules of soil reaction for the in-situ soil of 200 psi or greater, no effects

on the pipe due to live loads, a unit weight of soil of 120 pounds per cubic foot or less, and a pipe trench

width of 36 inches or greater are not required to perform the structural calculations in paragraph 1,

provided that the pipe is installed and tested in accordance with all other requirements of this subchapter.

Flexible pipe designs using pipes with pipe stiffness less than 46 psi or not meeting these conditions shall

complete all the structural design calculations detailed in paragraph (1) of this subsection.

(1) Flexible Pipe. Live load calculations; allowable buckling pressure determinations;

prism load calculations; wall crushing determinations; strain prediction calculations; and calculations which

quantify long term pipe deflection shall be included in the final engineering design report. The final

engineering design report shall include all information pertinent to the determination of an adequate design

including, but not limited to, the method of determining modules of soil reaction for bedding material; the

method of determining modules of soil reaction for in-situ material; pipe diameter and material with

reference to appropriate standards; modules of elasticity, tensile strength, pipe stiffness, or ring stiffness
Texas Commission on Environmental Quality Page 105
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

constant converted to pipe stiffness as described below; Leonhardt's zeta factor; trench width; depth of

cover; water table elevation; and unit weight of soil. In all cases, the design procedure shall dictate the

minimum pipe stiffness. For direct bury installations, a minimum stiffness requirement shall be specified

by the engineer to ensure ease of handling, transportation, and construction. Where appropriate, pipe

stiffness shall be related to Ring Stiffness Constant (RSC) by the following equation: (Figure 1:

§217.53(j)(1)

PS’ C( RSC( (8.337/D) Equation 1.c

PS = Pipe Stiffness, psi;

C = Conversion Factor, (0.80);

RSC = Ring Stiffness Constant; and,

D = Mean Pipe Diameter, in.

(2) Rigid Pipe. The final engineering design report shall include a structural analysis of

the pipe installation and shall include any details necessary to verify that the structural strength of the rigid

pipe is sufficient to withstand the stresses which the pipe is expected to experience. For rigid conduits,

the minimum strengths for the given class shall be noted in the appropriate standard for the pipe material.

A rigid pipe is defined as one that will experience structural distress at a deflection of 2% or greater.
Texas Commission on Environmental Quality Page 106
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(l) Minimum/Maximum Slopes. All sewers shall be designed and constructed with slopes

sufficient to give a velocity when flowing full of not less than 2.0 feet per second. The grades shown in

Table C.1 are based on Manning's formula with an assumed "n factor" of 0.013 and constitute minimum

acceptable slopes. The minimum acceptable "n" for design and construction shall be 0.013. The "n" used

takes into consideration the slime, grit and grease layers that will affect hydraulics or hinder flow as the

pipe matures. Where velocities greater than 10 feet per second will occur when the pipe is flowing full,

based on Manning’s formula and an n value of 0.013, special provisions shall be made to protect against

pipe and bedding displacement. Figure 2: §217.53 (k)


Texas Commission on Environmental Quality Page 107
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table C.1 - Minimum and Maximum Pipe Slopes

Size of Pipe (inches) Minimum Slope (%) Maximum Slope (%)

6 0.50 12.35

8 0.33 8.40

10 0.25 6.23

12 0.20 4.88

15 0.15 3.62

18 0.11 2.83

21 0.09 2.30

24 0.08 1.93

27 0.06 1.65

30 0.055 1.43

33 0.05 1.26

36 0.045 1.12

39 0.04 1.01

>39 * *

* For lines larger than 39 inches in diameter, the slope shall be determined by Manning's formula (as
shown below) to maintain a minimum velocity greater than 2.0 feet per second when flowing full and
a maximum velocity less than 10 feet per second when flowing full.

V’ (1.49/n)( (Rh0.67)( ( S) Equation 2.c

V = velocity (ft/sec)

n = Manning's roughness coefficient (0.013)

Rh = hydraulic radius (ft)

S = slope (ft/ft)

Texas Commission on Environmental Quality Page 108


Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(m) Alignment. Gravity sewers shall be laid in straight alignment with uniform grade between

manholes when possible. Deviations from straight alignment shall be justified by complying with the

requirements of this section. Deviations from uniform grade (i.e., grade breaks or vertical curves)

without manholes in open cut construction is prohibited.

(1) Construction methods which utilize flexure of the pipe joint are prohibited. The

engineer shall provide the calculations for horizontal pipe curvature in the final engineering design report

and detail the proposed curvature on the plans or shall indicate curvature of the pipe on the plans. The

maximum allowable joint deflection shall be the lesser of the following three alternatives:

(A) equal to 5E ;

(B) 80% of the manufacturer's recommended maximum deflection; or,

(C) 80% of the appropriate ASTM, AWWA, ANSI or nationally-established

standard for joint deflection.

(2) The maximum allowable manhole spacing for sewers with horizontal curvature shall

be 300 feet. A manhole shall be located at the P.C. and P.T. of the curve.
Texas Commission on Environmental Quality Page 109
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(m) Inverted Siphons/Sag Pipes. Sag pipes shall have two or more barrels, a minimum pipe

diameter of six inches, and shall be provided with necessary appurtenances for convenient flushing and

maintenance. The manholes shall have adequate clearances for rodding. Sufficient head shall be

provided and pipe sizes selected to assure velocities of at least three feet per second at initial and design

flows. The inlet and outlet details shall be arranged so that the normal flow is diverted to one barrel.

Provisions shall be made such that any barrel may be taken out of service for cleaning. Provisions shall

be made to allow cleaning across each bend with equipment available to the entity in charge of operation

and maintenance of the facility. Sag pipes design shall minimize nuisance odors.

(n) Bridged Sections. Pipe with restrained joints or monolithic pipe shall be required between

manholes on each end of bridged sections. Bridged sections shall be designed to withstand the hydraulic

forces applied by the occurrence of a 100-year flood including buoyancy. Pipe material shall also be

capable of withstanding impacts from debris. Bank stabilization shall be provided to prevent erosion of

bank sections. Bridge supports shall be spaced and designed to ensure that adequate grade, slope, and

structural integrity are maintained.

§217.54. Pipe Bedding.

(a) Bedding Material. Bedding Classes A, B, or C, as described in ASTM C 12 (ANSI A

106.2), Water Environment Federation (WEF) Manual of Practice (MOP) No. 9, or American Society of

Civil Engineers (ASCE) MOP 37 shall be used for all rigid pipes, provided that the proper strength pipe is
Texas Commission on Environmental Quality Page 110
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

used with the specified bedding to support the anticipated load(s). Embedment materials Classes IA, IB,

II, or III, as described in ASTM D-2321 (ANSI K65.171), shall be used for all flexible pipes. Regardless

of which bedding class is used, the pipe strength shall be sufficient to support the anticipated load when

used with the specified pipe bedding as required by §217.53(i) of this title (relating to Pipe Design).

Debris, large clods or stones greater than six inches in diameter, organic matter, or other unstable

materials shall not be used as hunching or initial backfill. All backfill shall be placed in such a manner as

not to disturb the alignment of the pipe. Where trenching encounters extensive fracture or fault zones,

caves, or solutional modification to the rock strata, construction shall be halted and an engineer shall

provide direction to accommodate site conditions.

(b) Bedding Compaction. Compaction of bedding envelope shall be in accordance with pipe

manufacturers recommendations and shall be sufficient to provide the modules of soil reaction for the

bedding material necessary to ensure the pipe’s structural integrity as required by §217.53(i) of this title.

The placement of the backfill above the pipe shall not affect the structural integrity of the pipe.

(c) Envelope Size. A minimum clearance of 6 inches below and on each side of the bell of all

pipes to the trench walls and floor shall be provided. The bedding or embedment material class used for

haunching and initial backfill shall be installed to a minimum depth of 12 inches above the crown of the

pipe.
Texas Commission on Environmental Quality Page 111
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(d) Trench Width. The width of the trench shall be ample to allow the pipe to be laid and jointed

properly and to allow the backfill to be placed and compacted as needed. As used herein, a trench shall

be defined as that open cut portion of the excavation up to one foot above the pipe. The engineer shall

specify the maximum and minimum trench width needed for safety and the pipe’s structural integrity.

The width of the trench shall be sufficient to ensure working room to properly and safely place and

compact hunching materials. The space between the pipe and the trench wall shall be wider than the

compaction equipment used in the pipe zone.

Figure 1: §217.54(d)
Texas Commission on Environmental Quality Page 112
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT
Texas Commission on Environmental Quality Page 113
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.55. Manholes and Related Structures.

Manholes shall be placed at all points of change in alignment, grade or size of sewer, at the

intersection of all sewers, and at the end of all sewer lines that may be extended at a future date.

Manholes placed at the end of the sewers that may be extended in the future shall include pipe stub outs

with plugs. Clean-outs with watertight plugs may be installed in lieu of manholes at the end of sewers

which are not anticipated to be extended. Cleanout installations shall pass all applicable testing

requirements outlined for gravity collection lines in this subchapter.

(1) Types (Materials). Manholes shall be monolithic cast-in-place concrete, fiberglass,

precast concrete, HDPE or of equivalent construction. Brick manholes are prohibited. The use of brick

to adjust manhole covers to grade is prohibited. All cast-in-place manholes shall be adequately designed

for structural integrity.

(2) Spacing. The maximum required manhole spacing for sewers with straight alignment

and uniform grades are in the Table C.2. Areas subject to flooding require special consideration to

minimize inflow. Tunnels are exempt from manhole spacing requirements due to construction constraints.

Tunnels are required to meet any venting requirements. Figure 1: §217.55(2)


Texas Commission on Environmental Quality Page 114
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table C.2 - Maximum Manhole Spacings

Pipe Diameter (inches) Maximum Manhole Spacing (feet)

6-15 500

18-30 800

36-48 1000

54 or larger 2000

(3) Diameter/Size. Manholes shall be of sufficient inside diameters to allow personnel to

work within them and to allow proper joining of the sewer pipes in the manhole wall. The minimum inside

diameter of manholes shall be 48 inches.

(4) Covers/Inlets/Base.

(A) Manhole Covers. Manhole covers of nominal 30 inch or larger diameter are

required for all sewer manholes where personnel entry is anticipated. Manholes located within the 100­

year flood plain shall have gasketed and bolted covers, or have another means of preventing inflow.

Impervious material shall be utilized for manhole cover construction.

(B) Manhole Inverts. The bottom of the manhole shall be provided with a "U"

shaped channel that is a smooth continuation of the inlet and outlet pipes. For manholes connected to

pipes less than 15 inches in diameter, the channel depth shall be at least half the largest pipe diameter.

For manholes connected to pipes 15 to 24 inches in diameter, the channel depth shall be at least three
Texas Commission on Environmental Quality Page 115
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

fourths the largest pipe diameter. For manholes connected to pipes greater than 24 inches in diameter, the

channel depth shall be at least equal to the largest pipe diameter. In manholes with pipes of different

sizes, the tops of the pipes shall be placed at the same elevation and flow channels in the invert sloped on

an even slope from pipe to pipe. The bench provided above the channel shall be sloped at a minimum of

0.5 inch per foot. Where sewer lines enter the manhole higher than 24 inches above the manhole invert,

the invert shall be filleted to prevent solids deposition. A drop pipe shall be provided for a sewer entering

a manhole more than 30 inches above the invert. If the drop is inside the manhole, a minimum of 48

inches of clear space shall be maintained and the drop shall be permanently affixed to the wall of the

manhole.

(5) Manhole Steps. The inclusion of manhole steps in manholes is prohibited.

(6) Connections. Watertight, size-on-size resilient connectors allowing for differential

settlement shall be used to connect pipe to manholes. Pipe to manhole connectors shall conform to

ASTM C-923.

(7) Venting. Where gasketed manhole covers are required for more than three

manholes in sequence, an alternate means of venting shall be provided at less than 1,500 foot intervals.

Vents shall be designed to minimize inflow. Vents shall be above the 100-year flood elevation.
Texas Commission on Environmental Quality Page 116
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(8) Cleanouts. Cleanouts shall be required to be the same size as the main and shall be

restricted to lengths of pipe less than 150'.

§217.56. Trenchless Design for Collection Systems.

Pipe installations using trenchless design shall be considered nonconforming technology and shall

be subject to review under the requirements of §217.10(2) of this title (relating to Types of Approvals).

Structural design and installation details of trenchless designs shall be approved by the reviewing authority

prior to construction.

§217.57. Testing Requirements for Installed Gravity Collection Lines.

An infiltration, exfiltration, or low-pressure air test shall be specified. Copies of all test results

shall be made available to the review authority upon request. Tests shall conform to the following

requirements:

(1) Low Pressure Air Test. The procedure for the low pressure air test shall conform to

the procedures described in ASTM C-828, ASTM C-924, ASTM F-1417, or other appropriate

procedures, except for testing times. The test times shall be as outlined in this section. For sections of

pipe less than 36-inch average inside diameter, the following procedure shall apply unless the pipe is to be

joint tested. The pipe shall be pressurized to 3.5 psi greater than the pressure exerted by groundwater
Texas Commission on Environmental Quality Page 117
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

above the pipe. Once the pressure is stabilized, the minimum time allowable for the pressure to drop from

3.5 pounds per square inch gauge to 2.5 pounds per square inch gauge shall be computed from the

following equation: Figure 1:§217.57(1)

T’ (0.085( D( K)/Q Equation 3.c

T = time for pressure to drop 1.0 pound per square inch gauge in seconds

K = 0.000419×D×L, but not less than 1.0

D = average inside pipe diameter in inches

L = length of line of same pipe size being tested, in feet

Q = rate of loss, 0.0015 cubic feet per minute per square foot internal surface shall be

used

(A) Since a K value of less than 1.0 shall not be used, there are minimum testing

times for each pipe diameter as shown in Table C.3. Figure 2: §217.57(1)(A)
Texas Commission on Environmental Quality Page 118
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table C.3 - Minimum Testing Times for Low-Pressure Air Test

Pipe Diameter (inches) Minimum Time (seconds) Length for Minimum Time Time for Longer Length

(feet) (seconds)

6 340 398 0.855(L)

8 454 298 1.520(L)

10 567 239 2.374(L)

12 680 199 3.419(L)

15 850 159 5.342(L)

18 1020 133 7.693(L)

21 1190 114 10.471(L)

24 1360 100 13.676(L)

27 1530 88 17.309(L)

30 1700 80 21.369(L)

33 1870 72 25.856(L)

(B) The test may be stopped if no pressure loss has occurred during the first

25% of the calculated testing time. If any pressure loss or leakage has occurred during the first 25% of

the testing period, then the test shall continue for the entire test duration, as outlined above, or until failure.

Lines with a 27-inch average inside diameter and larger may be air tested at each joint. Pipe greater than

36-inch diameter shall be tested for leakage at each joint. If the joint test is used, a visual inspection of

the joint shall be performed immediately after testing. The pipe shall be pressurized to 3.5 psi greater than

the pressure exerted by groundwater above the pipe. Once the pressure has stabilized, the minimum time
Texas Commission on Environmental Quality Page 119
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

allowable for the pressure to drop from 3.5 pounds per square inch gauge to 2.5 pounds per square inch

gauge shall be 10 seconds.

(2) Infiltration/Exfiltration Test. The total exfiltration, as determined by a hydrostatic

head test, shall not exceed 50 gallons per inch diameter per mile of pipe per 24 hours at a minimum test

head of two feet above the crown of the pipe at the upstream manhole. Following the exfiltration test, the

pipe shall be drained and shall be left empty for a period of 24 hours, upon which time the amount of

infiltration into the pipe shall be measured. The total infiltration for this period of time shall not exceed 50

gallons per inch diameter per mile of pipe. When pipes are installed below the groundwater level, an

infiltration test shall be used in lieu of the exfiltration test. The total infiltration, as determined by a

hydrostatic head test, shall not exceed 50 gallons per inch diameter per mile of pipe per 24 hours at a

minimum test head of two feet above the crown of the pipe at the upstream manhole, or at least two feet

above existing groundwater level, whichever is greater. For construction within the 25 year flood plain,

the infiltration or exfiltration shall not exceed 10 gallons per inch diameter per mile of pipe per 24 hours at

the same minimum test head. If the quantity of infiltration or exfiltration exceeds the maximum quantity

specified, remedial action shall be undertaken in order to reduce the infiltration or exfiltration to an amount

within the limits specified. Following remediation action, the line shall be retested.

(3) Deflection Testing. Deflection tests shall be performed on all flexible pipes. For

pipelines with inside diameters less than 27 inches, a rigid mandrel shall be used to measure deflection.

For pipelines with an inside diameter 27 inches and greater, other methods may be used to test for vertical
Texas Commission on Environmental Quality Page 120
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

deflections. Other methods shall provide a precision of ± two tenths of one percent (0.2 %) deflection.

The test shall be conducted after the final backfill has been in place at least 30 days. No pipe shall

exceed a deflection of five percent. If a pipe section fails to pass the deflection test, the problem shall be

corrected, and a second test shall be conducted after the final backfill has been in place an additional 30­

days. The tests shall be performed without mechanical pulling devices. The engineer shall recognize that

this test is a maximum deflection criterion for all pipes, and a deflection of less than five percent may be

more appropriate for specific types and sizes of pipe. Upon completion of construction, the engineer or

other Texas Licensed Professional Engineer appointed by the owner shall certify, to the Review

Authority, that the entire installation has passed the deflection test. This certification may be made in

conjunction with the notice of completion required in §217.13 of this title (relating to Completion

Notification). This certification shall be provided for the Review Authority to consider the requirements

of the approval to have been met.

(A) Mandrel Sizing. The rigid mandrel shall have an outside diameter (O.D.) not

less than 95% of the base inside diameter (I.D.) or average inside diameter of the pipe, as specified in the

appropriate ASTM, AWWA, UNI-BELL, or ANSI Standard, including any appendix. If a mandrel sizing

diameter is not specified in the appropriate standard, the mandrel shall have an O.D. equal to 95% of the

I.D. of the pipe. In this case, the I.D. of the pipe, for the purpose of determining the O.D. of the mandrel,

shall be the average outside diameter minus two minimum wall thicknesses for O.D. controlled pipe and

the average inside diameter for I.D. controlled pipe. All dimensions shall be per appropriate standard.
Texas Commission on Environmental Quality Page 121
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Mandrel Design. The rigid mandrel shall be constructed of a metal or a rigid

plastic material that can withstand 200 psi without being deformed. The mandrel shall have nine or more

"runners" or "legs," and the total number of legs shall be an odd number. The barrel section of the

mandrel shall have a length of at least 75% of the inside diameter of the pipe. A proving ring shall be

provided and used for each size mandrel in use.

(C) Method Options. Adjustable or flexible mandrels are prohibited. A television

inspection is not a substitute for the deflection test. A deflectometer may be approved for use on a case-

by-case basis. Mandrels with removable legs or runners may be approved for use on a case-by-case

basis.

§217.59. Testing Requirements for Manholes.

Manholes shall be tested for leakage separately and independently of the wastewater lines by

hydrostatic exfiltration testing, vacuum testing, or other methods acceptable to the Executive Director or

the designated Executive Director or the designated Reveiw Authority. The manhole shall be tested after

assembly and after backfilling. If a manhole fails a leakage test, the manhole shall be repaired and

retested until it passes the test.

(1) Hydrostatic Testing. The maximum leakage for hydrostatic testing shall be 0.025

gallons per foot diameter per foot of manhole depth per hour. Alternative test methods shall ensure
Texas Commission on Environmental Quality Page 122
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

compliance with the above-allowable leakage. Hydrostatic exfiltration testing shall be performed as

follows: all wastewater lines coming into the manhole shall be sealed with an internal pipe plug, then the

manhole shall be filled with water, and maintained full for at least one hour. For concrete manholes a

wetting period of 24 hours may be used prior to testing in order to allow saturation of the concrete. If the

manhole fails the hydrostatic test, the manhole shall be repaired and retested until it passes the test.

(2) Vacuum Testing. All lift holes and exterior joints shall be plugged with a non-shrink

grout. No grout shall be placed in horizontal joints prior to testing. All pipes entering the manhole shall be

plugged. Stubouts, manhole boots, and pipe plugs shall be secured to prevent movement while the vacuum

is drawn. A minimum 60-inch/lb torque wrench shall be used to tighten the external clamps that secure

the test cover to the top of the manhole. The test head shall be placed at the inside of the top of the cone

section, and the seal inflated in accordance with the manufacturer’s recommendations. A vacuum of 10

inches of mercury shall be drawn, and the vacuum pump shut off. With all valves closed, the time for the

vacuum to drop to 9 inches of mercury shall not be less than 2 minutes. If vacuum tests are used in lieu

of hydrostatic tests, the test shall be done both before and after backfilling of the manhole has occurred.

If the manhole fails a test, necessary repairs shall be made with a non-shrink grout while the vacuum is

being drawn. The test shall be repeated. If the vacuum test is failed twice, the manhole shall be repaired,

and a hydrostatic test shall be performed in accordance with paragraph (1) of this section.
Texas Commission on Environmental Quality Page 123
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.60. Lift Station Site Selection.

(a) Site access. The lift station shall have an access road located in a dedicated right-of-way or

a permanent easement. The road surface shall have a minimum width of 12 feet and shall be constructed

for access in all weather conditions. The road surface shall be above the water level caused by a 25-year

storm event.

(b) Security. The lift station, including mechanical and electrical equipment, shall be protected

from access by any unauthorized person. The lift station shall be enclosed within an intruder resistant

fence or located entirely within a lockable structure. An intruder resistant fence shall consist of a

minimum of a chain link fence 6 feet in height with a 1-foot section above consisting of 3 strands of

barbed wire.

(c) Flood Protection. The lift station including all electrical and mechanical equipment shall be

protected from a flood event on a 100-year frequency including wave action, and be fully operational

during such event.

(d) Odor Control. Lift stations shall be designed in a manner to minimize odor potential.

Incoming wet well gravity pipes shall be located to reduce turbulence. Retention times in the wet well

shall be minimized.
Texas Commission on Environmental Quality Page 124
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.61. Lift Station Wet Well/Dry Well Design Considerations.

(a) Pump Controls. All lift stations shall operate automatically based on the water level in the

wet well. Wet well level mechanisms shall be located so that they are unaffected by currents, rags,

grease, or other floating materials. All level mechanisms shall be fully accessible without entering the wet

well. Where bubbler systems are utilized for wet well control, dual air supply, and controls are required.

(b) Flood Protection. All electrical equipment shall be protected during a 100-year flood event

and be protected from potential flooding from the wet well. Motor control centers shall be mounted on a

4-inch tall housekeeping pad. All electrical equipment and connections in wet wells and dry wells shall

be explosion proof unless continuous ventilation is provided.

(c) Wet Wells. Wet wells and dry wells, including their structure, shall be separated by a

watertight and gas tight wall. All wall penetrations shall be gas tight. Equipment requiring regular or

routine inspection and maintenance shall not be located in the wet well, unless maintenance can be made

without entering the wet well. All gravity lines discharging to the wet well shall be located where the

invert elevation is above the liquid level of the pumps "on" setting. Gate valves and check valves shall not

be located in the wet well. Gate valves and check valves shall be located in a valve vault next to the wet

well. Based on peak flow, pump cycle time shall not be less than the those in Table C.4. Figure 1:

§217.61 (c)
Texas Commission on Environmental Quality Page 125
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table C.4 - Minimum Pump Cycle Times

Pump Horsepower Minimum Cycle Times (minutes)

less then 50 6

50 - 100 10

Over 100 15

Minimum Wet Well Volume shall be based on the following formula:

V’ (T( Q)/(4( 7.48) Equation 4.c

V = Volume (ft3 )

Q = Pump Capacity (GPM)

T = Cycle Time (Minutes)

7.48 = conversion factor in gallons/cubic foot

(d) Dry well access. Access shall be provided to underground dry wells. Stairways shall have

non-slip steps and conform to OSHA regulations with respect to rise and run. Where ladders are utilized

in lieu of stairways, ladders shall conform to OSHA requirements.

(e) Lift Station Ventilation.


Texas Commission on Environmental Quality Page 126
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Passive Ventilation for Wet Wells. Passive ventilation such as gooseneck type or

turbine type shall be screened to prevent the entry of birds or insects to the wet well. If passive

ventilation is provided for the wet well, all mechanical and electrical equipment in the wet well shall be of

explosion-proof construction. The passive ventilation shall be sized to vent at a rate equal to the maximum

pumping rate of the station and not exceed 600 fpm through the vent pipe. The minimum air vent size

shall be 4-inch diameter. Vent outlets shall be at least 1 foot above the 100-year flood elevation.

(2) Mechanical Ventilation in Lift Stations.

(A) Dry Wells. Mechanical ventilation shall be provided for all dry wells.

Ventilation equipment under continuous operations shall have a minimum capacity of six air changes per

hour. Ventilation equipment under intermittent duty shall have a minimum capacity of thirty air changes

per hour and be interlocked with the station's lighting system and a gas detection system. The gas

detection system shall monitor, at a minimum, oxygen deficiency, lower flammable limit (LFL), and

hydrogen sulfide concentration.

(B) Wet Wells. If explosion proof mechanical and electrical equipment is not

provided throughout the wet well, continuous mechanical ventilation shall be used to ventilate the wet

well. The ventilation equipment shall be sized for 12 air changes per hour and constructed of corrosion
Texas Commission on Environmental Quality Page 127
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

resistant material. In residential areas, consideration shall be given to reducing potential odors from the

ventilated wet well.

(f) Wet Well Slopes. The wet well floors shall have a minimum of 10 percent slope to the pump

intakes and have a smooth finish. There shall be no wet well projections which will allow deposition of

solids under normal operating conditions. Anti-vortex baffling shall be included on all lift stations with

greater than 5 MGD firm pumping capacity.

(g) Hoisting Equipment. Hoisting equipment or an access by hoisting equipment for removal of

pumps, motors, valves, etc., shall be incorporated into all lift station designs.

(h) Dry Well/Valve Vault Drains. Floor drains from valve vaults to wet wells shall be designed

to prevent gas from entering the valve vault. Such designs shall include flap valves, "P" traps, submerged

outlets, or a combination of these devices.

(i) Dry Well Sump Pumps.

(1) Pumps. Dual sump pumps, each with a minimum capacity of 1000 gallons per hour

and capable of handling liquid generated during peak operations, shall be provided in all dry wells. Pumps

shall have submersible motors. All wiring to the sump pumps shall be water tight. Dry well floors shall be

sloped toward a sump sized for each pump for proper drainage. The minimum sump depth shall be 6
Texas Commission on Environmental Quality Page 128
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

inches and shall be designed to prevent standing water on the dry well floor under normal operation.

Sump pumps shall operate automatically by use of a float switch or other level device.

(2) Piping. Sump pumps shall have separate piping which discharges above the

maximum liquid level of the wet well. The piping shall be a minimum of 1½ inches in diameter. Each

sump pump discharge pipe shall include two check valves in series.

§217.62. Pumps for Lift Stations.

(a) General Requirements. All raw sewage pumps shall be of a non-clog design, capable of

passing an incompressible sphere of 3-inches in diameter or greater, and shall have no less than 4-inch

diameter suction and discharge openings. Inspection and cleanout plates, located both on suction and

discharge sides of each pumping unit, are required for all non-submersible pumps to facilitate locating and

removing blockage causing materials unless the pump design accommodates easy removal of the rotation

elements. All pumps shall be securely supported to prevent movement or vibration during operation. For

submersible pumps, rail-type pump support systems, incorporating manufacturer approved mechanisms

designed to allow personnel to remove and replace any single pump without first entering or dewatering

the wet well, shall be provided. Submersible pump rails and lifting chains shall be constructed of Series

300 stainless steel.


Texas Commission on Environmental Quality Page 129
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(b) Lift stations designed for a peak flow of less than 120 gallons per minute shall be of

submersible design using grinder pumps.

(c) Lift Station Pumping Capacity. The firm pumping capacity of all lift stations shall be such

that the expected peak flow can be pumped to its desired destination. Firm pumping capacity is defined

as total station, maximum pumping capacity with the largest pumping unit out of service.

(d) Pump Head Calculations. The selection of pumps shall be based upon analysis of the system

head and pump capacity curves which determine the pumping capacities alone and with other pumps as

the total dynamic-head increases due to additional flows pumped through the force main. Piping head loss

shall be calculated in accordance with the Hydraulic Institute standards pertaining to head losses through

piping, valves, and fittings. The selected C factor used in calculation of friction head losses shall be based

on the pipe material selected. (Generally between 100 and 140). For lift stations with more than 2 pumps,

force mains in excess of one half mile, or firm pumping capacity of 100 gpm or greater, system curves

shall be provided for both the normal and peak operating conditions at C values for new and old pipe.

(e) Flow Control. Lift stations or transfer pumping stations located at wastewater treatment

systems, or those lift stations discharging directly to a wastewater treatment system, shall have a peak

pump capacity no greater than the peak design flow of the wastewater treatment system unless flow

splitting or equalization is provided. For wastewater treatment systems where the peak two hour flow is
Texas Commission on Environmental Quality Page 130
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

greater than 300,000 gallon per day, three or more pumps shall be provided, unless duplex automatically

controlled variable capacity pumps are provided.

(f) Self Priming Pumps. Self priming pumps shall be capable of priming at the design pump "on"

wet well level without reliance upon a separate priming system on the pump, an internal flap valve, or any

external means for priming. Suction pipe velocity shall be between 3 and 7 feet per second (fps), and

each pump shall have its own suction pipe. Each self priming pump shall include a means of venting air

back into the wet well during priming.

(g) Vacuum Priming Pumps. Vacuum primed pumps shall be capable of priming at the design

pump “on” wet well level by utilizing a separate positive priming system with a dedicated vacuum pump

for each main sewage pump. Suction pipe velocity shall be between 3 and 7 fps. Each pump shall have

its own suction pipe.

(h) Vertical Positioning of Pumps. All raw sewage pumps, other than submersible pumps with

"no suction" piping, vacuum primed pumps, or self-priming units capable of satisfactory operation under

any negative suction heads anticipated for the lift station under consideration, shall be positioned such that

the pumps always experience, during their normal on-off cycling, a positive static suction head.
Texas Commission on Environmental Quality Page 131
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(i) Individual Grinder Pumps. Grinder pump stations, serving only one residential or commercial

structure which is privately owned, maintained, and operated, shall be designed in accordance with all

local codes, ordinances, and other local requirements and are not subject to the rules of this Chapter.

§217.63. Lift Station Piping.

(a) Horizontal Pump Suctions. Each pump shall have a separate suction pipe. Eccentric reducers

shall be used on suction pipes in lieu of a concentric reducer. Pipes in wet wells shall be equipped with a

turn-down type flared intake.

(b) Valves. A check valve shall be installed on the discharge side of each pump followed by a

full-closing isolation valve on each pump. Check valves shall be swing type with an external lever. If the

full-closing valve is other than a rising stem gate valve, the valve shall include a position indicator to show

its open or closed position. Rubber ball check valves may be used for grinder pump installations only, in

lieu of swing type check valves. Butterfly valves, tilting disc check valves, or other valves utilizing a tilting

disc in the flow line shall not be allowed.

(c) Piping. Lift station piping shall have flanged or flexible connections to allow for removal of

pumps and valves without interruption of the lift station operations. Wall penetrations shall be designed to

allow for pipe flexure while excluding exfiltration or infiltration. Pipe suction velocities shall be between 3

and 7 feet per second.


Texas Commission on Environmental Quality Page 132
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.64. Emergency Provisions for Lift Stations.

Lift Stations shall be designed to prevent upstream overflows or by-passing of surcharge of raw

sewage. An audio-visual alarm system (red flashing light and horn) shall be provided for all lift stations.

All alarm conditions shall be transmitted, through use of an auto-dialer system or telemetering system, to a

location(s) where 24-hour assistance is available. The alarm system shall be activated in case of power

outage, pump failure, or a specified high wet well water level. In addition to the alarms and telemetering

requirements, all lift stations constructed to pump raw sewage, located at either the wastewater treatment

system or in the collection system, shall be provided with service reliability based on the options detailed in

paragraphs (1)-(5) of this section.

(1) Retention Capacity. The retention capacity in the lift station's wet well and incoming

gravity sewer lines shall be designed to insure that no discharges of untreated wastewater will occur at

the station or any point upstream for a period of time equal to the longest electrical outage recorded

during the past 24 months. If no records are available, the designer shall use 120 minutes to calculate

required retention capacity. A minimum of a 20-minute retention period shall be used even when power

company records indicate a shorter period of outage. Power outage records shall be on the utility

company letterhead, bear the signature of a utility representative, identify the location of the lift station, list

the total number of outages that have occurred in the past 24 months, and indicate the duration of each

power outage. For calculation purposes, the start of the outage period shall begin at the wet well
Texas Commission on Environmental Quality Page 133
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

elevation at which the last normally operating pump, excluding the standby pump, has just begun to

operate.

(2) Dual-Fed Electrical Power. The lift station may meet the emergency power

requirement by arranging for the facility to receive electrical service through either two separate electrical

distribution circuits or from separate power companies which have a fully automatic switch over

capability designed to assure continuous service. The two distributions lines shall be physically separated,

not carried on the same pole, and obtain their power from different substations. If separate distribution

circuits originate from the same substation, overall substation reliability shall be demonstrated.

(3) On-Site Generators. Emergency power may be provided by on-site, automatic

electrical generators sized to operate the station at its firm pumping capacity.

(4) Portable Generators or Pumps. Portable units may be used to guarantee service

provided the final engineering design report includes the location of the unit(s) and the amount of time

which will be needed to transport the unit(s) to the lift station(s); the number of lift stations for which each

unit is dedicated as a backup; what type of routine maintenance and upkeep is performed on the portable

units to ensure that they will be operational when needed and the power reliability records; and,

information detailed in paragraph (1) of this section. If portable units are proposed as a means of

providing service reliability, they shall meet all of the following criteria:
Texas Commission on Environmental Quality Page 134
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) The lift station shall be equipped with an automatic device for operator

notification;

(B) Operators shall be on call 24 hours per day and knowledgeable in operation

of the portable units;

(C) The station shall be fully accessible during the 100 year flood event;

(D) Station shall be equipped with a properly designed and tested quick

connection; and

(E) The portable unit shall be sized to handle the firm pumping capacity of the

station.

(5) Spill Containment Structures. The use of a spill containment structure as a means of

providing service reliability is prohibited. Spill containment structures may be used in addition to one of

the service reliability options detailed in this section, provided a detailed management plan for cleaning and

maintaining the spill containment structure is discussed in the final engineering design report. Additionally,

any spill containment structures shall be fenced with a six-foot fence which has a minimum of 3 strands of

barbed wire and which has a locked gate. Spill containment structures shall not be used to reduce other

power reliability requirements in any way.


Texas Commission on Environmental Quality Page 135
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.65. Materials For Force Main Piping.

Force main piping material shall be designed to withstand all working pressures, plus surge

stresses generated by instantaneous pump stoppage due to power failure under maximum pumping

conditions. The use of pipe and fittings rated at working pressure of less than 150 psi is prohibited. All

pipe shall be identified in the technical specifications with the appropriate ASTM, ANSI, or AWWA

specification number for both quality control (dimensions, tolerances, etc) and installation (bedding,

backfill, etc.). Pipe material specified for force mains shall be of a type having an expected life of at least

as long as that of the lift station and shall be suitable for the material being pumped.

§217.66. Force Main Joints.

Joints for force mains in buried service shall be either push-on rubber gaskets or mechanical

joints with a pressure rating equal or greater than the force main pipe material. Joints for exposed force

mains shall be flanged or flexible adequately secured to prevent movement due to surges. Where

possible, ASTM, AWWA, or other appropriate national reference standards for the joints shall be included

in the project specifications.

§217.67. Force Main Pipe Bedding.

Bedding for force mains shall comply with §217.54 of this title (relating to Pipe Bedding).
Texas Commission on Environmental Quality Page 136
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.68. Identification of Force Main Piping.

A detector tape shall be laid, in the same trench, above and parallel to the force main. The tape

shall state in a minimum of 1½ inch tall letters "pressurized wastewater" continuously along the tape.

§217.69. Force Main Design.

(a) Velocities. Force mains shall be a minimum of 4 inches in diameter unless used in

conjunction with a grinder pump station. For duplex pump stations, minimum force main velocities shall be

3 feet per second with one pump in operation. For pump stations with 3 or more pumps, the force main

velocity shall not be less than 2 feet per second with the smallest pump only in operation unless special

facilities are provided for cleaning the line, or it can be shown that a flushing velocity of five feet per

second or greater will occur once or twice daily. Pipeline velocities greater than 6 feet per second shall

be checked by the engineer for possible high and low negative surge pressures in event of sudden pump

failure.

(b) Detention Time. Detention time of the force main shall be calculated. This calculation shall

be performed using a range of flow rates which represent the flows expected to be delivered to the force

main by the upstream pump station during a 24-hour period.


Texas Commission on Environmental Quality Page 137
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) Water Hammer. Consideration of surges due to power failure during pumping shall be given

to force mains based upon the wave speed of the force main material to be provided. Surge control

measures shall be provided when pressures due to water hammer exceed the working strength of the

force main pipe.

(d) Connection to Gravity Main. All force mains shall terminate either at a manhole on the

gravity sewer system or at the wastewater treatment system in an appropriate structure or manhole. The

discharge end of a force main inside a manhole shall be designed to remain steady and produce non-

turbulent flow. The top of the force main shall be matched to the top of the design flow depth inside the

receiving sewer pipe where possible. The receiving sewer line shall be designed to handle the maximum

pump discharge without surcharging.

(e) Vertical alignment. Vertical alignment of a pipeline shall avoid, to the greatest extent

practical, following a pump with rapid rises of pipe grade followed by long stretches of flat grade. This

type alignment encourages water column separation resulting in surges. A rising pipe followed by a

falling pipe shall require an air valve at the summit.

(f) Pipe Separation. When installing a force main, the separation distance between the force

main and any existing or new waterline shall meet the minimum separation requirements established in

§290.44 (e) of this title (relating to Water Distribution).


Texas Commission on Environmental Quality Page 138
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(g) Odor Control. Force main discharge points shall be arranged to reduce turbulence. Force

mains shall terminate at or near a manhole invert with the top of pipe matching the water level in the

manhole at design flow. Odor control in the force main shall be implemented if the detention time creates

an odor problem.

(h) Air Release Valves in Force Mains. Air release valves or combination air release/air

vacuum valves, suitable for sewer service, shall be provided at all high points along the vertical force main

alignment. These air valves shall have an isolation valve between the air valve and the force main. The

air valves shall be installed inside of a vault for access with a minimum vault size of 48 inches in diameter.

The vault access shall have a minimum opening of 30 inches in diameter. The vault shall be vented.

§217.70. Force Main Testing.

Final plans and specifications shall describe the required pressure testing procedures. A pressure

test of 50 psi above the normal operating pressure of the force main is required on all installations. A

temporary valve for pressure testing may be installed near the discharge point of the force main and

removed after the successful completion of the test. The pump isolation valve may be used as the

opposite termination point. The force main shall be filled with water for the pressure test. The pipeline

shall be held at the designated test pressure for a minimum of 4 hours, and the equivalent leakage rate

shall not exceed 10 gallons per inch diameter per mile of pipe per day.
Texas Commission on Environmental Quality Page 139
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.71. Reclaimed Water and Irrigation Facilities.

In accordance with §217.9 of this title, (relating to Submittal Requirements), the design of

distribution systems which will convey reclaimed water to a user shall be submitted, reviewed, and

approved by the executive director. The design of the distribution systems shall meet the requirements of

Chapter 217 of this title (relating to Design Criteria for Sewerage Systems). Where a municipality is the

plan review authority for certain sewer systems which transport primarily domestic waste in lieu of the

commission, design submittals will not be subject to submittal to the executive director and instead shall be

approved by the municipality. Reuse facilities which are designed to transport Type II reclaimed water,

as defined by Chapter 210 of this title, shall comply with §217.52 through §217.70 of this subchapter, as

applicable to the project. Reuse facilities designs which are transporting Type I reclaimed water, as

defined by Chapter 210 of this title, may be designed with reduced minimum requirements. The minimum

requirements for Type I reclaimed water facilities are provided in this section.

(1) Gravity Piping in Type I Reclaimed Water Facilities. Lines which transport Type I

reclaimed water in gravity sewers under gravity flow shall meet the requirements detailed in paragraphs

(1)-(5) of this section.

(A) Type I reclaimed water gravity piping shall comply with §§217.53(c), (f),

(h), (j), (l), (n), 217.54, 217.55(1), 217.55(5), 217.58, and 217.59 of this title (relating to Pipe Design, Pipe
Texas Commission on Environmental Quality Page 140
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Bedding, Manholes and Related Structures, Testing Requirements for Installed Gravity Collection Lines,

Testing Requirements for Manholes).

(B) Where velocities greater than 10 feet per second will occur when the pipe is

flowing full based on Manning’s formula and an n value of 0.013, special provisions shall be made to

protect against pipe and bedding displacement.

(C) The designer shall consider methods to prevent or maintain lines to mitigate

the effect of the deposition of solids in the gravity conveyance.

(D) Appurtenances Identification.

(i) above-ground hose bibs (spigots or other hand operated connections)

are prohibited. Hose bibs shall be located in locked, below-grade vaults which shall be clearly labeled as

being of non-potable quality. As an alternative to the use of locked, below-grade vaults with standard

hose bibs services, hose bibs which may be only operated by a special tool shall be placed in non-lockable,

underground service boxes clearly labeled as non-potable water; and

(ii) Signs in both English and Spanish shall be posted and maintained at

storage areas, on hose bibs, and at faucets reading "Non-Potable Water, Do Not Drink" or similar
Texas Commission on Environmental Quality Page 141
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

warnings. Alternatively, the area shall be secured to prevent access by the public. All hose bibs and

faucets shall be painted purple and shall be designed to prevent connection to a standard water hose.

(E) Cross Connection Control - Separation Distances. Type I reclaimed water

piping shall be separated from potable water piping by a distance of at least nine feet, as measured from

the outside surface of each of the respective pieces. Physical connection between a drinking water

supply line and a reclaimed water line is prohibited. Any appurtenance shall be designed and constructed

to prevent any possibility of reclaimed water entering the drinking water system. Where the nine foot

separation distance cannot be achieved, the reclaimed water piping shall meet the requirements in

subparagraphs (A) and (B) of this paragraph.

(i) New Type I Reclaimed Water Line - Parallel Lines. Where a new

Type I reclaimed water line is installed parallel to an existing water line, the horizontal separation distance

shall be no less than three feet (outside to outside) with the water line at the same level or above the

reclaimed water line. The Type I reclaimed water line shall have a minimum pipe stiffness of 115 psi

with compatible joints, or shall have a pressure rating of 150 psi for both pipe and joints. The Type I

reclaimed water lines which parallel the water lines may be placed in the same benched trench, provided

the reclaimed water line is embedded in cement stabilized sand. Where cement stabilized sand is used,

the sand shall have a minimum of 10 percent cement per cubic yard of cement stabilized sand mixture,

based on loose dry weight volume (at least 2.5 bags of cement per cubic yard of mixture. The cement
Texas Commission on Environmental Quality Page 142
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

stabilized sand bedding shall be a minimum of 6 inches above and one quarter of the pipe diameter on

either side and below the sewer pipe.

(ii) New Type I Reclaimed Water Lines - Crossing Lines. Where a

new Type I reclaimed water line is installed crossing an existing potable water line, one segment of the

Type I reclaimed water pipe shall be centered on the water line such that the joints of the reclaimed water

line pipe are equidistant from the center line of the potable water line. Whenever possible, the crossing

shall be centered between the joints of the potable water line. The Type I reclaimed water pipe shall

have either a pressure rating of 150 psi for both pipe and joints or a pipe stiffness of at least 115 psi with

compatible joints for a minimum distance of 9 feet in each direction as measured perpendicularly from any

point on the water line to the Type I reclaimed water pipe. The minimum distance between a reclaimed

water line and any potable water line shall be 6 inches. Any portions of reclaimed water line within 9 feet

of a potable water line shall be embedded in cement stabilized sand. The cement stabilized sand shall

comply with the same requirements as those listed in subparagraph (A) of this paragraph.

(2) Site Selection of Type I Reclaimed Water Pump Stations. The design shall comply

with §217.60(a)-(c) of this title (relating to Lift Station Site Selection).

(3) Design of Type I Reclaimed Water Pump Stations. The design shall comply with

§§217.61(d), (g), 217.62(d), 217.63(a), (c) of this title (relating to Lift Station Wet Well/Dry Well Design

Considerations, Pump for Lift Stations, Lift Station Piping) and paragraphs (1)-(3) of this section.
Texas Commission on Environmental Quality Page 143
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Pump Controls. All electrical equipment shall be protected from, and

operable during, a 100-year flood event and be protected from potential flooding from the wet well.

Motor control centers shall be mounted on a 4-inch tall housekeeping pad.

(B) Pumps. All pumps shall be securely supported so as to prevent movement

or vibration during operation. For submersible pumps, rail-type pump support systems incorporating

manufacturer-approved mechanisms designed to allow the operator to remove and replace any single

pump without first entering or dewatering the wet well shall be provided. Submersible pump rails and

lifting chains shall be constructed of Series 300 stainless steel. The firm pumping capacity of all reuse

pump stations shall be such that the required flow can be pumped to its desired destination. Firm pumping

capacity is defined as total station maximum pumping capacity with the largest pumping unit out of

service.

(C) Lift Station Valving. A check valve shall be installed on the discharge side

of each pump followed by a full-closing isolation valve on each pump. Check valves shall be swing type

with an external lever. Gate valves with rising stems are recommended for full-closing valves. If other

than rising stem gate valves, such as plug valves, are used, then the valves shall include a position

indicator to show their open or closed position.

(4) Force Main Piping for Type I Reclaimed Water. The design shall comply with §§217.65,

217.66, 217.67, 217.69(a)-(c), (e), (h), 217.70, of this title (relating to Materials for Force Main Piping,
Texas Commission on Environmental Quality Page 144
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Force Main Joints, Force Main Pipe Bedding, Force Main Design, and Force Main Testing) and

paragraphs (1) and (2) of this section.

(A) Identification. The force main pipe shall be purple in color or contained in a 8 mil

polyethylene sleeve conforming to AWWA C105, Class C, that is purple in color.

(B) Isolation Valves. In-line isolation valves for reuse pipes shall open clockwise to

distinguish them from potable water isolation valves. Valve casings for underground isolation valves shall

have cast into the cast iron lid "REUSE" or "NPW."


Texas Commission on Environmental Quality Page 145
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER D : ALTERNATIVE SEWER COLLECTION SYSTEMS

§§217.91-217.100

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.91. Applicability.

This subchapter sets forth the design criteria for alternative sewer collection systems.

§217.92. Design of Alternative Collection Systems - Component Sizing.

Components shall be sized based on existing flow data from similar types of systems and service

areas, whenever such data is available. If flow data from similar service areas with conventional
Texas Commission on Environmental Quality Page 146
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

wastewater collection systems are used, consideration shall be given to the effects of inflow and

infiltration on the peak flows of the system. Design and construction of alternative wastewater collection

systems shall be done to minimize excess flows from inflow and infiltration. Roof, street, or other types of

drains that permit entrance of surface water into the sanitary sewer system are prohibited.

(1) On-Site Components. In the absence of existing data, Table B.1 in §217.32 of this

title (relating to Design of New Systems - Organic Loadings and Flows), in conjunction with the following

formula, shall be used for sizing on-site components in residential systems: Figure 1: §217.92(1)

Q’ X( (1% B) Equation 1.d

Where: Q = flow in gallons per day

X = per capita wastewater production

B = number of bedrooms

(2) Off-Site components. Design of the off-site components shall be based on the

maximum flow rate expected. The maximum flow rate shall be calculated by the following formula:

Figure 2: §217.92(2)
Texas Commission on Environmental Quality Page 147
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Q’ A( N% B Equation 2.d

Where: Q = Design flow rate (gallon per minute)

A = Design coefficient, typically 0.5

N = Number of EDUs served by the off-site component

B = Safety factor, assumed to be 20.0

(A) An EDU is assumed to have an occupancy of 3.5 people. For significantly

Q’ A1( P% B Equation 3.d

different occupancy rates, the following formula shall be used: Figure 3: §217.92(2)(A)

Where: Q = Design flow rate (gallon per minute)

A1 = Derived from A in previous equation, typically 0.15

P = population to be served

B = Safety factor, assumed to be 20.0


Texas Commission on Environmental Quality Page 148
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) The safety factor, B, may be adjusted if high wastewater flows are

anticipated. Discharges from commercial or institutional dischargers shall be measured directly or

calculated as previously indicated.

§217.93. Gravity Lines, Force Mains and Lift Stations in Alternative Collection Systems.

Except where specifically modified in this subchapter, designs for alternative sewer collection

systems shall comply with the applicable requirements of Subchapter C of this Chapter, in addition to the

requirements of this subchapter. The manager/operator of the alternative collection system shall comply

with all the requirements of this subchapter and shall ensure that all components which are a part of the

any alternative collection systems which are covered by a sewer service agreement are designed,

constructed and operated in compliance with all the requirements of this subchapter and any other

applicable rules. An operations and maintenance manual covering the recommended operating

procedures and maintenance practices for the alternative wastewater collection system and record

drawings indicating the location of all on-site components of the alternative wastewater collection system

shall be provided to the owner by the engineer, upon the completion of construction. The engineer shall

submit a letter to the Commission’s Wastewater Permitting Section certifying that this action has been

performed. The letter shall include:

(1) A copy of the operation and maintenance manual, and/or the record drawings to the

commission upon request.


Texas Commission on Environmental Quality Page 149
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) Permit number and names of the permittee.

§217.94. Management.

A management structure shall be established to be responsible for the operation and maintenance

of an alternative wastewater collection system.. The manager/operator of the alternative collection

system shall comply with either paragraphs (1) or (2) of this section.

(1) The manager/operator of the alternative collection system shall be the same as the

entity that holds the wastewater discharge permit for the facility treating the sewage collected by the

alternative collection system. When the manager/operator does not hold a wastewater discharge permit

and as such contracts by written agreement with another entity for wastewater treatment, then that

agreement shall address the responsibility for management and operation of the alternative collection

system. Regardless of which entity takes responsibility for management and operation of the alternative

collection system, it must be an entity under jurisdiction of the commission

(2) The manager/operator of the alternative collection system may contract for

management and operation services by a public or private service provider. The manager/operator shall

have the authority to terminate the contract at any time if the service provider’s services are in conflict
Texas Commission on Environmental Quality Page 150
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

with the manager/operator’s requirements or wastewater discharge permit, the requirements of this

chapter, or other commission requirements.

(3) Grinder pumps and septic tank effluent pumps, discharging directly into a

conventional gravity sewer system, are not required to comply with the requirements for management.

§217.95. Sewer Service Agreements.

A sewer service agreement shall be executed between the manager/operator of the alternative

wastewater collection system and the property owner that allows for the placement and maintenance of

alternative system components located on private property. The sewer service agreement between the

property owner and the manager/operator of the alternative system shall insure that proper construction

and competent maintenance of the on-site components shall be executed. The on-site components may

be owned by the property owner, or the manager/operator. The sewer service agreement shall be

submitted to the commission with the summary transmittal letter required in §217.9(c) of this title (relating

to Summary Transmittal Letter). Regardless of the ownership of the on-site components, a sewage

service agreement for alternative collection systems shall include the following provisions.

(1) Any existing alternative sewer system components, including building laterals that

are to be incorporated into an alternative collection system shall be cleaned, inspected, tested, repaired,

modified or replaced, as necessary, to the satisfaction of the manager/operator of the alternative


Texas Commission on Environmental Quality Page 151
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

wastewater collection system prior to connection of these components to the collection system, to insure

the integrity of, and the compatibility to, the alternative wastewater collection system.

(2) The manager/operator of the alternative wastewater collection system shall have

final approval for all materials and equipment prior to the incorporation of the materials and equipment into

any construction or repair of alternative sewer system components.

(3) The manager/operator of the alternative wastewater collection system shall inspect

and approve the actual installation of all alternative sewer collection system components prior to placing

the components into service.

(4) The manager/operator of the alternative wastewater collection system shall be

granted access at all reasonable times to inspect alternative sewer collection system components.

(5) The manager/operator of the alternative wastewater collection system shall be

granted the right to make emergency repairs and perform emergency maintenance to any alternative

sewer collection system components, including building laterals, and utility-owned on-site collection system

components, in order to protect the integrity or operation of the alternative system. The agreement shall

provide that the cost of such repairs or maintenance will be charged to the owner of the property, provide

a means to determine the cost of such repairs, provide a schedule of payment, and provide for a

methodology for cost recovery.


Texas Commission on Environmental Quality Page 152
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(6) For those alternative collection system designs that incorporate alternative collection

system components that use power, the service agreement shall provide for the delineation for

responsibility for power costs. Power for alternative collection system components serving an EDU may

be supplied from the electrical service equipment serving the EDU. Power for alternative collection

system components serving a MEDU shall be supplied separately from the MEDU.

(7) When a MEDU, because of the nature of its wastewater, shall employ pre-treatment

units, ownership and responsibility for the operation and maintenance of the facilities shall remain with the

MEDU unless otherwise agreed to by the manager/operator of the alternative collection system.

Regardless of ownership, a sewer service agreement between the owner of the pre-treatment units and

the manager/operator of the alternative collection system shall be executed. The agreement shall grant

the manager/operator of the alternative collection system the right to inspect and approve the installation

of any pre-treatment units, allow access for inspection of the units to determine their operational and

maintenance status, and allow the manager/operator of the alternative wastewater collection system to

make emergency repairs or perform emergency maintenance when required to protect the integrity or

operation of the alternative wastewater collection system. The agreement shall provide that the cost of

such repairs or maintenance will be charged to the owner of the pre-treatment units, provide a means to

determine the cost of such repairs or maintenance, provide a schedule of payment, and provide for a

methodology to recover costs.


Texas Commission on Environmental Quality Page 153
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(8) A utility-owned service isolation valve shall be provided upstream of any utility-

owned, on-site component. When the on-site components are privately owned, the service isolation valve

shall be located on the service line from the on-site components to the collection system, and as close as

practical to the property line. The location of the service isolation valve shall be accessible at all times by

the utility through an easement granted by the property owner to the utility or other means which

guarantees access. The manager/operator shall be given access to the isolation valve at all times.

(9) The manager/operator of the alternative wastewater collection system shall

demonstrate a capacity to manage any residual materials that may be generated by use of an alternative

wastewater collection system. Management shall include the ability to collect, transport, and dispose of

the residual materials.

§217.96. Design of Small Diameter Effluent Sewers (SDES).

(a) Interceptor tank design. Septic tanks used as interceptor tanks shall be designed and

constructed in accordance with Chapter 285 of this title (relating to On-site Sewage Facilities). A

commercially available effluent filter shall be installed on the outlet of the interceptor tank. The effluent

filter shall be designed to remove particles larger than 1/16 inch and shall be designed and installed to

facilitate easy cleaning. The volume of an EDU interceptor tank shall be based the criteria in Chapter

285 of this title (relating to On-site Sewage Facilities). MEDU interceptor tank sizing will be based on the

formula: Figure 1: 217.96(a)


Texas Commission on Environmental Quality Page 154
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

VT’ VR% VN Equation 4.d

Where: VT = Total Volume

VR = Reserve Volume = 0.75 x average daily flow (ADF)

VN = Nominal Volume

VN’ VIE% VCZ% VSO Equation 5.d

Where: VIE = Volume in gallons between elevation of the tank inlet and

the tank outlet ( #.165 ADF)

VCZ = Volume in gallons of the clear zone between

maximum sludge depth and scum accumulation

(ADF)

VSO = Volume in gallons dedicated to scum and sludge

storage (1.85 ADF)

(b) Pre-treatment units. MEDU establishments that discharge wastewater with excessive

amounts of fats, oils, or grease shall provide a method for trapping and removing these constituents from

the wastewater before the interceptor tanks. Grease traps shall be of a double compartment design.

Construction requirements of grease traps shall meet the same requirements as interceptor tanks with

regard to water tightness, materials of construction and access to contents. Grease retention capacity in
Texas Commission on Environmental Quality Page 155
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

pounds shall be equal to at least twice the unit's flow capacity in gallons per minute. The grease retention

capacity of the trap is defined as the amount of grease that it can hold before its efficiency drops below

90%. The primary compartment volume shall be at least 60% of the total tank volume. Plumbing for the

grease trap shall be designed to exclude waste from other fixtures, specifically blackwater, from entering

the trap.

(c) Tank monitoring. The manager/operator of the SDES shall monitor the sludge volume in

each interceptor tank. Before the sludge level is within 6 inches below the outlet, the interceptor tank

shall be pumped.

(d) Service line design. Pipe materials used for service lines shall meet the performance

characteristics of ASTM D 2241 Class 200 PVC pipe. Interceptor tanks with outlet elevations below the

main line elevation, or the hydraulic grade line in the depressed section of a main line, shall be designed

with pumping units. The minimum acceptable diameter for a service line serving an EDU is 2 inches.

Service lines for MEDUs shall be a minimum of 2 inches in diameter, but shall be designed based on the

actual hydraulic requirements. Diameter of service lines shall be no greater than the collection line to

which they connect. Service lines of low-lying interceptor tanks, that are subject to periodic back flow

shall be fitted with a check valve. The check valve shall be located immediately adjacent to the collection

line. Check valves shall be made from a corrosion resistant material and provide an unobstructed flow

way. A means to prevent the migration of odors from the collection line by use of traps or other in-line
Texas Commission on Environmental Quality Page 156
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

odor control devices shall be provided. The odor control devices shall be readily accessible for

maintenance.

(e) Collection system design.

(1) Hydraulic design. All SDES systems designed for open channel flow shall use a

design depth of flow of 100% of pipe diameter. Flow velocities in collection lines shall not be less than 1.0

feet per second at design flow nor greater than 8 feet per second at peak flows without velocity

protection. In no case shall the flow velocity exceed 13 feet per second in any portion of the SDES

system. Velocity calculations for each line segment shall be submitted with the final engineering design

report. Design of SDES shall insure that the elevation of the hydraulic grade line at peak flow conditions is

lower than the outlet invert of any upstream interceptor tank, except those which incorporate the use of

septic tank effluent pumps as on-site conveyance equipment. A system analysis for each line showing the

hydraulic grade line, energy grade line, and ground elevation in relationship to the outlet elevations of the

interceptor tanks being served by the collection line shall be included in the final engineering design report

accompanying the plans. When an SDES system is comprised of both open channel and pressure flow

segments, as found in VGES systems, separate analysis shall be made for each segment of the sewer in

which the type of flow does not change. For open pipe flow, a Manning’s "n" value of 0.013 shall be

used. For pressure flow a Hazen-Williams "C" value of 120 shall be used. The minimum pipe diameter

for an SDES shall be 2-inches.


Texas Commission on Environmental Quality Page 157
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) The vertical alignment of an SDES may be variable; however, the overall gradient

shall provide sufficient fall such that the lines have sufficient capacity to transport the expected peak

flows. The invert elevation of a section of a collection line, which is depressed below the static hydraulic

grade line, shall be at an elevation that does not permit the hydraulic grade line to rise above any upstream

interceptor tank outlet invert at peak flow, except those which are equipped with septic tank effluent

pumps. Venting shall be provided upstream and downstream of line segments that are below the

hydraulic grade line. The profile of the sewer lines shall be uniform with no abrupt or sharp changes in

profile. Cleanouts shall be used in lieu of manholes at upstream termini of collection lines, minor junctions

of collection lines, changes in collection line diameter, and at intervals along a collection line. Maximum

spacing of cleanouts along collection lines shall be 1000 feet. Cleanouts shall extend to ground level and

terminate in watertight valve boxes. Manholes shall be used at intersections of 3 or more collection lines.

Manholes shall not be located in the flow path of water courses or drainages, nor in areas where ponding

of surface water is probable. Wastewater service air release or combination air release/vacuum valves

shall be used for venting at summits in the collection lines, and where otherwise needed for proper

operations. The valves shall be constructed of corrosion resistant material and located in watertight

vaults. Piping materials used in the collection system shall meet the performance requirements of ASTM

D 3034 SDR 26 PVC pipe, except for those segments under pressure flow conditions where piping

materials shall meet the performance requirements of ASTM D 2241 Class 200 PVC pipe.

§217.97. Design of Pressure Sewers.


Texas Commission on Environmental Quality Page 158
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Pressure sewer systems include grinder pump sewer systems and septic tank effluent pump

systems. Except where this section specifically states otherwise, the requirements of this section apply to

both of these types of systems.

(1) Service Line Requirements. Pressure sewer service lines buried at a depth of less

than 30-inches shall incorporate a check valve and a fully closing gate or ball valve at the connection to

the collection line to allow isolation of the service line. Check valves shall be of a design that allows an

unencumbered flow. Valves shall be manufactured from corrosion resistant material and shall incorporate

a position indicator to show their open and closed position. Minimum size service line for an EDU is 1.25

inches and for a MEDU the minimum size service line is 1.5 inches. Connection to collection lines shall be

made by tee or service saddle. Solvent weld fittings may be used. The diameter of a service line shall be

no greater than the collection line to which it connects. Materials used in service line piping shall at least

be equivalent to the performance characteristics of ASTM D 2241 Class 200 PVC pipe.

(2) On-Site Pressure Sewer System Mechanical Equipment Requirements.

(A) Pump discharge rates shall be such that the expected wastewater peak flow

can be accommodated by the capacity of the pump and by the volume of the wet-well dedicated for flow

attenuation and storage. The engineering report shall include an engineering analysis which justifies the

selected pump(s).
Texas Commission on Environmental Quality Page 159
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Simplex units may be provided for an EDU; however, a MEDU shall be at

least a duplex unit which is capable of pumping the peak flow with the largest pump out of service.

(C) Calculations shall be done to show that lift stations and pump chambers are

protected against buoyancy forces.

(D) Control panels for all pumps shall be at least 2 feet above the ground floor

elevation of the structure being served by the equipment.

(E) All piping and appurtenances within the wet wells shall be corrosion

resistant.

(F) The reserve volume of an EDU grinder pump wet well or a STEP wet well

shall be at least 100 gallons after the activation of the high water alarm level. The reserve volume of a

MEDU grinder pump wet well shall be equal to the volume accumulated during the peak 2-hour period, or

100 gallons, whichever is greater. Pumps located in STEP chambers that are integral with the interceptor

tank may use the reserve volume of the interceptor tank for the required reserve volume. Housings that

contain the mechanical equipment or its controls shall be watertight when immersion of equipment or

controls will cause their failure.


Texas Commission on Environmental Quality Page 160
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(G) A visual and audio alarm shall be provided with all wet wells. For EDUs the

alarms shall activate at a specified high water level. For MEDUs the alarms shall activate in the event of

unit failure or high water level.

(H) Control panels and other electrical enclosures shall be constructed from

corrosion resistant materials, shall be water tight, and shall be designed and installed in a manner to

prevent the migration and venting of odors and corrosive or explosive gases to the panel. All electrical

equipment shall bear the seal of the Underwriter Laboratory, Inc., or shall comply with the National

Electric Code.

(I) On-site mechanical equipment used in STEP systems may be either housed

in the interceptor tank or in a separate stand alone unit. Pumps used in STEP systems shall be located in

a hydraulically independent chamber. The pump chamber shall be hydraulically connected to the

interceptor tank such that the liquid elevation in the pumping chamber is independent of the liquid elevation

in the interceptor tank. Designs that allow direct pumping of the contents of the interceptor tank such that

the liquid elevation in the tank fluctuates shall not be used.

(J) All on-site mechanical equipment and their control mechanisms shall be

housed in lockable or similar tamper-resistant structures. Vaults, chambers, wet-wells or other structures

used to detain wastewater which are integral with structures that contain on-site mechanical equipment

shall be watertight and able to withstand all expected structural loadings. Materials used for equipment
Texas Commission on Environmental Quality Page 161
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

housings and detention of wastewater shall be corrosion resistant and meet the same requirements with

regard to materials of construction as interceptor tanks.

(3) Discharge Piping Requirements. All discharge piping and connections used to

connect the on-site mechanical equipment to the service line shall be pressure rated at a minimum of 2.5

times the maximum system design pressure. Piping material and valves shall be corrosion resistant and

otherwise suitable for exposure to a sewage environment. For discharge piping that incorporates the use

of plastic hoses, direct burial of the hose shall not be allowed. Discharge piping for pressure systems shall

include a check valve, pipe union and a full closing gate or ball valve. The check valve shall precede the

full closing valve. Valves shall incorporate a position indicator to show their open and closed position.

Valves used in MEDU applications shall be housed in a valve box separate from the on-site mechanical

equipment.

(4) Collection System Design. Consideration shall be given to ensuring that grinder pump

pressure system main lines are designed to achieve velocities of 3 feet per second at least once per day.

Under no circumstances shall design velocities be less than 2 feet per second. Velocities in grinder pump

main lines shall not exceed 8 feet per second. Septic tank effluent pump pressure system main lines shall

achieve velocities of 1 foot per second at least once per day. Collection system headloss calculations

shall be based on a Hazen-Williams “C” factor appropriate to the piping material, but “C” factors of

greater than 120 are not allowed. Minimum size piping used for pressure system collection lines shall be
Texas Commission on Environmental Quality Page 162
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

1.5 inches. Material characteristics shall be at least equal to ASTM D 2241 Class 200 PVC pipe.

Elastomeric pipe joints shall be required for pipe equal to or greater than 3 inches in diameter. Air relief

shall be provided at the locations where air may accumulate due to a transition between full and partially

full flow conditions. Pumping units affected by the partially full flow conditions shall incorporate anti-

siphon devices. Isolation valves shall be located at intersections of collection system main lines, both sides

of stream crossings, both sides of areas of unstable soil, and at maximum intervals of 2,500 feet on long

routes. Isolation valves shall be resilient seated gate valves or ball valves, with a position indicator, and be

constructed from corrosion resistant materials. Isolation valves shall be located in locked valve boxes.

Wastewater type air release valves constructed from corrosion resistant materials shall be provided at all

significant peaks in elevation. The valve orifice shall not be less than 0.25 inches in diameter. Air release

valves in close proximity to residences shall incorporate a method to control odor released by their

operation. When intermediate pumping of the wastewater is required, the design of the collection system

lift stations shall meet the requirements of Subchapter C.

§217.98. Vacuum Sewer Systems.

Vacuum Sewer Systems shall be considered nonconforming technologies. If a review of a

vacuum sewer is performed by the executive director, the review will be done in accordance with

§217.10(b) of this title (relating to Types of Approvals) and the criteria described in this section.

(1) Design of Vacuum Sewers.


Texas Commission on Environmental Quality Page 163
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) On-Site Components-The building lateral shall be constructed from a piping

material that is at least equivalent in performance to ASTM D 2241 Class 160 PVC pipe. The building

lateral shall have a screened, auxiliary vent, no less than 4-inches in diameter located no closer than 10­

feet from the vacuum valve. Vacuum valve controls shall be housed in tamper resistant, watertight,

corrosion resistant structures. Vacuum valve pits shall be watertight with regard to surface and

groundwater inflow. Control mechanisms that incorporate pressure differential for operation shall use

atmospheric air supplied by a screened breather vented externally to the equipment housing. Vacuum

valves shall have a minimum capacity of 30 gallons per minute. Service lines shall be a minimum of 3­

inches in diameter. Materials used in the construction of service lines shall have performance

characteristics at least equivalent to ASTM D 2241 Class 200 PVC pipe. All joints shall be made be

either vacuum rated Elastomeric gaskets, or by solvent welding. There shall be at least 5 feet of service

line between the vacuum valve and the main line. When vertical profile changes are incorporated in

service lines, there shall be a minimum of 5-feet between the vacuum valve and first profile change, and

between the last profile change and the main line. Service lines shall have a minimum slope equal to the

greater of a 2-inch drop or 0.2% slope between the vacuum valve and main collection line, or between

vertical profile changes. Connection of service lines to main lines shall be done using a wye and a long

radius elbow, oriented so that the invert of the service line is higher than the crown of the collection line,

and shall not be made within 6-feet of a collection line vertical profile change.
Texas Commission on Environmental Quality Page 164
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Collection System Design. All piping used in vacuum sewers shall be

equivalent to the performance characteristics to ASTM D 2241 Class 200 PVC pipe. Joints shall be

made with vacuum rated rubber gaskets or by solvent welding. The minimum sized pipe used in vacuum

sewers shall be 4-inches in diameter, except for service lines which may be 3-inches in diameter. The

length of a 4-inch diameter line shall not exceed 2,000 feet; lengths for other larger diameter lines shall be

dictated by friction and lift head loss. The total available head loss in a system shall not exceed 18 feet.

Friction headloss for any sized pipe shall be limited to 0.0025 ft./ft. Head loss calculations shall be

submitted with the engineering report. Vacuum sewer systems shall be laid out in a branched pattern.

The line work shall have a sawtooth profile that slopes toward the vacuum station. Slope profile of the

collection line shall be the greater of 0.2% of the distance slope, ground profile, or 40% of pipe inside

diameter except for 4-inch pipe where 80% inside diameter is to be used. Design of upgrade mainline

transport must reduce the risk of completely blocking the pipe bore with trapped sewage. Collection lines

that must be depressed in order to avoid an obstruction shall have a minimum 20-foot segment centered

on the obstruction. Division valves shall be provided at collection line intersections, at both sides of a

watercourse crossing and areas of unstable soils, and at intervals of 1,500 feet. Plug valve or resilient

seated gate valves, capable of sustaining a vacuum of 24 inches of mercury are acceptable. Gauge taps

shall be provided downstream of the division valve. Cleanouts shall be provided at changes in pipe

diameter, and on collection line segments of 1500 feet or more where there are no service connections.
Texas Commission on Environmental Quality Page 165
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(C) Vacuum station design. The minimum vacuum pump capacity shall not be

less than 150 gpm, and shall be the greater of the capacities calculated using the following equations:

Figure 1: §217.98(1)(D)

Qvp = [A Qmax/7.5 gal./ft.3] + B Nv

Where:

Qvp = Minimum vacuum pump capacity

A = Variable based on line length

Qmax = Station peak flow (gal./min.)

B = Bleed rate of vacuum valve controller (ft.3/min.)

Nv = Number of vacuum valves in system

The appropriate values of A shall be as follows:


Texas Commission on Environmental Quality Page 166
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Longest Line Length

(ft.) A
0 - 3,000 5

3,001 - 5,000 6

5,001 - 7,000 7

7,001 - 10,000 8

10,001 - 12,000 9

12,001 - 15,000 11

Or,

Q = V/PDT ln (H1/H2)

Where:

Q = Flow rate of vacuum pump (ft.3/sec.)

PDT = Time to reduce head from H1 to H2 (sec.)

V = Volume of closed system (ft.3 )

H1 = Initial absolute pressure head (in. mercury)

H2 = Final absolute pressure head (in. mercury)

(D) Vacuum Pumps. Vacuum pumps must be sized to evacuate the system in no

more than 180 seconds. Duplicate pumps, each capable of delivering 100% of required air-flow, and

capable of continuous duty shall be provided. Either liquid-ring or sliding-vane type vacuum pumps may be
Texas Commission on Environmental Quality Page 167
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

used; however, liquid-ring pumps shall be sized 15% larger than the needed vacuum pump capacity. An

electrically or pneumatically controlled plug valve between the collection tank and reservoir tank shall be

included in the station piping to prevent carry over of liquid into the pumps.

(E) Duplicate discharge pumps. Duplicate discharge pumps, each capable of

delivering the peak flow, shall be provided. Pumps shall be designed for vacuum sewage duty, and have

equalizing lines installed. Pumps shall be capable of passing a 3-inch sphere and constructed from

corrosion resistant materials. Double mechanical shaft seals shall be used on the discharge pumps.

Discharge pumps shall have shut off valves on both the suction and discharge piping. Total dynamic head

calculation shall consider the head attributed to overcoming the vacuum in the collection tank. The

available NPSH must be greater than required NPSH for the expected vacuum operating range. Pump

suction lines shall be sized 2 inches larger than the discharge lines to prevent vortexing of wastewater in

the collection tank. Pump design calculations and pump curves shall be submitted with the engineering

report.

(F) Vacuum Reservoir. A vacuum reservoir tank shall be provided in addition to

the collection tank for vacuum systems that require a collection tank of 1600 gallons or greater. When a

vacuum reservoir tank is used, the vacuum pumps shall be piped directly to top of the reservoir tank.

Minimum size for a reservoir tank is 400 gallons. Provision shall be made in the design of the tanks for

internal access for periodic cleaning and inspection. All main lines shall connect directly to the collection

tank. The wastewater pump suction lines shall be placed at the lowest point on the collection tank and as
Texas Commission on Environmental Quality Page 168
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

far as possible from the main line inlets. The main line shall enter at the top of the collection tank with the

inlet elbows inside the tank turned at an angle from the pump suction opening. Liquid level sensing for

operation of the discharge pumps shall be by probes or other devices in the collection tank. Vacuum

pumps shall be controlled by vacuum switches located in the reservoir tank. Alarms for high liquid level in

the collection tank and low system vacuum shall be provided.

§217.99. Testing Requirements for Alternative Sewer Collection Systems.

All components of alternative wastewater collection systems shall be tested for water tightness

by methods as shown in Table D.1. Figure 1: §217.99

Table D.1 - Testing Requirements for Alternative Sewer Collection Systems

Component Type of Test(s)

Interceptor Tanks H.H.T. or V.T.T.

Buffer Tanks H.H.T. or V.T.T.

Vaults, Pits, Wet Wells H.H.T. or V.T.T.

Service Lines (Pressure) P.L.T.

Service Lines (SDES) H.H.P.

Collection Lines (Pressure) P.L.T.

Collection Lines (SDES) L.P.A. or H.H.P.


Texas Commission on Environmental Quality Page 169
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Where:

H.H.P. = Hydrostatic head test for linework

H.H.T. = Hydrostatic head test for tanks

L.P.A. = Low pressure air test for linework

P.L.T. = Pressure line test

V.T.T. = Vacuum test for tanks

(1) Hydrostatic Head Test for Linework. The total infiltration or exfiltration, as

determined by the hydrostatic head test, shall not exceed 10 gallons per inch diameter per mile of pipe per

24-hours at a minimum head of two feet. If the quantity of infiltration or exfiltration exceeds the maximum

quantity specified, remedial action shall be undertaken in order to reduce the infiltration or exfiltration to

an amount within the limits specified.

(2) Hydrostatic Head Test for Tanks. Tanks shall be tested in place before placement of

backfill. The tank will be filled to the top of the lid and allowed to stand for 24- hours. No leakage will be

allowed. Tanks constructed from flexible or semi-rigid material shall be placed and backfilled in

accordance with manufacturer’s recommendations, then tested according to the above procedure.

(3) Low Pressure Air Test. The low pressure air test shall conform to the requirements

of §217.58(1) of this title (relating to Testing Requirements For Installed Gravity Collection Lines).
Texas Commission on Environmental Quality Page 170
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(4) Pressure Line Test. Leakage shall be defined as the quantity of water that shall be

supplied into the pipe or any valved section thereof, to maintain pressure within 5 pounds per square inch

of the specified test pressure after the air in the pipeline has been expelled. The test pressure shall be

either a minimum of 25 pound per square inch gauge or 1.5 times the maximum line design pressure,

whichever is larger. The maximum allowable leakage shall be calculated using the formula below. If the

quantity of leakage exceeds the maximum amount calculated, remedial action shall be taken to reduce the

leakage to an amount within the allowable limit. Figure 2: §217.99 (4)

L’ (S( D( P 0.5)/133,200 Equation 5.d

Where:

L = Leakage (gal./hr.)

S = Length of pipe (ft.)

D = Inside diameter of pipe (in.)

P = Pressure (psi)

(5) Vacuum Test for Tanks. The total vacuum loss, as determined by this test, shall not

exceed 1 inch loss of mercury vacuum after 5 minutes. Additionally, for tanks constructed of flexible or

semi-rigid material, the maximum allowable change in tank dimensions shall be 3% in any direction. The

test will commence only after the establishment of an initial stable vacuum of 4-inches of mercury. If the
Texas Commission on Environmental Quality Page 171
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

quantity of vacuum loss or if tank deformation equals or exceeds the maximum quantity specified, then

remedial action shall be undertaken in order to reduce the amount of vacuum loss or amount of

deformation to comply with the criteria.

§217.100. Termination Facilities for Alternative Sewer Collection Facilities.

Termination of an alternative wastewater collection system at treatment facilities or into an

existing conventional sewer within close proximity of human habitation shall be designed to minimize the

potential for odors. Release of gases shall be controlled by incorporating methods that minimize turbulent

discharge of the alternative sewer into manholes, and discharge shall be into manholes that have a high

ratio of conventional flow to alternative flow. Alternative sewers that discharge at wastewater treatment

systems shall discharge below the liquid level at the headworks. Consideration shall also be given to the

corrosive nature of alternative wastewater system sewage in the materials used in the termination

facilities.
Texas Commission on Environmental Quality Page 172
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER E : PRELIMINARY TREATMENT UNITS

§§217.121-217.138

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.121. Applicability.

This subchapter deals with preliminary and primary treatment systems used at wastewater

treatment systems. These treatment systems may help limit damage to, and possible disturbance of,

downstream unit processes and operations. These treatment systems may also be used to optimize the

treatment process for a particular treatment unit.


Texas Commission on Environmental Quality Page 173
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.122. Coarse Screening Devices.

A coarse screening device, such as a bar screen, should be considered at all wastewater

treatment facilities.

§217.123. Coarse Screening Devices - Redundancy Requirements.

Bypass channels, sized to handle the two-hour peak flow of the facility, shall be provided to

bypass flow around any coarse screening device. Where mechanically cleaned coarse screening devices

are utilized in the primary channel, the bypass channel shall be equipped with a manually cleaned coarse

screening device. A means of diverting flow to the bypass channel shall be provided.

§217.124. Design of Coarse Screening Devices.

(a) Location Requirements. All coarse screening devices installed in an enclosed structure

containing other equipment or offices shall be designed with a separate entrance and shall be separated

from all areas by gas tight partitions. All screening device enclosures shall be equipped with a vent fan

capable of provided at least 30 air exchanges per hour when the space is configured to allow personnel

entry. All screening devices shall be located so they are readily accessible for maintenance and

screenings removal. Screening devices located four or more feet below ground level shall be provided

with equipment capable of lifting the screenings to ground level.


Texas Commission on Environmental Quality Page 174
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(b) Screen Openings. Coarse screen bar openings, the clear distance between individual bars,

shall not be less than ½ inch for manually cleaned screens and 1/4 inch for mechanically cleaned

screens. Maximum clear openings shall not exceed 1¾ inches. Manually cleaned screens shall be

constructed with a bar rack sloped at 30 to 60 degrees from the horizontal. For manually cleaned screens,

the bar rack shall be attached to a horizontal platform with provisions to drain and temporarily store the

screenings.

(c) Hydraulics. The velocity through the coarse screen bar racks shall be between one and three

feet per second at design flow. Manually cleaned screens shall have a minimum submerged bar rack

cross-sectional area (wetted area of the screen) of 200% of the inlet channel area based on the peak

flow. The inlet channel for screening devices shall be desinged to minimize deposition of solids. The flow

line of the inlet channel shall not be greater than 6-inches below the invert elevation of the incoming

sewer.

(d) Corrosion Resistance of Screens and Their Structures. All structures, equipment, and

materials associated with coarse screening devices shall be designed to resist the effects of corrosive

environments, .including the effects of long-term exposure to hydrogen sulfide.

§217.125. Coarse Screening Devices - Screenings and Debris Handling.


Texas Commission on Environmental Quality Page 175
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Facilities shall be provided for the storage of a minimum of one-day of screenings and debris.

Screenings and debris containers shall be equipped with a tight fitting cover. Suitable drainage facilities,

which drain to the head of the plant, shall be provided for all screenings storage areas. Runoff control

shall be provided around all screenings storage areas. All screenings and debris collected should be

managed and disposed of in accordance with Chapter 330 of this title (relating to Municipal Solid Waste).

§217.126. Fine Screens .

Fine screens are not required, but may be used in lieu of coarse screening devices. Fine screens

are any sreen with a clear opening less than or equal to 1/4 inch.

§217.127. Fine Screens - BOD5 Removal.

Fine screens shall not be considered equivalent to primary sedimentation. The use of fine

screens in lieu of primary sedimentation units is acceptable; however; if the engineer’s design of

downstream treatment units is based on reduction by the fine screen, the reduction percentage shall be

developed through testing and studies conducted on actual full scale operation of the fine screen unit

proposed. The justification for reductions in treatment unit sizes, based on removal of BOD5 from the use

of fine screens, shall be detailed in the final engineering design report.

§217.128. Fine Screens - Redundancy Requirements.


Texas Commission on Environmental Quality Page 176
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Where BOD5 reduction is credited through the fine screen, dual fine screen treatment trains shall

be provided. Designs using fine screen units, which claim credit for BOD5 reduction, shall include a

sufficient number of fine screen units so that any BOD5 reductions claimed in the engineering report may

occur with the largest fine screen unit assumed out of service. Fine screens may be installed as single

units where BOD5 reduction will not be credited through the fine screen; however, a bypass channel with

a coarse screening device shall be installed in these cases to accept flow when the fine screen is out of

service.

§217.129. Fine Screen Design Parameters.

Fine screens shall be proceeded by a coarse screening device unless manufacturers

recommendations include installation of the unit without such preliminary screening devices, or historical

data from similar installation is provided. The engineer shall consider the necessity for removal of oils and

grease prior to the fine screen. A continuous cleaning device, such as water jets or wiper blades, shall be

incorporated in the design of moving or rotating fine screens. The fine screen shall have provisions for

the automatic conveyance of material removed by the fine screen to a process which complies with

§217.125 of this title (relating to Coarse Screening Devices - Screenings and Debris Handling). Fine

screens shall be designed to meet manufacturer’s recommendation with respect to velocity and head loss

through the fine screen. Fine screen openings shall be 1/4 inch or less. Fine screens maybe constructed

using bars or perforated plate.


Texas Commission on Environmental Quality Page 177
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.130. Fine Screens - Screenings and Debris Handling.

Screenings and debris from fine screens shall be managed and disposed of in accordance with

§217.125 of this title (relating to Coarse Screening Devices - Screenings and Debris Handling).

§217.131. Grit Removal Facilities.

Grit removal should be considered for all wastewater treatment plants. Grit removal includes

those units and processes capable of removing inert unbiodegradable particles.. Grit removal facilities are

required for all wastewater treatment systems using anaerobic digesters. Grit removal facilities are

optional for all other facilities.

§217.132. Grit Removal Chambers - Redundancy Requirements.

Dual Grit Removal Processes shall be provided whenever grit removal is required. When dual

grit removal units are installed, each unit shall be capable of operation at the permitted two hour peak flow

of the wastewater treatment system. When single grit removal units are installed a bypass channel shall

be installed to accept flow when the grit removal facilities are off line. A means of diverting flow to the

bypass channel shall be provided.


Texas Commission on Environmental Quality Page 178
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.133. Design Requirements for Various Types of Grit Chambers.

(a) Horizontal Flow Grit Chambers. Velocity through the grit chamber shall generally not be less

than 0.8 feet per second, nor greater than 1.3 feet per second, during minimum and maximum flow

periods. The grit chamber channel shall be designed to minimize turbulence and shall provide uniform

velocity across the channel. The channel shall be sized in accordance with the grit removal equipment

capacity and shall accommodate grit storage.

(b) Aerated Grit Chambers. The air diffusers and baffle arrangements should be designed to

separaate the size of grit planned for removal. The aeration equipment shall be capable of varying air

feed rates along the length of the chamber from 3 to 8 scfm per linear foot. A minimum hydraulic

detention time of 3 minutes shall be provided based on the permitted two-hour peak flow of the facility.

The chamber shall be designed with a grit hopper. The grit hopper shall be located under the air diffuser.

Square Aerated Grit Chambers

(c) Mechanical Grit Chambers. The velocity through mechanical grit chambers shall be 1 foot

per second at the design flow. The channel shall provide a grit hopper at the side of the tank contiguous

to the grit removal mechanism. The inlet shall be provided with baffles to prevent short circuiting. Grit

removal shall be provided by a reciprocating rake, screw conveyor, or air lift pump.
Texas Commission on Environmental Quality Page 179
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(d) Cyclonic Degritters. The cyclone shall be designed to prevent entry-to-overflow short

circuits. An adjustable apex with a quick disconnect assembly shall be provided to remove oversized

objects. The unit selected shall be sized to maximize grit removal and minimize organic removal

contaminants. Detention time in the chamber shall be at least one minute at the design flow. Flow

velocities shall be between one and two feet per second at the design flow. To prevent clogging,

screening unit shall be installed upstream of the cyclonic degritter.

(e) Vortex Grit Chamber. Inlet channels shall include sufficient straight length to deliver smooth

flow to the units. Vortex system shall be equipped with rotating paddles in the center of the grit chamber

and shall rotate at a maximum 21 rpm. Minimum initial inlet velocity at the 2-hr peak flow shall be at least

2.0 fps. The outlet channel should maintain a constant elevation. Grit removal from the grit storage

chamber located below the grit separation chamber shall be by pumps specifically designed to handle grit.

§217.134. Grit Handling.

The need for grit washing shall be determined by the type of grit removal system and the final

means of grit disposal. Drainage for grit washing facilities and grit storage areas shall be returned to the

head of the plant. Grit chambers located below ground level shall have mechanical grit removal

equipment. Grit shall be stored in containers with a tight fitting cover and shall be managed and disposed

of in accordance with Chapter 330 of this title (relating to Municipal Solid Waste).
Texas Commission on Environmental Quality Page 180
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.135. Preaeration Facilities.

Preaeration may be used for odor control, flocculation of solids, reducing septicity, grease

separation, and promoting uniform distribution of solids to clarifiers. Preaeration system design and sizing

will vary greatly. The basis for preaeration system designs shall be detailed in the final engineering design

report.

§217.136. Flow Measurement.

A means of accurate effluent flow measurement shall be provided at all wastewater treatment

facilities. Where average influent and effluent flows are significantly different, e.g., plants with large

water surfaces located in areas of high rainfall or evaporation, or plants using a portion of effluent for

irrigation that is not measured by the final flow metering devices, both influent and effluent shall be mea­

sured. Internal flow monitoring devices, to measure returned activated sludge and/or to facilitate splitting

flows between units, shall be provided as required by other portions of this chapter. Effluent flow

measurement devices shall be of the open channel type to allow for easy inspection, calibration, and

cleaning. Flow measurement shall be by a combination of primary and secondary devices.

(1) Primary measuring devices. Primary measuring devices include weirs and flumes.

A non-corrosive ruler (staff gauge), graduated in ¼-inch increments and clearly visible, shall be installed
Texas Commission on Environmental Quality Page 181
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

upstream of the primary measuring device to permit the manual measurement of water depth. The

primary devices shall be located to facilitate easy cleaning by plant personnel.

(A) Weirs. The weir shall be located to provide accurate flow rate

measurements. The channel approach section to the weir shall be straight for a distance of at least 20

times the maximum expected head on the weir. The height of the weir from the channel bottom to the

weir crest shall be a minimum of twice the maximum expected head on the weir or 1 foot, whichever is

greater. The upstream edge of the weir shall be sharp. The crest of the weir shall be exactly level to

ensure a uniform depth of flow. The upstream face of the weir shall be smooth and perpendicular to the

axis of the channel in both the horizontal and vertical directions. The flow measurement device

(secondary measuring device) shall be placed upstream from the the weir, a minimum distance of 3 times

the maximum expected head on the weir, or as recommended by the equipment manufacturer.

(B) Flumes. Flumes shall be located in straight sections of an open channel.

Flumes shall be installed in accordance with manufacturer’s recommendations. The approaching flow

shall be distributed evenly across the flow channel and shall be designed to preclude turbulence and

waves.

(2) Secondary measuring devices. Secondary measuring devices shall measure the liquid

level in the primary measuring device, and shall convert this liquid level into a flow rate which is integrated

to a totalized volume. Secondary measuring devices shall be installed in accordance with manufacturer’s
Texas Commission on Environmental Quality Page 182
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

recommendations. All installations shall include, within easy observation of the primary device, a display

of the instantaneous flow rate being measured and a means of reading the totalized flow.

§217.137. Flow Equalization Basins.

Flow equalization basins shall be used whenever a facility’s total daily influent flow volume occurs

during a period of time less than or equal to 10 hours of a day, for any day of any week; whenever a

facility experiences periods of time where it receives an influent flow of less than 10% of its design

capacity, for a period of time greater than or equal to 48 hours in any one week; or, at any other time the

engineer deems that flow equalization is necessary to minimize random or cyclic peaking of organic or

hydraulic loadings. Flow equalization basins shall be preceded by a coarse screening device. The

engineer shall consider the necessity for grit removal prior to flow equalization.

(1) Aeration. Aeration of the flow equalization basin is required. The aeration system

shall be sized to maintain a dissolved oxygen level of at least 1.0 mg/l in the equalization basin at all times.

(2) Mixing. Mixing shall be provided which is sufficient to prevent solids deposition in

the basin. Mixing shall be provided by mixing equipment, a diffused aeration system, or a mechanical

aeration system.
Texas Commission on Environmental Quality Page 183
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(3) Volume. Sizing of the flow equalization basin shall be based on diurnal flow variation

and downstream process unit sizing and capabilities. Calculations justifying the sizing of the flow

equalization basin shall be included in the final engineering design report. The feasibility of using multiple

compartments shall be considered by the engineer to allow for operational flexibility, repair and cleaning.

(4) Pumped flow. For pumped flow to an equalization basin, the effluent from the basin

shall be controlled by a flow-regulating device capable of maintaining the flow rate within an acceptable

range for downstream process units. For pumped flow from the equalization basin, variable-speed pumps,

or multiple pumps are required in order to deliver a constant flow to downstream process units.

§217.138. Primary Clarifiers. - Design Basis.

(a) Inlets. Clarifier inlets shall be designed to provide uniform flow and stilling. Vertical flow

velocity through the inlet stilling well shall not exceed 0.15 feet per second at peak flow. Inlet distribution

channels shall not have dead-end corners and shall be designed to prevent the settling of solids in the

channels. Inlet structures shall be designed to allow floating material to enter the clarifier.

(b) Scum removal. Scum baffles and a means for the collection and disposal of scum shall be

provided for primary clarifiers. Scum from primary clarifiers shall be discharged to a sludge digester or

other approved method of disposal. DISCHARGE OF SCUM TO ANY OPEN DRYING AREA IS PROHIBITED .

Mechanical skimmer shall be used in units with a design flow greater than 25,000 gallons per day.
Texas Commission on Environmental Quality Page 184
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Smaller systems may use hydraulic differential skimming provided that the scum pickup is capable of

removing scum from the entire operating surface of the clarifier. Scum pumps shall be specifically

designed for this purpose.

(c) Effluent weirs. Effluent weirs shall be designed to prevent turbulence or localized high

vertical flow velocity in the clarifiers. Weirs shall be located to prevent short circuiting flow through the

clarifier and shall be adjustable for leveling. Based on peak flows, weir loadings shall not exceed 20,000

gallons per day per linear foot of weir length for plants with a design flow of 1.0 mgd or less. Weir

loadings for plants with a design flow in excess of 1.0 mgd shall not exceed 30,000 gallons per day peak

flow per linear foot of weir.

(d) Basin sizing. Overflow rates are based on the surface area of the clarifiers. The surface

areas required shall be computed using the following criteria. The actual clarifier size shall be based on

whichever is the larger size from the two surface area calculations (based on peak flow and design flow

surface loading rates). The following design criteria for primary clarifiers are based upon a minimum side

water depth of 10 feet and shall be considered acceptable:

(1) Maximum Surface Loadinga @ Peak Flow = 1800 gal/day/ft2

(2) Maximum Surface Loadinga @ Design Flow= 1000 gal/day/ft2


Texas Commission on Environmental Quality Page 185
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(3) Minimum Effective Detention Time b @ Peak Flow = 0.9 hrs

(4) Minimum Effective Detention Time b @ Design Flow = 1.8 hrs

(A) Does not include recirculation flow.

(B) Overflow rate and side water depth (SWD) may be adjusted, keeping the

detention time unchanged, over a range of 10 to 18 feet of SWD. The detention time is based on the

effective volume and the overflow rate of the circular or rectangular clarifier. (The effective volume

includes all liquid above the sludge blanket.) For cone bottom tanks, the top of the sludge blanket is

considered to be at the top of the cone. For flat bottom tanks, a sludge blanket of 3 feet shall be allowed

for development of maximum return sludge concentration.

(e) Sidewater depth. The minimum sidewater depth for primary clarifiers is 10 feet.

(f) Freeboard. Walls of primary clarifiers shall extend at least 6 inches above the surrounding

ground surface and shall provide not less than 12 inches freeboard at peak flow.

(g) Drains. Provisions shall be made for complete dewatering of each primary clarifier unit to an

appropriate point in the treatment facility. Portable dewatering pumps are considered acceptable for
Texas Commission on Environmental Quality Page 186
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

complete dewatering. Devices such as hydrostatic relief valves to prevent flotation of structures shall be

considered.

(h) Accessiblity. All primary clarifiers shall be designed to facilitate routine operation and

maintenance.

(i) Primary Clarifiers - BOD5 Removal. The assumed BOD5 reduction in a primary clarifier is

35 percent, unless satisfactory evidence is presented to indicate that the efficiency will be otherwise.

(j) Primary Clarifiers - Sludge Pumping and Piping. All primary clarifier units shall be provided

with mechanical sludge collection equipment designed to assure rapid removal of the sludge. Means for

transfer of sludge from primary clarifiers for subsequent processing shall be provided so that treatment

efficiency will not be adversely affected. Gravity sludge transfer lines shall not be less than eight inches

in diameter.
Texas Commission on Environmental Quality Page 187
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER F : ACTIVATED SLUDGE SYSTEMS

§§217.150-217.164

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.150. Applicability.

This subchapter provides the design requirements for activated sludge systems. Systems may be

designed using a traditional design approach which involves sizing the aeration basin and clarifier based on

values which have been used historically as standard engineering practice, or, the systems may be

designed using a volume-flux approach which involves sizing the aeration basin and clarifiers based on the

relationship between the volume flux of solids in the secondary clarifier, the sludge volume index, and the

sludge blanket depth.


Texas Commission on Environmental Quality Page 188
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.151. General Requirements for Activated Sludge Aeration Basins.

(a) Minimum Dissolved Oxygen Concentration in Aeration Basins. Aeration Systems shall be

designed to maintain a minimum dissolved oxygen concentration of 2.0 mg/l throughout the basin at the

maximum diurnal organic loading rate determined in §217.32(3) or §217. 33(2)of this title (relating to

Design of New System - Organic Loading Flows, Design of Existing System - Organic Loading and

Flows, and Table B.1).

(b) Alternate Aeration Volume. The volume in aerated influent wastewater channels and

aerated mixed liquor transfer channels may be used to meet aeration basin volume requirements, provided

the aeration is by diffused air, and the diffuser depth conforms to the requirements of §217.156(b)(5)(A)

of this title (relating to Aeration Equipment Sizing.)

(c) THE USE OF CONTACT STABILIZATION SYSTEMS FOR NITRIFICATION IS PROHIBITED .

§217.152. General Requirements for Activated Sludge Clarifiers.

(a) Inlets. Inlet valves or gates shall be provided for all clarifiers. Clarifier inlets shall be

designed to provide uniform flow and stilling. Precautions shall be taken to ensure that air is not trapped

or entrained in the transfer piping. Vertical flow velocity through the inlet stilling well shall not exceed
Texas Commission on Environmental Quality Page 189
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

0.15 feet per second at peak flow. Inlet distribution channels shall be designed to prevent the settling of

solids in the channels.

(b) Scum removal. Scum baffles and a means for the collection and disposal of scum shall be

provided for all clarifiers. Scum collected from clarifiers in plants utilizing the activated sludge process

and aerated lagoons may be discharged to aeration basin(s) and/or digester or disposed of by other

approved methods. Scum from all other clarifiers shall be discharged to the sludge digester or disposed of

in a manner which complies with Chapter 312 of this title (relating to Sludge Use, Transportation and

Disposal). Discharge of scum to any open drying area is not acceptable. Mechanical skimmer shall be

used in units with a design flow equal to or greater than 10,000 gallons per day. Smaller systems may use

hydraulic differential skimming provided that the scum pickup is capable of removing scum from the entire

operating surface of the clarifier. Scum pumps shall be specifically designed to pump scum.

(c) Effluent weirs. Effluent weirs shall be designed to prevent turbulence or a localized high

vertical flow velocity in the clarifiers. Weirs shall be located a minimum of six inches (horizontally) from

an outer wall or baffle. Weirs shall be located to prevent the short circuiting of flow through the clarifier.

Weirs shall be adjustable such that the water surface elevation in the clarifier may be raised and lowered

if needed. Weir loadings shall not exceed 20,000 gallons per day at the two-hour peak flow per linear foot

of weir length for plants with a design flow of less than 1.0 mgd. Special consideration will be given to

weir loadings for plants with a design flow equal to or greater than 1.0 mgd, but such loadings shall not

exceed 30,000 gallons per day two-hour peak flow per linear foot of weir. Circular clarifiers with
Texas Commission on Environmental Quality Page 190
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

peripheral overflow weirs shall have weirs around the entire perimeter of the clarifier. Circular clarifiers

with full perimeter weirs are not limited to the weir overflow rates as listed in this subsection.

(d) Sludge Lines. Means for transfer of sludge from clarifiers for subsequent processing shall be

provided so that treatment efficiency will not be adversely affected. Sludge lines shall be a minimum of

four inches in diameter to reduce the chances of clogging due to debris in the wastewater. In addition, the

flow velocity in the sludge line shall be greater than two feet per second to prevent deposition.

(e) Sludge Collection Equipment. All clarifier units that treat flow from a treatment plant facility

with a design flow of 10,000 gallons per day or greater shall be provided with mechanical sludge collecting

equipment.

(f) Pumped Inflow. For wastewater treatment systems with pumped inflow, clarifiers shall have

adequate capacity for two-hour peak flow or "firm pumping capacity." This flow rate may also include

skimmer flow, thickener overflow, filter backwash, and similar considerations. All treatment plants shall

be designed to hydraulically accommodate peak flows without adversely affecting the treatment pro­

cesses.

(g) Side Water Depth (SWD). The SWD is defined as the water depth from the top of the cone

in cone bottom tanks, or from 2 feet above the bottom in flat bottom tanks with a hydraulic sludge removal

mechanism to the water surface. All clarifiers with mechanical sludge collectors and with surface area
Texas Commission on Environmental Quality Page 191
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

greater than 300 ft2 shall have a minimum SWD of 10 feet. All clarifiers with a surface area less than

300 ft2 shall have a minimum SWD of 8 feet. The SWD for hopper bottom clarifiers shall be computed

using equation 1.f. The side water depth computed using equation 1.f excludes the hopper portion of the

clarifier. The upper third of the hopper portion of the hopper bottom clarifier may be counted as part of

the SWD only if the surface area of the hopper bottom clarifier is increased by 15% over the surface

area determined from the design surface loading calculated using Table F.2, and if the activated sludge

plant includes a flow equalization basin. The SWD of a hopper bottom clarifier shall never be less than 5

feet. Figure 1: §217.152(g)

SWD=160*Q+4 Equation 1.f

Where: SWD = side water depth required (ft)

Q = annual average flow in MGD as determined in §217.31(a)

(h) Restrictions on Hopper Bottom Clarifiers. Hopper bottom clarifiers without mechanical

sludge collection equipment shall not be used for facilities with a maximum flow greater than 10,000

gallons per day. When hopper bottom clarifiers are used, each hopper shall have individually-controlled

sludge removal. Hopper bottom clarifiers shall have a smooth wall finish and an upper hopper slope of

not less than 60 degrees measured from the horizontal.


Texas Commission on Environmental Quality Page 192
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(i) Short Circuiting. The influent stilling baffle and effluent weir shall be designed to prevent

short circuiting.

(j) Return Sludge Pumping Capacity. The capacity of return sludge pumping units shall be

calculated on the basis of the area of the activated sludge clarifiers, and the pumping capacity is

designated as the clarifier underflow rate in gallons per day per square foot. The maximum underflow

rate shall be 400 gpd/sf. Through throttling, variable speed, or multiple pumps, control ability shall be

provided to operate over the range of 200 gpd/sf to 400 gpd/sf.

§217.153. General Requirements Which Apply to both Aeration Basins and Clarifiers.

(a) Construction of Aeration Basins and Clarifiers. Aeration basins and clarifiers shall be

constructed of materials which are designed to resist the effects of corrosive sewage environments.

(b) Freeboard. All aeration basins shall have a minimum freeboard of 18 inches at the two hour

peak flow. All clarifiers shall have a minimum freeboard of 1 foot at the two hour peak flow.

(c) Flow Splitting. For all new installations which propose a design flow of greater than or equal

to 0.4 mgd, a minimum of two aeration basins and two clarifiers shall be provided. The piping shall be

designed to be capable of hydraulically passing the two hour peak flow with either the largest clarifier or

the largest aeration basin out of service. The individual aeration basins and clarifiers shall have gates or
Texas Commission on Environmental Quality Page 193
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

valves to allow them to be hydraulically isolated. All aeration basins and clarifiers shall have a dedicated

means for dewatering. The flow into and out of the clarifiers shall not be allowed to short circuit.

§217.154. Aeration Basin and Clarifier Sizing - Traditional Design Approach.

This section provides the standard design values which shall be used to size aeration basins and

clarifiers when using traditional design approaches.

(1) Aeration Basin Sizing. The aeration reactor shall be sized using the organic loads

calculated in §217.32(3) or §217.33(2) of this title (relating to Design of New Systems - Organic Loadings

and Flow and Design of Existing Systems - Organic Loadings and Flow). Based on these organic loads,

the aeration basin volume shall be sufficient to ensure that the organic loading on the aeration basins do

not exceed the rates in Table F.1. For purposes of design, the reactor temperature shall be assumed to be

equivalent to the average of the lowest conserctuive seven-day mean reactor temperature from a similar

facility located within 50 miles of the subject site. Figure 1: §217.154(1)


Texas Commission on Environmental Quality Page 194
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table F.1 - Design Organic Loading Rates for Sizing Aeration Basins Based on Traditional Design

Methods
Process Applicable Permit Effluent Sets Maximum Organic Loading

BOD5 /TSS/Ammonia Nitrogen Rates lbs BOD5 /day/1,000 cf

Conventional Activated Sludge 10/15 or 20/20 45

Process Without Nitrification

Conventional Activated Sludge 10/15/3,2, or 1 35

Process With Nitrification When

Reactor Temperatures Exceed

15 degrees C

Conventional Activated Sludge 10/15/3,2, or 1 25

Process With Nitrification When

Reactor Temperatures are 13 to

15 degrees C

Conventional Activated Sludge 10/15/3,2, or 1 20

Process With Nitrification When

Reactor Temperatures are 10 to

12 degrees C

Extended Aeration Basins 10/15/3,2, or 1 15

Including Oxidation Ditches

(MCRT over 20 days)


Texas Commission on Environmental Quality Page 195
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) Clarifier Sizing. Table F.2 details the maximum surface loading rates and the

minimum detention times which shall be used to determine the size of activated sludge clarifiers. The

clarifier shall meet both the detention time and overflow rate criteria. When calculating overflow rates

for proposed clarifiers, sludge recycle flow shall not be included for purposes of determining compliance

with Table F.2. Also, when calculating the overflow rate for a proposed clarifier, the surface area of the

stilling well shall be included as part of the clarifier surface area. Figure 2: §217.154(2)

Table F.2 - Maximum Clarifier Overflow Rates (based upon traditional design methods)
Permit Aeration Basin Process - Treatment Maximum Minimum

Limits Organic Loading Level overflow rate at Detention Time

(lbs 2-Hour Peak at 2-Hour Peak

CBOD5 /day/1000 Flow (gal/day/sf) Flow (hrs)

cf) (from Table

F.1)

20/20 or 45 Fixed Film - Secondary 1200 1.8

10/15 or Enhanced

Secondary
Texas Commission on Environmental Quality Page 196
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

20/20, 45, 35, 25 or 20 Activated Sludge ­ 1200 1.8

10/15, or Secondary, Enhanced

10/15/3 Secondary, or

Secondary with

Nitrification
20/20 15 Extended Air ­ 900 2.0

Secondary

10/15/3 15 Extended Aeration ­ 800 2.2

Enhanced Secondary

§217.155. Aeration Basin and Clarifier Sizing - Volume-Flux Design Approach.

This design approach is offered as an alternative to the traditional design approach. The design

method for this approach is located in Appendix I of this subchapter. This method is restricted to facilities

with a design flow greater than 0.40 mgd.

§217.156. Aeration Equipment Sizing.

(a) Oxygen Requirements (O2 R) of the Wastewater. Mechanical and diffused aeration systems

shall be designed to provide sufficient dissolved oxygen to the wastewater to meet the demands of the

aeration basin. Aeration systems shall be designed to provide a minimum dissolved oxygen concentration

in the aeration basin of 2.0 mg/l. Mechanical and diffused aeration systems shall be designed to supply
Texas Commission on Environmental Quality Page 197
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

the O2 R calculated by equation 2.f or use the recommended values presented in Table F.3. These O2 R

were calculated using concentrations of 200 mg/l BOD5 and 45 mg/l NH3 -N in equation 2.f. Figure 1:

§217.156(a)

O2 R=[1.2(BOD5 )+4.3(NH3 -N)]/(BOD5 ) Equation 2.f

Table F.3 - Minimum O2 R

Process O2 R, lbs O2 /lb BOD5

Conventional Activated Sludge Systems 1.2

which are not Intended to Nitrify

Conventional Activated Sludge Systems 2.2

which are Intended to Nitrify; and, Extended

Aeration Systems (including all Oxidation

Ditch Treatment Systems)

(b) Diffused Aeration Systems.

(1) Design Air Flow Requirements - Default Values. Table F.4 may be used to

determine the air flow for which the diffused air systems shall be sized. The values in Table F.4 were

developed using equation 4.f with the following assumptions: a transfer efficiency of 4.0 percent in

wastewater for all diffused air activated sludge processes; a diffuser submergence of 12 feet; a

wastewater temperature of 20E C; and the oxygen requirements in Table F.3. Figure 2: §217.156(b)(1)
Texas Commission on Environmental Quality Page 198
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table F.4 - Minimum Air Flow Requirements for Diffused Air

Process Air Flow/BOD5 load, standard cubic

feet (SCF)/day/lb BOD5

Conventional Activated Sludge Systems 1800

which are not Intended to Nitrify

Conventional Activated Sludge Systems 3200

which are Intended to Nitrify; and, Extended

Aeration Systems

(2) Design Air Flow Requirements - Equipment and Site Specific Values. When the

default values in paragraph (1) of this subsection are not used, the air flow requirements for the diffused

air equipment shall be calculated in accordance with subparagraphs (A)-(D) of this paragraph.

(A) Determine Clean Water Oxygen Transfer Efficiency (CWOTE). Clean

water oxygen transfer efficiencies greater than 4% may be used provided that full scale diffuser perfor­

mance data from a certified testing laboratory, or sealed by an independent licensed professional engineer

is presented which demonstrates the diffusers’ transfer efficiencies. The testing laboratory or licensed

engineer shall utilize the oxygen transfer testing methodology described in the ASCE publication entitled,

“A Standard for the Measurement of Oxygen Transfer in Clean Water” (1984). Diffuser systems which

claim a clean water transfer efficiency greater than 18% for coarse bubble systems and greater than 26%

for fine bubble systems shall be considered innovative technologies by the executive director, and will be

subject to §217.10(b) of this title (relating to Approvals of Innovative and Nonconforming Technologies)
Texas Commission on Environmental Quality Page 199
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

at the executive director’s discretion. Clean water transfer efficiencies obtained at temperatures other

than 20 degrees Celsius shall be adjusted to reflect approximate transfer efficiencies and air requirements

under field conditions by use of equation 3.f. Figure 3: §217.156(b)(2)(A)

FTE’ (Te)( (WOTE/CWOTE)( 1.024 T&20( (Cf/C t) Equation 3.f

Where:

Te = Test Efficiency

FTE = Field Transfer Efficiency (decimal)

WOTE = Wastewater Oxygen Transfer Efficiency (decimal)

CWOTE = Clean Water Oxygen Transfer Efficiency (decimal)

T = Temperature (degrees C)

Cf = Oxygen Saturation in Field (Includes temperature,

dissolved solids, pressure etc.)

Ct = Oxygen Saturation in Test Conditions

(B) Determine Wastewater Oxygen Transfer Efficiency (WOTE). The

wastewater oxygen transfer efficiency shall be estimated from clean water test data by multiplying the

clean water transfer efficiency by 0.65 for coarse bubble diffusers and by multiplying the clean water

transfer efficiency by 0.45 for fine bubble diffusers. Plants treating greater than 10 percent industrial
Texas Commission on Environmental Quality Page 200
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

wastes shall provide additional testing and data, including pilot studies when requested by the executive

director, to justify actual wastewater transfer efficiencies.

(C) Determining Required Air Flow (RAF) Rate. Equation 4.f shall be used to

calculate the air flow rate for which the diffuser system shall be sized for a 12-foot diffuser submergence.

If the diffuser submergence is other than 12 feet, the RAF shall be corrected as detailed in subparagraph

D of this paragraph. Figure 4: §217.156(b)(2)(C)

RAF’ [(PPD BOD5)( (O2/lb BOD5)]/[WOTE( 0.23( 0.075( 1440] Equation 4.f

Where:

RAF = Required Air Flowrate (SCFM)

PPD CBOD5 = Influent Organic Load in Pounds per Day

0.23 = lb 02 /lb air @ 20 degrees C

1440 = minutes/day

0.075 = lb air/(cubic foot)*

WOTE = Wastewater Oxygen Transfer Efficiency (decimal)

*
If the design inlet temperature is above 24 degrees C, the specific weight of

air shall be adjusted to the specific weight at the intake temperature.


Texas Commission on Environmental Quality Page 201
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(D) Corrections to RAF Rate Based on Varying Diffuser Submergence Depths.

If a diffuser submergence differing from 12 feet is proposed, the minimum air flow rate calculated in

subparagraph (C) of this paragraph shall be adjusted by multiplying the calculated values by the factors in

Table F.5. Figure 4: §217.156(b)(2)(D)

Table F.5 - Diffuser Submergence Correction Factors

Diffuser Submergence Depth (ft) Air Flow Rate Correction Factor

8 1.82

10 1.56

12 1.00

15 0.91

18 0.73

20 0.64

(3) Mixing Requirements for Diffused Air. Air requirements for mixing shall be

calculated along with those required for the design organic loading. (The designer may use to Chapter 11

of Design of Municipal Wastewater Treatment Plants, a joint publication of the American Society of

Civil Engineers and the Water Environment Federation, for mixing requirements.) Air input for mixing

shall be greater than or equal to 20 SCFM/1000 cf for coarse bubble diffusers and greater than or equal to

0.12 SCFM per square foot for fine bubble diffusers.


Texas Commission on Environmental Quality Page 202
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(4) Blowers and Air Compressors. Blowers and compressors shall be of such capacity

to provide the required aeration rate as well as the requirements of all supplemental units such as airlift

pumps. Blower or compressor calculations shall be included in the final engineering design report which

show the actual air requirements for the expected temperature range (both summer and winter conditions)

and the impact of the actual site elevation on the air supply. Multiple compressor units shall be provided

and shall be arranged so the capacity of the total air supply is adjustable to meet the variable organic load

to be placed on the treatment facility. The compressors shall be designed so that the maximum design air

requirements may be met with the largest single unit out of service. The blower/compressor units shall

automatically restart after a period of power outage, or the operator or owner shall be notified by some

method such as telemetry or an auto-dialer. The specified capacity of the blowers or air compressors,

particularly centrifugal blowers, shall take the following into account: the air intake temperature may

reach 100 degrees F (38 degrees C) or higher, and the pressure may be less than standard (14.7 pounds

per square inch absolute). The capacity of the motor drive shall also take into account that the intake air

may be 20 degrees F (-7 degrees C) or less and may require over sizing of the motor, or a means of

reducing the rate of air delivery, to prevent overheating or damage to the motor.

(5) Diffuser Systems - Additional Requirements.

(A) Diffuser Submergence. Submergence depths for diffusers shall not be less

than the depths in Table F.6 for new plants. For additions to existing plants, diffuser submergence depths

may be adjusted to match existing air pressure, delivery rate, and hydraulic requirements. DIFFUSER
Texas Commission on Environmental Quality Page 203
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBMERGENCE DEPTHS OF LESS THAN 7 FEET ARE PROHIBITED. Figure 6:

§217.156(b)(5)(A)

Table F.6 - Minimum Diffuser Submergence Depth

Design Flow, mgd Minimum Submergence Depth, feet

0.01 or less 8.0

0.01 to 0.10 9.0

Greater than 0.10 10.0

(B) Grit Removal. Systems which utilize fine bubble diffusers and have

wastewater which has high concentrations of grit shall either provide a grit removal unit upstream of the

aeration process or shall have multiple trains which may be taken out of service and are provided with a

means to achieve grit removal.

(C) Aeration System Piping. Each diffuser header shall include a control valve.

These valves are basically for open/close operation, but the use of a throttling type valve shall be

considered. Valves shall be designed to withstand the heat of the compressed air. Air headers shall be

designed to withstand temperatures up to 250 degree F. The air diffuser system, including piping and

diffusers, shall be capable of delivering 150 percent of design air requirements. The aeration system

piping shall be designed to minimize head losses. A hydraulic analysis of the entire air piping system shall

be included in the final engineering design report which quantifies head loss through the piping system and

which details the distribution of air from the blowers to the diffusers. The air hydraulic profile shall
Texas Commission on Environmental Quality Page 204
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

demonstrate that the air system is capable of delivering sufficient air to the aeration basin to supply the air

demands required by this section. The use of non-metallic piping for the aeration system shall be

restricted to use in the aeration basin only, and shall be a minimum of four feet below the average water

surface elevation in the aeration basin.

(c) Mechanical Aeration Systems.

(1) Required Air Flow - Default Values. This chapter does not provide default values

for mechanical aeration systems.

(2) Required Air Flow - Equipment and Site Specific Values. The air flow requirements

for which mechanical systems shall be designed shall be calculated in accordance with subparagraphs (A)

and (B) of this paragraph.

(A) Determine Clean Water Oxygen Transfer Efficiency. Clean water oxygen

transfer rates shall be less than or equal to 2.0 pounds of oxygen per horsepower-hour. Materials such as

performance curves, which detail the oxygen transfer rates of mechanical equipment, shall be included in

the final engineering design report. Proposed clean water transfer rates in excess of 2.0 pounds of

oxygen per horsepower-hour shall be justified by full scale performance data conducted by a certified

testing laboratory, or sealed by an independent, licensed professional engineer. The testing laboratory or

licensed engineer shall utilize the oxygen transfer testing methodology described in the ASCE publication
Texas Commission on Environmental Quality Page 205
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

entitled, “A Standard for the Measurement of Oxygen Transfer in Clean Water” (1984). Mechanical

equipment with proposed clean water transfer efficiencies in excess of 2.0 pounds of oxygen per

horsepower-hour shall be considered innovative technologies by the executive director and are subject to

the requirements of §217.10(b) of this title (relating to Approvals of Innovative and Nonconforming

Technologies).

(B) Determine Wastewater Oxygen Transfer Efficiency. The wastewater

transfer efficiency shall be estimated from the clean water transfer efficiency by multiplying the clean

water transfer efficiency by 0.65 for all mechanical aeration equipment. Plants treating greater than 10

percent industrial wastes shall provide data to justify actual wastewater transfer efficiencies.

(3) Mixing Requirements. In addition to providing sufficient oxygen transfer capability

for satisfying oxygen requirements, the mechanical aeration devices shall also be required to provide

sufficient mixing to prevent deposition of mixed liquor suspended solids (MLSS) under any flow

conditions. The mechanical aeration devices shall also be capable of re-suspending the MLSS after a

shutdown period caused by power outage or outage for maintenance purposes. A minimum of 100

horsepower per million gallons of aeration basin volume, or 0.75 horsepower per 1000 cubic feet of

aeration basin volume, shall be furnished for channel or basin type layouts.

(4) Mechanical Components.


Texas Commission on Environmental Quality Page 206
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Process reliability. A minimum of two mechanical aeration devices shall be

provided in each basin. The mechanical aeration devices shall be designed so that the maximum design

oxygen transfer requirements may be met with the largest single unit out of service. The mechanical

aeration devices shall automatically restart after a period of power outage or the operator or owner shall

be notified by some method such as telemetry or an auto-dialer.

(B) Operations and maintenance. Two speed or variable speed drive units shall

be used. Single speed units with timer controlled operation may be used if an independent means of mixing

is used. Bearings, drive motors, and gear reducers (if utilized) shall be operator accessible. Bearings,

drive motors, and gear reducers (if utilized) shall contain splash shields or other types of splash prevention

devices, such that routine maintenance can be performed on the components without the danger of the

plant operator being exposed to contact with raw or partially- treated sewage. Where gear reducers are

employed in the mechanical aerator design, adequate means for draining the gear reducer shall be

provided such that the operator does not come in contact with mixed liquor. If a hand pump is required to

drain the gear reducer, then the pump device shall be furnished with the mechanical aeration equipment.

§217.157. Sequencing Batch Reactors (SBR).

(a) System Sizing and Reliability. In general, system reliability shall be in accordance with

§217.156(b) and §217.156(c)(3) of this title(relating to Aeration Equipment Sizing). Power source

reliability shall be in accordance with §217.35 of this title (relating to Backup Power Requirements). At a
Texas Commission on Environmental Quality Page 207
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

minimum, the decantable volume of the SBR system, with the largest basin out of service, shall be sized to

pass the design flow on a continuous basis without changing cycle times. Aerated storage of mixed liquor

shall be provided separate from the SBR tank(s) to accommodate basin down times for all two-basin

treatment plants without removable aeration devices. Systems with fixed level decanters shall provide

more than two basins and additional decantable storage volume to account for the added settling time

before a discharge may occur. Equalization basins shall be considered for all SBR plants, and shall be

required for all SBR plants with fixed decant equipment where decant volumes do not accommodate the

design flow. Organic space loadings shall conform to §217.154(1) Table F.1 of this title (relating to

Aeration Basin and Clarifier Sizing- Traditional Design Approach). Maximum space loadings shall be

kept below 35 pounds of CBOD5 per 1,000 cubic feet of tank volume. The reactor MLSS level at the low

water level (normal operating level) shall be in the range of 3,000 mg/l to 5,000 mg/l. The depth of the

REACT volume shall not be less than 9 feet. The minimum side water depth of the tanks shall be 12 feet

or more. Sludge digestion shall be provided pursuant to the requirements in Subchapter J of chapter.

(b) Decanter Design.

(1) Velocities at the inlet port or at the edge of submerged weirs shall be designed to

eliminate vortexing, disturbance of the settled sludge, or entry of floating materials. The entrance velocity

to the decanter shall not exceed 1.0 feet per second. The decanter shall draw effluent from below the

water surface, and a device which excludes scum shall be provided. An adequate zone of separation

between the settled sludge and the decanter height shall be maintained, but in no case shall this distance
Texas Commission on Environmental Quality Page 208
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

be less than 12 inches. Decanters shall be provided with a means of excluding solids from entering the

decanter during the REACT cycle. Some available mechanisms include the following:

(A) recycle treated effluent to wash out solids trapped in the decanter;

(B) physically remove a decanter from the mixed liquor except during decanting;

(C) mechanically close the decanter when it is not in use; or

(D) fill the decanter with air except during the decant period.

(2) The decanter and related piping and valves shall be protected from freezing and ice

buildup. Floating or movable decanters are recommended over fixed decanters. Fixed decanters shall not

be used in basins where simultaneous fill and decant may occur. The decant system, with the largest tank

out of service, shall be sized to handle the design flow without changing the cycle time. This sizing is

applicable to any system of tanks that are fed sequentially. System flexibility and outfall piping shall be

provided to allow the decant of at least two tanks simultaneously for all SBR systems utilizing more than

two basins. Downstream treatment units shall be sized to handle peak flow rates. Flow equalization

downstream of the batch reactors, to dampen the higher flow rates associated with the decanting cycle,

shall be provided in order to minimize disinfection basin volume and size of disinfection equipment unless
Texas Commission on Environmental Quality Page 209
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

those downstream units and the receiving stream are sufficiently capable of accepting the peak flowrate

of the decanter.

(c) Tank Details. Multiple tanks are required. Influent baffling and physical separation from the

decanter shall be provided for all SBR systems with only two tanks, or any SBR system which may

operate with a continuous feed during settling and decanting phases. Elongated tanks shall be considered

for systems where influent baffling is required. All SBR tanks shall have a minimum freeboard of not less

than 18 inches. Protection from uplift when empty shall be provided where high groundwater may occur.

Structures utilizing common walls shall be designed for a worst case condition of one basin at maximum

liquid level and the adjacent basin completely empty. All walls shall be hydrostatically sound. A means of

dewatering each tank shall be provided. A sump shall be provided in all basins with flat bottoms.

Additionally, each SBR system shall have the capability to transfer sludge from each basin to the other

aeration basins. A means of scum removal from each aeration tank shall be provided. Prevailing winds

should be considered in scum control. Each tank shall be provided with an overflow to the other aeration

tank(s) or to a storage tank. Above this level, a high water overflow from the SBR tank(s) requiring

manual activation by operating personnel shall sound an alarm and notify plant operating personnel at

plants not manned 24-hours a day as outlined in §217.161 of this title (relating to Electronics and

Instrumentation System). All SBR projects shall consider the means and frequency for removal of grit and

other debris from the SBR basins. Adequate space for equipment access (possibly cranes) shall be

considered, especially if the tanks are deep. Fine screens may be utilized pursuant to Subchapter E,
Texas Commission on Environmental Quality Page 210
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.126 thru §217.130 of this title (relating to Preliminary Treatment Units). The use of communitors

shall be limited to SBR systems preceded by primary clarifiers.

(d) Aeration and Mixing Equipment. In addition to the requirements of §217.156 of this title

(relating to Aeration Equipment Sizing), aeration equipment shall be suitable for cyclical operation in a

sequencing batch reactor. The aeration and mixing equipment shall not produce flow patterns within the

aeration tank which interfere with quiescent settling. Oxygen transfer rates for the aerators, at average

water depth, during the fill cycle shall be designed to provide a residual of 2.0 mg/l D.O. in the basin.

Blower discharge pressure shall be determined at the maximum water depth. When the SBR system is

utilized for biological nutrient removal or reduction, the requirements of §217.163 of this title (relating to

Advanced Nutrient Removal) shall be used in the design. Provisions for the removal of air diffusers or

mechanical aeration devices without dewatering the tank shall be included. If aeration equipment cannot

be maintained without dewatering the tank, a minimum of four SBR tanks shall be provided.

(e) Electrical and Controls. The motor control center (MCC) should be located for convenient

operation of the facility. A location in close proximity to the process, with a view of the batch reactors is

strongly recommended. Programmable logic controllers (PLC) with limited operator adjustment shall be

provided and programmed to meet the required effluent limitations for the design loadings. A hard-wired

backup means of operating the plant shall be provided should the PLC fail. Battery backup of the PLC

shall be provided. In addition, a spare set of all circuit boards shall be provided to the plant at startup. In

the plant design, the engineer shall consider the diurnal variations affection on flow and organic loading for
Texas Commission on Environmental Quality Page 211
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

each cycle. Adequate controls for the separate operation of each reactor tank shall be provided. Tank

level systems shall employ floats or pressure transducers. Float systems shall be shielded from prevailing

winds and protected from freezing. Bubbler systems shall not be used for level systems (these systems

are not reliable in mixed liquor environments).

(1) Recommended list of control panel switches.

(A) Pumps - Hand/Off/ Automatic.

(B) Valves - Open/Closed/Auto.

(C) Blowers or Aerators - Hand/Off/Automatic.

(D) Selector switch for tank(s) in operation/standby.

(2) Recommended visual displays.

(A) Mimic diagram of the process showing status of pumps, valves (including

position), blowers or aerators, and mixers (if utilized).

(B) Process cycle and time remaining.


Texas Commission on Environmental Quality Page 212
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(C) Instantaneous and totalized flow to the plant and discharge.

(D) Tank level gauges or display of levels.

(E) Sludge pumping rate and duration.

(F) Air flow rate and totalizer.

(3) Required alarm condition indicators for the annunciator panel.

(A) High and Low water level in each tank.

(B) Valve - failure of all automatically operated valves.

(C) Decanter - failure.

(D) Blowers (if utilized) - low pressure, high temperature, and failure.

(E) Mechanical Aerator (if utilized) - high temperature, and failure.

(F) Pump - high pressure and failure.


Texas Commission on Environmental Quality Page 213
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(G) Mixers (if utilized) - failure.

§217.158. Solids Management.

(a) Solids Recycling and Monitoring. The return sludge system shall be capable of operating

satisfactorily within anticipated flow conditions including wet weather peak flows and dry weather flows.

The monitoring and control system shall provide a means to control return and waste sludge flows from

each clarifier, to control return sludge flows into each aeration basin, to meter return sludge flows, and to

measure waste sludge flows.

(b) Solids Wasting/Solids Blanket. The design shall include adequate downstream process

capacity (such as storage, stabilization, dewatering, or disposal) such that adequate solids removal rates

may be maintained.

(c) Return Activated Sludge (RAS) Pump Design. Centrifugal sludge pumps shall have a

positive suction head unless the pumps are self-priming. If airlift pumps are used, provisions shall be

included for cleaning the pumps without removal from the basin. Sufficient pumping units shall be

provided to maintain the maximum design return pumping rate with the largest single pumping unit out of

service.
Texas Commission on Environmental Quality Page 214
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(d) Waste Activated Sludge (WAS) Pump Design. If the design uses pumps for waste activated

sludge, at least two pumping units shall be provided. Sufficient pumping units shall be provided to prevent

excessive solids storage within clarifiers that could impair clarifier operation.

(e) Piping. The design of the sludge piping system shall provide adequate provisions for cleaning

and flushing. The design shall provide a pipe line velocity of at least 3 ft/sec. at the maximum

waste/return rate to prevent solids settlement and to provide scouring at anticipated normal operating

conditions. The sludge pipe system shall have a minimum nominal diameter of four inches.

§217.159. Process Control.

(a) Solids Retention Time (SRT) Control. The plant shall be designed with the necessary

equipment for the operator to control the SRT in the aeration tanks by wasting a measured volume of

surplus activated sludge regularly (at least weekly) from either the mixed liquor tank, a sludge re-aeration

tank, or from the return sludge. Wasting mixed liquor usually requires a thickener as part of the sludge

management process. Formulas for determining the SRT shall be presented in the Final Engineering

Design Report and included in the operating manual. The SRT required for nitrification applies to the

aerobic portion of the plant.

(b) Aeration System Control. Aeration control involves the total air supplied and the distribution

of air to the aeration tanks. In order to conserve energy, the design may provide the ability to adjust the
Texas Commission on Environmental Quality Page 215
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

airflow in proportion to the load demand of the plant. If this type of control is installed in the process,

aeration equipment shall be easily adjustable in increments and shall maintain solids in suspension within

these limits.

§217.160. Operability and Maintenance Considerations.

(a) Temperature. Equipment shall be designed to operate at the temperature extremes of the

plant location. If necessary, enclosures shall be provided to allow operation of the equipment at all times.

(b) Maintenance. Buildings that house equipment shall have adequate means to position the

equipment for removal for repair and for reinstallation. This ability may be by overhead lifting eyes to

mount a portable hoist, by overhead cranes, or by adequate building openings to allow access of truck

mounted or other lifting equipment.

§217.161. Electrical and Instrumentation Systems.

All three-phase motors shall have protection against a single-phase electrical condition. Electrical

power supplies to instrumentation and monitoring equipment shall have protection from power surges.

Optical isolation shall be considered for low voltage signal circuits to remote instruments. All plants shall

have fault monitoring and reporting. For plants that are not staffed 24 hours per day, reporting shall be to
Texas Commission on Environmental Quality Page 216
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

a location that may alert a responsible person. Faults to be monitored include the following: high wet well,

power interruption, disinfection failure, blower failure, and return sludge pumping failure.

§217.162. Flow Measurement.

Plants having a wet month design flow greater than 400,000 gpd shall provide process control

measurement at strategic operational control points: return sludge of each clarifier, waste sludge flow,

and effluent flow.

§217.163. Advanced Nutrient Removal.

Designs which anticipate advanced nutrient removal shall be considered Innovative and/or

Nonconforming technology and shall comply with §217.10(b) of this title (relating to Innovative and

Nonconforming Technology).

§217.164. Appendix I.

This design approach is offered as an alternative to the traditional design approach. The aeration

tank volume and the clarifier volume are determined by selecting a mixed liquor suspended solids and floc

volume (at SVI = 100) for the required minimum solids retention time. Larger values of mixed liquor

suspended solids require less aeration tank volume and greater clarifier volume. By examining a range of
Texas Commission on Environmental Quality Page 217
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

values of the mixed liquor suspended solids and the floc volume, the engineer may select the most

favorable arrangement for the project. When using the volume-flux design method, sizing of aeration

basins and clarifiers shall be done in accordance with the requirements of this section. This method is

restricted to facilities with design flows greater than 0.40 mgd. Figure 1:§217.164
Texas Commission on Environmental Quality Page 218
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

APPENDIX I : Volume-Flux Design Approach.

(a) Design approach.

(1) Determine the solids retention time (SRT) required to meet the permit requirement

for effluent CBOD and ammonia-nitrogen.

(2) Select a trial value mixed liquor floc volume, (for example mixed liquor suspended

solids (MLSS) at sludge volume index (SVI) of 100.

(3) Using the design organic loading rate, the required SRT and yield, and the trial

MLSS, determine the aeration tank volume.

(4) Using the trial value of mixed liquor flow volume, determine the clarifier area.

(5) For clarifiers overloaded in thickening at two hour peak flow, determine the final

MLSS during storm flow and the resulting sludge blanket depth.

(6) Observing limitations, determine the side water depth (SWD) and volume of the

clarifier.
Texas Commission on Environmental Quality Page 219
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(7) Repeat the items described 2 through 6 of this subsection at different mixed liquor

floc volumes and select the most favorable conditions for the plant design.

(b) Aeration Basin Sizing.

(1) For plants that do not require nitrification, the minimum SRT shall be as follows:

(A) For facilities with effluent CBOD values of 20 mg/l, the minimum SRT is 3

days;

(B) For extended aeration plants with effluent CBOD values of 20 mg/l, the

minimum SRT is 22 days;

(C) For facilities with effluent CBOD values less than 20 mg/L, the minimum

SRT is 4.5 days; and

(D) For extended aeration plants with effluent CBOD values less than 20mgl,

the minimum SRT is 25 days.

(2) For plants that require nitrification, the minimum SRT shall be based on the winter

reactor temperature as set forth in §217.154(a)of this title (relating to Aeration Basin and Clarifier Sizing ­
Texas Commission on Environmental Quality Page 220
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Traditional Design Approach) and the values of SRT and net solids production, Y, as listed in Table 1.

The maximum CBOD loading for single-step plants is 50 lb. CBOD/thousand cf and for the first step of

two-step plants is 100 lb. CBOD/thousand cf.

(3) Above-ground steel or fiberglass tankage shall be considered to be 2E C lower

minimum operating temperature than systems utilizing reinforced concrete tankage. Systems shall be

designed for an MLSS concentration between 2000 and 5000 mg/l. The net solids production, Y, in Table

1 includes both coefficients for yield and endogenous respiration.

Table 1 - Effect of Temperature on SRT, Net Solids Production, and F/M Rate

Temperature, "C SRT, days Net Solids Production, F/M Rate,

Y = .965-0.013(SRT) #BOD/#SS/day =

1/(Y*SRT)
18 4.76 0.90 0.233

17 5.25 0.90 0.212

16 5.79 0.89 0.194

15 6.38 0.88 0.178

14 7.04 0.87 0.163

13 7.77 0.86 0.150


12 8.56 0.85 0.137

11 9.45 0.84 0.126


Texas Commission on Environmental Quality Page 221
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

10 10.42 0.83 0.116

Where: Table 1 is based on the maximum growth rate of Nitrosomonas calculated using Equation 3-14

from EPA Manuel, Nitrogen Control, EPA/625/R-93/010, Sept. 1993, p. 90, shown below as equation 1.

Max. Growth Rate ’ 0.47e 0.098(T& 15),days &1 Equation 1

The necessary SRT was calculated using equation 2 as follows:

SRT ’ SF/(Max. Growth Rate) Equation 2

SF is often referred to as a safety factor, but here it also includes the design factor for the ratio of

average to maximum diurnal ammonia loading. A value of 3.0, as recommended in the EPA manual, was

used in calculating Table 1.

Determine the Volume of the Aeration Basin. Select a trial value of MLSS. The aeration basin volume is

calculated as the maximum value from equations 3 and 4.

Va ’ 1,000,000(CBODL)(Y)(SRT)/(62.4MLSS) Equation 3
Texas Commission on Environmental Quality Page 222
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

V a ’ 1,000(CBODL)/(maximum allowable lb CBOD/kcf) Equation 4

Where: Va = Volume of aeration basin, cubic feet

CBODL = Design CBOD load, per day

Y = yield of solids per unit CBOD removed

SRT = required solids retention time, days

MLSS = mixed liquor suspended solids, mg/L

lb CBOD/kcf = maximum CBOD load/thousand cf

(c) Clarifier Sizing. The clarifier basin sizing is based on volume flux which takes into account the

floc volume of solids entering the clarifier. Biological solids may occupy different volumes for the same

mass of solids as indicated by the SVI. Any return flows from units downstream of the clarifier, such as

flow from skimmer, thickeners and filter backwash shall be added to the design flow and two-hour peak

flow for purposes of determining overflow rates for clarifier sizing. All clarifiers shall be sized to ensure

overloading in clarification does not occur under any design condition. The settling velocity of the mixed

liquor solids shall be equal to or greater than the two-hour peak overflow rate. In addition, all clarifiers

shall be sized to preclude overloading in thickening at the design flow. The design maximum mixed liquor

floc volume shall be stated in the operating instructions.

(1) Dimensions for Clarifiers Designed for No Solids Storage (i.e., not overloaded in

thickening at the two hour peak flow).


Texas Commission on Environmental Quality Page 223
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Determine Overflow Rate and Area. When clarifiers are designed for no

solids storage, Table 2 shall be used to determine the maximum surface loading rates. The MLSS

concentration shall be the same concentration assumed for sizing the aeration basin. The underflow rate

shall be chosen by the design engineer. Using Table 2, the aeration basin MLSS concentration and a

selected underflow rate; the maximum overflow rate for the clarifier, at the two hour peak flow, may be

determined. The area of the clarifier may be determined as follows:

Ac ’ 1,000,000 Qp/0R p Equation 5

Where: Ac = area of the clarifier(s), sq ft.

Qp = two hour peak flow, MGD

ORp = overflow rate from Table 2, gpd/sf

(B) Determine Volume of Clarifier. The volume of the clarifier shall be the

greater of the values determined from the minimum SWD or the minimum detention time.

Vc, minSWD ’ A c(minSWD) Equation 6


Texas Commission on Environmental Quality Page 224
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

V c, minDT ’ (1,000,000Q p/24)(minDT)/(7.48) Equation 7

Where: V = volume of the clarifier(s), cf

Ac = area of the clarifier(s), sq ft.

minSWD = 10 ft, except as allowed in §217.152(g)

minDT = minimum detention time per Table F.2, hr

(2) Dimensions for Clarifiers Designed for Solids Storage Capabilities. When clarifiers

are designed to be overloaded in thickening at the design flow, the design shall include the ability to store

solids during peak flow events. Tables 2, 3, and 4 shall be used in the design. The process for designing

a clarifier based on this concept shall be as follows:

(A) Determine Area of the Clarifier. The area calculations shall be based on the

trial MLSS selected for the sizing of the aeration basin in paragraph (1) of this subsection. The area of the

clarifier shall be the greater of the areas determined from Table 3 for the two hour peak flow and the

area determined from Table 2 for the design flow using a selected underflow rate.

Ac,2& hr peak flow ’ 1,000,000Q p/0RT5 Equation 8


Texas Commission on Environmental Quality Page 225
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

A c,max 30& day average flow ’ 1,000,000Qmx30av/0RT4 Equation 9

Where: Qmx30av = design flow (MGD)

ORT5 = overflow rate from Table 3 for selected MLSS (gpd/sf)

ORT4 = overflow rate from Table 2 for selected underflow rate and

MLSS (gpd/sf)

(B) Determine the Final MLSS as the result of the transfer of solids from the

aeration tank to the clarifier by the two hour peak flow. For a clarifier that becomes overloaded in

thickening at just above the design flow, greater rates of flow will transfer solids from the aeration tank to

the clarifier until the mixed liquor solids are reduced to the concentration that no longer causes a thickener

overload.

Using Table 4 and the selected underflow rate, the MLSS concentration at peak flow may be

determined using equation 10.

MLSSp ’ (URT6( RSSST6 )/(0Rp% URT6) Equation 10


Texas Commission on Environmental Quality Page 226
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Where: URT6 = Underflow rate from Table 4 (gpd/sf)

Orp = Overflow rate at 2-hr peak flow (gpd/sf)

MLSSpf =Diluted MLSS during peak flow (mg/l)

RSSSm = Maximum Return Sludge Concentration from Table 4 for the

selected UR (mg/l)

(C) Determine Depth of Sludge Blanket at Two Hour Peak Flow. The depth of

the sludge blanket is determined by the aeration basin volume, the change in MLSS, the area of the

clarifier and the concentration of the blanket solids at the selected underflow rate as shown in equation

11.

SBD ’ v a(MLSSav & MLSSpf)/(AcBKSS)% 1.0 Equation 11

Where: SBD = Sludge Blanket Depth (ft)

Va = Volume of aeration basins (cu ft.)

Ac = Area of clarifier (sq ft.)

MLSSp = Diluted MLSS during peak flow (mg/l)

MLSSav = Diluted MLSS during average flow (mg/l)

BKSS = Blanket concentration from Table 4 at the selected underflow

rate (mg/l)
Texas Commission on Environmental Quality Page 227
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

1.0 = Assumed sludge blanket depth during design flow conditions

(D) Determine the SWD. The SWD of the clarifier shall be the maximum value

resulting from the following conditions:

(I) 10 ft unless a lower depth is allowed by §217.152(g),

(II) minimum detention time per Table F.2,

SWD DT ’ 0R p(DT)/180 Equation 12

(III) 3.0 times the Sludge Blanket Depth.

(E) Determine Clarifier Volume. The volume of the clarifier is the area

multiplied by the SWD determined in subparagraph (D) of this paragraph.

Vc ’ A c(SWD) Equation 13

Where: Vc = Volume of Clarifier, (cf)


Texas Commission on Environmental Quality Page 228
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Ac = Area of the Clarifier, (sq ft)

SWD = Side Water Depth determined in (D) above, (ft)

(F) Formulas for Tables 2, 3, and 4 Table 3 gives overflow rates that are equal

to the settling velocity of activated sludge at various floc volume concentrations. For values less than 30

percent, the floc volume is the 30-minute settled volume in an unstirred 1-liter graduated cylinder. For

greater values, the sample should be diluted so that the settled volume is between 15 and 30 percent, and

the result multiplied by the dilution factor.

(I) For floc volume less than 40 percent,

0RT5 ’ 5053.8(1& fv/100)3.83gpd/sf Equation 14

(II) For floc volume greater than 40 percent,

0RT5 ’ 9003610(fv &2.56)gpd/sf Equation 15

Where: ORT5 = Settling Velocity of Table 3 (gpd/sf)


Texas Commission on Environmental Quality Page 229
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

fv = Floc Volume (percent) = SVI(MLSS)/10,000 SVI (ml/g),MLSS

(mg/L)

Table 2 and Table 4 are based on an analysis of the floc volume flux, i.e. floc

volume times settling velocity, calculated from Equations 14 and 15. Table 4 is a tabulation of the

maximum concentration of the underflow at different underflow rates. The equation for Table 4 is as

follows:

RSSSm ’ 10,170,000(UR &0.391)/SVI Equation 16

Where: RSSSm = Return Sludge Suspended Solids (mg/L)

UR = Underflow Rate (gpd/sf)

SVI = Sludge Volume Index (ml/g)

Table 2 gives the overflow rate which, along with the underflow rate and MLSS,

will produce the same floc volume flux as shown in Table 4.


Texas Commission on Environmental Quality Page 230
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table 2 Table 3
Allowable Clarifier Surface Loading Rates For Given Underflow Maximum Allowable Clarifier

Rates With No Provisions For Sludge Storage in the Clarifier Overflow Rate Allowed for

OR Clarifiers Which are Designed to

The Maximum Surface Loading Rate at the Design Flow for Store Solids

Clarifiers Designed to Store Solids During Peak Events


SVI=100

(minimum allowable SVI)


MLSS UNDERFLOW RATE (gpd/sq.ft.) MLSS SURFACE

LOADING RATES
mg/l 200 250 300 350 400 (mg/l) (gpd/sq.ft.)
2000 1081 1218 1340 1452 1554 2000 2000
2100 1020 1148 1262 1366 1461 2150 2000
2200 965 1084 1191 1288 1377 2200 1952
2300 914 1026 1126 1217 1299 2300 1858
2400 868 973 1067 1151 1229 2400 1767
2500 825 924 1012 1091 1163 2500 1680
2600 786 879 962 1036 1103 2600 1596
2700 749 837 915 985 1048 2700 1514
2800 715 798 872 937 996 2800 1437
2900 684 762 831 893 948 2900 1362
3000 654 729 793 851 903 3000 1290
3100 627 697 758 812 861 3100 1220
3200 601 667 725 776 821 3200 1154
3300 577 640 694 742 784 3300 1090
3400 554 613 665 710 750 3400 1029
3500 532 589 637 680 717 3500 971
3750 483 533 575 611 642 3750 836
4000 441 484 520 551 577 4000 715
Texas Commission on Environmental Quality Page 231
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

4250 403 441 472 498 520 4250 611


4500 369 402 429 451 469 4500 528
4750 340 368 391 409 423 4750 459
5000 313 337 356 371 382 5000 403
Table 4 - Values For Use in Determining Sludge Storage Requirements

UNDERFLOW 200 250 300 350 400

(gpd/sq.ft.)
RSSS MAX (mg/l) 12813 11743 10935 10295 9771
B L A N K E T 7816 7163 6670 6280 5961

CONC. (mg/l)
POUNDS/CUFT 0.488 0.447 0.416 0.392 0.372

(Blanket)
Texas Commission on Environmental Quality Page 232
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER G : FIXED FILM AND FILTRATION

§§217.180-217.192

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.180. Applicability.

This subchapter details the requirements for trickling filters, rotating biological contactors,

submerged biological contactors, and filtration systems.


Texas Commission on Environmental Quality Page 233
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.181. Trickling Filters - General Requirements.

Trickling filters are secondary aerobic biological processes which are used for treatment of

sewage. Biofilters or biotowers are terms describing trickling filters which use random or stackable

modular synthetic media.

(1) Process Applicability. Trickling filters are classified according to applied hydraulic

loading in million gallons per day (including recirculation) per acre of filter media aerial cross section

surface area (mgd/acre), and influent organic loadings in pounds BOD per day per 1000 cubic feet of

filter media, (lb BOD/day - 1000 cu ft). The following factors shall be considered in the selection of the

design hydraulic and organic loadings: strength of the influent sewage; effectiveness of pretreatment;

type of filter media; and treatment efficiency required. Current practice normally distinguishes among

trickling filter types on the basis of the role in treatment rather than loading rates. Under this system,

trickling filters may be classified as roughing filters providing 50-75% removal of soluble BOD; secondary

treatment filters providing the required settled effluent BOD and TSS; combined BOD/nitrifying filters

providing the required settled effluent BOD, NH4 -N, and TSS; and tertiary nitrifying filters which provide

the required settled effluent NH4 -N (where the influent to the trickling filter is a clarified secondary

effluent). The applied hydraulic and organic loadings, which the different classes of trickling filters shall

be designed, are presented in Table G.1 of this paragraph. Figure 1: §217.181(1)


Texas Commission on Environmental Quality Page 234
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table G.1 - Typical Design Loadings


Operating Characteristics Standard Intermediate High High Rate Roughing

Rate Rate Rate

Media Rock Rock Rock Manufactur Either

ed

Hydraulic Loading: 1-4 4-10 10-40 15-90 60-180

mgd/acre
Hydraulic Loading: gpd/sf 25-90 90-230 230-900 350-1000 1400-4200
*
Organic Loading: 200-1000 700-1400 1000­ -- --

lb BOD5 /acre-ft/day 1300


*
Organic Loading: 5-25 15-30 30-150 up to 300 100+

lb BOD5 /day/1000cf

BOD5 Removal (%) 80-85 50-70 40-80 65-85 40-85

*Does not include recirculation


Includes subsequent settling

(2) Pretreatment. Rock media trickling filters shall be preceded by primary clarifiers

equipped with scum and grease removal devices. Preliminary treatment shall exist upstream of all

trickling filters. These preliminary treatment units shall effectively remove all grit, debris, suspended

solids, oil, grease, and all particles with a diameter greater than 3 millimeters. Measures to prevent or

control the release of hydrogen sulfide gas shall be provided where influent wastewater potentially

contains harmful or nuisance levels of hydrogen sulfide.


Texas Commission on Environmental Quality Page 235
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(3) Rock Filter Media.

(A) Materials. Crushed rock, slag, or similar material shall not contain more

than five percent by weight of pieces whose longest dimension is greater than three times the least

dimension. Rock media shall conform to the following size distribution and grading when mechanically

graded over a vibrating screen with square openings in accordance with the following:

(i) passing five inch sieve - 100 % by weight;

(ii) retained on three inch sieve - 95-100 % by weight;

(iii) passing two inch sieve - 0.2 % by weight;

(iv) passing one inch sieve - 0.1 % by weight; and

(v) the loss of weight by a 20-cycle sodium test, as described in

American Society of Civil Engineers Manual of Engineering and Engineering Practice No. 13, shall be

less than 10%.

(B) Placement. Rock media shall not be less than four feet in depth at the

shallowest point. The dumping of media directly on the filter is unacceptable. Instructions for placing
Texas Commission on Environmental Quality Page 236
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

media shall be included in the specifications. Crushed rock, slag, and similar media shall be washed and

screened or forked prior to placement to remove clays, organic material, and fines. Rock media shall be

placed by hand to a depth of 12 inches above the underdrains. The remainder of the material may be

placed by means of belt conveyors or equal mechanical methods approved by the engineer. All material

shall be carefully placed in a manner which will not damage the underdrains. Trucks, tractors, or other

heavy equipment shall not be driven over the filter media during or after construction.

(4) Synthetic (Manufactured or Prefabricated) Media Materials. All synthetic media

materials shall be utilized in accordance with all manufacturer’s recommendations. Synthetic media

materials may be considered innovative or nonconforming technology at the discretion of the executive

director and reviewed under §217.10(2) of this title (relating to Types of Approvals) accordingly. If this

type of review occurs, the engineer shall be notified as required by §217.9(d) of this title (relating to

Submittal Requirements).

(A) Suitability. The suitability of synthetic media materials shall be evaluated on

the basis of experience with installations treating similar strength wastewater under similar hydraulic and

organic loading conditions. Case histories involving the use of the media shall be included in the final

engineering design report.


Texas Commission on Environmental Quality Page 237
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Durability. Media shall be insoluble in sewage and resistant to flaking or

spalling, ultraviolet degradation, disintegration, erosion, aging, all common acids and alkalies, organic

compounds, and biological attack.

(C) Structural Integrity. The media structural design shall be capable of

supporting the media, water flowing through or trapped in voids, and the maximum anticipated thickness

of wetted biofilm. The media shall additionally be capable of supporting the weight of a person when the

trickling filter is in operation, or separate provisions shall be made for maintenance access to the entire top

of the trickling filter media and to the distributor.

(D) Placing of Synthetic Media. Modular media shall be placed as nearly as

possible with the edges matched, to provide consistent hydraulic conditions within the trickling filter, and

shall be installed to provide a close fit to adjacent modules.

(5) Filter Dosing. Wastewater may be applied to the filters by siphons, pumps, or by

gravity discharge from preceding treatment units when suitable flow characteristics have been developed.

Design for new facilities shall include provisions to control instantaneous dosing rates under both normal

operating conditions and filter-flushing conditions. Unless otherwise justified in the final engineering design

report, optimization of dosing intensity shall be achieved through control of the distributor speed, with

control of recirculation rate as a compensatory measure under low-flow conditions. Table G.2 provides
Texas Commission on Environmental Quality Page 238
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

design ranges of dosing intensity for normal usage periods and for flushing periods. The instantaneous

dosing intensity for rotary distributors may be calculated using Equation 1.g. Figure 2: §217.181(5)

SK’ [(q% r)( (1000mm/m)]/[(a)(n)(60min/hr)] Equation 1.g

Where:

SK = dosing intensity, mm/pass of an arm;

q = influent flow/filter top surface area, m3 /m2 /hr;

r = recycle flow/filter top surface area, m3 /m2 /hr;

a = number of arms; and,

n = revolutions per minute

Table G.2 - Trickling Filter Dosing Intensity Ranges (SK)


BOD5 loading kg/m3 /day Design SK mm/pass Flushing SK mm/pass

0.25 10-100 $200

0.50 15-150 $200

1.00 30-200 $300

2.00 40-250 $400

3.00 60-300 $600

4.00 80-400 $800


Texas Commission on Environmental Quality Page 239
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(6) Distribution Equipment. Settled wastewater may be distributed over the filter media

by rotary, horizontal, or traveling distributors provided the equipment proposed is capable of producing the

required uniformity of distribution at the design and flushing dosing intensities over the entire surface of

the filter. Deviation from a calculated uniformly distributed volume per unit surface area at the design

dosing intensity shall not exceed 10% at any portion of the filter. Filter distributors shall be designed to

operate properly at all anticipated flow rates. Electrically driven variable speed distributors shall be

provided for new facilities or upgrades of existing trickling filters to allow operation at optimum dosing

intensity independent of recirculation pumping. Excessive head in the center column of rotary distributors

shall be avoided, and all center columns shall have adequately sized overflow ports to prevent water from

reaching the bearings in the center column. Distributors shall include cleanout gates on the ends of the

arms and shall also include an end nozzle to spray water on the wall of the filter to wet the edge of the

media. The filter walls shall extend at least 12 inches above the top of the ends of the distributor arms.

(A) Seals. THE USE OF MERCURY SEALS IS PROHIBITED IN THE DISTRIBUTORS

OF TRICKLING FILTERS. If an existing treatment facility is to be modified, any mercury seals in the

trickling filters shall be replaced with oil or mechanical seals.

(B) Distributor Clearance. A minimum clearance of six inches shall be provided

between the top of the filter media and the distributing nozzles.
Texas Commission on Environmental Quality Page 240
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(C) Rate of Travel. Rotary distributor designs shall be capable of operation at

speeds as low as one revolution per 30 minutes, or slower.

(D) Maintenance. Trickling filters designed with a height or diameter which

does not allow distributors to be readily removed and replaced by a crane shall be provided with jacking

columns and pads at the distributor column, or other means to facilitate bearing replacement.

(7) Recirculation.

(A) Low Flow Conditions. In order to ensure that the biological growth on the

filter media remains active at all times, provisions shall be included in all designs for minimum recirculation

during periods of low flow. This minimum recirculation shall not be considered in the evaluation of the

efficiency of the filter unless it is part of the proposed specified continuous recirculation rate. The

required recirculation flow for minimum wetting is minimized in deep filters; however, the required

pumping head shall also be considered in recirculation design. Minimum flow to the filters shall not be

less than 1.0 mgd per acre of filter aerial surface. Minimum flow to the filters shall be sufficient to keep

the distribution nozzles operating properly. In addition, the minimum flow rate for designs using

hydraulically driven distributors shall be great enough to keep rotary distributors turning at the minimum

design rotational velocity. For facilities with a design capacity greater than or equal to 0.5 mgd and in

which recirculation is included in design computations for BOD5 removal, recirculation shall be provided

by variable speed pumps, and a method of conveniently measuring the recycle flow rate shall be provided.
Texas Commission on Environmental Quality Page 241
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Compensatory Recirculation. Designs shall provide recirculation to

supplement influent flow where design and flushing dosing intensities are not to be achieved by control of

distributor operation alone. Controls for the distributor speed and recycle pumping rate shall provide

optimum dosing intensity under all anticipated influent flow conditions.

(C) Process Calculations. The benefits of recirculation are considered to be

primarily related to dosing intensity, and may often be achieved by control of the distributor speed only.

Designs which propose recirculation for removal of remaining organic matter in the effluent shall be

justified in the final engineering design report, consider the effect of dilution of the influent on the rate of

diffusion of dissolved organic substrates into the biofilm, and the effect of reduced influent concentrations

on reaction rates in sections of the filter having first order kinetics.

(D) Maximum Recirculation Rate. Recirculation rates in excess of four times

design flow shall not be utilized unless specifically justified in the final engineering design report.

(E) Configuration. Where influent organic loadings are relatively constant, direct

recirculation of unsettled trickling filter effluent may be utilized provided the design ensures that the ability

of the media and distributor nozzles to handle recirculated sloughed biofilm is not exceeded. Where

influent organic loadings are variable, partial concentration equalization may be achieved by recirculating

trickling filter effluent following final clarification. Additional concentration equalization may be achieved

if the recirculated effluent is introduced into the primary clarifiers. If these types of design are proposed,
Texas Commission on Environmental Quality Page 242
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

clarifiers shall be sized to handle the total influent and recirculated flow, and the clarifier design shall

consider the potential for sludge denitrification and the potential for sludge denitrification shall be reviewed

by the engineer when designing the clarifier.

(8) Average Hydraulic Surface Loading. The engineering report shall include

calculations of the maximum, design, and minimum aerial cross section surface loadings on the filter(s) in

terms of million gallons per acre of filter area per day (for the initial year and design year). Average

hydraulic surface loadings of filters with crushed rock, slag, or similar media shall not exceed 40 mgd per

acre based on design flow except in roughing applications. The minimum surface loading shall not be less

than 1.0 mgd per acre. Loadings on synthetic (manufactured or prefabricated) filter media shall be within

the ranges specified by the manufacturer.

(9) Underdrain System Design. Underdrains with semicircular inverts or the equivalent

shall be provided for rock or other random media. The under drainage system shall cover the entire floor

of the trickling filter. Underdrains for rock media trickling filters shall be vitrified clay or precast

reinforced concrete. Half tile shall not be used for underdrain systems. Inlet openings into the underdrain

shall provide an unsubmerged gross combined area of at least 15% of the surface area of the filter.

Synthetic media of modular stackable designs shall be supported above the filter floor by beams with or

without posts and grating with support and clearances in accordance with the media manufacturer*s

recommendations.
Texas Commission on Environmental Quality Page 243
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(10) Underdrain Slopes. Underdrains and the filter effluent channel floor shall have a

minimum slope of one percent. Effluent channels shall be designed to produce a minimum velocity of two

feet per second at design flow rate of application to the trickling filter. Floors of new trickling filters using

stackable modular synthetic media shall slope downward toward the drainage channel at one to five

percent based upon filter size and hydraulic loading.

(11) Passive Ventilation. The underdrain system or synthetic media support structure,

effluent channels, and effluent pipe shall be designed to permit free passage of air. Drains, channels, and

effluent pipes shall have a cross sectional area such that not more than 50% of the cross sectional area

will be submerged at peak flow plus recirculation. Provisions shall be made in the design of the effluent

channels to accommodate the specified flushing hydraulic dosing intensity and to allow the possibility of

increased hydraulic loading. Extensions of underdrains through the filter side walls, ventilating openings

through the side walls, and effluent discharge conduits designed as partially full flow pipes or open

channels may be utilized to assist in ventilation. Vent openings through the trickling filter walls shall be

designed to be capable of hydraulic closure to allow flooding of the filter for nuisance organism control.

Designs using passive ventilation shall provide at least 2.5 square feet of ventilating area (vent stacks,

ventilating holes, ventilating ports, etc.) per 1000 lbs. of primary effluent BOD5 per day. The underdrain

system for rock media filters shall provide at least one square foot of ventilating area for every 250

square feet of plan area. Minimum required ventilating area for synthetic media underdrains shall not be

less than recommended by the manufacturer. The ventilating area shall be the greater of one square foot
Texas Commission on Environmental Quality Page 244
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

for every 175 square feet of synthetic media trickling filter plan area or 2.6 square feet for every 1000

cubic feet of media volume.

(12) Forced Ventilation. Forced ventilation shall be provided for trickling filters designed

for nitrification, for all trickling filter designs with media depths in excess of six feet, or for locations

where seasonal or diurnal temperatures do not provide sufficient difference between the ambient air and

wastewater temperatures to sustain passive ventilation. The engineer shall determine the minimum air

flows needed for forced ventilation and optimized process performance, and shall provide all calculations

associated with this determination in the final engineering design report. The engineer may use equation

2.g and the values in table G.3 to determine minimum air flow rates. Downflow forced ventilation systems

shall include provisions for removal of entrained droplets, or for return of air containing entrained moisture

to the top of the trickling filter. Downflow systems shall include reversible fans or other provisions to

allow reversal of air flow when wide temperature differences between the ambient air and wastewater

create strong natural updrafts. Ventilation fans and controls shall be designed to enable flooding of the

filter without sustaining damage. Figure 3: §217.181(12)

MAFR’ [(R A)( (L)(PF)]/(1440min/day) Equation 2.g

Where:
Texas Commission on Environmental Quality Page 245
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

MAFR = Minimum air flow rate, SCFM

RA = Aeration rate, scf/lb Table G.3

L = Loading rate, lb/day, Table G.3

PF = Loading peaking factor

Table G.3 - Aeration Rate and Loading Rate Factors


Filter Application RA (scf/lb BOD5 ) L (lb BOD5 /1000cf/day)

Roughing Filter at 75-200 lb 1080 BOD5 loading on the filter

BOD5 /1000cf/day
Secondary Treatment Filter at 1200 BOD5 loading on the filter

25-50 lb BOD5 /1000cf/day

Combined or Tertiary Filter 2400 1.25*BOD5 loading on the filter

+ 4.6*TKN loading on the filter

(13) Maintenance.

(A) Cleaning and Sloughing. All flow distribution devices, underdrains, channels,

and pipes shall be designed so the devices may be maintained, flushed, and properly drained. The devices

shall be capable of hydraulically accommodating the specified flush-dosing intensity. The units shall be

designed to facilitate cleaning of the distributor arms. A gate shall be provided in the wall to facilitate

rodding of the distributor arms. Designs shall prevent recirculation of sloughed biomass in pieces larger

than will pass through the distributor nozzles or the filter media voids.
Texas Commission on Environmental Quality Page 246
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Nuisance Organism Control. Current practice indicates that nuisance

organisms may be minimized by operation of trickling filters at proper design dosing intensities, with

periodic flushing at higher dosing intensities.

(i) Filter Flies. The structural and hydraulic design of new trickling

filters shall enable flooding of the trickling filters for filter fly control; however, consideration will be given

by the executive director to alternate methods of filter fly control for filters exceeding six feet in height

provided that the effectiveness of the alternate method is verified at a full-scale installation. This

information shall be justified in the final engineering design report. Designs shall minimize adjacent wet

and unwetted areas where filter flies may lay eggs. If existing rectangular trickling filters are retrofitted

with rotary distributors, any media which will not be fully wetted shall be removed.

(ii) Snails. Because snails lay eggs in sludge deposits, trickling filter

designs shall minimize areas where sludge may accumulate. A low velocity, open channel shall be

provided between the trickling filter and final clarifier, for manual removal of snails.

(iii) Corrosion Protection. All equipment and materials utilized in

construction of trickling filters, including ventilation equipment and covers, shall be designed to minimize

corrosion and shall utilize corrosion-resistant materials.


Texas Commission on Environmental Quality Page 247
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(14) Flow Measurements. Means shall be provided to measure flows to the filter and

recirculation flows.

(15) Odor Control. Odors shall be minimized by adequate ventilation and by operation of

trickling filters at sufficient design dosing intensities, with periodic flushing at higher dosing intensities.

(A) Covers. The engineer shall consider designing new trickling filters to

accommodate future installation of covers for control of odors and VOC emissions. Covers shall be

provided for new facilities sited in locations where a high potential exists for odor complaints, or for

upgrades of existing facilities having a history of odor complaints. Covers shall allow access to the entire

top of the filter media and to the distributor for maintenance, including removal. Covered trickling filters

shall be equipped with forced ventilation.

(B) Stripping. The engineer shall provide forced ventilation in a downflow mode

to minimize odors for trickling filters with high influent organic loadings. Odorous off-gases may be

recycled through the trickling filter; used to ventilate tertiary nitrifying trickling filters in an upflow mode;

diffused into aeration basins; or treated separately for odor control using scrubbers or adsorption columns.

(16) Final Clarifiers. Final clarifiers for trickling filters shall be sized to provide the

required effluent TSS removal at the maximum influent flow plus maximum recirculation, with all pumps

in operation.
Texas Commission on Environmental Quality Page 248
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(17) Treatment Process Design Requirements. The engineer shall provide design

calculations using at least one filter efficiency formula from a reliable source acceptable to the executive

director. Sufficient operating data shall be submitted from existing trickling filters of similar construction

and operation to justify projected treatment efficiency, kinetic coefficients, and other design parameters.

Use of more than one set of applicable design equations is recommended to allow cross-checking of

predicted treatment efficiency.

§217.182. Nitrifying Trickling Filters - Additional Requirements.

This section details requirements which shall be complied with when trickling filters are proposed

as a means of providing nitrification sufficient to meet the requirements of a discharge permit. The

requirements in this section are in addition to the requirements in §217.181 of this title (relating to

Trickling Filters - General Requirements).

(1) Ventilation. Forced ventilation shall be provided for nitrifying trickling filters. Air

flow shall be distributed throughout the underdrain area. Minimum design air flow rates shall provide the

greater of 50 lbs. O2 provided per lb. O2 required at average loading, or 30 lbs. O2 provided per lb. O2

required at peak loading based on stoichiometry.


Texas Commission on Environmental Quality Page 249
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) Temperature. The temperature utilized in the design equations shall be justified in the

final design engineering report. Temperature effects on removal efficiency may be minimized using deep

towers or other means to minimize recirculation while providing the design hydraulic dosing intensity.

(3) pH. Effects of pH on nitrification in trickling filters may be significant, with optimum

nitrification rates attained above pH 8.0. The final design engineering report shall verify that the design

recirculation rates are appropriate for dealing with the effects of effluent alkalinity and pH depression on

nitrification.

(4) Predation. The biomass of nitrifying filters is subject to predation by flies, snails, and

worms. Means for effective control of biomass predators shall be included in all designs for nitrification.

(5) Hydraulic Application Rates. Designs for nitrifying trickling filters shall

accommodate operation at a design dosing intensity of at least 1.47 gpm/ft2 . The design shall provide

operational control of dosing intensity over a range which accommodates the design conditions.

(6) Media. Crossflow synthetic media is suggested for new tertiary nitrification filters or

for the nitrifying section of new combined nitrification filters.

(7) Tertiary Nitrification Filters. Trickling filters treating influent having a BOD5 to TKN

ratio of # 1.0 and soluble BOD5 # 12 mg/L, are considered tertiary nitrification filters.
Texas Commission on Environmental Quality Page 250
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Design Justification. Process design calculations and selection of kinetic

coefficients for tertiary nitrifying filters shall be consistent with current design practices, and shall be

justified by operating data from existing trickling filters of similar construction and operation.

(B) Tower Depth. Tertiary nitrifying filter designs shall minimize pH depression

due to recirculation, by utilizing towers $ 20 feet deep, and by control of influent instantaneous application

rates, by means other than compensatory recirculation. Shallow towers operating in series may be used in

lieu of deep towers, where the design includes provisions to readily switch the operating sequence of the

filters.

(8) Combined BOD/Nitrification Filters. Trickling filters intended to perform nitrification

and treating influent, having a BOD5 to TKN ratio of $ 1.0, or soluble BOD5 $ 12 mg/L, are considered

combined BOD/nitrification filters.

(A) Design Justification. Designs for combined BOD5 /nitrification filter designs

shall be empirically based. The projected treatment efficiency and other design parameters shall be

justified by operating data from existing trickling filters of similar construction and operation, and data shall

take precedence over design equations for combined nitrification filter design.

(B) BOD Removal Requirements. Nitrification in combined nitrifying filters

occurs in the lower depths of the filter, or in the second stage of filters operated in series, following BOD
Texas Commission on Environmental Quality Page 251
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

removal. Designs shall not take credit for nitrification in sections of the filter having soluble BOD5 $ 20

mg/L. Combined nitrification filters shall be designed to achieve effluent total BOD5 # 15 mg/L.

(C) Recirculation. Unlike tertiary nitrification filters, use of recirculation to

achieve design dosing rates may enhance nitrification in combined filters by reducing the influent BOD5 to

TKN ratio. Combined nitrification filter designs shall enable high recirculation rates, with turndown

capability.

§217.183. Dual Treatment Systems Utilizing Trickling Filters .

(a) Classification. Trickling filters or other attached growth treatment units in series with

suspended growth processes are considered to be dual treatment processes.

(1) Activated Biological Filter (ABF). The ABF process consists of a tricking filter and

final clarifier, in which settled solids from the final clarifier are recirculated through the trickling filter, with

no separate aeration basin or solids contact basin.

(2) Trickling Filter/Solids Contact (TF/SC). The TF/SC process consists of a trickling

filter sized to perform the majority of the soluble BOD removal for the system, followed by an aerated

solids contact basin sized to provide polishing and improved sludge settleability, followed by a final
Texas Commission on Environmental Quality Page 252
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

clarifier. Activated sludge is recirculated to the solids contact basin rather than the trickling filter. A

sludge re-aeration basin may be included in the design.

(3) Roughing Filter/Activated Sludge (RF/AS). The RF/AS process consists of a

trickling filter sized to perform roughing and concentration dampening, followed by an aeration basin sized

to provide the majority of the soluble BOD removal for the system, followed by a final clarifier.

Activated sludge is recirculated to the aeration basin rather than to the trickling filter.

(4) Activated Biological Filter/Activated Sludge (ABF/AS). The ABF/AS process

consists of a trickling filter sized to perform roughing and concentration dampening, followed by an

aeration basin sized to provide the majority of the soluble BOD removal for the system, followed by a final

clarifier. Activated sludge is recirculated to the trickling filter rather than to the aeration basin.

(5) Trickling Filter/Activated Sludge (TF/AS). The TF/AS process consists of a trickling

filter sized to perform roughing and concentration dampening, followed by an intermediate clarifier,

followed by an aeration basin sized to provide the majority of the soluble BOD removal for the system,

followed by a final clarifier. Activated sludge is recirculated to the aeration basin rather than to the

trickling filter.

(b) Process Design. Attached and suspended growth subprocesses in dual systems shall be

designed in an integrated design process which considers the effluent quality from the first stage in
Texas Commission on Environmental Quality Page 253
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

determining the design basis of the second stage process. Performance of the first stage of treatment

may be estimated using applicable design equations and methodology used for design of single stage

processes. Performance of the second stage of dual systems may not be precisely predicted, and shall be

estimated using data from existing similar installations or applicable pilot studies. Treatment process

designs in which activated sludge is recycled to first-stage trickling filters shall not claim reduction of

oxygen demand to the second-stage aeration basin as a result of sludge recirculation to the trickling filters.

(c) Treatment Unit Design. Detailed design of suspended and attached growth systems shall

include all of the features and operational capabilities required for the same treatment units if used for

single-process treatment, as well as the following items.

(1) Pretreatment. Pretreatment for dual systems shall conform to requirements for the

first-stage process.

(2) Snail Control. A low-velocity channel shall be provided between the first stage and

second stage treatment units for control of snails.

(3) Return sludge. Designs including recirculation of activated sludge or sloughing to

trickling filters shall prevent recirculation of pieces larger than will pass through the distributor nozzles or

the filter media voids. High-rate, vertical flow, fully corrugated media shall be used for trickling filters in

systems where sludge is recirculated to the trickling filter. Sludge shall be pre-incorporated into influent
Texas Commission on Environmental Quality Page 254
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

prior to application to trickling filters, and shall be pre-incorporated into the effluent from first-stage

processes prior to being introduced into second-stage aeration basins.

(4) Aeration. Aeration system design for second-stage treatment units in systems not

designed for nitrification shall be capable of transferring at least 1.2 lbs. of O2 per lb. of first stage

effluent BOD5 per day. Aeration systems for second-stage treatment units in systems designed for

nitrification shall be capable of transferring sufficient oxygen to meet stoichiometric requirements for

biomass growth, respiration for both carbonaceous material oxidation and nitrification, and oxygen

demand due to biomass sloughing events from the first stage.

(5) Sludge Age. Design of second-stage suspended growth processes shall provide

operational flexibility to vary the sludge age. Mean cell residence time of up to at least 1.5 days shall be

provided in the suspended growth process for TF/SC systems, or of up to at least 3 days if the second

process is an activated sludge aeration basin. Nitrifying dual systems shall be capable of providing control

of total combined mean cell residence time in the attached and suspended growth systems of up to at least

10 days with capability to provide at least 6 days mean cell residence time in the suspended growth

process alone.

(6) Hydraulic Residence Time. Design of second-stage processes shall provide

minimum hydraulic residence time of 0.5 hours if the second process is an aerated solids contact basin,
Texas Commission on Environmental Quality Page 255
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

and a minimum hydraulic residence time of 3 hours if the second process is an activated sludge aeration

basin.

(7) Nitrification Design. Design for nitrification using dual treatment processes shall

include a sludge reaeration basin if the second process is an aerated solids contact basin, and shall include

an intermediate clarifier if the second process is an activated sludge aeration basin.

§217.184. Rotating Biological Contactors (RBC) - General Requirements.

(a) Pretreatment. RBC units shall be preceded by pretreatment to remove any grit, debris, and

excess oil and grease which may hinder the treatment process or damage the RBC units. Primary

clarifiers, fine screens, and grit removal chambers shall be included if the engineer deems that these types

of units are necessary because the influent waste stream includes or is expected to include high levels of

grease, oil, grit, or other debris. For wastes with high hydrogen sulfide concentrations, preaeration shall

be provided.

(b) Enclosures and Ventilation. RBC units shall be covered, and ample ventilation shall be

provided. Working clearance of approximately 30 inches shall be provided within the cover unless the

covers can be removed with equipment normally available on site. Enclosures shall be constructed of a

suitable corrosion resistant material. Access doors on each end, and observation ports with covers, shall

be provided at 3 foot intervals along the unit.


Texas Commission on Environmental Quality Page 256
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) Media Design. The design of the RBC media shall provide for self cleaning action due to the

flow of water and air through the media. Only low density media shall be used in the first stage. RBC

media shall be selected which is compatible with the wastewater.

(d) Design Flexibility. The designer of a RBC plant shall consider provisions to provide additional

operational flexibility such as controlled flow to multiple first stages, alternate flow and staging

arrangements, removable baffles between stages, and provision for step feed and supplemental aeration.

(e) Tank Configuration. The RBC tank shall be designed to minimize zones in which solids will

settle out. Tank drains shall be provided to facilitate removal of any accumulated solids.

(f) Control of Unwanted Growth in the Initial Stages. The engineer shall consider provisions for

the addition of chlorine just ahead of the RBC system. In proper dosages, chlorine may control the

growth of beggiatoa which is an unwanted microorganism that may inhibit the initial stage of an RBC

system.

(g) Downtime Maintenance Provisions. Two or more trains (RBC stages in series) shall be

provided for facilities which have a design flow limit of 1 mgd or greater. The trains shall be capable of

being taken off-line when maintenance or cleaning is required. Appropriately-spaced tank drains shall be

included in the design.


Texas Commission on Environmental Quality Page 257
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(h) Bearing Maintenance. Bearings shall be easily accessible for inspection and lubrication.

(i) Organic Loading Design Requirements. The organic loading for the design of RBC systems

shall be based on total BOD5 in the waste going to the RBC system including any side streams. The

maximum loading rate shall not exceed 8 pounds of BOD5 per day per 1,000 square feet of media in any

stage. The engineer shall adjust the required RBC media area as needed to compensate for the effects of

the ratio of soluble BOD5 to total BOD5 . Allowable organic loading for the entire RBC system shall not

exceed 3.0 square feet (sf) of media area for facilities required to meet secondary treatment with no

nitrification requirements and 2.0 pounds of BOD5 /day/1000 sf for facilities required to meet secondary

treatment and nitrification requirements.

(j) Hydraulic Loading Design Requirements. Flow equalization shall be included in the treatment

train when the peak-to-design flow ratio is higher than 2.5 to prevent loss of fixed growth from the media.

A means of spreading the influent flow evenly across the media shall be provided in the first stage of the

RBC system.

(k) Stages. A stage includes one or more RBC units divided by a vertical baffle or wall. The

minimum number of stages in series, for designed only BOD5 removal, shall be three. If the plant is

designed with less than three stages, the engineer shall provide justification in the final engineering design

report. The justification shall be based on either full-scale operating facilities or pilot unit operational data.

Any pilot unit data used in the justification shall take into consideration an appropriate scale-up factor.
Texas Commission on Environmental Quality Page 258
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(l) Drive Systems. The drive system for each RBC unit shall be selected for the maximum

anticipated media load. The engineer shall consider installing a variable speed system to provide

additional operator flexibility. The RBC units may be mechanically driven or air driven.

(1) Mechanical Drive. Each RBC unit shall have a positively-connected mechanical

drive with motor and speed reduction unit to maintain the required rpm. A fully-assembled spare

mechanical drive unit for each size shall be provided on-site. Supplemental diffused air shall be

considered for mechanical drive systems to help remove excess biomass from the media and to help

maintain the minimum dissolved oxygen concentration.

(2) Air Drive. Each RBC unit shall have air diffusers mounted below the media and off-

center from the vertical axis of the RBC unit. Air cups mounted on the outside of the media shall collect

the air to provide the driving force and maintain the required rotational speed. Blowers shall provide

enough air flow for each RBC unit plus additional capacity to double the air flow rate to any one unit

while the others are running normally. The blowers shall be capable of providing the required air flow

with the largest unit out of service. The air diffuser line to each unit shall be mounted such that the air

diffuser line may be removed without removing the RBC media. An air control valve shall be installed on

the air diffuser line to each RBC unit.


Texas Commission on Environmental Quality Page 259
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(m) Dissolved Oxygen. The RBC plant shall be designed to maintain a minimum dissolved

oxygen concentration of one milligram per liter in all stages during the maximum organic loading rate.

Supplemental aeration may be required.

§217.185. Nitrifying RBCs - Additional Requirements.

For BOD5 removal and nitrification of domestic wastewater in a single system, a minimum of four

stages shall be used, and the maximum overall organic loading rate shall be 1.6 pounds of BOD5 /day/1,000

square feet of media. When the influent pH is consistently below 7.0, capabilities for chemical addition,

as needed to increase the pH, shall be provided. RBC designs which are intended to provide nitrification

shall be substantiated by data and calculations in the final engineering design report to the satisfaction of

the executive director. These requirements are in addition to the requirements of §217.184 of this title

(relating to Rotating Biological Contactors (RBCs - General Requirements). These designs may be

subject to the requirements of §217.10(2) of this title (relating to Types of Approvals) at the discretion of

the executive director.

§217.186. Dual Treatment Systems Utilizing RBCs.

RBC units may be used in conjunction with other systems to take advantage of the strengths of

both systems. An RBC system may be used as a "roughing" unit in series with activated sludge as

described in §217.183 of this title (relating to Dual Treatment Systems Utilizing Trickling Filters).
Texas Commission on Environmental Quality Page 260
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Regardless of the type of dual system employing RBC units, the engineer shall submit supporting data,

calculations, process descriptions, and vendor information to describe how the proposed system will meet

the required treatment levels. These systems may be subject to the requirements of §217.10(2) of this

title (relating to Types of Approvals) at the discretion of the executive director.

§217.187. Submerged Biological Contactors (SBC) - General Requirements.

SBC units are generally larger in diameter than RBC units. The majority of the SBC unit is

submerged in the mixed liquor, including the media support shaft and bearings. As a result, SBC systems

are only air driven and do not require covers. SBC systems require the same pretreatment as RBC

systems. SBC systems shall be designed under the same criteria as RBC systems except as described in

paragraphs (1) and (2) of this section. The engineer shall submit design supporting data, calculations,

process descriptions, and vendor information in the final engineering design report to describe how the

proposed system will provide the required treatment levels. These designs may be subject to the

requirements of §217.10(2) of this title (relating to Types of Approvals) at the discretion of the executive

director.

(1) Number of Headers. Two air headers are required for each SBC unit: one for

rotation of the unit and one to provide dissolved oxygen for the biological activity.
Texas Commission on Environmental Quality Page 261
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) Bearing Requirements. The submerged bearings shall be sealed to prevent intrusion

of the wastewater. If lubrication is required, facilities shall be provided above the water level to provide

the lubricant without draining the tank.

§217.188. Dual Treatment Systems Utilizing SBCs.

SBC units may be used in conjunction with other systems to take advantage of the strengths of

both systems. An SBC system may be used as a "roughing" unit in series with activated sludge as

described in §217.183 of this title (relating to Dual Treatment Systems Utilizing Trickling Filters). SBC

units may also be installed in existing activated sludge basins to create a combination fixed and suspended

growth process. Regardless of the proposed dual system employing SBC units, the engineer shall submit

supporting data, calculations, process descriptions, and vendor information in the final engineering design

report to describe how the proposed system will provide the required treatment levels. These designs

may be subject to the requirements of §217.10(2) of this title (relating to Types of Approvals) at the

discretion of the executive director.

§217.189. Filtration - General Requirements.

(a) Reasons for Use.


Texas Commission on Environmental Quality Page 262
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Permit Requirements. Filtration shall be used as a unit operation to supplement

suspended solids removal for those treatment facilities with tertiary effluent limitations (e.g., total

suspended solids effluent quality less than 15 milligrams per liter).

(2) Specific Water Quality Requirements. Filtration may be used as a unit operation for

those treatment facilities with secondary or advanced secondary effluent limitations. Filtration normally

provides effective removal for suspended biological floc and residual materials which remain after

secondary clarification. Intermittent filter operation is acceptable where filters are not necessary to meet

permitted effluent limitations. Filtration may also reduce oxygen-demanding substances by removing the

non-soluble fraction of the clarifier effluent.

(b) Redundancy. If filters are being used to provide tertiary treatment for a permit requirement,

a minimum of two filter units shall be provided, and the required filter surface area shall be calculated

assuming the largest filter unit out of service. If filters are being provided voluntarily to polish wastewater

for situations where permit compliance does not in any way depend on the use of the filter, such as some

cases of reclaimed water usage, one filter is sufficient.

(c) Source of Backwash Water. Filtered effluent shall be used as the source of backwash

water.
Texas Commission on Environmental Quality Page 263
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(d) Disposition of Backwash Water. Backwash water containing material cleaned from the filter

shall be returned to the head of the treatment plant for processing.

(e) Place in Sequence of Treatment Units. Filter units shall be preceded by final clarifiers

designed in accordance with Subchapter F of this Chapter. Filter systems may be used in conjunction

with disinfection tanks to provide additional detention time, provided the filters are backwashed to the

headworks of the wastewater treatment facility.

(f) Overload Conditions. During times of peak flows or excessive carryover of suspended solids

from the final clarifier (40 to 50 milligrams per liter or more) for an extended period of time, the filter units

may overload. The filter run time may be abbreviated to the point that the filter becomes inoperable.

Provisions shall be made to prevent the effluent from overflowing from the wastewater treatment system

and to prevent damage to the wastewater treatment system equipment during these times.

(g) Control of Slime Growth. Facilities to provide continuous or periodic disinfectant in the

influent stream to the filters shall be provided to control slime growth in the filter and backwash storage

tank.

§217.190. Additional Specific Design Requirements for Deep Bed, Intermittently Backwashed,

Granular Media Filters.


Texas Commission on Environmental Quality Page 264
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

This subsection contains design criteria for deep bed, intermittently backwashed, granular media

filters. These requirements are in addition to the requirements in §217.189 of this title (relating to

Filtration - General Requirements).

(1) Application Rates. The design flow of the plant shall be used with the design

filtration rates below. The peak application rate to any unit shall not exceed twice the design application

rate with one unit out of service.

(A) Single Media. The design filtration rate for single media (sand) filters shall

not exceed 3 gallons per minute per square foot of media surface. The maximum filtration run time

between backwash periods shall be 6 hours.

(B) Dual Media. The design filtration rate for dual media (anthracite and sand)

filters shall not exceed 4 gallons per minute per square foot of media surface.

(C) Mixed Media. The design filtration rate for mixed media (non-stratified

anthracite, sand, garnet, or other materials) shall not exceed 5 gallons per minute per square foot of media

surface.

(2) Media Design. A graded gravel layer with a minimum depth of 15 inches, or other

filter media support material, shall be provided over the filter underdrain system. Filter media other than
Texas Commission on Environmental Quality Page 265
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

gravel shall be described and technically justified in the final engineering design report. Media depths for

the various filter types shall conform to the values in table G.4. Media depths significantly different than

these shall be justified in the final engineering design report. The justification shall include an analysis of

the backwash rates. Uniformity coefficients shall be 1.7 or less. The particle size distribution for dual

and mixed media filters shall result in a hydraulic grading of material during backwash which will result in

a filter bed with a pore space graded progressively coarse to fine from the top of the media to the

supporting layer. Figure 1: §217.190(2)

Table G.4 - Minimum Filter Depths for Deep Bed, Intermittently Backwashed Filters
Filter Type Type of Media Effective Particle Size Minimum Depth

(mm) (inches)

Single Media Sand 1.0-4.0 24

Dual Media Anthracite & Sand 1.0-4.0 16


Dual Media Anthracite 1.0-2.0 10

Dual Media Sand 0.5-1.0 6

Mixed Media Anthracite, Sand & 1.0-4.0 16

Other
Mixed Media Anthracite 1.0-2.0 10

Mixed Media Sand 0.6-0.8 4

Mixed Media Garnet or Similar 0.3-0.6 2

Material

(3) Backwash Systems


Texas Commission on Environmental Quality Page 266
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Flowrate and Media Expansion. The backwash system shall provide for a

minimum media expansion of 20%. For single media filters, a minimum backwash flowrate of 6 to 8

gallons per minute per square foot of media area shall be provided. For dual and mixed media, a minimum

backwash rate of 15 to 20 gallons per minute per square foot of media area shall be provided. Backwash

times of 10 to 15 minutes shall be provided, unless otherwise justified in the final engineering design

report.

(B) Surge Control. To minimize hydraulic surges on the plant, a backwash tank

shall be provided for plants which do not have flow equalization or other means of surge control. The

surge control shall prevent increases in flow greater than 15% of the design flow of the upstream

treatment units. For this purpose, an influent lift station is not considered a treatment unit. The engineer

shall provide calculations demonstrating that the design has appropriately accounted for the effects of

backwash water. The calculations shall show that the plant’s treatment capabilities will not diminish with

the return of backwash water to the plant’s headworks. Enclosed backwash tanks shall be vented to

maintain atmospheric pressure.

(C) Pumps. Pumps for backwashing filter units shall be designed to deliver the

required rate with the largest pump out of service. The backup pump unit may be uninstalled provided

that the spare unit may be quickly installed and placed into operation. Valve arrangement for isolating a

filter unit for backwashing shall be readily accessible for the operator. Provision for manual override shall

be provided for any backwash system employing automatic control.


Texas Commission on Environmental Quality Page 267
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(D) Supplemental Systems. An air scour system or combination air and water

scour system shall be provided in addition to the upflow backwash water system for single media filter

systems. For dual and mixed media filter systems, a surface air or water scour system shall be provided.

Air scour flowrates shall be 3 to 5 standard cubic feet per minute per square foot of media surface area,

and water scour flowrates shall be 0.5 to 2 gallons per minute per square foot of media area.

(4) Underdrain System. The filter underdrain system shall allow the passage of the

maximum filtration flowrate and the maximum backwash flowrate without excessive head loss. The

system shall be suitable for wastewater treatment, provide a uniform distribution for filter backwash, and

not be susceptible to excessive plugging.

(5) Tank Design. The bottom of the wash water collection troughs shall be a minimum

of 6 inches above the maximum elevation of the expanded media during backwash. A minimum

freeboard of 3 inches shall be provided in the washwater troughs during maximum backwash flowrates.

(6) Controls. The filter operation may be controlled manually or automatically. Control

indicators shall be mounted such that the operator may see the filter while adjusting the controls. If the

system is automatically controlled, a manual override system shall be provided. Each filter unit shall be

provided with a head loss indicator.


Texas Commission on Environmental Quality Page 268
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.191. Additional Specific Design Requirements for Multi-Compartmented, Low Head,

Automatically Backwashed Filters.

This subsection contains design criteria for multi-compartmented, low head, automatic backwash

filters. These requirements are in addition to the requirements detailed in §217.189 of this title (relating to

Filtration - General Requirements).

(1) Application Rates. The design flow of the plant shall be used with the design

filtration rates in subparagraphs (A) and (B) of this paragraph. The peak application rate to any unit shall

not exceed twice the design application rate with one unit out of service. Manufacturer's recommended

filtration rates may be considered if substantiated with test data.

(A) Single Media. The design filtration rate for single media (sand) filters shall

not exceed 3 gallons per minute per square foot of media surface.

(B) Dual Media. The design filtration rate for dual media (anthracite and sand)

filters shall not exceed 4 gallons per minute per square foot of media surface.

(2) Media Design. Filter media support material shall be used in each compartment (or

cell) of the filter. The support material shall be design to resist penetration of the filter media into the

support material. Filter media shall allow passage of the maximum filtration flowrate and maximum
Texas Commission on Environmental Quality Page 269
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

backwash flowrate without excessive head loss. The support material shall be suitable for wastewater

treatment, provide for a uniform distribution of filter backwash, and not be susceptible to excessive

plugging. Media sizes and depths shall correspond to the values in table G.5. Media sizes and/or depths

significantly different from these shall be justified in the final engineering design report. Figure 1:

§217.191(2)

Table G.5 - Filter Depths for Multi-Compartmented, Low Head, Automatic Backwash Filters
Filter Type Type of Media Effective Particle Size Minimum Depth

(mm) (inches)

Single Media Sand 0.55-0.65 11

Dual Media Anthracite & Sand 0.55-0.65 16


Dual Media Anthracite 1.0-2.0 10

Dual Media Sand 0.5-1.0 6

(3) Backwash System. The backwash system shall provide a minimum of 20 gallons per

minute per square foot of media being backwashed at a given time (usually one compartment or cell).

The backwash shall have a duration of 20 to 30 seconds for each compartment, and the backwash shall

expand the media a minimum of 20%. Manufacturer's recommended backwash rates may be considered

if substantiated with test data. The surge control and pumping system requirements shall be the same as

those detailed in §217.190(3)(B) of this title (relating to Additional Specific Design Requirements for

Deep Bed, Intermittently Backwashed, Granular Media Filters)


Texas Commission on Environmental Quality Page 270
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(4) Traveling Bridge. The traveling bridge mechanism shall provide support and access

to the backwash pumps and equipment. The bridge shall be constructed of corrosion resistant materials,

and shall have provisions for consistent tracking of the bridge and safe support of the power cords. The

bridge shall begin moving and initiate the backwash cycle automatically when a preset head loss through

the filter media occurs.

(5) Surface Floatables Control. A system shall be provided to automatically and

regularly remove any floating material from the surface of the filter. This material shall be returned to the

head of the plant for further processing.

§217.192. Alternative Designs for Effluent Polishing.

Use of other processes for tertiary suspended solids removal, other than filters such as

microscreens or countercurrent, continuous filtrate and backwash flow filters, will be considered

nonconforming technologies and shall be subject to the requirements of §217.10(2) of this title (relating to

Types of Approvals).
Texas Commission on Environmental Quality Page 271
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER H : NATURAL SYSTEMS

§§217.200-217.210

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.200. Applicability.

This subchapter provides the minimum design requirements for Imhoff tanks, constructed

wetlands, facultative ponds, aerated and partially-aerated ponds, stabilization ponds, treated effluent

storage ponds, evaporative pond systems, and overland flow processes.


Texas Commission on Environmental Quality Page 272
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.201. Primary and Secondary Treatment Units.

Aerated and partially-aerated ponds, facultative ponds, and Imhoff tanks are considered primary

treatment units. Stabilization ponds, constructed wetlands, and overland flow processes are considered

secondary treatment units or processes. Evaporative ponds are used as both primary treatment units and

secondary treatment units. The secondary treatment options may also be used for polishing and tertiary

treatment; however, unless otherwise clarified in this subchapter, they shall be assumed to be secondary

treatment units. Treated effluent storage ponds are considered to be any ponds downstream of the permit

sampling location, and are not considered to provide any treatment or disinfection for the purposes of this

Chapter. All secondary treatment units shall be preceded by a primary treatment unit. All units which

are being utilized to comply with tertiary permit requirements shall be preceded by both primary and

secondary treatment units. If natural system treatment units are utilized for tertiary treatment, the degree

of treatment expected and the technical justification to support the expected treatment levels shall be

detailed in the final engineering design report. The executive director shall have the option of requesting

additional information regarding the use of natural treatment systems for tertiary treatment prior to

granting approval of such systems.

§217.202. General Design Considerations for Natural Systems.


Texas Commission on Environmental Quality Page 273
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

This section outlines a variety of requirements which apply to one or more of the natural systems

detailed in this subchapter. Each of the subsections of this section will include specific references to the

natural treatment systems or units for which the design criteria detailed in the subsection apply.

(1) Flow Distribution. This subsection applies to constructed wetlands, overland flow

processes, facultative ponds, aerated and partially-aerated ponds, stabilization ponds, and overland flow

processes. These treatment facilities shall be of such shape and size to ensure even distribution of the

wastewater flow. The distribution system for overland flow processes shall be designed in a manner

which ensures sheet flow distribution of the wastewater. The sheet flow shall be uniform onto and across

the overland flow terraces.

(2) Windbreaks & Screening. This section applies to all natural system treatment units

listed in §217.200 of this title (relating to Applicability). Windbreaks shall be considered when spray

irrigation is utilized in a location where drift may present a risk of contact with the general public.

Vegetative screening shall be considered when aesthetic factors might improve project acceptance with

the general public. All decisions regarding the use, the type, and the extent of windbreaks or vegetative

screening shall be left to the best professional judgement of the engineer unless required by the executive

director.

(3) Maximum Liner Permeability. This section does not apply to evaporative pond

systems or overland flow systems. Liner and permeability requirements for these systems are detailed in
Texas Commission on Environmental Quality Page 274
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§§217.207 and 217.209 of this title (relating to Evaporative Ponds and Overland Flow Process). Except

as exempted in paragraphs (1) and (2) of this section, this section applies to constructed wetlands,

facultative ponds, earthen aerated and partially-aerated ponds, stabilization ponds, and treated effluent

storage ponds. These treatment units shall be constructed with a liner which is as restrictive as, or more

restrictive than, material with a coefficient of permeability of 1x10-7cm/sec with a thickness of 2 feet at

depths less than 8 feet and 3 feet at depths greater than 8 feet. For the purposes of this subchapter, the

liner shall extend from the lowest pond or constructed wetland elevation up to an elevation of 2 feet above

normal water elevation in the pond or constructed wetland.

(A) If a wastewater discharge permit contains language which allows a variance

to the liner requirements, the permit requirement shall supersede the requirements of this subsection.

(B) If a pond is constructed to store treated wastewater which is to be utilized as

reclaimed water in accordance with an authorization under 30 TAC Chapter 210 of this title (relating to

the Uses of Reclaimed Water), the pond liner requirements shall comply with the requirements of

relevant Chapter 210 and supersede the requirements of this subsection.

(4) Method of Ensuring that the Maximum Liner Permeability is not Exceeded.

Subparagraphs (A)-(D) of this paragraph provide the minimum criteria for satisfying the executive

director that the liner’s permeability will not exceed that allowed in paragraph (3) of this section. The
Texas Commission on Environmental Quality Page 275
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

results of any tests required in this subsection shall be included in the final engineering design report under

the seal of a licensed professional engineer in the State of Texas.

(A) Using Unmodified In-Situ Soils. In some cases ,the soils which naturally

exist at a proposed pond or constructed wetland site may restrict the movement of the wastewater to a

degree equivalent to a liner placed as described in paragraph (2) of this section. If the engineer believes

this situation to be the case, the following protocol shall be followed to verify the permeability of the in-situ

soil layer and ensure that groundwater quality and surface water quality are protected. A minimum of

one core sample per 0.25 acres of pond bottom area, or constructed wetland bottom area, shall be taken

for each pond or constructed wetland. Each core sample shall be tested to determine the coefficient of

permeability, the percent passing a 200 mesh sieve, the liquid limit value, and the plasticity index value for

the 2 feet of soil (or 3 feet of soil for portions of the pond holding more than 8 feet of wastewater at

normal elevation) which is to serve as the liner. The results of the tests shall show a coefficient of

permeability of less than or equal to 1x10-7 cm/sec and compliance with subparagraph (B)(i)-(iii) of this

paragraph. If the test results do not show a coefficient of permeability of 1x10-7 cm/sec or less along with

the appropriate liner thicknesses, or if any of the soil characteristics in subparagraph (B)(i)-(iii) of this

paragraph do not exist in the in-situ soil, the liner shall be constructed in accordance with one of

subparagraphs (2), (3), or (4) of this section. If the in-situ soil meets all these requirements, the in-situ soil

may be used as the pond liner or constructed wetland liner provided that one layer of excavated in-situ

material, which meets all the minimum soil characteristic requirements, is placed in one 8-inch loose lift
Texas Commission on Environmental Quality Page 276
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

compacted to no less than 6 inches at 95% standard proctor density in accordance with ASTM D 698.

This placed layer shall be keyed into the in-situ soil.

(B) Placed Liners. The soil characteristics of the liner material of a placed liner

shall, at a minimum, comply with clauses (i)-(v) of this subparagraph. The tests to determine the soil

characteristics shall conform to standard method such as ASTM.

(i) The liner material shall have more than 30% passing a 200 mesh

sieve;

(ii) The liner material shall have a liquid limit greater than 30%;

(iii) The liner material shall have a plastic index of greater than 15;

(iv) The liner material shall be placed in four-eight inch maximum loose

lifts which shall be compacted to 95% standard proctor density in accordance with ASTM D 698. The

lifts shall be no less than 6 inches thick after compaction for a total liner width of at least 24-inches (2

feet); and,

(v) The lowest level lift shall be keyed into the existing soil.
Texas Commission on Environmental Quality Page 277
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(C) Using Modified In-Situ Soils. Soil admixtures such as bentonite clay may be

blended with imported soils, or soils excavated from the proposed pond site, to obtain a less permeable

material for use as a liner. If soil admixtures are used, the soil shall be amended sufficiently to decrease

the coefficient of permeability to 1x10-8 cm/sec. This permeability shall be verified by taking three

representative samples from each 6,700 cubic feet of amended soil, running one field permeability test and

running one laboratory permeability test for each of the three representative samples. If the tests do not

verify that the coefficient of permeability is equal to or less than 1x10-8 cm/sec, additional soil admixture

shall be blended into the soils and the tests shall be repeated. This process shall continue until all the

amended soils achieve a coefficient of permeability of 1x10-8 cm/sec or less, as verified by the testing

requirement. The liner shall not be placed until the proper coefficient of permeability is obtained for the

amended soil. When soil permeabilities are decreased in this manner, the liner thickness throughout the

pond may be decreased to 6-inches provided that the liner is placed in one 8-inch loose lift compacted to

no less than 6-inches at 95% standard proctor density in accordance with ASTM D 698. This placed layer

shall be keyed into the in-situ soil. Alternatively, the coefficient of permeability may be 1x10-7cm/sec if

the modified material is placed in accordance with subparagraph (B)(iv) and (v) of this paragraph.

(D) Using synthetic membrane liners. Synthetic membrane liners shall have a

minimum thickness of 40 mils. Ponds with membrane liners shall be designed with an underdrain leak

detection system which shall consist of, at a minimum, a leachate collection and a detection system.

Proper compaction of soils beneath the liner shall be required by the construction specifications. The liner
Texas Commission on Environmental Quality Page 278
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

material shall be capable of receiving constant sunlight without degrading. This option shall not be used

for constructed wetlands liners.

(5) Embankment Design and Construction. This section applies to constructed wetlands,

facultative ponds, aerated and partially-aerated ponds, stabilization ponds, treated effluent storage ponds,

and evaporative ponds. The top width of embankments shall be a minimum of 10 feet to permit access of

vehicles and maintenance equipment. INNER AND OUTER EMBANKMENT SLOPES STEEPER THAN 1 FOOT

VERTICAL TO 3 FEET HORIZONTAL ARE PROHIBITED . The engineer shall justify designing any slope

steeper than 1 foot vertical to 4 feet horizontal from the top down to the normal operating level to allow

for safer mower access. All embankments shall be protected against erosion by such measures as

planting grass, paving, or riprapping. Flatter slopes may have the disadvantage of added shallow areas

conducive to emergent vegetation. Where embankments are to be vegetated, a minimum cover of 6­

inches of topsoil shall be provided.

(6) Disinfection. If a detention time of at least 21 days is provided in the entire, free-

water surface, natural system, chemical or ultraviolet disinfection is not required.

(7) Sampling Point Significance. Detention times and surface areas of any natural

treatment units or processes, which are downstream of the sampling point used to monitor for permit

compliance, are not allowed to be counted for purposes of sizing treatment units upstream of the permit

monitoring sampling point. All wastewater ponds downstream of the sampling location shall be considered
Texas Commission on Environmental Quality Page 279
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

to be treated effluent storage ponds for the purposes of this rule. Treated effluent storage ponds are

utilized to comply with municipal permit storage requirements or for reclaimed water projects authorized

by Chapter 210 of this title (relating to Use of Reclaimed Water). In these cases, if a conflict exists

between the requirements of the permit or reclaimed water authorization and this Chapter, the

requirements of this chapter which are in conflict shall be waived, and the ponds shall be designed and

constructed to meet the permit or Chapter 210 of this title requirements.

(8) Storm Water Drainage. Storm water drainage shall be prevented from entering all

natural treatment systems.

§217.203. Imhoff Tanks.

This section provides the design criteria which shall be utilized when constructing Imhoff tanks.

(1) Settling Compartment. The length-to-width ratio of the settling compartment shall be

2:1 or greater. The tank inlet shall be designed to provide uniform flow distribution across the width of the

settling compartment. The septum walls shall slope to the center of the compartment at an angle of 50 to

60 degrees from horizontal. The septum walls shall be designed to create an overlap, with a continuous

slot at least 8 inches wide provided between the walls, to allow solids to be dispersed into the digestion

compartment. Maximum depth between the normal water level and the plane of the slot shall be 9 feet.
Texas Commission on Environmental Quality Page 280
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

At least 18 inches of freeboard, above the normal water level, shall be provided. One of the walls shall

continue past the slot to create a slot overhang. The slot overhang shall be a minimum of 8 inches.

(2) Surface Loading. The design loading rate is dependent upon the surface area of the

settling compartment. The settling compartment loading rate shall not exceed 800 gallons per day per

square foot of settling compartment area under design flow conditions. The longitudinal velocity of

wastewater through the settling compartment shall not exceed 1 foot per second under 2-hour peak flow

conditions.

(3) Scum Baffles. Scum baffles shall be provided at the inlet and outlet of the tank.

Baffle height above and below normal water level shall consider the water levels at minimum and at peak

flows.

(4) Gas Vents. Gas vents shall be provided parallel to the settling compartment, and the

total area of vents shall not be less than 20% of the total tank surface area. Width of the vent openings

shall allow maintenance access into the digestion compartment.

(5) Digestion Compartment - Loading. The digestion compartment minimum volume

shall be 3.5 cubic feet per capita or 20.5 cubic feet per pound of influent BOD5 per day, whichever is

greater.
Texas Commission on Environmental Quality Page 281
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(6) Imhoff Tank Dimensions. The first 18 inches of tank depth below the plane of the

slot is considered the “neutral zone” and shall not be included as design digestion volume. The total depth

of the Imhoff tank shall not be less than 15 feet as measured from the water surface elevation to the

bottom of the digestion compartment.

(7) Sludge Removal. The Imhoff tank shall have the capability to withdraw sludge from

the digestion compartment through a sludge withdrawal pipe. The sludge withdrawal pipe shall have a

minimum diameter of 8 inches and provide ample cleanouts or other provisions for regular cleaning. The

digestion compartment shall be constructed in a manner which allows portable pumps to remove sludge

which has accumulated in the Imhoff tank.

(8) Odor Management. As deemed necessary by the engineer, the effects of periodic

offensive odors from the gas vents on the neighboring properties shall be minimized or eliminated. In

cases where Imhoff tanks will be constructed and installed next to residences, the executive director may

require odor control devices such as bio-filters and carbon filters to minimize odors.

(9) Treatment Efficiency. Imhoff tanks provide only primary sedimentation of the raw

wastewater and shall be followed by subsequent treatment units. For design of subsequent units, a 35%

removal of influent BOD5 and 60% removal of influent TSS may be assumed for typical municipal raw

wastewater.
Texas Commission on Environmental Quality Page 282
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(10) Material and Construction. Imhoff tanks shall be constructed of reinforced

concrete. All concrete used in the Imhoff Tank shall include a factory installed liner which is resistant to

the corrosive effects of the sewage environment. All components of the Imhoff Tank shall be resistant to

the corrosive effects of the sewage environment.

§217.204. Facultative Ponds.

(a) Configuration/Inlets/Outlets. The length-to-width ratio of the facultative pond shall be three

to one (3:1). Other dimensions more suitable to the site may be used upon justification by the design

engineer in the engineering report. For facultative ponds, flow shall be from the inlets along one end of

the pond to the outlets at the opposite end. The length of the facultative pond shall be oriented in the

direction of the prevailing winds with the inlet side located such that debris will be blown toward the inlet.

Inlet baffles shall be provided in facultative ponds to collect floatable material when no prescreening is

provided. The outlets shall be constructed so that the water level of the traditional facultative pond may

be varied under normal operating conditions. The engineer may wish to locate facultative ponds in a

central location with regard to the surrounding secondary ponds to facilitate compliance with the buffer

zone requirements specified in Chapter 309 of this title (relating to Domestic Wastewater Effluent

Limitations and Plant Siting).

(b) Depth. For the facultative pond design, the portion of the pond near the inlets shall have a

depth of not less than 12 feet to provide sludge storage and anaerobic treatment. This deeper portion shall
Texas Commission on Environmental Quality Page 283
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

be at least 25 percent of the area of the pond bottom. The remainder of the facultative pond shall have a

depth of not less than 8 feet.

(c) Organic loading. The organic loading, based on the surface area of the facultative pond, shall

not exceed 150 pounds of BOD5 per acre per day.

(d) Odor Control. The facultative pond inlets shall be submerged at least 24 inches below the

water surface to minimize odor and the outlets shall be submerged at least 12 inches below water surface,

but shall not disturb the anaerobic zone. Capabilities for recirculation at 50% to 100% of the design flow

shall be provided for facultative ponds. Facultative ponds shall be designed to preclude situations where

siphoning of pond contents through submerged inlets may occur.

(e) Removal efficiency. Up to 50% of the influent BOD5 may be assumed to be removed in the

facultative pond.

§217.205. Aerated Ponds.

Complete mix aerated ponds are those which have adequate mixing to maintain all biological

solids in suspension and provide uniform oxygen concentrations in the pond. Partially mixed aerated

ponds allow for settling and anaerobic composition of a portion of the influent suspended solids as well as
Texas Commission on Environmental Quality Page 284
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

the biological solids generated in the system. The requirements of this section apply to both completely

mixed ponds and partially mixed ponds, except where otherwise specified.

(1) Wastewater Oxygen Requirements. Mechanical or diffused aeration equipment for

aerated pond systems shall be sized to provide a minimum of 1.6 pounds of oxygen per pound of influent

BOD5 .

(2) Redundancy. The oxygen requirements for aerated pond systems shall be

maintained with the largest unit in each pond out of service. If the pond system’s piping and valves are

such that flow may be proportionally rerouted and the aeration equipment is equipped with alarms which

will provide sufficient notification to ensure maintenance can be provided which prevents permit

violations, the system may be sized to provide a minimum of 1.6 pounds of oxygen per pound of influent

BOD5 assuming the largest single aeration unit in the overall pond system out of service.

(3) Removal Efficiency. The basis for calculating the BOD5 removal in each pond shall

be equation 1.h. For domestic wastewater and a complete mix pond, the value of K shall be 0.50 day-1 at

20°C. If the aerated pond is designed for partial mixing, a K value of 0.28 day-1 at 20°C shall be used.

The value, K, shall be adjusted for the minimum monthly water temperature using equation 2.h. Values

for K for high-strength or industrial wastewater shall be determined by either laboratory studies or

evaluation of existing facilities treating a similar wastewater. Figure 1: §217.205(3)


Texas Commission on Environmental Quality Page 285
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

E’ 1[1% K(V/Q)] Equation 1.h

where: E = efficiency of a complete mix reactor, in this case an aerated

lagoon, without recycle (% BOD5 removal in aerated lagoon).

K = first order removal rate constant, day-1.

V = aeration basin volume, million gallons.

Q = influent wastewater flow rate, million gallons per day.

KT’ [K20( 1.06( (T& 20EC)]/1.06 Equation 2.h

where: KT = K value which corresponds to the lowest average water

temperature expected during any 30-day period.

K20 = K value at 20E C

T = The average water temperature expected during any 30-day

period.

(4) Aeration Equipment. The aeration equipment in aerated ponds shall be sized to

supply the oxygen demand determined in paragraph (1) of this section. For purposes of sizing aeration

equipment, aerated ponds shall be assumed to be the same as an aeration basin and shall comply with the

mechanical and diffused air requirements in §217.156 of this title, (relating to Aeration Equipment Sizing).

Where multiple partially mixed aerated lagoons are utilized in series, the power input may be reduced as

the influent BOD5 to each pond decreases.


Texas Commission on Environmental Quality Page 286
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(5) Aerated Pond Construction and Design Requirements. Aerated ponds shall be

designed and constructed in accordance with all the same requirements for wastewater treatment ponds

detailed in §§217.202(e), 217.206(2), (4), and (6) of this title (relating to General Design Consideration for

Natural Systems and Wastewater Stabilization Ponds).

(6) Scour Prevention. All earthen lined aerated lagoons shall include concrete scour

pads in all areas of the earthen liner which will be subject to velocities of 1 foot per second or greater.

§217.206. Wastewater Stabilization Ponds.

This subsection applies to ponds which are designed as secondary treatment units to treat

suspended and dissolved organic matter in wastewater. When utilizing these stabilization ponds, the

settleable and floatable solids in the influent wastewater shall be removed by primary treatment prior to

discharge into the stabilization ponds.

(1) Odor Management. Wastewater stabilization ponds shall be located so that the local

prevailing winds will be toward uninhabited areas. Where clean water is available, the ponds shall be

prefilled to the two foot level to encourage rapid start-up of the biological process and to discourage odor.

The pond system shall include a piping arrangement which allows the recirculation of effluent from the

final pond to the influent side of the initial stabilization pond. Recirculation provides active algal cells to

the upstream feed area, providing photosynthetic oxygen for organic digestion. Recirculation also
Texas Commission on Environmental Quality Page 287
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

provides a more completely-mixed environment within the pond system. A return of recirculation water

by surface spray, to assist in maintaining aerobic conditions at the pond surface and reduce potential

odors, may be used.

(2) Minimum Number of Wastewater Stabilization Ponds. All pond systems, which

utilize stabilization ponds to comply with secondary or tertiary treatment limits in a municipal wastewater

permit, shall have a minimum of two stabilization ponds. The stabilization ponds shall be operated in series

with each other following the primary treatment unit.

(3) Pond Dimensions and Water Level Considerations. The length-to-width ratio of the

ponds shall be at least 3:1. No islands, peninsulas, or coves shall exist within the ponds boundaries. The

stabilization ponds shall have a normal water depth of 3 to 5 feet. Inlet and outlet structures shall allow

for raising and lowering water levels a minimum of 6 inches to assist in controlling weeds and other

vegetative growth. A 2 foot minimum freeboard shall be provided above the normal pond operating level.

A 3 foot minimum freeboard shall be provided for ponds whose normal water surface area is 20 acres or

less.

(4) Hydraulic and Piping Considerations. The hydraulic capacity of all structures and

piping incorporated in a pond system shall be sized to transport at least 250% of the facility’s design flow.

The inlet and outlet structures shall be sized to hydraulically pass the volume of water found in the top 6

inches of the pond during normal operating depths, per day, at the available head. The pond system’s
Texas Commission on Environmental Quality Page 288
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

piping and recirculation arrangement shall be designed in a manner which allows any one pond to be taken

out of service while maintaining a level of water quality which complies with the facility’s permit

requirements.

(5) Maximum Organic Loading on Stabilization Ponds. The maximum organic loading

rate on the stabilization ponds shall be 35 pounds of BOD5 per acre of total secondary treatment

stabilization pond surface area per day. The maximum organic loading rate on the first treatment

stabilization pond in the stabilization pond series shall be 75 pounds of BOD5 per acre per day. The

organic loading which is applied to the stabilization ponds is equal to the total influent organic loading

minus any reduction in organic load provided by the primary treatment units.

(6) Inlet/Outlet Structures. All outlets shall be baffled with removable baffles to prevent

floating material from being discharged, and shall be constructed so that the level of the pond surface may

be varied under normal operating conditions. Outlets shall be submerged to a depth between 18 and 24

inches to assist in controlling the discharge of algae. The engineer shall consider the use of multipurpose

control structures to facilitate normal operational functions such as drawdown and flow distribution flow

depth, measurement, sampling, pumps for recirculation, chemical additions, and to minimize the number of

construction sites within embankments. Seep water-stop collars shall be located on all piping embankment

penetrations. All ponds shall have drain piping to allow emptying for maintenance. Pumps may be used

as part of the drainage system if ponds cannot be partially drained by gravity. If not permanently

installed, a temporary piping suction station shall be provided.


Texas Commission on Environmental Quality Page 289
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.207. Evaporative Ponds.

(a) General. A minimum of two ponds shall be provided for the evaporative pond process. The

primary pond surface area shall be sized to provide approximately 60% of the total surface area required.

Additional secondary ponds may be added, but the 60% primary/40% secondary split shall be maintained.

The number and size of ponds is determined by high and low periods of evaporation. During high

evaporation periods, only the primary pond may be required for effective operations. During low

evaporation wet weather periods, the secondary ponds may be required to provide adequate evaporative

surface area to accommodate the influent flows and precipitation.

(b) Odor Management. Evaporative ponds shall be located so that the local prevailing winds will

be toward uninhabited areas, wherever practical.

(c) Liners. Evaporative ponds shall be constructed with synthetic liners. Synthetic membrane

liners shall have a minimum thickness of 40 mils. The liners shall be designed with an underdrain leak

detection system which shall consist of, at a minimum, a leachate collection and a detection system.

Proper compaction of soils beneath the liner shall be required by the construction specifications. The liner

material shall be capable of receiving constant sunlight without degrading

(d) Configuration/Depth/Loading.
Texas Commission on Environmental Quality Page 290
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Ponds may be constructed in round, square or rectangular shapes. The corners of

square and rectangular shaped ponds shall be rounded in order to minimize accumulation of floating

materials.

(2) The depth of a given pond is dependant on its location within the pond system

process. The operating depth for primary ponds shall be a maximum of 5 feet, except that the area

around the inlet shall be designed for solids deposition according to the same criteria as a facultative pond

Secondary pond operating depths shall be a maximum of 8 feet.

(3) Evaporation and Organic Loading. Sizing of evaporation ponds shall be based on the

evaporation rate for a given site and a maximum allowable organic loading rate. The evaporation loss

shall be determined by using the Penman-Monteith Method or a comparable established method. The

sizing of the evaporative ponds shall take into account the influent flows and provide for the effects of the

precipitation occurring from a 25-yr. frequency, one-year rainfall amount in accordance with

§309.20(b)(3)(B) of this title (relating to Land Disposal of Sewage Effluent). If an alternate method is

used to determine the evaporative loss, the method, the sources of the method, and all supporting

calculations and documentation associated with the method shall be included in the final engineering

design report. The maximum organic loading rate on an evaporative pond is dependant on the evaporation

rate and shall be determined based on the best professional judgement of the engineer with the exception

that in no case shall the BOD5 loading on the primary pond exceed 150 pounds of BOD5 per acre of

primary pond surface area per day.


Texas Commission on Environmental Quality Page 291
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(e) Embankment. Embankments shall be constructed in accordance with §217.202(5) of this title

(relating to General Design Considerations for Natural Systems).

(f) Inlet/Outlet Structures. The influent line shall terminate into a manhole located along the

embankment edge. The inlet manhole invert shall be constructed a minimum of 6 inches above the

maximum high water level of the primary pond. From the manhole, submerged discharge piping shall be

constructed along and anchored to the bottom of the pond. The inlet discharge piping shall discharge into

a depression near the center of the primary pond. At the point of discharge a concrete apron shall be

provided which prevents scour. The apron shall be at least 2 square feet in surface area and at least 8

inches thick. The concrete shall be of a nature which is resistant to the corrosive effects of a raw

sewage environment. Other materials may be used for the apron provided the material and its suitability

for use in a sewage environment are discussed in the final engineering design report. Inlet and outlet

structures for evaporative ponds shall be constructed in a manner which allows the water surface

elevation to be varied during normal operating conditions.

§217.208. Constructed Wetlands .

Constructed wetlands are man-made complexes of saturated substrates, emergent and

submergent vegetation, animal life, and water designed to simulate natural wetland ecologic conditions.

Constructed wetland are designed to be inundated or saturated by wastewater flow at a frequency and

duration sufficient to support a prevalence of flora and fauna typically adapted for life in wetlands
Texas Commission on Environmental Quality Page 292
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

conditions. Constructed wetlands described in these rules are intended to function exclusively as

secondary wastewater treatment units. Constructed wetlands may include free water surface systems

(FWS) or subsurface flow systems (SFS). Each of these systems presents special design considerations.

The use of natural wetlands for wastewater treatment is prohibited.

(1) General Design Considerations.

(A) Nitrification. All constructed wetlands intended by the engineer to provide

nitrification shall be considered an innovative and nonconforming technology, and shall be subject to

§217.10(2) of the title (relating to Type of Approval).

(B) Floating Material Removal. Provisions shall be made for the removal of

primary treated effluent algal mat or other floating materials prior to entering the wetlands. Removal

mechanisms may include screens, submerged adjustable inlets, baffles or other methods if deemed

effective by the engineer. The use of covered primary treatment systems, such as Imhoff or septic tanks,

may eliminate the need for algal mat removal. Removed floating material shall be stored and disposed of

in such a manner as to minimize nuisance odors. Similar provisions shall be provided at the wetlands

discharge. Any disposal practices shall not conflict with the requirements in Chapter 330 of this title

(related to Municipal Solid Waste).

(C) Typical Vegetation. Commonly used flora for constructed wetlands include:
Texas Commission on Environmental Quality Page 293
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(i) Emergent aquatic vegetation such as Scirpus spp. (bulrush), Sagittaria

spp. (arrowhead), Phragmites spp. (reeds), Juncus spp. (rushes), Elecharis spp. (spikerush), Cyperus spp.

(sedges). Typha spp. (cattails), and various aquatic grass species (e.g. wild rice, etc.). A diverse

vegetative community is recommended to minimize adverse impacts from potential disease, insect pests,

or species specific toxicity.

(ii) Floating aquatic vegetation such as Lemna spp. (duckweed),

Hydrocotyle umbellata spp. (water pennywort), Limnobium spongia spp. (frogbit), Nymphaea spp. (water

lily), Wolffia spp. (water meal), or other appropriate species may be used in conjunction with emergent

plant species.

(iii) The use of indigenous plants is recommended, provided that these

species have been demonstrated as effective for the constructed wetlands wastewater environment.

Plans for harvesting aquatic plants from waters of the state shall be reviewed with the U.S. Corp of

Engineers to determine if permitting or other regulatory coordination is required. Procurement of seed

plants from natural wetlands shall assure minimum impact on the harvested plant community.

(iv) The use of all harmful or potentially harmful wetlands plant and

organisms, as described in 31 TAC 57.111-57.118 and 31 TAC 57.251-57.258, shall first be approved by

the Texas Parks and Wildlife Department. Planned wetlands plant and organisms shall be defined in the

Final Engineering Report.


Texas Commission on Environmental Quality Page 294
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(D) Herbicides, insecticides, and fertilizers are prohibited within constructed

wetlands.

(E) Maintenance of emergent and aquatic vegetation in constructed wetlands

may be improved by periodic removal of dead plant matter and detritus. Removal methods shall be

carefully selected to prevent damage to living plants, liners, and system hydraulics. Wetlands plant

maintenance may assist in promoting active growth, controlling of mosquitos, and maintaining hydraulic

capacity. Methods of constructed wetlands maintenance shall not result in a deterioration of water

quality.

(F) Constructed wetlands require time for maturity of flow ecosystems before

effective wastewater treatment may be anticipated. The engineer shall make provisions to ensure that a

properly functioning wetlands system has been developed before wastewater effluent is processed in the

wetlands system. This may be done by including appropriate language in the project specifications and/or

instituting a management and oversight program which considers items such as construction scheduling,

plant species selection, planting practices, and start-up procedures.

(G) Wetlands are subject to significant evaporative losses in warm climate

applications. If the engineer determines that the climate and/or size of the pond are such that evaporative

losses might have a significant impact on the effectiveness of the wetland system, the engineer shall
Texas Commission on Environmental Quality Page 295
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

perform water balance calculations, determine the potential effect of evaporation on the predicted effluent

concentrations, and include such analyses in the final engineering design report.

(H) Allowed Uses. Free Water Surface and Submerged Flow wetlands may be

used as either secondary treatment units, advanced secondary treatment units, or as a means of polishing

wastewater effluent.

(I) Primary Treatment. All constructed wetlands shall be preceded by primary

treatment. Systems may be preceded by secondary treatment. Primary treatment may include septic

tanks, Imhoff tanks facultative lagoons, aerated lagoons, stabilization ponds, or any other primary

treatment process properly designed to remove settleable and floating solids. Odor and algae control shall

be considered in selecting the primary treatment system. Primary treatment units shall be designed to

normally produce an effluent quality of less than 150 mg/l BOD5 to help minimize anaerobic conditions

and stress of vegetative communities in subsequent wetlands treatment units.

(J) Liners. Liners for wetlands systems shall comply with the requirements of

§§217.202(3) and (4) of this title (relating to General Design Considerations for Natural Systems), except

that synthetic liners shall not be used in wetland systems. A minimum 6-inch layer of productive topsoil

shall be placed above the liner to encourage subgrade root penetration.


Texas Commission on Environmental Quality Page 296
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(K) Flood Hazard Analysis. Constructed wetlands shall be protected from flood

hazard in accordance with the requirements of §217.34 of this title (relating to 100-Year Flood Plain

Requirements).

(L) Berms. Constructed wetlands berms shall not be constructed with side

slopes steeper than 3:1. Interior berm sideslopes shall be lined when wetlands design requires lining.

Interior berm sideslopes above the normal operational water level, and exterior berm sideslopes, shall be

finished with a minimum 6-inch productive topsoil layer and vegetated with grass or a comparable natural

erosion control system. An alternate synthetic side slope protection system, such as slope paving, may be

provided.

(M) Wastewater treatment systems which utilize constructed wetlands as the

means of complying with a permit effluent limit shall be sized and designed in a manner which ensures

that the permit limits may be complied with assuming any one constructed wetland cell out of service.

(2) Free Water Surface Systems. FWS wetlands are shallow open water bodies,

normally less than 24 inches water depth, populated principally by various emergent plant species.

Wastewater flows through the wetland, primarily in the horizontal direction, and is treated by a variety of

physical, biological, and chemical treatment processes.


Texas Commission on Environmental Quality Page 297
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) FWS General Design. FWS wetlands designs shall be based on a maximum

water depth of not greater than 24 inches in emergent vegetated areas at design flow.

(B) FWS Plant Spacing. Spacing of wetland plants during planting will affect

the systems start-up schedule. Plant stocks shall be placed adequately close to assure maturity of the

wetlands flora ecosystem under normal growing conditions before the application of wastewater to the

wetlands. FWS wetlands plant spacing shall be not more than 72 inches on center. The actual plant

spacing shall depend on the site conditions and the plant species selected.

(C) FWS Configuration. FWS wetlands facilities shall include the following

minimum configuration standards.

(i) Multiple Units. The treatment system shall include multiple units,

preferably arranged in parallel, which may be operated independently, allowing individual units to be

removed from service while maintaining system operations. Units shall be sized to meet permit effluent

water quality limits with any single unit removed from service.

(ii) Minimum slope. Wetland cells shall be provided with adequate

bottom slope to facilitate drainage for maintenance. Bottom slope shall be designed to maintain

appropriate wetlands water depth range along the entire wetlands length under all anticipated operational

flow conditions.
Texas Commission on Environmental Quality Page 298
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(iii) Parallel trains. Parallel treatment trains shall be provided to increase

operational flexibility.

(iv) Wind protection. Wetland cells shall be oriented to avoid cross

winds perpendicular to the process flow direction, where practical, to avoid undesirable mixing effects.

Elevated berms or vegetative windbreaks may provide an effective alternative to cell orientation.

(D) Flow Distribution. Treatment efficiency for constructed wetlands depends

largely on effective flow distribution and collection. FWS wetlands facilities shall include the following

minimum flow distribution standards.

(i) Uniform distribution. FWS wetlands inlets and outlets shall be

designed to assure uniform distribution of influent flow and uniform collection of effluent flow across the

entire cell cross section. Inlet and outlet devices shall be designed to minimize erosion of wetlands

substrate from locally high velocities. Outlet and inlet devices shall be designed to allow variations in

operational water level.

(ii) Submergence. Inlets shall be submerged under normal operational

conditions. Placement of inlets and outlets in gravel or comparable coverage may help distribute flow,

reduce algal clogging, and prevent intrusion by aquatic plants and animals.
Texas Commission on Environmental Quality Page 299
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(iii) Inspection and Cleaning. Provisions shall be made to allow

inspection and cleaning of inlet and outlet devices.

(E) FWS Organic Loading/Treatment Efficiency. Constructed wetlands process

design may normally be based on organic loading design for typical municipal wastewater primary or

secondary effluent. Suspended solids removal efficiency normally does not require separate design

consideration, being equally efficient or more efficient than organic removal efficiency. Organic removal

treatment efficiency for FWS wetlands shall be based on the areal loading rate equation, equation 3.h, or

comparable methods. If an alternate method is used to determine the organic removal treatment

efficiency, the method, the sources of the method and all supporting calculations and documentation

associated with the method shall be included in the final engineering design report. Figure 1:

§217.208(2)(E)

Ka
C0’ C ( % (Ci& C ( )exp& Equation3.h
0.0365Q

where:

Ci = influent BOD5 concentration, mg/l

Co = target effluent BOD5 concentration, mg/l

C* = wetland background limit, mg/l

(for TSS, C* = 5.1 = 0.16Ci )

(for BOD5 , C* = 3.5+ 0.053 Ci )


Texas Commission on Environmental Quality Page 300
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

k = first-order areal rate constant: (34 m/yr @ 20B C for BOD)

A = is required wetland area, ha (1,000 m/yr @ 20B C for TSS)

(active treatment area, not including dike, buffers, etc.)

Q = is design flow in m3 /d

(F) Vector Control. Provisions for mosquito control within FWS wetlands shall

be included as part of the system’s design. Such provisions may include: the use of mosquito fish

(Gambusia) and other natural predators, maintenance of aerobic conditions, and use of biological controls.

The engineer shall take into consideration the potential damage to wetlands caused by mammals such as

nutria and muskrats during the design process.

(3) Subsurface Flow Systems. SFS wetlands are shallow water bodies, normally with a

water depth less than 24 inches, populated by various emergent plant species. Wastewater flow in SFS

wetlands is maintained below the surface of a porous media, such as gravel, in which the emergent plants

are rooted. Wastewater flows through the SFS wetland, primarily in the horizontal direction, and is

treated by a variety of physical, biological, and chemical treatment processes similar to those provided in

FWS wetlands.

(A) SFS General Design. Root penetration into the wetted subsurface media is

a significant design consideration for SFS wetland systems. Treatment efficiency generally improves with

effective root penetration through the entire wetted media depth. Design operational water depth shall not
Texas Commission on Environmental Quality Page 301
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

exceed 18 inches at design flow, or shall not exceed the maximum normally anticipated root penetration

for the planned primary population emergent plant species, whichever is less. The design shall include

provision for seasonal drawn down of the water level to encourage deeper root penetration into the

wetted media.

(B) SFS Plant Spacing. Spacing of the wetlands plants during planting will

impact system start-up schedule. Plant stocks shall be placed adequately close to assure maturity of the

wetlands flora ecosystem under normal growing conditions, before scheduled wastewater loading. SFS

wetlands plant spacing shall be not more than 36 inches on center. Actual spacing shall depend on the

site conditions and the plant species selected.

(C) SFS Configuration. SFS wetlands facilities shall include the following

minimum configuration standards.

(i) Multiple units. The treatment system shall include multiple units,

arranged in parallel, which may be operated independently, allowing individual units to be removed from

service while maintaining system operations. Units shall be sized to meet permit effluent limits with any

single unit removed from service.

(ii) Hydraulic profile. Hydraulic profile of SFS wetlands may be

significantly steeper than FWS systems. Smaller length to width ratios generally assist effective hydraulic
Texas Commission on Environmental Quality Page 302
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

profile design. SFS wetlands shall be designed to maintain minimum 6-inch dry media cover during design

flows, at least 2-inches of upstream media cover during 2-hour peak flow conditions, and not more than

12-inches of upstream media cover during diurnal low flow conditions. SFS wetland hydraulic profile

design shall be based on Darcy’s Law, equation 4.h, unless an alternate design method, which includes the

sources of the method and all supporting calculations and documentation associated with the method, is

justified in the final engineering design report. Figure 2: §217.208(3)(c)(ii)

Q’ K s( A( S Equation 4.h

where:

Q = Design flow (gal/day)

KS = Media hydraulic conductivity (gal/sf/day) (see Table H.1

S = Hydraulic gradient (ft/ft)

A = Cross sectional area perpendicular to the flow

Table H.1 - Typical Media Characteristics

Media Effective Size (inches) Porosity (%) Hydraulic Conductivity

(gal/sf/day)

Fine Gravel 5/8" 38 185,000

Medium Gravel 1¼” 40 250,000

Coarse Rock 5" 45 2,500,000


Texas Commission on Environmental Quality Page 303
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(iii) Maximum depth. SFS wetlands shall be designed for a maximum

wetted media depth of 24-inches at design flow, or the maximum normally anticipated root penetration for

the planned primary population emergent plant species, whichever is less. A dry media cover depth of 6

to 9 inches shall be provided above the design flow hydraulic gradient.

(iv) Minimum slope. SFS wetland cells shall be provided with adequate

bottom slope to facilitate drainage for maintenance, while maintaining appropriate media water depth and

cover along the entire cell length under all anticipated operational flow conditions.

(v) Parallel trains. Parallel treatment trains shall be provided to increase

operational flexibility.

(D) Flow Distribution. Constructed wetlands treatment efficiency depends

largely on effective flow distribution and collection. SFS wetlands facilities shall include the following

minimum flow distribution standards.

(i) Flow distribution. SFS wetlands inlets and outlets shall be designed to

assure uniform distribution of influent flow and uniform collection of effluent flow across the entire cell

cross section. Inlet and outlet devices shall be designed to minimize transport of wetlands media from

locally high velocities. Outlet and, where necessary, inlet devices shall be adjustable to allow variation in

operational water level and flooding of cells for weed control.


Texas Commission on Environmental Quality Page 304
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(ii) Submergence. Inlets and outlets shall be below the media surface

and shall be designed to allow variations in operational water level.

(iii) Maintenance. Provisions shall be made to allow inspection and

cleaning of inlet and outlet devices.

(iv) Staged influent feed. If deemed necessary by the engineer,

provisions for optional staged influent feed to improve process control, particularly where a high influent

BOD5 load is anticipated, shall be included as part of the wetland system’s design.

(E) SFS Organic Loading/Treatment Efficiency. Constructed wetlands process

design may normally be based on organic loading design for typical municipal wastewater primary or

secondary effluent. Suspended solids removal efficiency normally does not require separate design

consideration, being equally efficient or more efficient than organic removal efficiency. Organic removal

treatment efficiency for SFS wetlands may be based on the areal loading equation, equation 5.h. If an

alternate method is used to determine the organic removal treatment efficiency, the method, the sources

of the method and all supporting calculations and documentation associated with the method shall be

included in the final engineering design report. Figure 3: §217.208(3)(E)


Texas Commission on Environmental Quality Page 305
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Ka
C0’ C ( % (Ci& C ( )exp& Equation5.h
0.0365Q

where:

Ci = influent BOD5 concentration, mg/l

Co = target effluent BOD5 concentration, mg/l

C* = wetland background limit, mg/l

(for TSS, C* = 5.1 = 0.16Ci )

(for BOD5 , C* = 3.5+ 0.053 Ci )

k = first-order areal rate constant: (180 m/yr @ 20B C for BOD)

A = is required wetland area, ha (3,000 m/yr @ 20B C for TSS)

(active treatment area, not including dike, buffers, etc.)

Q = is design flow in m3 /d

(F) Temperature. Winter design condition water temperature for SFS wetlands

are generally warmer than FWS wetlands design due to improved insulation and shorter hydraulic

residence time of SFS wetlands, particularly if upstream treatment processes do not provide significant

heat loss opportunity. This warmer temperature shall be accounted for in the design as deemed

necessary by the engineer.


Texas Commission on Environmental Quality Page 306
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(G) Vector Control. Mosquito control is generally not as significant a concern

for SFS wetlands as with FWS systems. Vegetation maintenance practices shall include removal of

excessive plant litter and detritus to prevent mosquito breeding opportunities.

(H) Media Design. SFS wetlands media shall be appropriate for constructed

wetlands wastewater application and shall meet the following minimum requirements.

(i) Media shall be hard rock, slags, or other clean, comparable media

material. Media shall maintain less than 0.1% by weight of clay, sand and other fine materials.

(ii) Rock or mineral media materials shall have a Mohs hardness of at

least 5.0, and all media shall be resistant to acidic conditions.

(iii) Synthetic medias shall be considered nonconforming and/or

innovative technologies and shall be subject to §217.10(2) of this title (relating to Types of Approvals).

(iv) Media gradation and uniformity will determine wetlands hydraulic

conductivity. The executive director shall have the discretion to require a laboratory determination of the

hydraulic gradient for the proposed media.


Texas Commission on Environmental Quality Page 307
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(v) Media shall be carefully placed in the SFS wetlands by light

equipment to avoid introduction of clay or other undesirable materials, to avoid compaction, and to avoid

rutting of the subgrade.

(vi) Where a gravel media larger than one and one-half inch diameter is

used in the subsurface flow system, a top layer of small gravel shall be provided to encourage healthy

plant rooting. The gravel layer shall be maintained above the normally saturated media zone. A

transitional (medium grade) layer shall be provided between small gravel caps and coarse gravel to

minimize small gravel migration into lower void spaces.

§217.209. Overland Flow Process.

The overland flow process (O.F.) is the application of wastewater along the upper portion of

uniformly sloped and grass covered land and allowing it to flow in a thin sheet over the vegetated surface

to runoff collection ditches. The primary objective of this process is treatment of wastewater. Utilization

of this process does result in a discharge; therefore, a wastewater discharge permit from the commission

is required. This process is best utilized on soils with low permeability. The performance of the overland

flow process is dependent on the detention time of the wastewater on the vegetated sloped area. In order

to meet a specified effluent criteria, the hydraulic loading rate, the application rate, and the effectiveness

of the distribution system are essential design considerations.


Texas Commission on Environmental Quality Page 308
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Nitrification. All overland flow processes, which are intended by the engineer to

provide nitrification, shall be considered an innovative and nonconforming technology, and shall be subject

to §217.10(2) of this title (relating to Types of Approvals).

(2) Design Constraints. All overland flow processes shall at a minimum be preceded by

a bar screen and one of the primary treatment options detailed in §§217.203-217.205 of this title (relating

to Imhoff Tanks, Facultative Ponds, and Aerated Ponds) and §§217.138 (i) and (j), of this title (relating to

Primary Clarifiers-Design Basis, Primary Clarifiers-BOD5 Removal and Primary Clarifiers-Sludge

Pumping and Piping). Except as stated in this section, the overland flow process may only be used as a

means of providing sufficient secondary treatment to comply with a permit with the following effluent

sets: 10 mg/l BOD5 and 15 mg/l TSS; 20 mg/l BOD5 and 20 mg/l TSS; or 30 mg/l BOD5 and 90 mg/l

TSS.

(3) Hydraulic Loading Rate. The hydraulic loading rate and application rate may vary

depending on levels of pretreatment, desired quality of effluent, temperature, and other climatic conditions.

Table H.2 provides suggested values for application rates. The design rates selected and their justification

shall be included in the final engineering design report. In no case shall an application rate greater than

0.5 gallons per minute per foot of slope be used. Figure 1:§217.209(3)
Texas Commission on Environmental Quality Page 309
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table H.2 - Suggested Application Rates for Overland Flow Systems - *

Process Conditions Application Rate (gallons/minute/foot of slope)

Overland Flow 0.16

Preceded by Primary Treatment

Permit Limits: 30 mg/l BOD5

90 mg/l TSS

Maximum Soil Temperature > 10E C

Overland Flow 0.13

Preceded by Primary Treatment

Permit Limits: 30 mg/l BOD5

90 mg/l TSS

Maximum Soil Temperature < 10E C

Overland Flow 0.13

Preceded by Primary Treatment

Permit Limits: 20 mg/l BOD5

20 mg/l TSS

Maximum Soil Temperature > 10E C

Overland Flow 0.12

Preceded by Primary Treatment

Permit Limits: 20 mg/l BOD5

20 mg/l TSS

Maximum Soil Temperature < 10E C


Texas Commission on Environmental Quality Page 310
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Overland Flow 0.12

Preceded by Primary Treatment

Permit Limits: 10 mg/l BOD5

15 mg/l TSS

Maximum Soil Temperature > 10E C

Overland Flow 0.09

Preceded by Primary Treatment

Permit Limits: 10 mg/l BOD5

15 mg/l TSS

Maximum Soil Temperature < 10E C

Overland Flow 0.19

Preceded by Secondary Treatment

* - Numbers are based on the EPA’s Process Design Manual EPA/625/1-81/013a titled Supplement on Rapid Infiltration and

Overland Flow

(4) Climate/Wastewater Storage. Temperature significantly affects treatment

performance. As temperatures approach 0°C (32°F), treatment performance deteriorates, particularly for

nitrogen removal. At temperatures below freezing, ice may form on the terraces causing the applied

wastewater to run over the ice. The wastewater will not contact the soil, and treatment will cease.

Storage is, therefore, needed for the wastewater for days when temperatures preclude operation.

Precipitation is not a significant factor with respect to treatment performance as effluent BOD5 and TSS

concentrations increase only slightly during rainfall events. The additional runoff generated by the rainfall

greatly increases the mass of these pollutants’ discharge limits; therefore, provisions shall be made to
Texas Commission on Environmental Quality Page 311
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

store influent wastewater during rainfall sufficiently to ensure compliance with the organic load mass

limits in the discharge permit. The number of days of storage required for the overland flow process shall

be determined by the engineer with the provision that the minimum number of days of storage shall be 2

days.

(5) Storage Basin Design. To minimize the impact of algae on the treatment

performance, storage basins shall be designed as off-line basins, used only as needed, and emptied as

soon as possible by blending with other pretreated wastewater prior to application.

(6) Storage Basin Construction. Any storage basins constructed as part of an overland

flow system shall comply with §§217.202(3)-(5) and 217.206(6) of this title (relating to General Design

Considerations for Natural Systems and Wastewater Stabilization Ponds).

(7) Nuisance Odor Prevention. The engineer shall determine if odors from any portion

of the overland flow system will be a nuisance to adjacent landowners. If the engineer determines that

the overland flow system will be a nuisance to adjacent landowners, the design shall include sufficient

measures to prevent the nuisance odors.

(8) Soil/Soil Testing. Overland Flow systems shall be allowed only in soil conditions

which will not allow any effluent percolation to groundwater. Overland flow systems shall not be

allowed in soils which have a coefficient of permeability greater than 0.6 inches per hour. Core samples
Texas Commission on Environmental Quality Page 312
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

shall be taken at sites where overland flow systems are proposed, and a soil profile and a permeability test

shall be performed for these cores. The number of cores which shall be analyzed shall be at least 10

cores, or one core for each two acres, whichever is greater. Additionally, a geological investigation shall

be done which determines the depth to groundwater and the depth to bedrock under the overland flow

site. The soil profile evaluation shall extend to a depth of at least 4 feet below the root zone of the

vegetation in the overland flow system. Deeper soil profiles and further hydraulic and geological

analyses may be required at the discretion of the executive director to ensure that the overland flow

system does not constitute a threat to groundwater. All testing results and geological information shall be

included in the final engineering design report.

(9) Distribution Systems. The method of application shall achieve and maintain uniform

coverage of the overland flow area onto and across the terraces. The application cycle shall provide a

maximum of 12 hours for dosing followed by a minimum period of 12 hours of resting.

(10) Terraces. The sloped areas to receive wastewater shall be uniformly graded to

eliminate wastewater ponding and short circuiting for the length of the flow. Site grading procedures and

tolerances shall be included in the specifications. Minimum slopes shall equal or exceed 2 percent;

maximum slope shall not exceed 8 percent. The application site shall be protected from flooding. The

minimum slope length for the applied wastewater shall be 100 feet.
Texas Commission on Environmental Quality Page 313
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(11) Vegetation Selection. A vegetative cover shall be provided on the application site.

The plant types selected shall be suitable for overland flow conditions and shall provide uniform coverage

of soil to prevent short circuiting and channelization of the area.

(12) Buffer Zone. The overland flow process treatment area shall be subject to the

same buffer zone requirements as aerobic wastewater treatment system units.

(13) Disinfection. Wastewater quality and disinfection requirements for overland flow

process discharges will be established by the discharge permit.

(14) Sampling. An effluent sampling station shall be provided prior to discharge to

surface waters. The sampling and reporting requirements will be established by the discharge permit.

§217.210. Integrated Facultative Ponds.

Integrated facultative ponds shall be considered nonconforming technology. If a review of an

integrated facultative ponds is performed by the executive director, the review will be done in accordance

with §217.10(2) of this title (relating to Types of Approvals) and the criteria described in this section.

(1) Configuration/Inlets/Outlets. The length-to-width ratio of the facultative pond shall

be three to one (3:1), but other dimensions more suitable to the site may be used upon justification by the
Texas Commission on Environmental Quality Page 314
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

design engineer. The inlet shall be located in the pit portion of the pond. The pit shall not be less than

0.40 acres in total surface area, and the outer pond area, shall not be less than 10 times the surface area

of the pit. The pit shall be sized with a volume adequate to contain 0.1 cubic feet per capita per year

sludge storage (minimum 20-year design period) plus a two day hydraulic retension time above the sludge

storage area. The upflow velocity in the pit shall not exceed two feet per day at design flow. More than

one pit may be located within a single integrated facultative pond as long as each pit receives an

equivalent amount of wastewater influent. The outlet shall be constructed so that the water level may

vary by no more than one (1) foot. The engineer shall locate facultative ponds in a central location with

regard to the surrounding secondary ponds to facilitate compliance with the buffer zone requirements

specified in Chapter 309 of this title (relating to Domestic Wastewater Effluent Limitations and Plant

Siting).

(2) Depth. The inlet pit shall not be less than 15 feet deep from the water surface

elevation during normal operating conditions to the influent inlet point within the pit. For the integrated

facultative pond, berms or other deflection devices, at least 5 feet high or one-half the depth of the outer

pond, whichever is less, shall be constructed around the pit within the integrated facultative pond. The

depth from the water surface elevation during normal operating conditions, to the top of the berm around

the pit, shall be at least 5 feet.

(3) Organic Loading. The organic loading shall be no more than 300 pounds of ultimate

BOD per acre of total pond area per day into the pit.
Texas Commission on Environmental Quality Page 315
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(4) Odor Control. Odor shall be controlled by placing the inlet to the pit(s) 3 feet above

the bottom of the pond with the flow directed downward. Furthermore, water from the next stage pond

following the facultative pond shall be recirculated to the surface of the integrated facultative pond.

Capabilities for recirculation at 50% to 100% of the design flow shall be provided for the facultative

pond(s), from the outlet of the downstream pond. Facultative ponds shall be designed to preclude

situations where siphoning of pond contents through submerged inlets may occur.

(5) Removal Efficiency. In the integrated facultative pond removal efficiency may be

assumed to be up to 60% of the influent BOD5 in the pit portion of the integrated facultative pond.

Subsequent removal of BOD5 within the outer portion of the integrated facultative pond may be assumed

to be up to 50% of the remaining 40%. A minimum of 21-days hydraulic retention time shall be provided

in the integrated facultative pond.


Texas Commission on Environmental Quality Page 316
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER J : SLUDGE

§§217.240-217.252

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.240. Applicability.

This subchapter establishes the minimum design requirements for sewage sludge treatment

processes and treatment units. For purposes of this rule, sludge process is assumed to include thickening,

stabilization, and dewatering. The selection and operation of the sewage sludge unit processes shall be

based on the ultimate utilization of the final sludge product. All municipal wastewater treatment facilities

that dispose of sludge under Chapter 312 (relating to Sludge Use, Disposal, and Transportation) shall use

stabilization. All municipal wastewater treament facilities that dispose of sludge under Chapter 330

(relating to Municipal Solid Waste) shall comply with the requirements of that chapter.
Texas Commission on Environmental Quality Page 317
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.241. Control of Sludge and Supernatant Volumes.

Provisions shall be made for the return of supernatant, or centrate, resulting from sludge

processing activities to the head of the treatment works, discharged at a point preceding the aeration

system, or preceding the secondary treatment unit(s) if no aeration exists at the plant. Digester

supernatant liquor volume shall be minimized to the greatest extent practical. The impact of the returned

supernatant on the downstream units shall be accounted for in the unit designs.

§217.242. Sludge Piping.

Any sludge piping included as part of the sludge processing facilities shall have sufficient gradient

to insure the flow of sludge. Piping under stationary structures shall be arranged so that stoppages may

be readily eliminated by rodding or with sewer cleaning devices. Gravity piping shall be laid on uniform

grade and alignment. Slopes on gravity discharge piping shall not be less than three percent. Sludge

piping within digesters, including sludge drain lines, shall be a minimum of four inches in diameter. Sludge

withdrawal piping for anaerobic digesters and gravity thickeners shall have a minimum diameter of 6

inches for gravity withdrawal and 4 inches for pump suction and discharge lines. Where withdrawal is by

gravity, the available head on the discharge pipe shall be at least four (4) feet. Also, where gravity

withdrawal is to be used as the primary withdrawal method, the piping design for the primary sludge

clarifier pump shall allow the pump to be used for removal of digested sludge. Sludge piping shall include

a means to observe the quality of the supernatant from each of the withdrawal outlets provided. All
Texas Commission on Environmental Quality Page 318
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

sludge processing and treatment units shall be capable of being drained independently of one another.

Special consideration shall be given to the corrosion resistance and continuing stability of supporting

systems for piping located inside the digestion tank.

§217.243. Sludge pumps.

The engineer shall select sludge transfer pumps based on both the quantity and character of the

anticipated solids load to be handled by them. Where mechanical pumps are used, a sufficient number of

pumps shall be provided so that the design pumping capacity is available with the largest sludge pump out

of service. Air lift pumps are an acceptable mechanism for sludge transfer. Duplicate design pumping

capacity is not required when air lift pumps are used. Pumps used for pumping sludge shall be specifi­

cally designed for that purpose. Centrifugal sludge pumps shall have a positive suction head unless the

pumps are self-priming or equipped with some other priming device. Positive displacement pumps or

other types of pumps with demonstrated solids handling capability shall be provided for handling raw

sludge. The minimum positive head necessary for proper operation shall be provided at the suction side of

centrifugal type pumps. A positive head of 24 inches or more may be desirable for all types of sludge

pumps. Maximum suction lifts shall not exceed 10 feet for positive displacement pumps.
Texas Commission on Environmental Quality Page 319
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.244. Exclusion of Grit and Grease from Sludge Treatment Units.

The design of the wastewater facility shall minimize, to the greatest extent possible, the discharge

of grit, debris, oil, or grease to the sewage sludge treatment units. The ultimate use and disposal of the

various solids generated during the treatment of domestic sewage shall be included in the design of the

treatment facility. If the sewage sludge is to be land applied, all screening, grit, and grease shall be

removed from the treatment process and disposed of separately from the land applied sewage sludge.

§217.245. Ventilation.

Any sludge treatment or processing areas, where the presence of fumes or gases of a level

sufficient to constitute a public health hazard or a threat to air quality, shall be provided with sufficient

ventilation to eliminate these dangers. Where such conditions exist in an enclosed area, mechanical

ventilation shall be utilized. The mechanical ventilation may be either continuous or intermittent. At a

minimum, the ventilation, if continuous, shall provide at least six complete air changes per hour. If

intermittent, shall provide at least 30 complete air changes per hour. A higher air exchange rate may be

necessary as determined by the engineer. Where such conditions exist in an area which is not enclosed,

the facility design shall include a means of ventilation which protects public health and air quality.
Texas Commission on Environmental Quality Page 320
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.246. Odor Control.

The design of all sewage sludge process units shall be designed to minimize or eliminate nuisance

odors. If nuisance odors are likely, provisioins for abatement of these odors shall be considered.

§217.247. Chemical Pretreatment of Sludge.

Chemical addition to enhance solids removal is necessary for many sludge treatment or

processing units. This section contains the minimum criteria for the use and handling of chemicals and

equipment.

(1) Chemical Selection. Chemicals shall be compatible with the unit operation and shall

have no detrimental effect upon receiving waters. Pilot plant studies or data from unit operations treating

design flows of sewage or domestic waste waters of similar characteristics (organic levels, metal

concentrations, etc., within 25% of proposed design) shall be used to determine appropriate chemicals and

feed ranges.

(2) Safety Provisions for Storage of Chemicals. Liquid chemical storage tanks shall

include a liquid level indicator and have an overflow and a receiving basin or drain capable of complete

retention of accidental spills or overflows. Powdered activated carbon shall be stored in an isolated

fireproof area. Explosion proof electrical outlets, lights, and motors shall be used in all storage and

handling areas where potentially volatile chemicals or conditions exist. Chemicals shall remain contained
Texas Commission on Environmental Quality Page 321
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

during transport, storage, and use sufficiently to preclude discharges to the atmosphere. For each

operator who will handle dry chemicals which are known to pose potential health problems resulting from

human exposure, protective equipment for eyes, face, head, and extremities shall be provided. Facilities

shall be provided for eye washing and showering. Protective equipment and neutralizers shall be stored in

the operating area.

(3) Minimum Chemical Supply. Space shall be provided where at least thirty (30) days

of chemical supply may be stored in dry storage conditions, at a location that is convenient for efficient

handling. The chemical supply may be reduced if the final engineering design report includes information

which verifies that such storage may be reduced without limiting the dependability of the necessary

supply. Solution storage tanks or direct feed day tanks shall have sufficient capacity for daily operation at

the design flow of the facility.

(4) Chemical Handling. Provisions shall be made for measuring quantities of chemicals

used to prepare feed solutions. Storage tanks, pipe lines, and equipment for liquid chemicals shall be

specific to the chemicals and not for alternates. Different chemicals shall not be fed, stored, or handled in

such a manner that intermixing of such chemicals could occur during routine treatment operations.

Concentrated liquid acids shall not be handled in open vessels, but shall be pumped in undiluted form from

the original containers to the point of treatment, to a covered day tank, or to a storage tank. Concentrated

acid solutions or dry powder shall be kept in closed, acid-resistant shipping containers or storage units.

Transfer of toxic materials shall be controlled by positive actuating devices. One or more of the control
Texas Commission on Environmental Quality Page 322
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

methods in subparagraphs (A)-(C) of this paragraph shall be utilized to ensure that the transfer of dry

chemicals from shipping containers to storage bins or hoppers is done in a way which minimizes the

quantity of dust which may enter the equipment room. Provisions shall be made for disposing of empty

containers in a manner which precludes the potential for harmful exposure to chemicals.

(A) Vacuum pneumatic equipment of closed conveyor systems.

(B) Facilities for emptying shipping containers in special enclosures.

(C) Exhaust fans and dust filters which put the hoppers or bins under negative

pressure sufficient to eliminate chemical particles which escape into the air.

(5) Housing of Chemicals. Structures, rooms, and areas accommodating chemical feed

equipment shall provide convenient access for servicing, repair, and observation of operations. Floor

surfaces shall be smooth, slip resistant, impervious, and well drained with a minimum slope of 1/8 inch per

foot. Open basins, tanks, and conduits shall be protected from chemical spills or accidental drainage.

(6) Feed Equipment.

(A) Redundancy. Sufficient equipment redundancy shall be provided to ensure

process dependability during the shutdown of the largest operational unit. A minimum of two feeders shall
Texas Commission on Environmental Quality Page 323
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

be provided. Feeders shall be able to supply, at all times, the amounts of chemicals needed for process

reliability, at an accurate rate, throughout the range of feed.

(B) Design and Capacity. Proportioning of chemical feed to the rate of flow

shall be provided where the flow rate is not constant. Positive displacement type solution feed pumps

shall not be used to feed chemical slurries unless justified by the engineer in the final engineering design

report. The treatment works’ potable water supply shall be protected from contamination by chemical

solutions or sewage by providing an air gap between the supply line and the solution tank. Materials and

surfaces shall be resistant to the chemical solution(s) which they will come into contact with. Dry

chemical feeder systems shall measure chemicals volumetrically or gravimetrically; provide effective

mixing and solution of the chemical in the solution pot; provide gravity feed from solution pots, if possible;

completely enclose chemicals; and prevent emission of dust to the operation room.

(C) Location. Feed equipment shall be located near the points of application to

minimize length of feed lines and shall be readily accessible for servicing, repair, and observation. Feed

equipment shall be provided with protective curbing so that chemicals from equipment failure, spillage, or

accidental drainage will be contained.

(D) Control. Feeders shall be automatically controlled. The automatic control

shall be capable of reverting to manual control. The feeders shall be manually started. Automatic

chemical dose or residual analyzers shall be used as deemed necessary by the engineer. Where
Texas Commission on Environmental Quality Page 324
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

automatic chemical dosing or residual analyzers are used, the engineer shall determine the need for

alarms for critical values and recording charts.

(E) Weighing Scales. Weighing scales shall be provided for volumetric dry

chemical feeders. The scales shall accurately measure increments of 0.5 percent of load. Weighing

scales shall be provided for weighing of carboys which are not calibrated volumetrically.

(F) Feeder System Protection. The entire feeder system shall be protected

against freezing and shall be readily accessible for cleaning.

(G) Service Water Supply. Water used in the feeder system shall be protected

from contamination. The service water shall be ample in supply and have sufficient pressure to ensure

dependable operations. The water supply shall include a means for measurement when preparing specific

solution concentrations. Where a booster pump is required, sufficient duplicate equipment to ensure

process reliability shall be provided.

(7) Solution Tanks. Means shall be provided to maintain uniform strength of solution

consistent with the nature of the chemical solution. Continuous agitation shall be provided to maintain

slurries in suspension. Two (2) solution tanks shall be required for a chemical to assure continuity of

chemical application during servicing. The total tank capacity shall provide storage for at least one full

day of operation at design flow. Each tank shall be provided with a drain. Means shall be provided to
Texas Commission on Environmental Quality Page 325
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

indicate the solution level in the tank. Make-up potable water shall enter the tank through an air gap.

Chemical solutions shall be kept covered with access openings curbed and fitted with tight covers.

Subsurface locations for solution tanks shall be completely impermeable, protected against buoyancy

forces, include provisions to drain groundwater or other accumulated water away from the tank, include

design provisions which will detect leaks, and allow for containment and remediation of any chemical

leaks, spills or overflows. Overflow pipes shall be turned downward, have free discharge, and be placed

in the most practical location which is most likely to be noticed during normal maintenance and operation

of the facilities. The overflow pipes shall not contaminate the wastewater or receiving stream and shall

not constitute a hazard to operating personnel.

(8) Requirements for Chemical Application. Chemical application shall assure

maximum efficiency of treatment and provide maximum safety to operators. Chemical application shall

also assure satisfactory mixing of the chemicals with the sludge. Chemicals shall be applied in a manner

which prevents backflow or back-siphonage between multiple points of feed through common manifolds.

The application of pH affecting chemicals to the wastewater shall be done prior to the addition of

coagulants.
Texas Commission on Environmental Quality Page 326
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.248. Sludge Thickening.


Texas Commission on Environmental Quality Page 327
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Sludge thickening is used for volume reduction and conditioning of sludge, prior to sludge

treatment, as an aid to processing and managing the sludge waste stream. Sludge thickening is not

required. If sludge thickeners are used, the following criteria shall apply.

(1) General Requirements for Thickeners.

(A) Capacity. Thickeners shall be designed to operate effectively during the

two-hour peak flow.

(B) Flexibility. A bypass around the thickening process shall be provided. Dual

units, alternate means of thickening, alternte disposal methods or adequate storage shall be provided for

all treatment works whose design flow is greater than 1.0 mgd capacity.

(2) Specific Requirements for Mechanical (Gravity) Thickeners.

(A) Equipment Features. Mechanical thickeners shall employ low speed stirring

mechanisms for continuous mixing and flocculation within the zone of sludge concentration. The

mechanical thickener shall be designed to provide for sludge storage, if sufficient storage is unavailable

within other external tankage. A means of controlling the rate of sludge withdrawal shall be provided.

The scraper mechanical train shall be capable of withstanding all expected torque loads. The normal
Texas Commission on Environmental Quality Page 328
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

working torque load shall not exceed ten (10%) of the rated torque load. Chemical addition and dilution

water feed systems may be used to optimize performance.

(B) Design Basis. The basis of design shall be detailed in the final engineering

design report. The executive director shall have the discretion to require data obtained from a pilot study.

Thickener overflow rates shall be 400-800 gpd/sf. The side water depth shall be a minimum of 10 ft.

Circular thickeners shall have a minimum bottom slope of 1.5 in/ft. The scraper mechanism peripheral

velocity shall be 15 to 20 ft/min. The thickener shall be designed to minimize short circuiting.

(3) Specific Requirements for Dissolved Air Flotation Thickeners.

(A) Equipment Features. Dissolved air flotation (DAF) basins shall be equipped

with bottom scrapers to remove settled solids. The bottom scraper shall function independently of the

surface skimmer mechanism. The recycle pressurization system shall utilize DAF effluent or secondary

effluent in lieu of potable water. A polymer feed system shall be provided. The feed system shall meet

the requirements of §217.247(6) of this title (relating to Chemical Pretreatment of Residuals). Dissolved

air flotation units shall be enclosed in a building. A positive air ventilation system shall be provided.

(B) Design Basis. The basis of design shall be detailed in the final engineering

design report. The executive director shall have the discretion to require data obtained from a pilot study.

Hydraulic loading rates shall not exceed 2.0 gal/min/sq.ft. The solids loading rate shall be 1.0 to 4.0
Texas Commission on Environmental Quality Page 329
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

lb/hr/sq.ft. The air to solids weight ratio shall be 0.02 to 0.04. The retention tank system shall provide a

minimum pressure of 40 psig. The skimmer shall be designed for multiple or variable speeds. The speeds

shall allow an operational range from one (1) fpm up to 25 fpm.

(4) Specific Requirements for Centrifugal Thickeners. The basis of design shall be

detailed in the final engineering design report. The executive director shall have the discretion to require

data obtained from a pilot study. The centrifuge shall be preceded by pretreatment to prevent plugging of

the nozzle and/or excessive wear in the bowl. Centrate shall be handled in the same way as supernatant

and shall be subject to §217.241 of this title (relating to Control of Sludge and Supernatant Volumes).

§217.249. Sludge Stabilization.

The design requirements for the stabilization processes listed below are based on the assumption

that the process is the sole stabilization process employed at the treatment works. If technically justified in

the final engineering design report, consideration will be given to reducing some of these requirements for

treatment works employing series operation of two or more stabilization processes or methods.

(1) Anaerobic Digestion.

(A) Multiple Design. For facilities with a design flow exceeding 0.5 mgd, a

minimum of two anaerobic digesters shall be provided, so each digester may be used as a first stage or
Texas Commission on Environmental Quality Page 330
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

primary reactor for treating primary and secondary sludge flows generated at the treatment works.

Where multiple digesters are not provided, a storage basin shall be provided for emergency use, so the

digester may be taken out of service without unduly interrupting treatment works operations. Where

multiple digesters are required, each digester shall have the means for transferring a portion of its

contents to other digesters.

(B) Depth. The anaerobic digester shall provide a minimum of six feet of

storage depth for supernatant liquor.

(C) Maintenance Provisions. The design shall allow for safe access to all units

and appurtenances which may require cleaning, emptying, or maintenance.

(D) Slope. The digester bottom shall slope to drain towards the withdrawal pipe.

Flat-bottomed digestion chambers shall not be used.

(E) Access Manholes. At least two access manholes shall be provided in the

top of the digester, in addition to the gas dome. One opening shall be large enough to permit the use of

mechanical equipment to remove grit and sand. A separate side wall manhole shall be provided at ground

level.
Texas Commission on Environmental Quality Page 331
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(F) Safety. The operation and maintenance manual shall specify non-sparking

tools, rubber soled shoes, safety harness, gas detectors for inflammable and toxic gases, and at least one

self contained breathing apparatus.

(G) Sludge Inlets and Outlets. Multiple sludge inlets, draw-offs, and multiple

recirculation section and discharge points (minimum of three) to facilitate flexible operation and effective

mixing of the digester contents shall be provided. One inlet shall discharge above the liquid level and be

located at approximately the center of the digester to assist in scum breakup. Raw sludge inlet discharge

points shall be located to minimize short circuiting to the supernatant draw-off.

(H) Digester Capacity. Where the composition of the sewage has been

established, digester capacity shall be computed from the volume and character of the sludge to be

digested. The total digestion volume shall be determined by rational calculations based upon such factors

as volume of sludge added, the percent solids and character of the sludge, the temperature to be

maintained in the digesters, the degree or extent of mixing to be obtained, and the size of the installation

with appropriate allowance for sludge and supernatant storage. These detailed calculations shall be

included in the final engineering design report to justify the basis of design. The digester shall be capable

of maintaining a minimum average sludge digestion temperature of thirty five degrees Celsius (35o C) (95o

F) with the capability of maintaining temperature control within a 4o (+/-) C range. The design average

detention time for sludge undergoing digestion for stabilization shall be a minimum of 15 days within the

primary digester, but longer periods may be required to achieve the necessary level of pathogen control
Texas Commission on Environmental Quality Page 332
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

and vector attraction reduction necessary for the method used for sludge management (30 TAC Chapter

312). If unheated digesters are utilized, they shall have the capacity to provide a minimum detention time

of 60 days within the digestion volume in which sludge is maintained at a temperature of at least 20o C

(68o F) (30 TAC Chapter 312).

(i) Completely Mixed Systems. For digesters providing for intimate and

effective mixing of the digestion volume contents, the systems shall be designed for an average feed

loading rate of less than 200 pounds of volatile solids per 1,000 cubic feet of volume per day in the active

digestion volume. Confined mixing systems where gas or sludge flows are directed through vertical

channels, mechanical stirring or pumping systems and unconfined continuously discharging gas mixing

systems shall be designed to insure complete tank turnover every 30 minutes. For tanks over 60 feet in

diameter, multiple mixing devices shall be used. The minimum gas flow supplied for complete mixing shall

be 15 cubic feet per minute per 1,000 cubic feet of digestion volume. Flow measuring devices and

throttling valves shall be used to provide the minimum gas flow. The power supplied for mechanical

stirring or pumping type complete mixing systems shall be a minimum of 0.5 horsepower per 1000 cubic

feet of digestion volume.

(ii) Moderately Mixed Systems. For digestion systems where mixing is

accomplished only by circulating sludge through an external heat exchanger, the system shall be loaded at

less than 40 pounds of volatile solids per 1,000 cubic feet of volume per day in the active digestion

volume. The design volatile solids loading shall be established in accordance with the degree of mixing
Texas Commission on Environmental Quality Page 333
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

provided. Where mixing is accomplished by other methods, loading rates shall be justified in the final

engineering design report. Where low speed mechanical mixing devices are specified, more than one

device shall be provided unless other mixing devices are also provided.

(I) Gas Collection, Piping, Storage and Appurtenances.

(i) General Requirements. All portions of the gas system including the

space above the liquid surface in the digester, storage facilities, and piping shall be designed so that,

under all normal operating conditions including sludge withdrawal, the gas will be maintained under

positive pressure.

(ii) Safety Equipment. Pressure and vacuum relief valves and flame

traps, and automatic safety shut-off valves shall be provided in all cases where lack of such features

presents safety hazards. INSTALLATION OF WATER SEAL EQUIPMENT ON GAS PIPING IS

PROHIBITED.

(iii) Gas Piping and Condensate. Gas piping shall be adequate for the

volume of gas to be handled and shall be pressure tested for leakage (at 1.5 times the design pressure)

before the digester is placed into service. All gas piping shall slope at least 1/8 inch per foot to provide

drainage of condensation in the gas piping. The main gas line from the digester shall have a sediment trap

equipped with a drip trap. THE USE OF FLOAT CONTROLLED CONDENSATE TRAPS IS
Texas Commission on Environmental Quality Page 334
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

PROHIBITED. Condensation traps shall be placed in accessible locations for daily servicing and

draining. Drip traps shall be provided at all other low points in gas piping. The gas piping to every gas

outlet, including the pilot line to the waste gas burner, shall be equipped with flame checks or flame traps.

A natural or bottled gas source shall be utilized for the burner pilot. Flame traps with fusible shut-offs

shall be included in all main gas lines. The gas line to the waste gas burner shall include a suitable

pressure, vacuum, and relief valve.

(iv) Electrical Fixtures and Equipment. The electrical equipment

provided in sludge digester pipe galleries containing gas piping shall be designed and installed to eliminate

potential explosive conditions.

(v) Waste gas. Waste gas burners shall be readily accessible and shall

be located at least 50 feet away from any structure, if placed at ground level. Gas burners may be located

on the roof of the control building if sufficiently removed from the digester. Waste gas burners shall not

be located on top of the digester. In remote locations, discharge may be permissible for small quantities of

digester gas (less than 100 CFH) to the atmosphere through a return bend screened vent terminating at

least 10 feet above the walking surface provided the assembly incorporates a flame trap.

(vi) Ventilation. Any underground enclosures connected with anaerobic

digesters tanks, containing sludge, gas piping, or equipment shall be provided with forced ventilation in
Texas Commission on Environmental Quality Page 335
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

accordance §217.245 of this title (relating to Ventilation). Tightly-fitting, self-closing doors shall be

provided at connecting passageways and tunnels to minimize the spread of gas.

(vii) Meter. A gas meter with bypass shall be provided to meter total

gas production.

(viii) Manometers. Gas piping lines for anaerobic digesters shall be

equipped with closed-type indicating gauges. These gauges shall read directly in inches of water.

Normally, three gauges will be provided: one to measure the main line pressure, a second to measure the

pressure to gas-utilization equipment, and the third to measure pressure to waste burners. Gas tight shut­

off and vent cocks shall be provided. The vent piping shall be extended outside the building, and the

opening shall be screened and arranged to prevent the entrance of rainwater. The engineer shall

determine what safety devices and/or appurtenances are needed for the manometer piping system and

shall provide such safety items.

(J) Digestion Temperature Control.

(i) Insulation. Digester shall be constructed above the water table and

shall be suitably insulated to minimize heat loss.


Texas Commission on Environmental Quality Page 336
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(ii) Heating Facilities. Sludge shall be heated by circulating the sludge

through external heaters. Unless effective mixing is provided within the digester, piping shall be designed

to provide for the preheating of feed sludge before introduction to the digesters. Provisions shall be made

in the layout of the piping and valving to facilitate cleaning of these lines. Heat exchanger sludge piping

shall be sized for heat transfer requirements.

(iii) Heating Capacity. Sufficient heating capacity shall be provided to

consistently maintain the design temperature required for sludge stabilization. For emergency usage, an

alternate source of fuel shall be available, and the boiler or other heat source shall be capable of using the

alternate fuel.

(iv) Mixing. Facilities for mixing the digester contents shall be provided.

(v) Sludge Heating Device Location. Sludge heating devices with open

flames shall be located above grade in areas separate from locations of gas production or storage.

(K) Supernatant Withdrawal.

(i) Piping Size. Supernatant piping shall not be less than 6 inches in

diameter.
Texas Commission on Environmental Quality Page 337
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(ii) Withdrawal Arrangements. Piping shall be arranged so that

withdrawal may be made from three or more levels in the tank. A positive, un-valved, vented overflow

shall be provided. On fixed cover digesters, the supernatant withdrawal level shall preferably be selected

by means of interchangeable extensions at the discharge end of the piping. If a supernatant selector is

provided, provision shall be made for at least two other draw-off levels located in the supernatant zone of

the digester in addition to the un-valved emergency supernatant draw-off pipe. High pressure backwash

facilities shall be provided.

(iii) Sampling. Provisions shall be made for sampling at each

supernatant draw-off level. Sampling pipes shall be at least 1.5 inches in diameter.

(iv) Supernatant Handling. Problems associated with digester

supernatant, such as shock organic loads, shall be addressed in the treatment works design and detailed in

the final engineering design report. Supernatant liquor from anaerobic digesters may be treated by chemi­

cal means or other acceptable methods, before being returned to the plant. If the commonly used method

of dosing with lime is employed, the following criteria shall apply: lime shall be applied to obtain a pH of

11.5; the lime feeder shall be capable of feeding 2,000 mg/l of hydrated lime or its equivalent; the lime

shall be mixed with the supernatant liquor by a rapid mixer or by agitation with air in a mixing chamber;

and, after adequate mixing, the solids shall be allowed to settle. The supernatant liquor treatment system

may be a batch or continuous process. If a batch process is used, the mixing and settling may be in the

same tank. The sedimentation tank shall have a capacity to hold 36 hours of supernatant liquor, but not
Texas Commission on Environmental Quality Page 338
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

less than 1.5 gallons per capita. If a continuous process is used, the sedimentation tank shall have a

detention time of not less than eight hours. Solids settled from the supernatant liquor treatment are to be

returned to the digester or conveyed to the sludge handling facilities. The clarified supernatant liquor shall

be returned to the head of the treatment works in accordance with §217.241 of this title (relating to

Control of Sludge and Supernatant Volumes).

(L) Digester Covers. Uncovered anaerobic digesters shall not be constructed

or used. The sludge and supernatant withdrawal piping for all single-stage and first-stage digesters with

fixed covers shall be arranged in a manner which minimizes the possibility of air being drawn into the gas

chamber above the liquid in the digester. All digester covers shall include a gas chamber adequate for the

gas production anticipated. Digester covers shall be gas tight and the specifications shall require a test of

every digester cover for gas leakage. Digester covers shall be equipped with an air vent which includes a

flame trap, a vacuum breaker, and a pressure relief valve.

(2) Aerobic Sludge Digestion. This subsection applies to the stabilization of waste sludge

to a Class B Biosolid by aerobic digestion. If sludge is not to be digested to a Class B Biosolid, 15 days

of solids storage shall be provided.

(A) Solids Management. A solids management plan shall be prepared by the

engineer, and included in the final engineering design report, which demonstrates a method of managing
Texas Commission on Environmental Quality Page 339
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

the waste solids which will provide adequate stabilization and adequate volume to maintain the design

sludge age for the biological process.

(B) Detention Time and Mass Balance Requirements. Aerobic digestion is

sensitive to changes in temperature, so the engineer shall use the lowest one week average of the water

temperature for the design temperature of the aerobic digester system. The lowest one week average is

the lowest daily average of seven consecutive days. In addition to designing for the total detention time,

mass balance calculations shall be done. The mass balance calculations shall take into account process

design sludge age, waste stream concentration, operational hours, operational volume in tanks, decant or

dewatering volumes and characteristics, time frames needed for decanting or dewatering, and the volume

needed for storage and sampling.

(i) Single Stage. Single stage aerobic digestion consists of utilizing one

(1) tank operating in continuous-mode-no supernatant removal, continous mode feeding-batch removal, or

other mode as detailed in the solids management plan. The minimum total detention times, based on the

water temperature which shall be used to size aerobic digesters, are provided in Table J.1. The digester

size shall be of sufficient volume to provide both the detention time in table J.1 and to provide for the mass

load to be received by the unit. Figure 1: §217.249(2)(B)(i)

Table J.1 - Minimum Detention Times for Aerobic Digesters

Temperature (Degrees Celsius) Total Detention Time

15 60 days
Texas Commission on Environmental Quality Page 340
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

20 40 days

(ii) Multiple Stage. Multiple stage aerobic digestion consists of two or

more completely mixed reactors of the same volume operating in series. The residence time required for

this type of system to meet pathogen reduction goals may be 30% lower than the residence time

determined in (i) above.

(iii) Field Data. If an existing facility can demonstrate satisfactory

compliance with current fecal coliform levels for Class B sludge, that facility may continue to operate at

the time–temperature conditions at least as severe as those used during their tests. Significant increases

in flow, organic loading, or process modifications require new testing and verification of current time-

temperature operating parameters. Expansion of existing facilities may be designed and operated

according to time-temperature conditions previously established. New facilities may be re-rated after

sufficient supporting data is collected and evaluated.

(C) Design Requirements. The engineer shall consider providing an additional

tank to accommodate testing of the sludge prior to disposal. A maximum design concentration of two

percent solids concentration shall be used to calculate the total detention time for aerobic digesters which

concentrate the waste sludge only in the digester tank. A design concentration of up to three percent

solids may be used upon collection of supporting data. If additional thickening equipment, designed in

accordance with this chapter, is used, then the design concentration shall be reviewed on a case by case

basis. If used, diffuser shall be of the type which minimizes clogging, and the diffusers shall be designed
Texas Commission on Environmental Quality Page 341
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

to permit removal for inspection, maintenance, and replacement without dewatering the tanks. The

volatile solids loading shall be in the range of one to two tenths (0.1 to 0.2) pounds of volatile solids per

cubic foot per day, unless otherwise justified in the final engineering design report. Dissolved oxygen

concentration maintained in the liquid shall be 0.5 (½) milligrams per liter. Energy input requirements for

mixing shall be in the range of 0.5 to 1.5 horsepower per 1,000 cubic feet, where mechanical aerators are

utilized, and 20 to 30 standard cubic feet per minute per 1,000 cubic feet of aeration tank, where diffused

air mixing is utilized. Facilities shall be provided for effective separation and withdrawal, or decanting of

supernatant.

(2) Heat Stabilization.

(A) Capacity. The design of heat treatment systems shall be based on the

anticipated sludge flow rate (gpm) with the required heat input dependent on sludge characteristics and

concentration. The system shall be designed for continuous 24-hour operation to minimize additional heat

input to start up the system.

(B) Flexibility. Multiple units shall be provided unless nuisance-free storage or

alternate stabilization methods are available to avoid disruption to treatment works operation when units

are not in service. If a single system is provided, standby grinders, fuel pumps, air compressor (if ap­

plicable), and dual sludge pumps shall be provided. A reasonable downtime for maintenance and repair
Texas Commission on Environmental Quality Page 342
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

based on data from comparable facilities shall be included in the design. Adequate storage for process

feed and downtime shall be provided.

(C) Equipment Features. The process shall provide heat stabilization in a

reaction vessel within a range from 175o C or 350 degrees Fahrenheit (350o F) for 40 minutes to 205o C or

400o F for 20 minutes at pressure ranges of 250 to 400 psig, or provide for pasteurization at temperatures

of 30o C or 85o F or more and gage pressures of more than one standard atmosphere (14.7 psi) for periods

exceeding twenty five (25) days. Sludge grinders shall be provided to protect the heat exchangers from

rag fouling. An acid wash or high pressure water wash system shall be available to remove scale from

heat exchangers and reactors. The decant tank shall be equipped with a sludge scraper mechanism and

shall be covered to prevent odor release. Corrosion resistant materials of construction shall be selected

for heat exchangers. Separate, additional grit removal (in addition to grit removal at the treatment works

influent) shall be considered to prevent abrasion of piping. Control parameters shall be adequately

monitored. Continuous temperature recorders shall be provided.

(D) Recycle Loads. The method of treatment for recycle streams from heat

treatment shall be detailed in the final engineering design report, and shall not impact water quality or the

facilities treatment processes negatively.

(6) Alkaline Stabilization.


Texas Commission on Environmental Quality Page 343
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Design Basis.

(i) Alkaline Dosage. The alkaline additive dosage required to stabilize

sludge is determined by the type of sludge, chemical composition of sludge, and the solids concentration.

Performance data taken from pilot plant test programs or from comparable facilities shall be used in

determining the proper dosage.

(ii) pH and Contact Time. The design objective shall be to furnish

uniform mixing in order to maintain the pH and contact time as specified in §§312.82-312.83 of this title

(relating to Pathogen Reduction and Vector Attraction Reduction) for alkaline addition in the alkaline

additive-sludge mixture.

(iii) Temperature and Contact Time. The design shall meet the

temperature and contact time objectives described in §§312.82-312.83(b) of this title for the alkaline-

sludge mixture.

(iv) Reliability. Multiple units shall be provided unless nuisance free

storage or alternate stabilization methods are available to avoid disruption to treatment works operations

when units are not in service. If a single system is provided, standby conveyance and mixers, backup

heat sources, and dual blowers shall be provided. A reasonable downtime for maintenance and repair
Texas Commission on Environmental Quality Page 344
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

based on data from comparable facilities shall be included in the design. Adequate storage for process,

feed, and downtime shall be included.

(B) Housing Facilities. Housing facilities shall be designed in accordance with

§217.247(5) of this title (relating to Chemical Pretreatment of Residuals). Mechanical or aeration

agitation which ensures uniform discharge from storage bins shall be provided.

(C) Feeding Equipment. Alkaline additive feeding equipment shall meet the

requirements of §217.247(6) of this title. Hydrated lime shall be fed as a 6 to 18 Percent Ca(OH2 ) slurry

by weight unless otherwise justified in the final engineering design report. Other suitable means shall be

developed for controlling the feed rate for dry additives, and the feed method shall be described in the

final engineering design report.

(D) Mixing Equipment. The additive/sludge blending or mixing vessel shall be

large enough to hold the mixture for 30 minutes at maximum feed rate. In a batch process, a pH greater

than 12 shall be maintained in the mixing tank during this period. In a continuous flow process, the nominal

detention time (defined as tank volume divided by volumetric input flow rate) shall be used in design, and

a pH greater than 12 shall be maintained in the exit line. Slurry mixtures may be mixed with either

diffused air or mechanical mixers. Mixing equipment shall be designed to keep the alkaline slurry mixture

in complete suspension.
Texas Commission on Environmental Quality Page 345
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(i) Air Mixing. With air mixing using coarse bubble diffusers, a

minimum air supply of 20 scfm per 1000 cubic feet of tank volume shall be provided for adequate mixing.

The mixing tank shall be adequately ventilated and odor control equipment shall be provided.

(ii) Mechanical Mixing. Mechanical mixers shall be sized to provide 5 to

10 HP per 1,000 ft3 of tank volume. Impellers shall be designed to minimize fouling with debris in the

sludge.

(E) Detention Time. Pasteurization vessels shall be designed to provide for a

minimum retention period of thirty (30) minutes. Provisions for external heat shall be specified in the final

engineering design report.

§217.250. Sludge Dewatering.

This section contains the minimum design criteria to be used for comprehensive consideration of

sewage sludge dewatering unit processes. The engineer shall include in the final engineering design

report the rationale for the proposed units, design calculations, results from any pilot studies, all

assumptions, and appropriate references. The dewatering unit(s) shall be designed using mass balance

principles. Total suspended solids values are usually used to size dewatering units.

(1) General Requirements.


Texas Commission on Environmental Quality Page 346
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(A) Centrate or Filtrate Recycle. Drainage from beds and centrate or filtrate

from dewatering units shall be returned to the head of the wastewater facility. The effects of these

organic loads shall be accounted for in the design of any downstream units.

(B) Sludge with Industrial Waste Contributions. Dewatering of municipal sludge

containing significant industrial waste, especially when thermal or chemical stabilization processes are

employed, shall not allow the release of constituents such as free metals, organic toxicants, or strong

reducing/oxidizing compounds in a manner which threatens water quality or discharge permit compliance.

(C) Redundancy. Where mechanical dewatering equipment is employed, at

least two units shall be provided unless adequate storage (separate or in-line) or an alternative means of

sludge handling is detailed in the final engineering design report. Whenever performance reliability and

sludge management options are soley dependent on production of dewatered sludge, each of the mechani­

cal dewatering units provided shall be designed to operate for less than sixty (60) hours during any six day

period. In these cases, each facility shall be able to dewater in excess of 50% of the average daily sludge

flow with the largest unit out of service. The requirements for excess capacity shall depend upon the type

of equipment provided, peak sludge factor, and storage capability not otherwise considered.

(D) Storage Requirements. Where mechanical dewatering equipment will not

be operated on a continuous basis and the treatment works is without digesters with built-in short-term

storage, separate storage shall be provided. In-line storage of stabilized or un-stabilized sludge shall not
Texas Commission on Environmental Quality Page 347
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

interfere with the design function of any of the treatment unit operations. Separate sludge storage from

primary digesters shall be aerated and mixed as necessary to prevent nuisance odor conditions.

(E) Sampling Points. Sampling stations before and after each dewatering unit or

any appropriate segment of the unit shall be designed to allow the periodic evaluation of the dewatering

process.

(F) Bypass Requirements. All units shall have bypass capabilities to allow

maintenance to be performed on the units.

(2) Sludge Conditioning. Chemical or other additives shall be mixed with the sludge

quickly and completely. Adequate mixing time for the reaction between the chemical or other additive

shall be provided. Subsequent handling shall avoid floc shearing. The injection or addition point shall be

located in relation to downstream equipment and in relation to the combined effect of other additives.

Pilot plant testing or full size performance data shall be utilized to determine the characteristics and design

dosage of the additives and shall be determined in the final engineering design report. In-stream

flocculation/coagulation system designs shall be supported by comparable performance data or pilot plant

testing. If conditioning tanks are employed, mixers may be necessary, and the design shall include the

capability for variable detention times. Solution storage or day tanks may be smaller than the design

volume required for daily dosages, if the equipment design does not require continuous operation. A

minimum of eight (8) hours storage shall be provided unless the specific chemical or additive selected is
Texas Commission on Environmental Quality Page 348
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

adversely affected by storage. Storage for batch operations shall be adequate for one batch at maximum

chemical demand. Storage volume reductions shall be justified in the final engineering design report, and

other methods to ensure a continuous supply of chemicals through the operating day or batch shall be

provided.

(3) Sludge Drying Beds.

(A) Sizing. Drying beds size may be based on data from similar facilities in the

same geographical area with the same influent sludge characteristics. If such data is unavailable, or if the

executive director determines that the data is not appropriate for the proposed facility, sludge drying beds

shall be sized according to clauses (i) and (ii) of this subparagraph.

(i) Open Beds. The minimum surface area for sludge drying beds shall

be calculated using the values in Table J.2. These sizing factors are minimum sizing factors and do not

take into account additional surface area which may be needed to justify using sludge drying beds in areas

of the State that experience both high rainfall (greater than 45 inches per year on average) and high

relative humidity (yearly average of 50% or greater), as determined by utilizing data from the National

Weather Service. In these areas, other methods of sludge dewatering shall be utilized in lieu of sludge

drying beds. Other dewatering methods are not required if the design provides methods of effectively

dewatering sludge such as covering the beds; providing a means for accelerated dewatering; increasing

the size of the sludge drying beds sufficiently to store accumulated sludge during periods of extended high
Texas Commission on Environmental Quality Page 349
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

humidity and rainfall; and providing an alternative dewatering method to effectively dewater the sludge

during periods of extended high humidity and rainfall. The final engineering design report shall provide

justification for use of sludge drying beds in these high rainfall, high relative humidity areas of the state.

Figure 1: §217.250(3)(A((i)\

Table J.2 - Surface Area Requirements for Sludge Drying Beds

Stabilization Process Pounds Digested Dry Solids Per Square Foot Per Year

Anaerobic Digestion 20.0

Aerobic Digestion 15.0

(ii) Gravel Media Beds. These types of sludge drying beds shall be laid

in two or more layers. The gravel around the underdrains shall be properly graded and shall be at least 12

inches in depth, extending at least six inches above the top of the underdrains. The top layer shall be at

least three inches thick and shall consist of gravel 1/8 inch to 1/4 inch in size.

(iii) Sand Media Beds. These types of beds shall consist of at least 12

inches of sand with a uniformity coefficient of less than 4.0 and an effective grain size between 0.3 and

0.75 millimeters above the top of the underdrain.

(iv) Underdrains. Underdrains shall be at least four inches in diameter

and sloped not less than one percent to drain. Underdrains shall be spaced not more than 20 feet apart.
Texas Commission on Environmental Quality Page 350
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(v) Decanting. A method of decanting supernatant may be installed on

the perimeter of the bed(s).

(vi) Walls. Interior walls shall be watertight and extend 12 to 24 inches

above and at least 6 inches below the bed surface. Exterior walls shall be watertight and extend 12 to 24

inches above the bed surface or ground elevation, whichever is higher. The exterior walls shall extend 12

to 15 inches below the bottom of the underdrain pipes.

(vii) Sludge Removal. Not less than two beds shall be provided, and the

beds shall be arranged to facilitate sludge removal. Concrete pads serving as vehicle support tracks shall

be provided for all percolation type sludge beds. Pairs of support tracks for percolation type beds shall be

on 20-foot centers.

(viii) Sludge Influent. The sludge pipe to the beds shall terminate at least

12 inches above the surface and be arranged so that the pipe will drain to a sump to be pumped to the

headworks. Concrete splash plates shall be provided at sludge discharge points.

(ix) Drying Bed Bottom. The bottom of the drying bed shall consist of a

minimum of one-foot layer of clayey subsoil having a permeability of less than 10-7 cm/sec. In locations

where the ground water table is within four (4) feet of the bottom, an impermeable concrete pad shall be

installed over the liner.


Texas Commission on Environmental Quality Page 351
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(x) Bed Configuration. Bed width and configuration shall be determined

by a rational basis considering the sludge handling and treatment and sludge management options. If

polymers or other chemicals are used to enhance sludge dewatering, the effects of the polymer dosage on

uniform distribution of sludge on the bed shall be accounted for in the design.

(4) Modified Drying Beds. Vacuum assisted or other variations to the gravity drying bed

concept will be considered innovative and/or nonconforming technologies and shall be subject to

§217.10(2) (relating to Types of Approvals).

(5) Rotary Vacuum Filtration.

(A) Filtration Rate. The rates of filtering, in pounds of dry solids per square foot

of filter area per hour, for various types of sludge, in Table J.3, may be used for design with proper

conditioning. The actual value used shall be determined by the engineer and justified in the final

engineering design report. Figure 2: §217.250(5)(A)

Table J.3 - Filtration Rates

Type of Treatment Pounds of Dry Solids Per Square Foot Per Hour (Minimum ­

Maximum)

Primary 4-6

Primary and Trickling Filter 3-5

Primary and Activated Sludge 3-4


Texas Commission on Environmental Quality Page 352
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Duplicate Equipment. Unless dual trains are provided, the following

appurtenant equipment shall be provided in duplicate, with necessary connecting piping and electrical

controls, to allow equipment alternation: feed pump, vacuum pump and filtrate pump. Spare filter fabric

shall be provided except when metal coils are utilized.

(C) Filter Equipment. Wetted parts shall be constructed of corrosion-resistant

material. Drum and agitator assemblies shall be equipped with variable-speed drives, and provisions shall

be made for altering the liquid level.

(D) Filter Speed Requirements. The filter speed shall be variable.

(E) Pumps. Vacuum pumps shall be provided with a capacity of at least 1.5 cfm

per square foot for metal-covered drums. Vacuum receivers are required with dry-type vacuum pumps.

Filtrate pumps shall be of adequate capacity to pump the maximum amount of liquid to be removed from

the sludge. Each filter shall be fed by a separate feed pump to ensure a proper feed rate.

(6) Centrifugal Dewatering. Successful application of centrifugation of municipal type

sludge requires consideration of numerous factors. The bases of sizing and design shall be supplied in the

final engineering design report. Proper scale-up data pertaining to the particular sludge to be dewatered

shall be provided. The engineer shall account for the abrasiveness of each sludge supply in scroll
Texas Commission on Environmental Quality Page 353
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

selection. Adequate sludge storage shall be supplied for proper operation. Unless dual trains are provided,

the following spare appurtenant equipment shall be furnished with necessary connecting piping and

electrical controls to allow equipment alternation: drive motor, gear assembly, and feed pump. Each feed

pump shall be variable speed. Separate feed systems shall be equipped for each centrifuge. Centrifuges

shall be equipped with provisions for variation of scroll speed and pool depth. A crane or monorail shall

be furnished for equipment removal or maintenance. Provisions for adequate and efficient wash down of

the interior of the machine shall be an integral part of the design.

(7) Plate and Frame Presses.

(A) Sizing. When available, actual performance data developed from similar

operational characteristics shall be utilized for design and shall be detailed in the final engineering design

report. If no data is available, then the engineer shall submit the results of a pilot scale tests or full scale

tests as part of the final engineering design report. Appropriate scale-up factors shall be utilized for full

size designs if pilot scale testing is done in lieu of full-scale testing.

(B) Duplicate Equipment and Spare Parts. Unless multiple units are provided,

duplicate feed pumps, air compressors, and washwater booster pumps shall be provided. Additionally,

unless multiple units are installed, the following spare appurtenances shall be provided: at least one extra

plate for every ten required for startup, but not less than two; one complete filter fabric set; one closure

drive system; one feed pump; air compressor; and, one washwater booster pump.
Texas Commission on Environmental Quality Page 354
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(C) Operational Requirements. Filter feed pumps shall be capable of a

combination of initial high flow low pressure filling, followed by sustained periods of operating at 100 to

225 psi. The engineer may use an integral pressure vessel to produce this initial high volume flow.

Operating pressures less than 225 psi may be used if actual performance data using similar sludge

justifying such a use is provided in the final engineering design report. The engineer may include

provisions for cake breaking to protect or enhance down line processes where necessary.

(D) Maintenance. Crane or monorail services capable of removing the plates

shall be provided. A high pressure water or acid wash system to clean the filter shall be provided.

(8) Belt Presses.

(A) Sizing. Actual performance data developed from similar operational

characteristics shall be utilized for design. A second belt filter press or an approved backup method of

sludge disposal shall be provided whenever a single belt press will be operated sixty (60) hours or more

within any consecutive five (5) day period, or whenever the average daily flow received at the treatment

works equals or exceeds four (4) mgd. Appropriate scale-up factors shall be utilized for full size designs

if pilot plant testing is performed in lieu of full-scale testing. The design basis for the belt filter press

dewatering system shall be detailed in the final engineering design report.


Texas Commission on Environmental Quality Page 355
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Duplicate Equipment and Spare Parts. Unless multiple units are provided,

duplicate feed pumps and washwater booster pumps shall be provided. Unless multiple units are installed,

the following spare appurtenances shall be provided: one complete set of belts, one set of bearings for

each type of press bearing; duplicate tensioning; and tracking sensors; one set of wash nozzles; one

doctor blade; and, duplicate conditioning or flocculation drive equipment.

(C) Conditioning. A polymer selection methodology, accounting for sludge

variability and anticipated sludge loading to the press, shall be described in the final engineering design

report.

(D) Sludge Feed. Sludge feed shall be as constant as possible to eliminate

difficulties in polymer addition and press operation. The range in feed variability shall be identified, and

equalization shall be provided as deemed necessary by the engineer. Inclusion of grinders ahead of the

flocculation system shall be evaluated by the engineer. A method for uniform sludge dispersion on the

belt shall be provided. Thickening of the feed sludge shall be an integral part of the design of the filter

press unless separate thickening or dual purpose thickening is fully detailed in the final engineering design

report.

(E) Filter Press Belts. The belt speed shall be variable. Belt tracking and

tensioning equipment shall be provided. Belt replacement availability shall be considered in the equipment

selection, especially if weave, material, width, or thickness may not be reasonably duplicated.
Texas Commission on Environmental Quality Page 356
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(F) Filter Press Rollers. Rubber coating or other protective finish shall be

provided on the rollers. The maximum roller deflection and operating tension of the belt, shall be

considered in equipment selection. Roller bearings shall be watertight and be rated for a B-10 life of

100,000 hours.

(G) Water Supply Considerations. High pressure wash water shall be provided

for each belt and the specified operating pressure at the point of washwater discharge shall be

determined. Booster pumps shall be provided as deemed necessary by the engineer. Spray wash

systems shall be designed in a manner which allows them to be cleaned without interfering with the

system operation. Particular care in nozzle selections and optional nozzle cleaning systems shall be taken

when recycled wastewater is used for belt washing. Replaceable spray nozzles and spray curtains shall

be provided.

(H) Maintenance Requirements. Drip trays shall be provided under the press

and under the thickener, if gravity belt thickening is employed. Adequate clearance to the side and floor

shall be provided for maintenance and removal of the dewatered sludge. All electrical panels or other

materials which are subject to corrosion shall be located out of the area of the press. Doctor blade

clearance shall be adjustable.

§217.251. Sludge Storage.


Texas Commission on Environmental Quality Page 357
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

This section applies to the storage of residuals after processing and prior to final disposal or

removal from the site. Storage of solids on site may be provided in either liquid, dewatered, or dry form

where the solids have been stabilized in the treatment process.

(1) General. Storage facility shall be designed to abate nuisance and odor conditions.

All facilities shall be required to provide storage of waste sludge outside of the biological treatment

process. The design of all storage facilities shall take into account process design, sludge age, waste

stream concentration, operational hours, operational volume in tanks, decant or dewatering volumes and

characteristics, time frames needed for decanting or dewatering, and volume needed for storage and

sampling. Utilizing this information, a solids management plan shall be prepared by the engineer, and

detailed in the final engineering design report, which demonstrates a method of managing the waste solids

which will maintain the design sludge age for the biological process utilizing the sludge handling and

storage facilities.

(2) Solids Storage.

(A) Aerobically Digested Solids. Aerobically digested solids may be stored for

extended periods of time. The basin contents shall be kept thoroughly mixed using diffused air or

mechanical mixing. A minimum air requirement of 30 standard cubic feet per minute per 1000 cubic feet

of volume shall be provided. If mechanical surface aerators are used, a minimum horsepower

requirement of 1.0 horsepower per 1000 cubic feet of volume shall be provided. If earthen basins are
Texas Commission on Environmental Quality Page 358
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

used, they shall be lined in accordance with §217.202(3) and (4) of this title (relating to General Design

Considerations for Natural Systems).

(B) Anaerobically Digested Solids. Anaerobically digested solids may be stored

in covered basins or facultative solids basins. The anaerobically digested solids storage facility shall be

designed to abate nuisance and odor conditions. The facultative solids storage basin shall be designed to

maintain an aerobic surface layer free of scum accumulation. The organic loading rate for a facultative

solids storage basin shall not exceed 20 pounds of volatile solids per 1000 square feet of surface area per

day. Surface aerators shall be used to maintain the aerobic zone and breakup surface film. The surface

aerators shall be designed to minimize the mixing action between the aerobic and anaerobic zones. The

facultative solids basin shall have a minimum side water depth of 12 feet. The top 3 feet shall be kept

aerobic. If earthen basins are used, they shall be lined in accordance with §217.202 (3) and (4) of this

title.

(3) Dewatered Solids Storage. Dewatered solids with a solids content of less than 35

percent may be stored on site up to 7 days except for extenuating circumstances due to inclimate weather

that do not allow transport or disposal. Each occurrance shall be fully documented and kept on file. The

dewatered solids may be stored in steel or concrete containers and shall be located and stored to preclude

re-wetting by rainfall. Dewatered solids with a solids content of less than 50 percent and greater than or

equal to 35 percent, may be stored on site up to 90 days. The dewatered solids may be stored in

containers or in stockpiles. The storage facility shall be located to preclude re-wetting by rainfall. Solids
Texas Commission on Environmental Quality Page 359
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

stored in stockpiles shall be placed on an impervious pad to preclude groundwater contamination. Open

stockpiles shall include provisions for collecting rainfall runoff. All rainfall runoff shall be collected and

returned to the head of the treatment facility.

(4) Dried Solids Storage. Dewatered solids with a solids content of greater than or equal

to 50 percent may be stored on site in bins or covered facilities. Enclosed structures may produce

explosive gaseous byproducts or dust. The enclosed area of the storage structure shall be sufficiently

ventilated to eliminate the accumulation of dangerous gas mixtures. The enclosed storage structure shall

be mechanically ventilated with approximately 20 to 30 air changes per hour. All exhaust air shall pass

through an odor control system.

§217.252. Final Use or Disposal of Sludge.

The final use or disposal of sewage sludge shall be included in the design of the wastewater

treatment facility. The use, disposal, and transportation of sewage sludge shall be conducted in

accordance with the requirements contained in Chapter 312 of this title (relating to Sludge Use, Disposal

and Transportation).

(1) Quantities. Quantity of solids generated by the treatment process selected shall be

calculated or estimated from similar full scale facilities or pilot facilities. A mass balance approach shall

be used to determine the quantity of sludge produced at the facility.


Texas Commission on Environmental Quality Page 360
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) Pollutants. Pollutants in sewage sludge shall be determined using standard method

laboratory test procedures. The use or disposal option shall be designed based on proper characterization

of the sewage sludge. Pollutant levels shall be less than the levels specified in Chapter 312 of this title.

(3) Pathogens. The wastewater treatment facility shall be designed to reduce pathogens

to levels specified in Chapter 312 of this title with regards to the ultimate use or disposal method.

(4) Vector Attraction. The wastewater treatment facility shall be designed to reduce

vector attraction of the sewage sludge to levels specified in Chapter 312 of this title with regards to the

ultimate use or disposal method.

(5) Emergency Provisions. The final engineering design report shall describe a backup

plan to be utilized to provide flexibility in the event of equipment failure or conditions which prevent the

primary use or disposal method.

(6) Weather Factors. The design shall account for weather factors such as rainfall, wind

conditions, and humidity in the selection of the use or disposal of sewage sludge.
Texas Commission on Environmental Quality Page 361
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER K : DISINFECTION

§§217.270-217.278

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code as well as the authority to set standards to prevent the

discharge of waste that is injurious to the public health under §26.041 of the Texas Water Code.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.270. Applicability.

This subchapter details the requirements for disinfection, dechlorination, post aeration, and

sampling point locations.


Texas Commission on Environmental Quality Page 362
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.271. Chlorine and Sulfur Dioxide Disinfection and Dechlorination Systems.

(a) Redundancy. All chlorine, sulfur dioxide disinfection, and dechlorination systems shall include

two banks of cylinders each. Each bank of cylinders shall include a sufficient number of cylinders to

meet the requirements of subsection (b)(2) of this section. The two banks of cylinders shall include an

automatic switch over device. This device shall automatically switch operations from an empty bank of

cylinders to a full bank of cylinders, in a manner which ensures that the chemical flow needed to assure

disinfection is continuously supplied. Sufficient space to store a bank of empty cylinders shall be

provided. A minimum of two chlorinators, sulfonators, or evaporators shall be provided. Chemical

delivery systems shall be setup so that the pound per day requirements in subsection (b)(1) of this section

may be met with the largest chlorinator, sulfonator, or evaporator out of service. Chemical delivery

systems shall also be provided with backup pumps for any injector water supply systems requiring booster

pumps.

(b) Capacity and Sizing.

(1) Pounds per Day Requirements. The pounds per day for which the chlorine and

sulfur dioxide gas withdrawal systems shall be sized shall be determined by using the 2-hour peak flow as

determined from §217.32(2) of this title (relating to Design of New Systems Organic - Loadings and

Flows) or §217.33(1) of this title (relating to Design Existing Systems - Organic Loadings and Flow) and

Equation 1.k. Table K.1 provides the minimum acceptable design chlorine dosage for disinfection. A
Texas Commission on Environmental Quality Page 363
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

demand of one unit of sulfur dioxide gas to dechlorinate at least one unit of chlorine gas shall be assumed

to determine the pounds per day of sulfur dioxide needed to neutralize the chlorine residual ($1 mg/l of

sulfur dioxide for every 1 mg/l of chlorine residual which shall be dechlorinated). Figure 1:

§217.271(b)(1)

PPD=Q*D*8.34 Equation 1.k

PPD = pounds per day of chlorine or sulfur dioxide required for

treatment

Q = peak 2 hour flow (millions of gallons per day)

D = chlorine concentration from Table 1, or sulfur dioxide dosage

needed to dechlorinate the expected chlorine residual

8.34 = conversion factor

Table K.1 - Minimum Design Chlorine Concentration Needed for Disinfection

Type of Effluent Chlorine Concentration (mg/l), (D)

Primary 15

Fixed Film 10

Activated Sludge 8

Tertiary Filtration Plant Effluent 6

Nitrified Effluent 6
Texas Commission on Environmental Quality Page 364
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(2) Cylinder Bank Sizing. The number of chlorine or sulfur dioxide cylinders required,

per bank of cylinders, shall be determined as follows:

(A) Cylinder Withdrawal Rates.

(i) Gas Withdrawal. Determine the gas withdrawal rate per cylinder

using Equation 2.k and the variables from Table K.2. If the cylinders are not stored in a temperature

controlled area, the ambient temperature shall be based on the lowest 7-day average of the average daily

local temperatures over the last 10 years, as measured at the nearest National Oceanic and Atmospheric

Administration’s (NOAA) National Weather Service weather station. If storage of cylinders in non-

temperature controlled areas is proposed, refer to subsection(d)(2)(B) of this section. If heating blankets

are used with sulfur dioxide cylinders, refer to subsection (d)(1)(B) and (d)(2)(C) of this section.

HEATING BLANKETS ARE PROHIBITED ON CHLORINE GAS CYLINDERS. Figure 2:

§217.271(b)(2)(A)(i)

Wg =(TA -Tth )*F Equation 2.k

TA = Low Ambient Temperature, E F

Tth = Threshold Temperature, E F

F = Withdrawal Factor, lb/E F/day

Wg = Maximum Gas Withdrawal Rate per Cylinder, lb/day


Texas Commission on Environmental Quality Page 365
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Table K.2 - Threshold Temperatures and Withdrawal Rates for Chlorine and Sulfur Dioxide - *

Gas and Cylinder Size Withdrawal Factor, (F) Threshold Temperature, Threshold Temperature,
lb/E F/day (T th ) for Cylinder Mounted (T th ) for Manifold Systems
Vacuum Regulator, E F at 10-15 psig Pressure, E F

150 pound Chlorine 1.0 0 10


Cylinder

1 ton Chlorine Cylinder 8.0 0 10

150 pound Sulfur Dioxide 0.75 30 40


Cylinder

1 ton Sulfur Dioxide 6.0 30 40


Cylinder

* - Values found in the Handbook of Chlorination, Second Edition, Geo. Clifford White, Van Nostrand Reinhold

(ii) Liquid Withdrawal. If liquid withdrawal from one ton cylinders is

proposed, the following maximum withdrawal rates shall be used: Figure 3: §217.271(b)(2)(A)(ii)

Wl (Chlorine) = 9,600 pounds per day

Wl (Sulfur dioxide) = 7,200 pounds per day

(B) Cylinders per Bank. Calculate the number of cylinders per cylinder bank with

Equation 3.k: Figure 4: §217.271(b)(2)(B)

Cyl=PPD/Wg,l Equation 3.k


Texas Commission on Environmental Quality Page 366
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

Cyl = minimum number of cylinders required per bank (round

up to the nearest whole number)

PPD = pounds per day of chemical required as determined in

equation 1.K

Wg,l = pounds per day of chemical which may be withdrawn

per cylinder as determined in §§217.271(b)(2)(A)(I) or

(ii) of this title (relating to Gas Withdrawal and Liquid

Withdrawal).

(c) Dosage Control. Automatic dosage control shall be provided for all new and upgrades to

existing chlorine and sulfur dioxide systems. The dosage control shall be designed to automatically adjust

the dosage of chlorine or sulfur dioxide relative to at least the flow of the effluent stream.

(d) Handling of Chemicals. This subsection details requirements related to handling of sulfur

dioxide and chlorine system equipment and cylinders.

(1) Systems Utilizing 150 Pound Cylinders.

(A) Heated Rooms. Chlorine and sulfur dioxide systems which utilize 150 pound

cylinders shall be located completely indoors at a minimum temperature of 65E F. This provision applies to

all chemical feed equipment beginning at banks of cylinders and ending at the chlorinators or sulfonators,
Texas Commission on Environmental Quality Page 367
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

including the cylinders, chlorinators, and/or sulfonators. Unconnected cylinders may be stored outdoors,

provided the cylinders are moved indoors soon enough to allow them to reach at least 65E F before being

connected to the system.

(B) Heating Blankets for 150 Pound Cylinders. HEATING BLANKETS ARE

PROHIBITED ON CHLORINE GAS CYLINDERS. Heating blankets may be used on 150 pound

sulfur dioxide cylinders, in temperature controlled rooms, to increase the temperature inside the cylinders

above the ambient room temperature. If heating blankets are used for sulfur dioxide cylinders in

temperature controlled rooms, the engineer shall determine what temperature the heating blankets may

maintain inside the cylinders, when stored at a 65E F or greater room temperature. The temperature

which may be maintained inside the cylinder at the assumed room temperature is used as the ambient

temperature when determining the cylinder withdrawal rate in subsection (b)(2)(A) of this section. If

heating blankets are used the blankets shall include a mechanism which ensures that the blankets do not

heat the cylinders above 100E F. If heating blankets are used, a pressure reducing valve shall be installed

downstream of the operating cylinder(s) and the system shall be designed to deactivate blankets high

pressure is detected downstream to the cylinder(s).

(C) Separation. All chlorine equipment for systems utilizing 150 pound cylinders,

including the cylinders, shall be stored in rooms which are separate and completely isolated from any

sulfur dioxide equipment and sulfur dioxide cylinders. All sulfur dioxide equipment for systems which

utilize 150 pound cylinders, including the cylinders, shall be stored in rooms which are separate and
Texas Commission on Environmental Quality Page 368
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

completely isolated from any chlorine equipment and chlorine cylinders. The design of these systems shall

ensure that chlorine and sulfur dioxide will never come into contact with each other.

(2) Systems Utilizing One Ton Cylinders - Gas Withdrawal.

(A) Heated Rooms. Chlorinators and sulfonators for systems which utilize one

ton cylinders shall be located indoors at a minimum temperature of 65E F.

(B) Outdoor Storage of One Ton Cylinders. One ton chlorine and sulfur dioxide

cylinders may be stored outdoors for systems which utilize one ton cylinders. If one ton cylinders are

stored outdoors, the temperature used for system sizing needs to be determined. Subsection (b)(2)(A) of

this section provides details of how the proper temperature for system sizing may be obtained. If one ton

cylinders are stored outdoors, the design shall ensure that the cylinders are protected from direct sunlight.

Structures built to protect the cylinders from direct sunlight shall be constructed to allow safe removal and

replacement of the one ton cylinders. Additionally, operational cylinders stored outdoors, as deemed

necessary by the engineer, shall have heated piping to prevent gas reliquefication from occurring when

the chemical enters the heated building or when gas cools down in pressure pipe.

(C) Heating Blankets for One Ton Cylinders. HEATING BLANKETS ARE

PROHIBITED ON CHLORINE GAS CYLINDERS. Heating blankets may be used on one ton sulfur

dioxide cylinders to increase the operating temperature of the sulfur dioxide system. The engineer shall
Texas Commission on Environmental Quality Page 369
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

determine what temperature the heating blankets may maintain inside the cylinders based on the lowest 7­

day moving average of the daily local temperatures over the last ten years. This temperature is used as

the ambient temperature when determining the cylinder withdrawal rate in subsection (b)(2)(A) of this

section. If heating blankets are used, the blankets shall include a mechanism which ensures that the

blankets will not heat the cylinders above 100E F. If heating blankets are used, a pressure reducing valve

shall be installed downstream from the operating cylinder(s), and the system shall have a high pressure

interlock to deactivate the blankets.

(D) Separation. For one ton cylinders, housing of the sulfur dioxide feed

equipment and cylinders shall be separate from the chlorination feed equipment and cylinders. For one

ton cylinders, the chlorination and sulfonation feed equipment shall be separated from the one ton chlorine

and sulfur dioxide cylinders with a gas tight wall. The following exceptions are allowed:

(i) Sulfur dioxide cylinders and chlorine cylinders may be stored in the

same area, provided: the cylinders are stored outdoors; a minimum distance of 10 feet is maintained

between the outlet valves of any one sulfur dioxide cylinder and the outlet valves of any one chlorine

cylinder; and provisions are made, such as markings or signs, to ensure that chlorine equipment and

chlorine storage containers cannot be confused with sulfur dioxide equipment and sulfur dioxide storage

containers.
Texas Commission on Environmental Quality Page 370
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(ii) Sulfur dioxide and chlorine chemical feed equipment may be stored

in the same room provided that both systems are of the remote vacuum type, where no pressure gas

piping exists in the room, no cylinders are stored in the room, and the design ensures that chlorine and

sulfur dioxide will never be allowed to come into contact with each other.

(3) Systems Utilizing One Ton Cylinders - Liquid Withdrawal.

(A) Heated Rooms. Chlorinators and sulfonators shall be located indoors at a

minimum temperature of 65E F.

(B) Outdoor Storage of One Ton Cylinders. For systems utilizing liquid

withdrawal, the chlorine and sulfur dioxide cylinders may be stored outdoors without reducing the

withdrawal rates assumed in subsection (b)(2)(A)(II) of this section.

(C) Separation. The separation requirements for one ton cylinder liquid

withdrawal systems are the same as those for one ton cylinder gas withdrawal systems. Refer to

subsection (d)(2)(D) of this section for further details.

(e) Housing Requirements for Chlorine and Sulfur Dioxide Disinfection and Dechlorination

Systems. This subsection details the requirements for the building in which the chemicals are stored.
Texas Commission on Environmental Quality Page 371
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Floor Drains. Floor drains from chlorine or sulfur dioxide feed and storage rooms

shall not drain to any piping system common with other rooms of the wastewater treatment system. Floor

drains for chlorine rooms shall never drain to a piping system common with floor drains for sulfur dioxide

rooms.

(2) Doors and Windows. All doors shall open to the outside of the building, and doors

shall be equipped with panic hardware. All enclosed rooms shall include a minimum of one clear, gas-

tight window installed in the exterior door. Additional windows shall be installed, if deemed necessary by

the engineer, to ensure that the disinfection and dechlorination systems may be viewed without entering

the enclosed rooms.

(3) Ventilation. Forced mechanical ventilation, which provides a minimum of one air

change every three minutes, shall be included in all enclosed storage and feed rooms. The exhaust

equipment shall be automatically activated by external switches, and leak detection equipments. The fan

shall be located at the top of the room and shall push air across the room and through an exhaust vent on

the bottom of the opposite side. The location of the exhaust vent shall not allow contamination of air inlets

into other buildings. Negative pressure ventilation may be used in lieu of the forced mechanical

ventilation, provided the facilities have gas containment and treatment as prescribed by the current

Uniform Fire Code (UFC). Vents from any appurtenances or components of the sulfur dioxide or

chlorine gas feed systems shall be piped to a point which is not frequented by personnel, which is not near

a fresh air intake, and clearly identified.


Texas Commission on Environmental Quality Page 372
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(4) Gas Detectors and Protection. Gas detectors and alarms shall be located in each

area containing chlorine or sulfur dioxide under pressure. Respiratory air-pac protection equipment, of the

pressure-demand type meeting the requirements of the National Institute for Occupational Safety and

Health (NIOSH), shall be available where pressurized gases are handled. Respiratory equipment shall be

stored in such a way that, upon discovery of a problem within the feed or storage room, the respirator

may be accessed in three minutes or less. The equipment shall not be located inside any rooms where

gases are stored or used under pressure. Instructions for using the equipment shall be kept with, or

posted next to, the equipment. The units shall use compressed air and shall have at least a 30-minute

capacity.

(f) Equipment and Materials. All equipment and materials used in the disinfection and

dechlorination systems shall be of the type that the manufacturer recommends for the pertinent chemical.

Some specific requirements for the equipment and materials are listed in paragraphs (1)-(6) if this

subsection.

(1) Storage Orientation. One ton cylinders shall be stored horizontally on trunnions, and

150 pound cylinders shall be stored vertically and be secured by a clamp or chain.

(2) Measurements. A scale for determining the amount of chemical used daily, as well

as the amount of chemical remaining in the container, shall be provided for all chlorine and sulfur dioxide

systems.
Texas Commission on Environmental Quality Page 373
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(3) Pressure Piping Systems- Gas Transport. Gas transport pressure piping shall be

constructed of schedule 80 black seamless steel pipe with 2,000 pound forged steel fittings. THE USE OF

PVC AT ANY POINT IN THESE SYSTEMS IS PROHIBITED. For one ton cylinder systems, gas

filters shall be used upstream of any pressure reducing valves. Pressure reducing valves shall be installed

in pressure piping in the following situations: systems with long lengths of supply piping; sulfur dioxide

systems which utilize heating blankets; and, in the pressure piping on the gas discharge side of

evaporators. Rupture disks and high pressure switches which warn of disk rupture shall be installed in

pressure piping at the gas discharge side of any evaporators. A heated leg drop sediment trap shall be

provided where the gas line enters a chlorinator or sulfonator. Sulfur dioxide systems shall have 316

stainless steel seat and stem in lieu of the monel seat and stem used in chlorine systems.

(4) Pressure Piping Systems - Liquid Transport. THE USE OF PVC AT ANY POINT

IN THESE SYSTEMS IS PROHIBITED. Manifolding ton containers for simultaneous liquid chemical

withdrawal is prohibited. Liquid piping systems shall include a rupture disk, a pressure switch to warn of

disk rupture and an expansion chamber.

(5) Vacuum piping. Vacuum piping and fittings may be PVC or 316 stainless steel

downstream of the vacuum regulator, using socket joints, not threaded.


Texas Commission on Environmental Quality Page 374
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(6) Diffusers. The engineer shall include calculations in the engineering report which

verify that a minimum velocity of 10 feet per second exists through any chlorine or sulfur dioxide system

diffusers or a mechanical mixer shall be provided.

§217.272. Design of Sodium Hypochlorite and Sodium Bisulfite Systems.

(a) Redundancy. All sodium hypochlorite and sodium bisulfite systems shall include a minimum

of two chemical solution pumps. Sufficient pumps shall be included in the design to ensure that the

capacity requirements of §217.271(b)(1) of this title (relating to ) may be met with the largest pump out

of service. The pumping system shall be set up in a manner which ensures that permit compliance is

maintained in the event of a pump failure.

(b) Capacity and Sizing. The gallons per hour, for which each chemical liquid solution pumping

and piping network needs to be sized, shall be determined as follows:

(1) Sodium Hypochlorite (NaOCl).

(A) Determine Pounds Per Day of Chlorine Required. Refer to table 1 and

equation 1 in §217.271(b)(1) of this title (relating to Chlorine and Sulfur Dioxide Disinfection and

Dechlorination Systems) to determine the pounds per day of chlorine required.


Texas Commission on Environmental Quality Page 375
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Cl2 Determination. Determine pounds of available Cl2 per gallon of NaOCl

solution using values supplied by chemical manufacturer and appropriate references.

(C) Gallons per Hour Determination. Calculate the Gallons per Hour for which

the chemical metering equipment shall be sized using the values found in §217.271(b)(1) of this title in

Equation 4.k. Figure 1: §217.272(b)(1)(C)

R=PPD/(24*C) Equation 4.k

R = minimum size of chemical metering equipment, (gal/hr)

PPD = pound per day of Cl2 which shall be delivered to the wastewater,

(ln/day)

C = Pounds of available Cl2 in one gallon of NaOCl, (lb Cl2 /gal)

(2) Sodium Bisulfite (NaHSO 3 ).

(A) Determine Assumed Pounds Per Day of Chlorine Residual Which Shall be

Dechlorinated. Use equation 1 in §217.271(b)(1) of this title (relating to Pounds Per Day Requirements)

to determine the pounds per day of chemical required.


Texas Commission on Environmental Quality Page 376
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Calculate Pounds of NaHSO 3 Needed. The minimum amount of NaHSO 3

needed to dechlorinate one pound of chlorine is 1.465 pounds. Multiply the pounds per day of chlorine

which shall be dechlorinated, as determined in subparagraph (A) of this paragraph, by 1.465 pounds of

NaHSO 3 per pound of Cl2 , to determine the pounds of NaHSO 3 needed.

(C) Calculate the Gallons per Hour (R) of NaHSO 3 solution which shall be

delivered by the chemical metering equipment with equation 5.k. Figure 1: §217.272(b)(2)(C)

R=(lbs NaHSO3 )/[(10.9 lbs NaHSO3 /gallon NaHSO3 )*(1/solution strength in percent)*24]

Equation 5.k

(c) Dosage Control. Automatic dosage control shall be provided for all upgrades to existing

sodium hypochlorite and sodium bisulfite systems, and for all new sodium hypochlorite and sodium bisulfite

systems. Dosage control systems shall be designed to automatically adjust sodium hypochlorite or sodium

bisulfite feed rate to correspond to at least the flow of the effluent stream.

(d) Handling of Chemicals.

(1) Storage Tank Sizing. For solution strengths greater than or equal to 10%, bulk

storage facilities shall not be sized to store more than a 15-day supply of sodium hypochlorite unless

automatic feed control is supplied by residual analyzer or oxidation-reduction potential (ORP) monitoring
Texas Commission on Environmental Quality Page 377
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

to compensate for solution degradation. In cases where sodium hypochlorite solution strengths are less

than 10%, and where residual analyzers or ORP instruments are provided for sodium hypochlorite

solutions, the facilities shall not be sized to store more than a 30-day supply of chemical. A minimum of

two tanks shall be provided for facilities with design flows above 1 mgd.

(2) Temperature considerations. If sodium hypochlorite tanks are not stored indoors, the

tanks shall be opaque, or otherwise block sunlight penetration. Sodium bisulfite storage and piping

facilities which are to be stored outdoors shall be insulated and heat traced in locations where the ambient

temperature, based on the lowest 7-day average of the average daily local temperatures over the last 10­

years as measured at the nearest National Oceanic and Atmospheric Administration’s (NOAA) National

Weather Service weather station, is below 40E F.

(e) Equipment and Materials. Materials used for storage, pumping, and transport of sodium

hypochlorite shall be per manufacturer’s recommendation and suitable for use with an extremely

corrosive strong oxidant chemical environment. Materials used for storage, pumping and transport of

sodium bisulfite shall be per manufacturer’s recommendations and suitable for use with an acidic, strong

reducing agent chemical environment.

(f) Safety.
Texas Commission on Environmental Quality Page 378
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(1) Ventilation. Chemical storage areas shall be ventilated sufficiently to prevent buildup

of fumes.

(2) Liquid-depth indicators. External-tank liquid-depth indicators shall be provided to

discourage routine opening of tank lids.

(3) Spill containment. Chemical storage areas shall be provided with secondary

containment equal to 125 percent of the volume of the full content of the largest storage tank. Manifolded

tanks shall be provided with secondary containment adequate to contain 125 percent of the cumulative

manifolded tank volume, unless the system piping design precludes a combined release. Tanks shall be

placed on equipment pads elevated above the secondary containment maximum liquid level, or provided

with positive drainage from below the tank. Containment for sodium hypochlorite shall be separate from

containment for sodium bisulfite.

(4) Emergency and Protective Equipment. Chemical storage areas shall be provided

with at least one emergency eye wash station and adequate personal protective equipment for all plant

personnel working in the area.

§217.273. Application of Disinfection and Dechlorination Chemicals.


Texas Commission on Environmental Quality Page 379
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(a) Mixing Requirements. New facilities shall be constructed so that the applied chlorine is

thoroughly mixed with the wastewater prior to entry into the chlorine contact chamber. Any mixing zones,

which exist within the chlorine contact basins of existing facilities, shall not be counted as part of the

volume needed for disinfection.

(1) Chlorine and Sodium Hypochlorite. Effective initial mixing may be provided by

applying the chlorine gas or solution in a highly turbulent flow regime created by in-line diffusers,

mechanical mixers, or jet mixers. The mean velocity gradient in the area of turbulent flow, (G value),

shall exceed 500/sec.

(2) Sulfur Dioxide and Sodium Bisulfite. The appropriate degree of mixing for sulfur

dioxide and sodium bisulfite systems shall be determined by the engineer, but shall be sufficient to comply

with all relevant discharge permit requirements. As deemed necessary by the engineer, a mean velocity

gradient, or G value, of 250/sec or greater shall be provided.

(b) Disinfection Contact Basins. Chlorine contact basin shall be designed to provide a minimum

hydraulic residence time at 2-hour peak flow of 20 minutes. Contact chambers shall be designed to

prevent short circuiting, and shall assure that at least 70 percent of the wastewater is retained in the basin

for 20 minutes. The final engineering design report shall include supporting data from contact basin

design models, performance data of similar designs, or field tracer studies.


Texas Commission on Environmental Quality Page 380
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(c) Dechlorination Contact Time. Sufficient mixing and contact time between the disinfected

wastewater and the dechlorinating agent shall be provided to ensure continuous compliance with the

permitted chlorine limits. A minimum contact time of 20 seconds shall be provided at peak flow.

§217.274. Other Chemical Disinfection and Dechlorination Systems.

All chemical disinfection or dechlorination systems which are not discussed in this subchapter,

such as chlorine dioxide, ozone, all tablet or powder disinfection and dechlorination systems, and liquid

solution disinfection and dechlorination systems other than sodium hypochlorite and sodium bisulfite, shall

be subject to the requirements of §217.10(2) of this title (relating to Types of Approvals).

§217.275. Ultraviolet Light Disinfection Systems.

Refer to §309.3 of this title (relating to Application of Effluent Sets) for details of the permit

requirements which exist when Ultraviolet (UV) light disinfection systems are used.

(1) Definition.

(A) Modules. A module is defined as a grouping of UV lamps, electrically and

physically connected together to form an independent subcomponent of a bank and is not capable of

treating the full chanel design width and depth.


Texas Commission on Environmental Quality Page 381
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(B) Banks. A bank is defined as a grouping of individual UV lamps or modules,

electrically connected together and physically connected together or physically adjacent to each other that

forms a complete unit capable of treating the full channel design width and depth. A bank may be

composed of several indiividual lamps or severl modules. A complete UV system may be composed of

multiple channels with several banks in each channel.

(2) Redundancy. Ultraviolet (UV) disinfection systems shall include a minimum of two banks of

UV bulbs. UV light disinfection systems shall be designed so that the dosage requirements determined

from paragraph (4) of this section may be met assuming the largest bank of UV bulbs in each channel out

of service at 2-hour peak flow as defined in §217.32(1) or §217.33(1) of this title (relating to Design of

New Systems - Organic Loadings and Flows and Design of Existing Systems - Organic Loadings and

Flows).

(3) Monitoring and Alarms. The following items shall be continuously monitored: flow

rate in the UV disinfection channel(s), UV transmittance, liquid level in the UV disinfection channels,

status of each UV bank (On/Off), status of each UV lamp (On/Off), UV intensity measured by the

greataer of one probe per bank or one probe per 40 lamps, and lamp age in hours of each UV lamp.

Flowrate alone shall not be relied upon as a means for automatic control (flow pacing). Any automatic

system must account for flowrate, intensity of the lamps, and the age of the lamps continually. Each bank

of UV lamps shall be capable of indicating elapsed operating time. An alarm system shall be incorporated

as part of the design for all UV systems. Plants which are unattended at any time shall include telemetry
Texas Commission on Environmental Quality Page 382
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

as part of their alarm system. The telemetry system shall notify an experienced operator in the event of a

major UV alarm. A UV control system shall include the following minimum alarm conditions:

(A) Minor alarms indicate the need for operator attention as soon as possible.

Minor alarms shall be included for low UV intensity (45% after 100 hours burn in), high temperature and

individual lamp failure.

(B) Major alarms indicate the need for immediate operator attention. Major

alarms shall be included for low UV intensity (25% after 100 hour burn in), adjacent lamp failure, multiple

lamp failures (more than 5% of lamps in one bank), communication failure and module failure.

(3) Hydraulics. Manufacturer’s of UV systems shall provide tracer studies for each

lamp/ballast configuration of their UV systems. These tracer studies shall determine a residence time

distribution (RTD) for each configuration of lamps/ballasts. These RTDs shall be used in conjunction with

a bioassay (as described in subsection (d) of this section) as the basis of design.

(4) Dosage and System Sizing. Low pressure systems may be sized based on the latest

version of the EPA’s UV disinfection model titled UVDIS. The executive director may require a bioassay

to be performed on low pressure systems sized using the UVDIS model. The sizing of all other UV

disinfection systems shall be based on the results of a bioassay which was performed on a system

developed by the same manufacturer as the manufacturer of the proposed system and on the same
Texas Commission on Environmental Quality Page 383
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

lamp/ballast configuration as the configuration for the proposed UV system. The results of the bioassay

shall be used to determine the minimum dose of the UV system and the minimum number of

lamps/ballasts per unit of flow rate. If the proposed design accommodates different lamp/ballast

configurations, comparable bioassays shall be provided. Bioassays will only be considered comparable if

each follows the same testing protocol under similar test conditions. The bioassay procedure shall

generally conform to the publication, USEPA (1986) “Design Manual: Municipal Wastewater

Disinfection,” EPA/625/1-86/021. The UV system shall be designed to deliver a minimum specified dose

based upon all of the following: UV lamp output at 65% of nominal, UV transmittance based on treatment

process, RTDs, and the results of a bioassay. In lieu of the bioassay, the UV system may also be sized

based on full scale pilot test data. The testing results and protocol shall be clearly detailed in the final

engineering design report. Systems sized on full scale pilot test data will be considered nonconforming

technology for the purposes of this rule and shall be subject to the requirements of §217.10(2) of this title

(relating to Types of Approvals).

(5) Reactor Design. The unobstructed approach channel shall have a minimum length

before the first UV bank of 4 feet, or 2 times the channel water depth, whichever is larger. The

unobstructed downstream channel length following the last bank of UV lamps, before the fluid level

control device, shall have a minimum length of 4 feet, or 2 times the channel water depth, whichever is

larger. All inlets to UV reactors shall be designed to hydraulically distribute the reactor influent in plug

flow with radial dispersion. Inlet channels shall provide equal flow distribution across all UV channels.

The downstream discharge point of the reactor shall include level controls which ensure that the UV bulbs
Texas Commission on Environmental Quality Page 384
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

remain submerged at a near constant depth regardless of flow. The maximum water surface elevation

variation in each UV channel is 3 inches between periods of no flow (zero flow) and the maximum design

peak flow. The upstream and downstream portions of the UV reactor channel between UV banks shall

be covered sufficiently to shut out all natural light (light tight).

(6) Cleaning and Maintenance. Provisions for routine cleaning of the UV bulbs and

modules shall be incorporated into the design. Also, the design shall include provisions for draining each

UV disinfection channel. Spare parts shall be provided for all UV systems. At a minimum, spare parts

provided shall meet the greater of one complete uninstalled module, or, as a percentage of the total

system, 5% lamps, 2% ballasts, 5% enclosure tubes, and 2% modules (minimum of one unit).

(7) Safety. Appropriate clothing, UV rated face shields, and safety glasses or goggles

shall be worn in the reactor area.

§217.276. Power Reliability.

All disinfection systems shall include backup power provisions which are capable of providing

sufficient power to operate all power dependant components of the disinfection system during any power

outage. The backup power shall automatically restart the disinfection system during a power outage.

Details describing backup power requirements for various wastewater treatment components are found in

§217.35 of this title (relating to Backup Power Requirements).


Texas Commission on Environmental Quality Page 385
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.277. Post Aeration.

Post aeration shall be provided as needed to ensure permit complied with dissolved oxygen (DO)

requirements. If the permit requires a minimum DO of 5 mg/l or greater, the engineer shall include details

in the final engineering design report which explain how the minimum DO level will be maintained.

§217.278. Sampling Points.

Sampling points which may be safely accessed by the wastewater treatment system operators

shall be provided at all wastewater treatment systems. Sufficient sampling points shall be provided to

allow all permit requirements to be monitored safely on a routine basis. Any units which are downstream

of the final monitoring location shall not be considered part of the treatment train for purposes of

determining whether or not the wastewater treatment system will treat wastewater sufficiently to ensure

continuous permit compliance.


Texas Commission on Environmental Quality Page 386
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

SUBCHAPTER L : SAFETY

§§217.290-217.307

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. These rules are also proposed under the Texas Water Quality

Control Act, which gives the commission the authority to adopt rules for the approval of disposal system

plans under §26.034 of the Texas Water Code. These rules are also proposed under §26.041 of the

Texas Water Code, which gives the commission the authority to use any means to prevent a discharge of

waste that is injurious to public health.

There are no other rules, codes, or statutes that will be affected by this proposal.

§217.290. Applicability.

This subchapter details the general safety requirements which shall be followed in the design,

construction, and installation of wastewater treatment facilities.


Texas Commission on Environmental Quality Page 387
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.291. General Policy.

The engineer shall consider occupational safety, health hazards and risks to the workers, other

persons, and the public as part of treatment process, disinfection, and chemical selection in preliminary

and final designs. The engineer shall consider selecting and specifying processes that require or use non­

hazardous, non-toxic, less hazardous or less toxic chemicals, diluted forms of chemicals, and a minimum

inventory of chemicals. In addition to requirements set forth in this subchapter, the engineer shall

consider guidelines established under 29 CFR Parts 1901.1 (OSHA) and other regulatory authorities.

Specific attention shall be paid to the following topics: walking and working surfaces; means of access

and egress; occupational health and environmental controls; hazardous materials and toxic and hazardous

substances; general environmental control; fire and explosion hazard protection; compressed gas and

equipment; material handling and storage; machinery and machine guarding; hand and power tools and

other hand held equipment; electrical systems; confined space entry; lockout/tagged of energy sources;

site fence and other fencing; portable equipment such as lighting, blowers, and ventilators; warning signs

for slippery areas; non-potable water; low head clearance; open service manholes, vaults, and tanks;

railways and walkways; hazardous/toxic chemical storage areas; ventilation; and eyewash fountains and

safety showers. For the purposes of this rule, compliance with these requirements shall be shown by

implementation of §§217.292 and 217.293 of this title (relating to Safety Audit and Job Hazard Analysis

and Protective Equipment Lists).


Texas Commission on Environmental Quality Page 388
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.292. Safety Audit.

For existing facilities being modified or expanded, the owner or designated representative and to

the extent that documentation is available, shall conduct a safety audit of the facility for the prior three-

year period in order to determine the locations, causes, types of injuries, and jobs being performed when

the injuries occurred. Locations and jobs associated with high injury or incident rates shall be evaluated,

corrective action identified, and corrective measures implemented that will eliminate the cause or reduce

the frequency, magnitude, and duration of exposure to the cause of the injury. Corrective actions

identified, that may be eliminated or minimized as part of the modification or expansion project, shall be

addressed in the design of the facilities.

§217.293. Job Hazard Analysis and Protective Equipment Lists.

For new, expanded, or modified facilities, an analysis of hazardous operation and maintenance

tasks shall be performed by the owner or designated representative. The intent is to develop layouts that

will result in the easiest, safest, and cost-effective way to accomplish potentially hazardous tasks. Based

on the hazardous jobs workers shall perform, and in conjunction with the owner or designated

representative, the engineer shall develop a list of the following: tools, equipment, and supplies; fixed and

portable lifting equipment; fixed and portable monitoring equipment; personal protective equipment and

clothes; warning signs and guards; and first-aid supplies. The tools shall be sufficient to allow workers to

safely and properly operate equipment; perform required preventive maintenance, as per manufacturers'
Texas Commission on Environmental Quality Page 389
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

minimum requirements; make repairs; and otherwise maintain processes, pumps, motors, blowers,

compressors, laboratory, instrumentation, and other equipment.

§217.294. Railings, Ladders, Walkways, and Stairways.

Openings in railings shall have removable chains. Open valve boxes, pits, tanks, and basins

extending less than four feet above ground shall be guarded by railings. Steep and vertical ladders are

acceptable for infrequent access to equipment. Walkways, steps, landings, and ladder rungs shall have a

non-slip finish. Walkways above open tanks shall have kick plates. Ladders shall have flat safety tread

rungs and extensions at least one (1) foot out of a vault. Seven feet of clearance shall be provided for

overhead piping unless piping is padded to prevent head injury and warning signs are provided.

§217.295. Electrical Code.

Electrical design shall conform to local electrical codes. Where there are no local electrical

codes, the design shall conform to the National Electrical Code. Adequate lighting shall be provided,

especially in areas to be serviced by personnel on duty during hours of darkness.


Texas Commission on Environmental Quality Page 390
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.296. Unsafe Water.

When non-potable water is made available to any part of the plant, all yard hydrants and outlets

shall be properly marked "Unsafe Water," and all underground and exposed piping shall be identified as

specified in §217.298 of this title (relating to Color Coding of Piping).

§217.297. Plant Protection.

The plant area shall be completely fenced and have lockable gates at all access points. Plants

containing open clarifiers, aeration basins, and other open tanks shall be surrounded by an eight-foot fence

with a minimum single apron barbed wire outrigger, or a six-foot high fence with three strands of barbed

wire to a height of 78 inches. A five strand barbed wire fence may be used in lieu of these chain link or

board fences in rural areas for stabilization ponds, lagoons and overland flow plots. Hazard signs stating

"Danger - Open Tanks - No Trespassing" shall be secured to all wastewater treatment system fences,

within visible sighting of each other, as well as on all gates and levees. Plants shall have at least one all-

weather access road with the driving surface situated above the 100-yr. flood plain or shall detail an

alternate means of access during 100-year flood conditions in the final engineering design report.

§217.298. Color Coding of Piping.


Texas Commission on Environmental Quality Page 391
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

All piping for new facilities shall be color coded. All non-metallic underground plant piping for

new facilities shall be installed with tracer tape. All piping, for upgrades or modifications to facilities, both

exposed and to be buried or located out of view, which will contain gas, chlorine, or other hazardous

materials, shall be color coded and installed with tracer tape. Non-potable waterlines shall also be iden­

tified with a proper color coding. These lines shall be painted white and be stenciled "NON-POTABLE

WATER" or "UNSAFE WATER," or, if the lines are to be used as part of a reclaimed water system in

accordance with Chapter 210 of this title (relating to the Use of Reclaimed Water), these reclaimed water

lines shall be marked and installed in accordance with the requirements of Chapter 210 of this title. The

following coding is required:

(1) Sludge Line - Brown;

(2) Gas Line - Red;

(3) Potable Water Line - Blue;

(4) Chlorine Line - Yellow;

(5) Sulfur Dioxide - Lime Green with Yellow Bands;

(6) Sewage Line - Grey;


Texas Commission on Environmental Quality Page 392
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

(7) Compressed Air Line - Green;

(8) Heating Water Line - Blue with 6" red bands spaced 30" apart;

(9) Power Conduit - Orange; and

(10) Reclaimed Water Lines - Purple.

§217.299. Portable Ventilators and Gas Detection Equipment.

Portable, gasoline-operated ventilators shall be provided for ventilating manholes. Personal gas

detectors are required for wear by all personnel whose jobs require entering enclosed spaces capable of

having accumulations of hydrogen sulfide or other harmful gases. An approved, personnel-retrieval

system shall be provided for confined space entry.

§217.300. Potable Water.

Ppotable water should be provided to the plant site. If potable water is provided, double check

backflow preventers shall be provided at the main plant service. Atmospheric vacuum breakers are re­

quired at all potable water wash down hoses.


Texas Commission on Environmental Quality Page 393
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§217.301. Freeze Protection.

All surfaces subject to freezing shall be adequately sloped to prevent standing water.

§217.302. Noise Levels.

Noise levels in all working areas shall be kept below standards established by the Occupational

Safety and Health Act. REMOVABLE NOISE ATTENUATORS should not be utilzed.

§217.303. Safety Training.

Safety training shall be provided annually to all employees.

§217.304. Confined Space.

The engineer should avoid designing or otherwise providing areas that may be considered

confined spaces as described in 29 CFR 1910.146.

§217.305. Plans and Specification Safety Review.


Texas Commission on Environmental Quality Page 394
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

The design plans and specifications should include reasonable and adequate safeguards to

minimize worker exposure to workplace hazards. To the extent reasonably and economically possible,

environmental conditions that increase the probability of worker accidents during normal operations and

emergency situations shall be minimized. Hazards to be considered include abnormal atmospheres;

airborne hazards; burns; harmful chemicals; confined spaces; drowning; earthquakes; electrical shock;

elevated areas; explosive gases, liquids, and dusts; falls; fires; flooding; food contamination; housekeeping;

impact; infections and diseases; ingress and egress; laboratory; ladders, stairs, and ramps; lifting; materials

handling; moving machinery; natural hazards; night operations and maintenance; noise; noxious gases and

vapors; openings; open tanks; overhead fixtures, pipes, and conduits; pinning and crushing; radioactive

material; slips and falls; spillage and sprays; storms; vapors and dust; vehicles; ventilation; vibration;

walkways; weather, and yard work. Environmental conditions that shall be considered include noise,

humidity, odor, temperature, illumination, vibration, and chemical exposure.

§217.307. Other Safety Design Guidelines.

For additional safety design guidelines, the engineer shall refer to latest edition of Design of

Municipal Treatment Plants, WEF Manual of Practice No.8, published by the Water Environment

Federation, 601 Wythe Street, Alexandria, Virginia 22314-1994, or other publications or authoritative

documents.
Texas Commission on Environmental Quality Page 395
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

The Texas Natural Resource Conservation Commission (commission) proposes the repeal of

§§317.1-317.15, concerning the design criteria for sewerage systems.

EXPLANATION OF PROPOSED RULE

Chapter 317 is being substantially revised to bring the standards and requirement of design criteria for

wastewater treatment facilities up to date with current engineering practices and technology. The

revision also provides opportunities for variances for innovative technology and non-conforming

technology that may be rare today, but commonplace in the next few years.

The extensive rewrite of the chapter, plus the commission’s goal of having all of the water-related rules

and regulations contained in the 200 series, make it reasonable to repeal Chapter 317 and propose,

through another action, a new Chapter 217 concerning the design criteria for sewerage systems.

An industry workgroup made up consulting engineers, wastewater treatment system operators, equipment

manufacturers and suppliers, and affected municipalities’ representatives has assisted commission staff in

recommending the repeal of this chapter and has assisted staff in developing the new proposed

requirements found in proposed Chapter 217.

FISCAL NOTE

Stephen Minick, Strategic Planning and Appropriations Division, has determined that for the first five-year

period the proposed repeal is in effect, there will be no significant fiscal implications for the state or local
Texas Commission on Environmental Quality Page 396
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

governments. The repeal of this chapter and the proposed new chapter may provide a cost savings for

local governments from better guidance on acceptable sewage system designs and clearer flexibility for

innovative technology.

PUBLIC BENEFIT

Mr. Minick has also determined that for the first five years that the proposed repeal is in effect, and the

proposed new chapter is in effect, the public benefit anticipated will be wastewater design criteria that is

clearer and more consistent with current engineering practices and that should lead to better designed and

more efficiently functioning wastewater treatment facilities. There are no significant fiscal implications

anticipated for small businesses. There are no economic costs anticipated for any person subject to the

repeal as proposed.

DRAFT REGULATORY IMPACT ANALYSIS

The commission has reviewed the proposed rulemaking in light of the regulatory analysis requirement of

Texas Government Code, §2001.0225, and has determined that the rulemaking is not subject to

§2001.0225 because it does not meet the definition of a major environmental rule as defined in the act,

and it does not meet any of the four applicability requirements listed in §2001.0225(a).

TAKINGS IMPACT ASSESSMENT

The commission has prepared a Takings Impact Assessment for these rules pursuant to Texas

Government Code Annotated, §2007.043. The following is a summary of that assessment. The specific
Texas Commission on Environmental Quality Page 397
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

purpose of the proposed repeal is to remove the current and outdated Chapter 317 rules and to propose

new and updated criteria under a new Chapter 217. The proposed repeal of these rules will not affect

private real property which is the subject of the rules.

PUBLIC HEARING

A public hearing on the proposal will be held ________________at ___________ a.m. in Room _____

of the commission Building __, located at 12100 Park 35 Circle, Austin. The hearing is structured to

receive oral or written comments by interested persons. Individuals may present oral statements, when

called upon, in the order of registration. Open discussion will not occur during the hearing; however, a

commission staff member will be available to discuss the proposal 30 minutes prior to the hearing and will

answer questions before and after the hearing.

SUBMITTAL OF COMMENTS

Written comments on the proposal should refer to Rule Log No. 95100-317-WT and may be submitted to

Betty Bell, Texas Natural Resource Conservation Commission, Office of Environment Policy, Analysis

and Assessment, MC 205, P.O. Box 13087, Austin, Texas 78711-3087, (512) 239-6087. Comments may

be faxed to (512) 239-5687, but must be followed up with the submission and receipt of the written

comments within three working days of when they were faxed. Written comments must be received by

5:00 p.m., ______________. For further information concerning this proposal, please contact Louis C.

Herrin, III, P.E., Texas Natural Resource Conservation Commission, Water Permits and Resource

Management Division, (512) 239-4552.


Texas Commission on Environmental Quality Page 398
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

COASTAL MANAGEMENT PLAN

The executive director has reviewed the proposed repeal and found that the rule is neither identified in

Coastal Coordination Act Implementation Rules, 31 TAC §505.11, relating to Actions and Rules Subject

to the Coastal Management Program, nor will the proposed repeal affect any actions/authorization

identified in Coastal Coordination Act Implementation Rules, 31 TAC §505.11. Therefore, the proposed

rule is not subject to the CMP.

STATUTORY AUTHORITY

These rules are proposed under the Texas Water Code, §5.102, which provides the commission with the

authority to carry out duties and general powers of the commission under its jurisdictional authority as

provided by Texas Water Code, §5.103. The proposed repeal and proposal of new rules are also

proposed under the Texas Water Quality Control Act, which gives the commission the authority to adopt

rules for the approval of disposal system plans under §26.034 of the Texas Water Code.
Texas Commission on Environmental Quality Page 399
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

CHAPTER 317

DESIGN CRITERIA FOR SEWERAGE SYSTEMS

§317.1. General Provisions.

§317.2. Sewage Collection System.

§317.3. Lift Stations.

§317.4. Wastewater Treatment Facilities.

§317.5. Sludge Processing.

§317.6. Disinfection.

§317.7. Safety.

§317.8. Design and Operation Features.

§317.9. Appendix A.
Texas Commission on Environmental Quality Page 400
Chapter 217/317 - Design Criteria For Sewerage System
Rule Log No. 95100-317-WT

§317.10. Appendix B - Overland flow process.

§317.11. Appendix C - Hyacinth Basins.

§317.12. Appendix D.

§317.13. Appendix E - Separation Distances.

§317.15. Appendix G - General Guidelines for the Design of Constructed Wetlands Units for

use in Municipal Wastewater Treatment