Professional Documents
Culture Documents
MADHYAMIK
W.B.B.S.E. GENERAL 1982 78.56 I
PARIKSHA
HIGHER
W.B.C.H.S.E. SCIENCE 1984 80.10 I
SECONDARY
BACHELOR BENGAL
MECHANICAL
OF ENGINEERING 1988 75.04 I
ENGG.
ENGINEERING COLLEGE[C.U ]
OPERATION
RESEARCH IN
MASTER
BURDWAN INDUSTRY 2001 69.40 I
OF
UNIVERSITY AND
TECHNOLOGY
BUSINESS
MANAGEMENT
1
Post Qualification Experience :
COMPUTER LITERACY
PROFESSIONAL EXPOSURE
1st Organisation: ABB ABL LTD (Formerly named as ACC BABCOCK LTD.)
Period: From 16th September, 1988 to 17th June, 2000
General profile of ABB ABL LTD (a Multinational Organisation) is famous in Design, Manufacture,
the Company: Erection & commissioning of Utility & Industrial Boilers of various types and also
expert in Renovation & Modernisation of different types of Boilers of different
Technology.
System and Thermal Design of various types of Boilers such as Pulverised Fuel Fired
Boiler (Front, opposed and downshot fired Boiler as per BABCOCK, UK Technology
(up to 250 MW) and Tilting Tangential fired Boiler as per COMBUSTION
ENGINEERING Technology) (up to 500 MW Boiler), Heat Recovery Steam
Generator, Oil & Gas Fired, Bagasse Fired, Fluidised Bed (both AFBC & CFBC),
Chemical Recovery Boiler etc, HRSG, Renovation & Modernisation of different types
of Boiler.
General Arrangement Drawing, Layout and Setting of Boiler Plant and also pressure
parts GA drawing for IBR approval.
Doing Proposal Engineering and making total Bid Proposal of Boilers during tendering
stage and doing Final Contract Engineering, System and Thermal Design after award
of contracts.
Performance Design of Boiler and its Components such as Furnace sizing, Burner
arrangement, Superheater, Reheater, Economiser and Airpreheater sizing etc.
Normal Performance runs, Performance upset runs, Metal Temperature calculation
and Computer runs, Circulation Balance Check , Scantlings of Tubes, Headers and
Piping , Header Unbalance calculation, Cage stability check etc.
Drum sizing, FD, ID and PA fan duties, ESP, Bag Filter duties and Milling Plant
design including pf flow balancing.
2
Preparing Boiler Plant layout Drawing.
Writing Operation and Maintenance Manual in details describing Basic operation and
control philosophy, maintenance procedure, each equipment detailed description and
its function, safety interlock philosophy etc.
Preparing Technical Specification for Boiler Components and its Auxiliaries such as
Burner, Boiler Feed Pumps, Fans, Dampers , Expansion joints, , Tubes, Pipes ,
Plates ,Feed and Spray control Valves , safety valves, Silencers , “SCAPH” , Oil
pumps & Heaters, ESP , Fuel Oil Pumps, Deaerator, Rotary Airpreheater etc.
Experience in working as an EPC team member for a few 250 MW coal based Power
Plants.
Assisting Sales and Marketing Group in Technical matters as and when required by
them.
• 210 MW PF fired Boiler (Opposed fired) for Bakreswar Thermal Power Station.
• Involved in 250 MW Downshot fired Boiler for Budge Budge Plant
• 67 MW PF fired Boiler (Opposed fired) for Ahmedabad Electricily Board.
• 30 MW PF fired Boiler (Bi-Drum) for Tisco.
• 143 TPH oil fired Boiler for MRL.
• 130 TPH oil fired Boiler for MRPL.
• 50 TPH oil fired Boiler for Alkhaleej Sugar, Dubai.
• 90 TPH AFBC Boiler for ACC Jamul & Kymore.
• Renovation and modernisation of a few Nos. PF fired Boiler in the range of 60
MW.
3
Technical Proposal done by me using BABCOCK, UK TECHNOLOGY:
• 5 to 6 Nos. PF fired Boiler (Front and Opposed) in the range of 210 – 250 MW.
• Quite a few Nos. PF fired Boiler in the range of 60 – 80 MW.
• Quite a few Nos. oil and gas fired Boilers.
• Quite a few nos. Renovation and Modernisation job.
Prepared Operation and Maintenance Manual for all the above mentioned contract as
a part of contract check calculation.
Experience / Job System and Thermal Design of various types of boilers such as Pulverised Fuel
Nature: Fired, Heat Recovery Steam Generator, Oil & Gas Fired, Bagasse Fired, Fluidised
Bed Boiler etc, Renovation & Modernisation of different types of Boiler of different
Technology.
General Arrangement Drawing , Layout and Setting of Boiler Plant.
Performance Design of Boiler and its Components such as Furnace sizing, Burner
arrangement, Superheater, Reheater, Economiser and Airpreheater sizing etc.
Normal Performance runs, Performance upset runs, Metal Temperature calculation
and Computer runs, Circulation Balance Check , Scantlings of Tubes, Headers and
Piping , Header Unbalance calculation, Cage stability check etc.
Drum sizing, FD, ID and PA fan duties, ESP, Bag Filter duties and Milling Plant
design.
Preparing Technical Specification for Boiler Components and its Auxiliaries such as
Burner, Boiler Feed Pumps, Fans, Dampers , Instruments, Tubes, Pipes , Plates
,Valves , Silencers , “SCAPH” , Oil Heater, ESP , Fuel Oil Pumps, Deaerator, Rotary
4
Airpreheater etc.
Got appreciation letter from Mr. P. S. Menon of Mitsuibabcock, UK for doing a good
job in Talcher.
Nominated for going to MITSUI BABCOCK, Crawley for 6 months for assisting in
writing TM01 Manual
Experience in designing Rice Husk fired Boiler with the help of BABCOCK
Technology and Agrilectric Company, USA.
Proposal done for quite a few nos. oil and gas fired Boilers.
General Profile Of ALSTOM PROJECTS INDIA LTD (a Multinational Organisation) is famous in Design,
The Company: Manufacture, Erection & commissioning of Utility & Industrial Boilers of various types
and also expert in Renovation & Modernisation of different types of Boilers.
Experience / Job • Responsible for complete Technical proposal alongwith all BOQs and
Nature: Technical specification of Boilers during Tendering stage.
• Responsible for all the Technical guarantees of Boiler.
• Responsible for conceptual and basic Engineering upto GA drawing in case
of a Contract.
• Responsible for Field Engineering including commissioning support.
• Presently looking after detailed Engineering too in absence of Head of detail
Engineering.
5
Publication • Published a technical paper on “ NOx and its effect on Environment ” in All
India Seminar on Boiler Management , Design, Manufacturing , Operation and
Maintenance ( 19 Th & 20 th September 1997 ) organised by “The Institution
of Engineers ( India )” , West Bengal State Centre
In-House Training • Six months Training in various departments such as Project Management,
in ABB ABL LTD Sales & Marketing, Procurement, Manufacturing, Operation etc.
Training in • Went to Stuttgart, Germany for the proposal work of 2 x 270 MW Boilers.
Germany
• Went to Stuttgart, Germany for training in 300 MW Tower type Boiler