You are on page 1of 6

RESUME

Name : Munshi Naimul Islam


Father’s Name : Late Munshi Nurul Islam
Date of Birth : 12/01/1966
Permanent Address/ Address for : FLAT NO. : B-501, DESIGNER’S PARK
Communication SECTOR - 62
NOIDA
UTTAP PRADESH
PH. NO. – (91) 9810654498
E-mail – mnislam1966@yahoo.co.in

Marital Status : Married


Passport No : E-4900890
Nationality : Indian
Academic Qualification : Graduate in Mechanical Engineering,
M.Tech in Operation Research in
Industry and Business Management.

EXAMINATION BOARD / STREAM/ YEAR OF % MARKS CLASS /


PASSED UNIVERSITY SUBJECT PASSING OBTAINED DIVISION

MADHYAMIK
W.B.B.S.E. GENERAL 1982 78.56 I
PARIKSHA

HIGHER
W.B.C.H.S.E. SCIENCE 1984 80.10 I
SECONDARY

BACHELOR BENGAL
MECHANICAL
OF ENGINEERING 1988 75.04 I
ENGG.
ENGINEERING COLLEGE[C.U ]

OPERATION
RESEARCH IN
MASTER
BURDWAN INDUSTRY 2001 69.40 I
OF
UNIVERSITY AND
TECHNOLOGY
BUSINESS
MANAGEMENT

1
Post Qualification Experience :
COMPUTER LITERACY

Operating • DOS, WINDOWS Environment. Exposure to UNIX


System
/Environment
Database • Exposure to MS ACCESS,MS WORD and MS EXCEL

• One Year Computer Training from DATAPRO in C++,UNIX, PASCAL

Drawing/Drafting • Drafting Experience with AUTO CAD

PROFESSIONAL EXPOSURE

1st Organisation: ABB ABL LTD (Formerly named as ACC BABCOCK LTD.)
Period: From 16th September, 1988 to 17th June, 2000

General profile of ABB ABL LTD (a Multinational Organisation) is famous in Design, Manufacture,
the Company: Erection & commissioning of Utility & Industrial Boilers of various types and also
expert in Renovation & Modernisation of different types of Boilers of different
Technology.

Position held: Manager, Engineering (Proposal & Performance)

Reported to: Deputy General Manager, Engineering (Proposal & Performance)

Experience / Job Used BABCOCK, UK Technology from 1988 to 1995.


Nature: Used COMBUSTION ENGINEERING Technology from 1995 to 2000.

System and Thermal Design of various types of Boilers such as Pulverised Fuel Fired
Boiler (Front, opposed and downshot fired Boiler as per BABCOCK, UK Technology
(up to 250 MW) and Tilting Tangential fired Boiler as per COMBUSTION
ENGINEERING Technology) (up to 500 MW Boiler), Heat Recovery Steam
Generator, Oil & Gas Fired, Bagasse Fired, Fluidised Bed (both AFBC & CFBC),
Chemical Recovery Boiler etc, HRSG, Renovation & Modernisation of different types
of Boiler.

General Arrangement Drawing, Layout and Setting of Boiler Plant and also pressure
parts GA drawing for IBR approval.

Doing Proposal Engineering and making total Bid Proposal of Boilers during tendering
stage and doing Final Contract Engineering, System and Thermal Design after award
of contracts.

Performance Design of Boiler and its Components such as Furnace sizing, Burner
arrangement, Superheater, Reheater, Economiser and Airpreheater sizing etc.
Normal Performance runs, Performance upset runs, Metal Temperature calculation
and Computer runs, Circulation Balance Check , Scantlings of Tubes, Headers and
Piping , Header Unbalance calculation, Cage stability check etc.
Drum sizing, FD, ID and PA fan duties, ESP, Bag Filter duties and Milling Plant
design including pf flow balancing.

2
Preparing Boiler Plant layout Drawing.

Preparation of Piping and Instrumentation Diagrams ,Valve, Damper and Instruments


Schedule, Preparation of basic Control Philosophy and Boiler Safety Interlocks write
up.

Preparation of Contract Data Sheet

Preparing Final Guarantee Document for Thermal Efficiency, Auxiliary Power


Consumption, Performance Guarantee test procedure, generate necessary data for
Plant Heat Rate guarantee for EPC job.

Technical Supports to Field Operation group

Writing Operation and Maintenance Manual in details describing Basic operation and
control philosophy, maintenance procedure, each equipment detailed description and
its function, safety interlock philosophy etc.

Interacting with Customer / Consultant and attending technical discussion with


Customer / Consultant during Proposal and Contract Engineering stage.

Preparing Technical Specification for Boiler Components and its Auxiliaries such as
Burner, Boiler Feed Pumps, Fans, Dampers , Expansion joints, , Tubes, Pipes ,
Plates ,Feed and Spray control Valves , safety valves, Silencers , “SCAPH” , Oil
pumps & Heaters, ESP , Fuel Oil Pumps, Deaerator, Rotary Airpreheater etc.

Preparing Boiler Pressure Parts ordering Information.

Experience in working as an EPC team member for a few 250 MW coal based Power
Plants.

Communication with Procurement Group for necessary procurement of above


mentioned items.

Assisting Sales and Marketing Group in Technical matters as and when required by
them.

Attending Technical Seminars and presenting Papers.

Active involvement during Boiler commissioning and Performance Test period.

Contract check done by me using BABCOCK, UK TECHNOLOGY:

• 210 MW PF fired Boiler (Opposed fired) for Bakreswar Thermal Power Station.
• Involved in 250 MW Downshot fired Boiler for Budge Budge Plant
• 67 MW PF fired Boiler (Opposed fired) for Ahmedabad Electricily Board.
• 30 MW PF fired Boiler (Bi-Drum) for Tisco.
• 143 TPH oil fired Boiler for MRL.
• 130 TPH oil fired Boiler for MRPL.
• 50 TPH oil fired Boiler for Alkhaleej Sugar, Dubai.
• 90 TPH AFBC Boiler for ACC Jamul & Kymore.
• Renovation and modernisation of a few Nos. PF fired Boiler in the range of 60
MW.

3
Technical Proposal done by me using BABCOCK, UK TECHNOLOGY:

• 5 to 6 Nos. PF fired Boiler (Front and Opposed) in the range of 210 – 250 MW.
• Quite a few Nos. PF fired Boiler in the range of 60 – 80 MW.
• Quite a few Nos. oil and gas fired Boilers.
• Quite a few nos. Renovation and Modernisation job.

Contract check done by me using COMBUSTION ENGINEERING TECHNOLOGY:

• 165 TPH oil fired Boiler for IOCL, Haldia.


• Renovation and Modernisation of a few nos. PF fired Boiler of different
Technology.

Technical Proposal done by me using COMBUSTION ENGINEERING


TECHNOLOGY:

• 7 to 8 nos. PF fired Boiler in the range of 250 – 280 MW.


• Assisted CE in doing proposal of a few 500 MW PF fired Boiler.
• Quite a few Nos. oil and gas fired Boilers.

Prepared Operation and Maintenance Manual for all the above mentioned contract as
a part of contract check calculation.

2nd Organisation: Mitsui Babcock Energy (India) Limited


Period: From 21st June,2000 to 23rd June,2001

General Profile Of Mitsui Babcock (a Multinational Organisation) is famous in Design, Manufacture,


The Company: Erection & commissioning of Utility & Industrial Boilers of various types and also
expert in Renovation & Modernisation of different types of Boilers of different
Technology.

Position held: Manager, Engineering.

Reported to: General Manager, Engineering.

Experience / Job System and Thermal Design of various types of boilers such as Pulverised Fuel
Nature: Fired, Heat Recovery Steam Generator, Oil & Gas Fired, Bagasse Fired, Fluidised
Bed Boiler etc, Renovation & Modernisation of different types of Boiler of different
Technology.
General Arrangement Drawing , Layout and Setting of Boiler Plant.

Performance Design of Boiler and its Components such as Furnace sizing, Burner
arrangement, Superheater, Reheater, Economiser and Airpreheater sizing etc.
Normal Performance runs, Performance upset runs, Metal Temperature calculation
and Computer runs, Circulation Balance Check , Scantlings of Tubes, Headers and
Piping , Header Unbalance calculation, Cage stability check etc.
Drum sizing, FD, ID and PA fan duties, ESP, Bag Filter duties and Milling Plant
design.

Preparation of Piping and Instrumentation Diagrams ,Valve, Damper and Instruments


Schedule.

Preparing Technical Specification for Boiler Components and its Auxiliaries such as
Burner, Boiler Feed Pumps, Fans, Dampers , Instruments, Tubes, Pipes , Plates
,Valves , Silencers , “SCAPH” , Oil Heater, ESP , Fuel Oil Pumps, Deaerator, Rotary
4
Airpreheater etc.

Went to MITSUI BABCOCK, Crawley regarding Design vetting of 60 MW PF fired


Renovation and Modernisation job of NTPC Talcher.

Got appreciation letter from Mr. P. S. Menon of Mitsuibabcock, UK for doing a good
job in Talcher.

Nominated for going to MITSUI BABCOCK, Crawley for 6 months for assisting in
writing TM01 Manual

Experience in designing Rice Husk fired Boiler with the help of BABCOCK
Technology and Agrilectric Company, USA.

Proposal done for quite a few nos. oil and gas fired Boilers.

3rd Organisation: ALSTOM PROJECTS INDIA LTD


Period: From 1st July,2001 to till date

General Profile Of ALSTOM PROJECTS INDIA LTD (a Multinational Organisation) is famous in Design,
The Company: Manufacture, Erection & commissioning of Utility & Industrial Boilers of various types
and also expert in Renovation & Modernisation of different types of Boilers.

Position held: Head of Proposal and Performance Engineering

Reporting to: Head of Engineering

Experience / Job • Responsible for complete Technical proposal alongwith all BOQs and
Nature: Technical specification of Boilers during Tendering stage.
• Responsible for all the Technical guarantees of Boiler.
• Responsible for conceptual and basic Engineering upto GA drawing in case
of a Contract.
• Responsible for Field Engineering including commissioning support.
• Presently looking after detailed Engineering too in absence of Head of detail
Engineering.

5
Publication • Published a technical paper on “ NOx and its effect on Environment ” in All
India Seminar on Boiler Management , Design, Manufacturing , Operation and
Maintenance ( 19 Th & 20 th September 1997 ) organised by “The Institution
of Engineers ( India )” , West Bengal State Centre

In-House Training • Six months Training in various departments such as Project Management,
in ABB ABL LTD Sales & Marketing, Procurement, Manufacturing, Operation etc.

• One year on job training experience of Commissioning of 210 MW Utility


Boiler.

Training in USA • Went to Combustion Engineering USA as an expert to check Boiler


Pressure Parts as Per IBR for an Indian HRSG Project.

• Went to Combustion Engineering, USA to set Training program for ABB


ABL Limited.

• Went to Combustion Engineering, USA for 6 months training in Utility and


Industrial Boilers.

• One Months on job training in Combustion Engineering , U.S.A on “ 150


TPH Oil and Gas Fired Boiler ”

Training in UK • Went to Mitsui Babcock, UK regarding Design review of a 60 MW coal fired


Renovation job of NTPC, India.

Training in • Went to Stuttgart, Germany for the proposal work of 2 x 270 MW Boilers.
Germany
• Went to Stuttgart, Germany for training in 300 MW Tower type Boiler

• Went to Stuttgart, Germany for training in 125 MW CFBC Boiler

Reference in Mitsui 1. Mr. S. S. Rao (Mitsui Babcock, India)


Babcock 2. Mr. Padmanabhan (Mitsui Babcock, India)
3. Mr. P. S. Menon (Mitsui Babcock, UK)
4. Mr. Sarajit Sen (Mitsui Babcock, UK)

You might also like