SYNOPSIS
The equipments used in the substation under general category of switchgear are circuit
breakers and isolators. For an EHV substation, the judicious selection of various parameters will
reflect heavily on the performance and reliability of the plant.
The interrupting and load carrying capability of circuit breakers with special reference of
long time application and desire to limit the switching surges to a value around 2.0 p.u. have
been considered.
The selection of isolators play an important role influencing the outlook of the switchyard.
The use of pantograph isolators has been made for simplicity, better performance and trouble-
free maintenance.
1. Introduction
1.1 Two main functions being performed by switchgear in any power system are:
(a) To permit plant and transmission lines to be conveniently put into and taken out of
service.
(b) Under faulty conditions to enable the same plant and lines to be rapidly and safely
isolated automatically from the unfaulted system.
1.2 The above vigorous duties and important functions performed by the circuit breakers and
isolators in a network at 400 kV and above require a high degree of reliability. On such
equipments depend the proper operation of the protected parts of EHV installations.
2.1 The selection of the type of circuit breakers is governed mainly by the following important
factors:
The world practice is towards such design whose characteristics are well defined. To this
category comes the SF6 breaker whose performance practically for all types of duties out class air
blast. The natural choice is SF6 breakers.
2.2.5Operating Speed:
Not only from the considerations of transient stability but also because of less system
disturbances, less damage to the plant involved in a fault and less wear and tear on the breaker
contacts, shorter total break time has been preferred. The high speed breakers have assumed
special importance both in the weak system having remotely situated power station loosely
connected and in the system stiffly connected with strong sources.
It is felt that reliability and high speed operation must go together. Presently two cycle breakers
do not involve any additional mechanism and are proved very reliable for preference.
To attain a time of two cycles in air blast breakers without affecting the reliability is very easy
whereas high energy and high inertia linkages of minimum oil breakers would impose a servere
limitation on it. Thus only air blast circuit breakers remain in the field. This is one of the reasons
why air blast breakers have been insisted upon.
The other importance aspect is of pole span. The influence of non-synchronous opening and
closing of three poles when higher than five millisecond is quite significant and is considered
important from over-voltages due to energisation and reenergisation. With increase in pole span
the over voltages are higher but after a certain limit there is no noticeable increase. This occurs
when all the unfavourable closing moments are with in the pole span. With closing resistors it
must, however, be ensured that pre-insertion time is more than pole span of the breakers.
2.2.6Maintenance problem:
It is a recognized fact that air blast breaker in particular requires much less maintenance. A
review of CEGB practice would reveal that time schedule of major overhaul or inspection of air
blast breaker is much less than that of oil breakers. The principal components such as breaking
chamber and control mechanism practically require very little attention. The main attention is
required on compressed air plant. In order to have smooth working, rule three compressor sets
each of 100 percent rating have been specified. It has been the experience in our board and also
abroad that most of the equipment induced major failures has been caused by the mal functioning
of very minor components owning to defects which originated during equipment design and
modification stages. The second factor contributing to trouble has been the installation problem.
The lack of good workmanship and skill causes many inherent failures.
It is also appreciable that important part like breaker chamber if opened too frequently may cause
trouble due to frequent disassembly and reassembly. In terms of chamber maintenance the air
blast chamber stands at No. 2; No. 1 place being occupied by SF6.
3.1 The layout of the 400 kV substation utilised double main and transfer bus system with
strung main, transfer and jack buses. Pipe connectors have been adopted only for
connections between isolators, circuit breakers and other equipments such as instrument
transformers, lightning arrestors, power transformers, etc.
3.2 The pantograph type vertical break isolators have been selected mainly due to following
considerations.
(a) In EHV system using reduced insulation levels it is the switching surge which dictates
the insulation requirements rather than impulse wave.
(b) Switching surges behave in a more strange manner as compared to familiar impulse
surges.
(c) The range in kV from 100 percent withstand to 100 percent flashover is much larger
for switching surges than for impulse.
(d) 250 ± 75/3500 ± 500 micro second switching surge waves have been found to
produce the lowest break-down voltage on porcelain and air insulation system.
(2) Keeping above in view it is desired that the open gap flashover should not exceed 10
percent at a voltage which will produce a 90 percent probability of flashover (10 percent
probable withstand) on the insulators.
(3) For the voltage of which produces 90 percent probability of flashover on a 1800 BIL
insulator column is 1450 kV where as the same 1450 kV voltage will produce a
probability of flashover of less than 10 percent for a 4267 mm (168 in.) single break
isolator whereas for a double break isolator a gap of more than 5080 mm (200’’) is
required. This indicates that a fairly large gap is needed for a double isolator requiring
inordinate long blades. Hence the overall switch length must be at least several hundred
millimeters longer that the single break switches offering the same open gap insulation
level. The open gap coordination is not at all a problem in vertical reach pantograph
type of isolator.
3.2.2Cost of Structures:
Due to large open gap requirements in double break isolators over single break isolators the size
of the double break isolators is much larger causing increased cost of structures. Whereas in case
of pantograph type isolators only one insulator has to be supported causing still reduction in cost.
4. Conclusion
4.1 In view of the pre – insertion resistors, inherent restrike free interruption, consistent
characteristics, simple and reliable mechanism, fast operating speed, ease in maintenance, for
our 400kV system the SF6 circuit breaker is a best suited choice.
4.2 Considering the best open gap coordination, i.e. free from phase to phase sparkover, lower
cost of mounting structure, lower phase to phase clearance requirements, i.e., lower bay
width, lower cost of insulators, neat and clear lay out, the best choice could be of pantograph
type bus isolator over the other.