for Preparation of PC-I and Conducting the Program
Dated 14th February, 2009
Benazir Bhutto Shaheed
Youth Development Program
A. CONCEPT …………………………………………………………………………..................... 1
B. VISION 2009-2010 (Short-term) …………………………………………… ……………. 1
C. VISION 2015-2020 (Long-term) ……………………………………………................... 1
D. OBJECTIVES …………………………………………………………………………............... 1
E. METHODOLOGY …………………………………………………………………………... 1
1. Preparation of Proposal ……………………………………………………………......... 2
Category-I “Training through Institutes” …………………………………….................. 2
Category-II “On-Job Training” …………………………………………………………. 2
2. Mandatory Provision ………………………………………………………................ 3
3. Selection of Training Institute/Premises …………………………………………… …… 3
4. Trainees’ Selection Criteria ………………………………………………………………….. 3
5. Application and Processing ………………………………………………………………….. 4
5A. Joining, Attendance, and Leaves of Trainees ………………………………………………… 5
a. Joining Period …………………………………………………………………………… 5
b. Attendence of Trainees …………………………………………………………………... 5
c. Leave of Trainees …………………………………………………………………... 5
6. Program Implementation Arrangement ………………………………………............... 6
a. Provincial Steering Committee (PSC) ……………………………………..………….. 6
b. Technical Committee of Program ………………………………………………… 6
c. Provincial Coordination Unit (PCU) …………………………………………… …… 6
d. District Coordination Committee (DCC) ………………………………………………… 6
e. Project Management Unit (PMU) ………………………………………………… 6
f. Role of the Administrative Department(AD) ………………………………………... 7
g. Private Sector Participation ………………………………………………............... 7
h. Program financing ………………………………………………………………….. 8
i. Monitoring Mechanism ………………………………………………………………….. 8
j. Graduation Ceremony and Feedback …………………………………………… …… 9
k. Reporting system ………………………………………………………………….. 9
F. WEBSITE DEVELOPMENT PROCESS ……………………………………………….... 10
Appendices
Appendix 01 ………………………………………………………………………………………… 12
Appendix 02 ………………………………………………………………………………………… 20
Appendix 03 ………………………………………………………………………………………… 21
Appendix 04 ………………………………………………………………………………………… 22
Appendix 5A ………………………………………………………………………………………… 23
Appendix 5B ………………………………………………………………………………………… 24
Appendix 06 ………………………………………………………………………………………… 25
Appendix 07 ………………………………………………………………………………………… 26
Appendix 08 ………………………………………………………………………………………… 27
Appendix 09 ………………………………………………………………………………………… 28
Appendix 10 ………………………………………………………………………………………… 29
Appendix 11 ………………………………………………………………………………………… 30
Appendix 12 ………………………………………………………………………………………… 31
Appendix 13 ………………………………………………………………………………………… 32
Appendix 14 ………………………………………………………………………………………… 34
Appendix 15 ………………………………………………………………………………………… 36
Appendix 16 ………………………………………………………………………………………… 37
Appendix 17 ………………………………………………………………………………………… 38
Appendix 18 ………………………………………………………………………………………… 39
Appendix 19 ………………………………………………………………………………………… 40
Appendix 20 ………………………………………………………………………………………… 41
Appendix 21 ………………………………………………………………………………………… 43
Appendix 22 ………………………………………………………………………………………… 44
A. CONCEPT:
The Government of Sindh has launched a major initiative, titled “Benazir Bhutto Shaheed
Youth Development Program”, for addressing the issues of poverty and un-employment
through Human resource development in the province. The Program aims to provide
opportunities for short-term employment and skill development to approximately 100,000
semi-literate and educated unemployed youth in Sindh for a period varying between 3
months to one year. The unemployed youth will be offered various skill development
opportunities and job oriented certification courses to adapt to local and international job
markets. This will help contain poverty and improve the socio-economic conditions of
common citizens. In addition, the public and private sector business efficiency will increase
through a well-placed, developed and skilled workforce.
1. Semi-literate and educated youth provided employable skills to meet the demand of local
and international market;
2. Maximum available training institutes of Sindh Government activated and equipped to
provide required training (where dormant, reactivated in stages);
3. All training material for tutors and trainees translated in either Sindhi, Urdu or English as
per requirement;
4. Procedure for conducting and monitoring such training streamlined by institutes, PMU, and
PCU;
5. Private and public sector coordination procedures and channels established;
6. Public awareness at grass root level of BBSYDP;
D. OBJECTIVES:
E. METHODOLOGY:
While preparing the training proposal/PC-I, the program requires careful designing and
guarded approach towards all steps involved in the process. Since the number of
stakeholders and the target group is large, therefore reaching out efforts would be required
for involvement of departments and institutions with a sense of ownership and trust.
1. Preparation of Proposal:
All the administrative departments will be responsible to draw up training proposals in the
form of PC-I (Appendix–1), clearly defining the target group for each trade or field along
with duration and cost of the trainings. Simultaneously, the Administrative departments have
to identify the training institutes through which these trainings shall be imparted. The
training proposal submitted, as a part of PC-I should be broadly in two categories;
In this category, the training of individuals shall be carried out from various public and
private institutes by means of both in -practice and customized courses for different
trades/fields, if required.
* Batches in a year
** Two shifts in every batch (morning and evening shift)
*** Language: “E” - English; “S”- Sindhi; “U”- Urdu
This category shall target the trained and skilled youth available in different
trades/professions but still unemployed, for placement on various jobs/trainings
complementing the program initiatives. The on-job category can be further classified into (i)
Trainees (ii) Tutors/Trainers.
The administrative departments shall clearly define the requirement of persons to be selected
for performing on-job assignments. These persons would also be tested and certified, where
required. The departments shall clearly specify the following:
a. The clear job description and expected outputs of On-Job trainees for all proposed
training courses;
b. Where these trainees shall be best utilized;
c. Prospects for their future employment;
d. The existing vacancy position in the departments shall not be disturbed with this
arrangement;
e. The stipend for the period of training to be paid to trainees according to their
qualification/Course;
f. The trainers/tutors and trainees required to complete training program syllabus for
classrooms and practical;
g. Develop trainers/tutors and trainees training material/modules in required language.
h. Specific location, contact person of OJT facilities should be provided to PCU before
commencement of training.
2. Mandatory Provision
Department would submit following mandatory documents with their proposed PC-Is for
consideration from PDWP:
a. The selection of training institutes shall be in a manner that all districts in the province
are covered.
b. The selection of training institutes should be standard based;
c. The selected institutes must fulfill the specific training needs of particular fields in terms
of training material, modules, qualified faculty and proper certification;
d. The selected institutes must have the capacity to process the applications and conduct
entry or aptitude tests for selection of trainees;
e. Institutes are expected to monitor the performance of the trainees and submit the
monthly progress report to the Project Management Unit of the respective administrative
department;
f. An inspection team of PMU/ departmental committees must physically visit the selected
institutes on a monthly basis;
g. Institutes will be hired through contract administration with specific terms of reference,
deliverables and payment schedule;
h. Where required, departments can obtain the premises on rent for training purposes for
the period of training not exceeding one year.
b. The selection of trainees shall be in a manner that all districts in the province are
covered. In order to address this issue, the department must submit a Dist rict Placement
plan with their proposals. (Appendix–2)
c. Age bracket shall be training-specific, preferably between 18-35 years.
d. Minimum qualification must be met, in accordance to the prescribed rules/procedures.
e. Preference will be given to:
i. Candidates from households with less income.*
ii. At least one candidate from each unemployed family.
iii. Women candidates.
f. A candidate will be provided the opportunity for only one training course in a year.
g. All candidates will be required to apply for a specific trade/field of training on the
prescribed application form.
h. The selection of applicants will be merit-based.
i. Applicant will be required to apply to the training institutes or departmental offices as
specified in the advertisements.
* To be determined through “Undertaking Form”. (Appendix –3)
q. Advertisement:
All program activities related to trainings must be carried out in a transparent manner
and through wide publicity in media as per following arrangements:
i. The details containing the district and trade wise bifurcation of seats must be
published in Urdu, Sindhi and English newspaper advertisements as well as on the
proposed website for facilitation of applicants.
ii. All the departments must prepare the advertisements for their respective training
programs and forward to PCU for vetting and standardization.
iii. Advertisements related to media coverage, selection of trainees and training
institutes shall be published by PMU of the department.
a. Joining Period:
i. The selected trainees would be allowed maximum 07 days joining time after
publication of list / issuance of offer letters. Those trainees that do not report
within the stipulated time would not be allowed to join.
ii. The list of trainees on waiting list would be published for slots lying vacant due to
non-reporting of first list of selected trainees. These trainees would be allowed
maximum 7 days joining time or as advertised which ever is less.
iii. No trainee will be accepted/ enrolled after commencement of Training except in
exceptional circumstances. Trainees will be issued ID cards 2 to 7 days after the
commencement of Training. The stipend would be calculated from the date of
commencement of Training.
b. Attendance of Trainees:
i. A BBSYDP trainee shall attend a minimum of 85% of classes/field attachment
every month. If attendance is between 60% to 85%, the trainee shall be given a
written warning advising him to improve attendance otherwise the trainee shall be
terminated from the program. In case of non-compliance in the succeeding month,
the trainee shall be terminated and such intimation shall be communicated to him
in writing.
ii. The trainees having attendance below 60% during two consecutive months shall
be removed from the Program through written order.
iii. Every Institute/organization would have to maintain a daily attendance register
duly checked and verified by in charge. No trainee would be marked “Present”
after one hour of commencement of training/classes.
iv. In case of field attachment (OJT), an attendance diary/register would be provided
to each trainee to be signed by the person to whom the trainee has been deputed.
The training in charge in the district would counter check this diary weekly.
c. Leave of Trainees:
i. Any kind of leave other than serious illness must be discouraged. The trainees
however can be allowed two days leave per month on request and only Institute
in-charge is authorized to allow such leave.
ii. Leave of more than two days can be authorized by the PD-concerned. If such
leave request is beyond 10 days for trainings of less than 6 months duration, the
trainees would be dropped from the training program.
iii. Only sanctioned leave would be considered in calculating the 85%attendance.
Note (Addendum-1):
*The amendment/insertion 5 -A would be effective from 16th February 2009
and apply on all projects being carried out under BBSYDP.
The PSC would be the epic body to provide the leadership and guidance for steering the
program activities. The constitution and Terms of References (TORs) are attached as
Appendices–5A and 5B.
The Technical Committee will provide guidance on technical aspects of the program and
review the proposals received by departments and private sector organizations. The
committee will approve the private sector proposals and award the contracts. The
committee will undertake visits of training institutions and project monitoring units of
the departments and private sector institutes/organizations and assist PSC in evaluation
of periodic monitoring reports of the program. The constitution and Terms of References
(TORs) are attached as Appendix–6.
The PCU will be the implementation arm of the PSC. It will act as Secretariat of the PSC
and provide technical assistance to the departments in the implementation process. The
PCU will develop various mechanisms for uniform application at Provincial and
departmental level. The establishment of PCU, its organogram and Terms of Reference
are attached as Appendices–7, 8 and 9.
There shall be a DCC in every district where the program activity is being undertaken.
The DCC would be headed by DCO and EDOs of project departments would be its
members with F&G SDSSP, as its Secretary.DCO will nominate 2 persons of the civil
society as its members. The F&GS working for BBSYDP would be called District
Program Coordinator (DPC).
Each partner department will notify a Project Management Unit (PMU) for
implementation of the departmental proposal/PC-1. PMU will have a dedicated team for
Project Management without any additional responsibilities the Terms of Reference ,
proposed Organogram and salary are attached at Appendices–10, 11 and 12.
i. The overall administrative cost (including PMU expenses) should not exceed 5%
of the total project cost.
ii. There shall be no creation of posts and purchase of Vehicles for PMU. However,
temporary staff can be employed from the Project funds to meet the project
Human Resource requirements as per PC-I.
iii. Remuneration package for different positions of PMU has been prepared and
placed at Appendix –12.
iv. Each partner department will indicate separately the budget required for
establishing and running the PMU.
v. The PMU will provide district wise information of successful candidates along
with their identification number and their bank account details to Finance
Department and to AG Sindh with the copy to PCU.
vi. PDs are authorized to sign the ID card with photograph issued to successful
applicants/Tutors who have accepted the offer of training/teaching. These ID card
are to be worn around the neck by trainees and trainers for easy identification by
monitoring.
vii. The PMUs would specify the institutions for conducting the courses / OJ
Trainings and a list with full address, telephone Number of contact persons and
Institutional Head name would be provided to PCU.
The private sector is the biggest stakeholder in terms of human resource and
employment. In order to build strategic partnership it is essential to evolve synergetic
relationship with sector to compliment activities of the program.
i. Identify the demand and skills required for each trade and industry so that training
courses and institutes could be articulated in appropriate manner.
ii. The private sector organizations shall clearly define the requirement of persons to
be selected for performing on-job assignments. These persons would also be
tested and certified, where required.
iii. The organization imparting on job training shall clearly give the synopsis of the
training process defining the job description of each skill, the stages /levels to be
covered by the internee and the expected out puts of the internship or skill
development program.
iv. The demand/need for skill in the job market and future prospects of employment
of trainee in the organization impa rting on job training.
j. Program financing
i. The Fund Flow Mechanism (FFM) has been developed for the Program by
Finance Department (Appendix –13).
ii. Remuneration for trainers shall be in accordance with their experience,
qualification and job assignment.
iii. PMU shall be responsible for disbursing the stipend to the trainees according to
their qualification as under:-
? Matriculate or below = Rs 4000/
? Intermediate = Rs 5000/-
? Graduate = Rs 6000/-
? Masters = Rs 7000/-
iv. To facilitate those candidates who will be undertaking trainings out side their own
district and travel more than 70 kilometers, a dislocation cost will be provided as
under:
? Candidates who are taking training in institutes of Karachi coming from other
districts will receive Rs. 3000
? Candidate s joining their adjoining districts will receive Rs.2000/ month.
v. Payments to training Institutes will be made by PMU against the contracts.
vi. All payments of trainers, trainees and training institutes would be made through
FFM devised by FD.
vii. AD would get the monthly Expenditure statements reconciled with AG office with
a copy to PCU.
viii. PCU will publish monthly expenditure report as part of monthly performance
report.
k. Monitoring Mechanism
In consultation with the stakeholders the PCU will develop a unif orm monitoring
mechanism for the program and circulate it with the approval of PSC for
implementation. This mechanism will contain structured formats for monthly and
quarterly monitoring reports. Following are the salient features of the monitoring system:
At the end of the every course the institute will organize a “Graduation Ceremony” to
distribute the training certificates.
All graduating trainees are to be given post paid feedback forms to inform
PCU/PMU about their employment and quality training. (Appendix–15)
m. Reporting system
All reports will have standard format as developed by PCU in consultation with the
partner departments.
The website is being developed to contain relevant information including, the scope, training
programs of various departments, district and trade wise availability of trainings, progress
/Expenditure/monitoring reports and application forms.
All departments, the PSC, the PCU, the PMU, project directors and the Finance Department
will have their own access code to the website and its content to ensure security of
information and incorruptibility of data. Data input and correction will be possible only
through authorized personalized access codes.
The developed website will contain relevant information including, the scope, training
programs of various departments, district and trade wise availability of positions, guidelines
and application forms. Furthermore, will be applicants encouraged to apply through online
application forms in order to simplify the selection of candidates.
All departments, the P SC, the PCU, the PMU, project directors and the Finance Department
must have their own access code to the website and its content in order ensure security of
information and incorruptibility of data. Data input and correction should be authorized only
through personalized access codes.
Following is the schedule of MIS related activities that all PSC, PCU and PMU members
MUST follow for the proper execution of this said program:
Website: www.bbsydpsindh.gov.pk
Appendix – 1
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
PC-1 FORM
(SOCIAL SECTORS)
2. Location
i. Sponsoring
ii. Execution
iii. Operation and maintenance
iv. Concerned federal ministry
4. Plan Provision
i. Financial
ii. Social benefits with indicators
iii. Employment generation (direct and indirect)
iv. Environmental impact
v. Impact of delays on project cost and viability
15. Certified that the project proposal has been prepared on the basis of
instructions provided by the Planning Commission for the preparation of
PC-I for Social Sector projects.
Prepared by _________________________
Name, Designation & Phone#
Checked by _________________________
Name, Designation & Phone#
Approved by _________________________
Name, Designation & Phone#
Revised 2005
GOVERNMENT OF PAKISTAN
PLANNING COMMISSION
Instructions to Fill-in PC-I Proforma(Social Sectors)
2. Location
? Provide name of District/Province.
? Attach a map of the area, clearly indicating the project location.
5. Project objectives
? The objectives of the sector/sub sector as indicated in the medium
term/five year plan be reproduced. Indicate objectives of the
project and develop a linkage between the proposed project and
sectoral objectives.
? In case of revised Projects, indicate objectives of the project, if
different from original PC-I.
6. Description and justification of project
? Describe the project and indicate existing facilities in the area and
justify the establishment of the Project.
? Provide technical parameters and discuss technology aspect of the
Project.
? Provide details of civil works, equipment, machinery and other
physical facilities required for the project.
? Indicate governance issues of the sector relevant to the project and
strategy to resolve them.
In addition to above, the following sector specific information be
provided
? Give student-teacher ratio for the project and the national average for the
proposed level of education.
? Year-wise proposed enrolment of the institution for 5 years.
? For scholarship projects, indicate number of scholarships to be awarded each year
alongwith selection criteria .
? Provide faculty strength in relevant discipline, in case of expansion of facilities.
? Indicate the extent of library and laboratory facilities available in case of
secondary, college and university education.
? Provide details of technical staff required for operation & maintenance of
laboratories.
a) Health projects
b) Nutrition
c) Family planning
? Provide information relating to motivation and distribution sub-system.
? Give benchmark data and targets relating to number of couples to be
approached and number of contraceptives and other devices to be
distributed.
? Mode/mechanism of advocacy and awareness
Water supply & sewerage
? Present and projected population and water availability/ demand.
? Indicate source and water availability (mgd) during next 5,10,20 years.
? For waste water/sewerage, provide present and future disposal
requirements, gaps if any and proposed treatment methods and capacity.
? Indicate present and proposed per capita water supply in the project area,
comparison be made with water supply in similar localities.
? Indicate whether the proposed project is a part of the master plan. If so,
provide details.
Culture, sports, tourism & youth
? Existing and projected flow of tourists in the country/project area.
? Capacity of existing departments to maintain archaeological
sites/museums.
? Relationship of archaeological projects with internal and foreign tourism.
Mass media
? Indicate area and population to be covered with proposed project.
Research
? Indicate benefits of the research to the economy.
? Mention number of studies/papers to be produced.
? Indicate whether these studies would result in commercial application of the
process developed (if applicable).
? Phasing of Capital cost be worked out on the basis of each item of work as
stated above and provide information as per following.
Year-wise/component-wise financial phasing
(Million Rs)
Item Year-I Year-II Year-III Total
Total Local FEC Total Local FEC Total Local FEC Total Local FEC
A.
B.
C.
Total
Sources of financing
(a) Equity:
b) Debt
Indicate the local & foreign debt, interest rate, grace period and repayment
period for each loan separately. The loan repayment schedule be also
annexed.
c) Grants along with sources
d) Weighted cost of capital
Outcome
Targets after Targeted
S.No Input Output Baseline
Completion of Impact
Indicator
Project
1
2
3
4
5
.
.
.
.
.
13. Management structure and manpower requirements
15. Certificate
? The name, designation and phone # of the officer responsible for ,
preparing and checking be provided. It may also be confirmed that PC-I
has been prepared as per instructions for the preparation of PC-I for
social sector projects.
? The PC-I alongwith certificate must be signed by the Principal
Accounting Officer to ensure its ownership.
District Placement Plan Appendix – 2
Population and Backwardness weights taken as per SDSSP Shares distribution for the year 2004-05
Weightage of Indicators Distribution of 100 Seats
40% Pop & 60% Backwardness
S. Population Backwa rdness
No District Population Backwardness (40 seats) 60 seats Total Share
1 Karachi 0.313513 0.0569 12.54 3.41 15.95
2 Hyderabad 0.04766 0.0601 1.91 0.90 2.81
3 Matiyari 0.01671 0.0601 0.67 0.90 1.57
4 Tando Allahyar 0.01568 0.0601 0.63 0.90 1.53
5 Tando Muhammad Khan 0.01645 0.0601 0.66 0.90 1.56
6 Badin 0.0379 0.051 1.52 3.06 4.58
7 Thatta 0.036987 0.1315 1.48 7.89 9.37
8 Dadu 0.03675 0.0727 1.47 2.18 3.65
9 Jamshoro 0.01955 0.0727 0.78 2.18 2.96
10 Sukkur 0.0303 0.0433 1.21 2.60 3.81
11 Khairpur 0.0516 0.0882 2.06 5.29 7.36
12 Nausheroferoze 0.0363 0.0538 1.45 3.23 4.68
13 Ghotki 0.0324 0.0552 1.30 3.31 4.61
14 Nawabshah 0.0357 0.031 1.43 1.86 3.29
15 Larkana 0.03353 0.0698 1.34 2.09 3.44
16 Kambar 0.03077 0.0698 1.23 2.09 3.32
17 Shikarpur 0.0294 0.0407 1.18 2.44 3.62
18 Jacobabad 0.02475 0.0561 0.99 1.68 2.67
19 Kashmore 0.02285 0.0561 0.91 1.68 2.60
20 Mirpurkhas 0.03003 0.0859 1.20 2.58 3.78
21 Umerkot 0.02227 0.0859 0.89 2.58 3.47
22 Sanghar 0.0485 0.0659 1.94 3.95 5.89
23 Tharparkar 0.0304 0.0379 1.22 2.27 3.49
Total 1 1 40 60 100
In case of Hyderabad, Dadu, Larkana, Jacobabad and Mirpurkhas the share of Placements obtained under Backwardness Index is
divided equally among new carved out Distrcits.
Population 1998 Census
Backwardness SPDC data
Appendix – 3
Benazir Bhutto Shaheed
Youth Development Program
APPLICATION FORM
COURSE DETAILS
Department:
(for office use only)
Trainee ID:
Course Name: Institute’s Name:
Institute’s Code:
Course Code:
APPLICANT’S DETAILS
Name of Applicant:
6 months’ Average Electricity Bill (PM): Rs. Total monthly income of house hold: Rs.
UNDERTAKING
I solemnly state that the information given on the form is true &correct. And that currently I am not employed anywhere.
Further, I understand and accept that any information with held or incorrectly given will disqualify me from the program and its benefits
Page 21
Appendix – 4
OFFER LETTER
Mr./Ms.
This is in reference to your application for the subject Program and it is to inform that you have been
successfully selected and as such you are offered -------------- trainee position on following terms and
conditions:
1. The training period is for ------ months starting from – date ---.
2. You will be paid Rs.----- / - (Rupees ------------------------) only, in each month.
3. The payment of monthly stipend depends upon your regularity and punctuality and your absence
without any plausible reason will make you ineligible for payment. Stipend will only be paid to
those trainees who have 90% attendance.
4. The stipend will be paid to successful candidates in assessment test, to be conducted in the last
week of every month.
5. In case of any misconduct, in any form, with the Trainers, Officers and Staff of the Directorate,
your training will be terminated.
6. During training you will be required to attend various Lectures, Seminars, Laboratory testing, site
visits, and any other official gathering.
7. Part of your training is that you will be posted at -------------------- site to supervise the work.
8. A certificate of training will be issued to you after successful completion of training.
9. You will start training and will receive stipulated stipend only when a valid ID card from the
Department will be issued in your name.
10. This offer letter is valid till the starting date of the particular trade/skill at the prescribed center.
Late comers will not entertained.
11. This offer of training is not an offer of appointment in ----------------------- department;
If you agree with the above terms & conditions, please sign this letter, as token of acceptance, and
return it along with two passport size photographs, duly attested, so that internship ID card can be
issue d, making you eligible to participate in your training, commencing from -------------------, at -----
------------- Training Center, Address:------------------------, City-----------------.
PROJECT DIRECTOR
PROJECT MANAGEMNENT UNIT
-----------------------DEPARTMENT
Signature of Candidate: ____________________________
Page 22
Appendix – 5A
Page 23
Appendix – 5B
Page 24
Appendix – 6
Page 25
Appendix – 7
Page 26
Appendix – 8
Page 27
Appendix – 9
Provincial Coordinator
Accounts
Deputy Program Coordinator Officer
Page 28
Appendix – 10
1. Based on employment prospects in public and private sector, plan, prepare, implement
and monitor the project.
2. To ensure quality training, coordinate with public and private institutes imparting
trainings and skill development
3. To assess the capacity of trainer, trainee and training institutes and recommend its
strengthening plan.
4. To plan placement of trainees liaise with private sector, civil society, bureaus of
employment.
6. To share project data and knowledge of implementation status liaise with the
Provincial Coordination Unit
Page 29
Appendix – 11
Assistants
Page 30
Appendix – 12
Salary Per
Sr. # Post Month
(Rs.)
The Other Officers / Officials of PMU on Deputation from Department shall be entitled to
Project Allowance at the following rates;
Page 31
Appendix – 13
Government of Sindh
Finance Department
A. Government of Sindh, through Finance Department may accord special powers to Project
Director, PMU for authorizing expenditure sanctions for drawl of stipend of the successful
candidates and allowing expenditure sanctions for meeting operational expenses of PMU
through AG Sindh/DAO.
B. A detailed Delegation of Financial Powers will be drawn out after discussion with the
Secretaries of concerned Departments
C. At the request of Administrative Department, Finance Department would declare a gazetted
officer of PMU as Drawing and Disbursement Officer (DDO) and issues a unique Fund Centre
code to PMU.
D. Finance Department would issue Budget Release Order to the Administrative Department
indicating Object -wise break-up of the funds for drawl on quarterly basis.
Disbursement of Stipends
For making payment to the Training Institutes in case of out sourcing, following information will be
required;
1. Details of object wise operational expenses throughout the year like salary of temporary staff,
purchases of computer hardware, office stationary, TA/DA, mailing cost strictly in accordance
with provision of Budget.
1. The Project Director will be responsib le for conducting internal Audit and Inspection on half
yearly basis on the basis of laid down criteria.
2. A written report of such Internal Audit to be provided to Finance Department
3. Expenditure Statements to be reconciled with the AG Office
Others
1. Undisbursed amounts to be credited back into Government Account through
Page 33
Appendix – 14
1. 5.
(Incharge)
2. 6.
3. 7.
4. 8.
Institution Information:
Name of Institution:
Address:
Contact #:
Parent Department:
Situation Questionnaire:
1. Class Room/OJT centre existing: Yes No
2. If no reason thereof:
Page 34
If all or some/any of trainees not present, reasons:
Signatures
1. Incharge, Inspection Team: Date:
Page 35
Appendix – 15
Benazir Bhutto Shaheed
Youth Development Program
POST TRAINING FEEDBACK FORM
Date: - -
1. Basic Information
a. Name of Trainee:
b. Father’s Name :-
c. Trainee’s CNIC: - -
d. Trainee’s Reg. No:-
e. Name of Training course :
f. Course Code : --
g. Duration of Training :-
h. Address : ---------
i. District / City: -- -
j. Phone No: -------
k. Fax No: ----------
l. Cell No: ----------
m. Email : ------------
2. Have you acquired a Job? Yes No ( If yes please mention the following)
a. Name of Company :
b. Place of Posting : --
c. Pay P ackage : -------
i. Basic Pay :
ii. Allowances :-
d. Fringe Benefits : ---- -
4. Has the training helped you in starting your own business? Yes No
How: Briefly
Signature:
Page 36
Appendix – 16
BASELINE REPORT
(to be filled in by Institute)
Concept:
The concept of baseline report should be in terms of available physical infra-structure and capacity (Building & its conditions available facilities, Nos. of Persons to be trained, and
availability of H. R. & Material Resource).
INCEPTION REPORT
(to be filled in by PMU)
Concept:
This report should focus on the training venues, duration commencement and completion date . The department will summariz e venue wise approved training programs showing date of
approval.
Department : _______________________________________
Attendance
No. of
working
Sr.No Name of Student Registration No Course ID days P A P% Remarks
1 3 4 5 6 7 8 9 10
1.
2.
3.
4.
5.
6.
7.
8.
9.
Stipend Disbursement will depend upon Atleast 80% attendance
Page 39
Appendix – 19
Conducted
Scheduled
Available
Required
Training
Stipend
Admn
cost
Duration of
Sr. No Name of Course course
1 2 3 4 5 6 7 8 9 10 11
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
Page 40
Appendix – 20
Particulars of
candidates
Stipend Cost
alongwith bank
A details
Course A
Co urse B
Course C
Course D
Course E
Total - A
B Training
Remuneration of Trainers
Course A
Course B
Course C
Course D
Course E
Fee payment to Training
Institutes
Course A
Course B
Course C
Course D
Course E
Travelling Allowance / Daily
Allowance
Course A
Course B
Course C
Course D
Course E
Accommodation Expenses
Course A
Course B
Course C
Course D
Course E
Training Material
Course A
Course B
Course C
Course D
Course E
Others
Total - B
Checked & Verified By:
Prepared By: _________________________________________ _______________________
Signature &
Signature & date date
Name: Name
Designation: Deputy Director/
Accounts Officer Designation HR/Admin
Instructions
1 All expenses reported must have annexures containing details
2 MES must be reconciled with AG office on monthly basis
Page 41
C Admin Cost
Printing & Stationery
POL
Contingent Staff Salaries
Advertisement Cost
Recruitment Cost
Communication Expenses(
Postage, Telephone & Internet)
Electricity
Rent
Repair & Maintenance
Miscellaneous
Total - C
Grand Total (A+B+C)
Instructions
1 All expenses reported must have annexures containing details
2 MES must be reconciled with AG office on monthly basis
Page 42
Appendix – 21
Prepared By:______________________________________________________________
5. Private Sector organizations enlisted with departments to link for post training employability of trainees.
6. Please state how many trainees linked to gain full employment in Private/ Public Sector?
7. Please state how many Trainees linked to Micro Finance/ SME organizations?
8. Constraints/ problems/issues encountered to project implementation and progress, if any;
9. Solution Found / Proposed:
(General or specific for program improvement; as per data collected whether there is need for any change or
improvement in program design and planned activities to achieve the program objectiv es more effectively)
10. Expenditure Report:
11. Major achievements in terms of information given at S. No2-10:
12. Project Design change identified, if any with justification and how to be incorporated in to project:
13. Any new activity Planned for next Report:
14. Key Les sons Learnt:
15. Other aspects/ details
Print / Electronic Media Coverage ________________________
16. Next quarter’s work Plan:
? Activities details
? Duration of activity
? Time lines
? Start date
? Finish date
Page 43
Appendix – 22
2. Prepared By:______________________________________________________________
7. Shift: (Morning/Evening)
12. Problems:
_______________________________________________________________________________________________
_______________________________________________________________________________________________
___________________________________________________________
Page 44