SUBSTRUCTURE
Hardcore Filling
CONCRETEWORK
REINFORCEMENT
3/2
Item FORMWORK
Sawn to:
BLOCKWORK
PLASTERWORK
20mm cement and sand (1:4)
smooth rendering finished with a wood
float on:
3/3
Page No COLLECTION
3/1 4,296.80
/2 11,596.80
/3 2,744.10
SUBSTRUCTURE
Carried to Summary GH¢ 18,637.70
3/4
Item BRICKWORK AND BLOCKWORK
BLOCKWORK
ROOFING
ROOFING
Carried to Summary GH¢ 12,596.00
CARPENTRY
STRUCTURAL TIMBERS
CARPENTRY GH¢
Carried to Summary 546.00
3/5
Item
METALWORK
COMPOSITE UNITS
METAL WORK
Carried to Summary GH¢ 1,490.00
3/6
Item
IN-SITU FINISHINGS
B 50mm cement and sand screed to floors 384 " 6.5 2,496.00
3/7
Item
3/8
BILL NO. 3 - THE BUILDING
SUMMARY
Page
No.
SUPERSTRUCTURE
3/9