SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Acoustical False Ceilings Receiving & Storage Inspection SAIC-M-1052 18-May-05 CIVIL-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A Acoustical False Ceiling Receiving Inspection

Acoustical tile and suspension system shall be cellulose, mineral or


glass fiber with painted finish, membrane faced overlay, perforated SAES-M-100
A1
steel/aluminum faced or scrubable pigmented/clear finish. Sec. D
(1997 UBC, Sec. 25.202)

Suspended ceiling metal suspension system shall be standard direct- SAES-M-100


A2
hung metal suspension systems. (1997 UBC, Sec. 25.202) Sec. D

Suspended ceilings shall be made of noncombustible and nondusting SAES-J-801


A3
types of acoustical tile or boards. Sec. 8.3.5

Wire hangers for suspended carrying channels or main runners shall be


SAES-M-100
A4 12 gage (2.05mm) galvanized, soft-annealed, mild steel wire.
Sec. D
(1997 UBC, Sec. 25.209.1)

All other requirements and specifications shall be as per the Purchase


A5 Purchase Order
Order.

B Storage & Protection Inspection

Store all materials in the original manufacturer's packaging in Manufacturer's


B1
accordance with the manufacturer's recommendations. Manual

REMARKS:

REFERENCE DOCUMENTS:
1- SAES-M-100, "Saudi Aramco Building Code" Issued 29 January 2003
2- SAES-J-801, "Control Buildings" Issued 30 January 2002

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:
*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED