SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)

SAIC NUMBER DATE APPROVED QR NUMBER


SAUDI ARAMCO INSPECTION CHECKLIST
Review Monthly Aggregate & Water Test Reports and
SAIC-Q-1001 18-May-05 CIVIL-
Calibration Certificates
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

Test results for Saudi Aramco acceptance purposes shall be from a 09-SAMSS-097
A1
Saudi Aramco-approved independent laboratory. Sec. 18.1

The raw materials test results i.e. coarse fine aggregates shall comply 09-SAMSS-088
A2
with the maximum allowable, % by weight of aggregate as follow: Table A
Coarse Fine Aggregate Test
Test Required
Aggregate (%) (%) Frequencies
Clay Lumps and Friable
5.0 3.0 Monthly
Particles
Gradation and Materials Finer
1.0 5.0 Weekly
than No. 200 Sieve
Row 1 & 2 combined 4.0 6.0 N/A

Water Absorption 2.5* N/A Monthly


Acid Soluble Chloride as Cl
0.03 0.06 BI-Monthly
(ASTM C-114)
Acid Soluble Sulfate as S03
(ASTM C-114 or BS-812: Part 0.40 0.40 BI-Monthly
118)

Magnesium Sulfate Soundness 25.0 25.0 BI-Monthly

Note:
(1)
Unwashed aggregate that meets the requirements of this table need not to be washed.
* This number is for the predominant size fraction of each single aggregate.

09-SAMSS-097
A3 The Total Dissolved Solids (TDS) and pH value of mixing water shall be:
Table B

Type of Test Test Frequencies Maximum Minimum

TDS Weekly 500 ppm N/A


pH Value Weekly 8.0 6.0

The combined grading of coarse aggregate shall comply with: 09-SAMSS-088


A4
(ASTM C-33, Table 2) Sec. IV.B
Sieve Nominal 1.18m
37.5mm 25mm 19mm 12.5mm 9.5mm 4.75mm 2.36mm 300
# Size(mm) m
5 25-12.5 100 90-100 20-55 0-10 0-5

56 25-9.5 100 90-100 40-85 10-40 0-15 0-5

57 25-4.75 100 95-100 25-60 0-10 0-5

6 19-9.5 100 90-100 20-55 0-15 0-5

67 19-4.75 100 90-100 20-55 0-10 0-5

7 12.5-4.75 100 90-100 40-70 0-15 0-5

8 9.5-2.36 100 85-100 10-30 0-10 0-5

89 9.5-1.18 100 90-100 20-55 5-30 0-10 0-5


a
9 4.75-1.18 100 85-100 10-40 0-10 0-5

Note:
Size number 9 aggregate is defined in Terminology C-125 as a fine aggregate. It is included as a coarse
aggregates when it is combined with a size number 8 material to create a size 89, which is a acoarse
aggregates as defined by Terminology C-125.

Page 1 of 2
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - August 2004)
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Review Monthly Aggregate & Water Test Reports and
SAIC-Q-1001 18-May-05 Civil
Calibration Certificates
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
Fine aggregates shall comply with the following :
Sieve Percent Passing
9.5-mm 100
4.75-mm (No. 4) 95 to 100
2.36-mm (No. 8) 80 to 100
1.18-mm (No. 16) 50 to 85
09-SAMSS-088
600-µm (No. 30) 25 to 60
Sec. IV.B
A5 300-µm (No. 50) 5 to 30
ASTM C 33
150-µm (No. 100) 0 to 10
Sec.6.1
Note: Fine aggregate failing to meet these grading requirements shall meet the
requirements of this section provided that the supplier can demonstrate to the
purchaser or specifier that concrete of the class specified, made with fine aggregate
under consideration, will have relevant properties. ASTM C-33, Section 6.3.

The batch plants weighing scales (cement, aggregates, water meter and
09-SAMSS-097
A6 admixture dispensers) shall be calibrated no less than three times a year
Sec. 9.3
by Saudi Aramco approved calibration agency.

REMARKS:

REFERENCE DOCUMENTS:
1- 09-SAMSS-088 -- Aggregates for Concrete, 30 May 2001
2- 09-SAMSS-097 -- Ready Mixed Portland Cement concrete, 31 August 2002

Contractor / Third-Party Saudi Aramco


Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED