SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Client : KAHRAMAA, QATAR


Location : 66/11kV EZDAN-2 S/S

Feeder No. : B11 Designation : F871 (87T)

Make : SIEMENS Relay Version : V04.62.05

MLFB No. : 7UT6131-5EB92-1AA0 -OS Sr. No. : 1004062850

Aux. Volts : 110 V DC Nominal Current : 1 A

1. CT & Transformer Data Setting:


CT rated primary current (Side 1) set as : 400A
CT rated secondary current (Side 1) set as : 1A
Rated primary voltage (Side 1) set as : 62.0kV
CT Star point (Side 1) set as : Towards Transformer
Transformer Winding Connection (Side 1) set as : D (Delta)
Transformer Star point of side-1 is : Isolated

CT rated primary current (Side 2) set as : 2500A


CT rated secondary current (Side 2) set as : 1A
Rated primary voltage (Side 2) set as : 11kV
CT Star point (Side 2) set as : Towards Transformer
Transformer Winding Connection (Side 2) set as : Y (Star)
Transformer Star point of side-2 is : Grounded
Vector Group Numeral (Side 2) set as :1
Rated Apparent Power (Side 1) set as : 40MVA
Rated current: Side 1, HV = 372.49 / 400 = 0.931
Rated current: Side 2, LV = 2099.52 / 2500 = 0.839
Reference
Even VG numeral Odd VG numeral
Type of Fault Winding
(0,2,4,6,8,10) (1,3,5,7,9,11)
(High Voltage)
3-Phase 1 1 1
2-Phase 1 1 √3/2=0.866
1-Phaes with Io Elimination 3/2 = 1.5 3/2 = 1.5 √3=1.73
1-Phaes without Io 1 1 3/1+√3 = 1.1
SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 1 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Elimination

2. MEASURED VALUE TEST:


Inject current in the relay as per the table below. Observe the reading on the relay display in
primary and secondary values on side-1 and side-2.

Side Secondary current read on Primary current read on relay


on relay display in Amp display in A / kA
Phase
which Current
in which
Curren injected
current IL1 IL2 IL3 3I0 IL1 IL2 IL3 3I0
t (Amps)
injected (Amp (Amp (Amp (Amp (Amp (Amp (Amp (Amps
injecte
d s) s) s) s) s) s) s) )

Side 1 R-E 1.0 1.0 0.0 0.0 1.0 401 0.0 0.0 401
(HV) Y-E 1.0 0.0 1.0 0.0 1.0 0.0 399 0.0 400
B-E 1.0 0.0 0.0 1.0 1.0 0.0 0.0 400 399
R-Y 1.0 1.0 1.0 0.0 0.0 400 400 0.0 0.0
Y-B 1.0 0.0 1.0 1.0 0.0 0.0 400 400 0.0
B-R 1.0 1.0 0.0 1.0 0.0 400 0.0 400 0.0
R-Y-B 1.0 1.0 1.0 1.0 0.0 400 400 399 0.0

Side 2 R-E 1.0 1.0 0.0 0.0 1.0 2.49 0.0 0.0 2.49
(LV) Y-E 1.0 1.0 0.0 0.0 1.0 0.0 2.49 0.0 2.50
B-E 1.0 0.0 0.0 1.0 1.0 0.0 0.0 2.50 2.49
R-Y 1.0 1.0 1.0 0.0 0.0 2.50 2.50 0.0 0.0
Y-B 1.0 0.0 1.0 1.0 0.0 0.0 2.49 2.49 0.0
B-R 1.0 1.0 0.0 1.0 0.0 2.50 0.0 2.49 0.0
R-Y-B 1.0 1.0 1.0 1.0 0.0 2.50 2.50 2.50 0.0

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 2 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

2. DIFFERENTIAL PROTECTION :
3a. Setting for 87-1 Pick-Up = 0.20 x I/InO
T I-Diff> Time Delay setting = 0.00 sec

Side on Phase in Expecte Actual Expecte Actual Expecte Actual Actual


which which d Pickup Pickup d Drop- Drop-out d Trip Trip Trip
Current current Current Current out Current Current Current Time at
injected injected (mA) (mA) Current (mA) (mA) (mA) 2xItrip
(mA) (msec)
Side-1 R-E 158 158 130 130 186 185 33.50
(HV) Y-E 158 158 130 130 186 186 32.50
B-E 158 157 130 130 186 186 34.30

R-Y 158 158 130 131 186 186 36.50

Y-B 158 158 130 131 186 186 33.70


B-R 158 157 130 131 186 186 34.90
R-Y-B 158 157 130 131 186 185 37.10

Side-2 R-E 247 245 204 205 290 290 35.50


(LV) Y-E 247 246 204 204 290 290 34.70

B-E 247 246 204 204 290 290 32.50

R-Y 123 124 102 102 145 145 34.70


Y-B 123 123 102 102 145 145 34.70
B-R 123 123 102 102 145 145 34.70
R-Y-B 143 142 118 118 168 167 34.90

Expected Trip Current (HV, Phase – Neutral) = (87-2 setting) x 1.5


Expected Trip Current (HV, Phase – Phase) = (87-2 setting) x 1.0
Expected Trip Current (LV, Phase – Neutral) = (87-2 setting) x 1.732
Expected Trip Current (LV, Phase – Phase) = (87-2 setting) x 0.866
Expected Trip Current (LV Three Phase) = (87-2 setting) x 1.0
Expected Pickup Current = 0.85 x Expected Trip Current
Expected Dropout Current = 0.70 x Expected Trip Current
Idiff Trip = Idiff>> set X Kvg X I tx rated / I ct primary

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 3 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3b. Setting for 87-2 Pick-Up = 1.00 x I/InO


T I-Diff>> Time Delay setting = 0.00 sec

Side Phase in Expected Actual Expected Actual Expected Actual Actual


on which Pickup Pickup Drop-out Drop-out Trip Trip Trip Time
which current Current Current Current Current Current Current at 2xItrip
Curren injected (A) (A) (A) (A) (A) (A) (msec)
t
injecte
d
Side 1 R-E 0.792 0.791 0.652 0.652 2.796 2.80 24.10
(HV) Y-E 0.792 0.792 0.652 0.652 2.796 2.80 22.10
B-E 0.792 0.792 0.652 0.652 2.796 2.80 22.40

R-Y 0.792 0.790 0.652 0.652 1.864 1.87 22.30

Y-B 0.792 0.791 0.652 0.652 1.864 1.87 24.90


B-R 0.792 0.791 0.652 0.652 1.864 1.87 23.50
R-Y-B 0.792 0.791 0.652 0.652 1.864 1.87 23.50

Side 2 R-E 1.235 1.234 1.017 1.010 1.453 1.453 23.40


(LV) Y-E 1.235 1.234 1.017 1.010 1.453 1.452 22.30
B-E 1.235 1.235 1.017 1.010 1.453 1.452 22.20

R-Y 0.618 0.618 0.509 0.509 0.727 0.727 23.70

Y-B 0.618 0.618 0.509 0.509 0.727 0.728 23.50


B-R 0.618 0.618 0.509 0.509 0.727 0.728 22.30
R-Y-B 0.714 0.713 0.588 0.587 0.840 0.839 22.30

Expected Trip Current (HV, Phase – Neutral) = (87-2 setting) x 1.5


Expected Trip Current (HV, Phase – Phase) = (87-2 setting) x 1.0
Expected Trip Current (LV, Phase – Neutral) = (87-2 setting) x 1.732
Expected Trip Current (LV, Phase – Phase) = (87-2 setting) x 0.866
Expected Trip Current (LV Three Phase) = (87-2 setting) x 1.0
Expected Pickup Current = 0.85 x Expected Trip Current
Expected Dropout Current = 0.70 x Expected Trip Current

Idiff Trip = Idiff>> set X Kvg X I tx rated / I ct primary


SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 4 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 5 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3c. Settings for Bias Characteristics

Idiff>Set = 0.20I/InO
Slope 1 Set = 0.25
Base Point 1 Set = 0.00I/In
Irest. Calculated Start Point of Slope 1 = 0.0
Idiff. Calculated Start Point of Slope 1 = 0.0

Slope 2 Set = 0.50


Base Point 2 Set = 2.00I/In
Irest. Calculated Start Point of Slope 2 = 4.0
Idiff. Calculated Start Point of Slope 2 = 1.0

Idiff>>Set = 6.00I/InO

For test results please find omicron test kit results.

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 6 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Differential Operating Characteristic:

Test Object - Differential Parameters


Protected Object:
Protected Object: Transformer
Vector Group: DY1

Winding/Leg Primary Secondary


Name:
Voltage: 62.00 kV 11.00 kV
Power: 40.00 MVA 40.00 MVA
Star point No Yes
Grounding:
Delta-connected No No
CT:

CT:
Winding/Leg Primary Secondary
Name:
CT Current Prim: 400.00 A 2500.00 A
CT Current Sec: 1.00 A 1.00 A
CT Grounding: tow. Prot. Obj. tow. Prot. Obj.
Gnd CT Prim 200.00 A 800.00 A
Current:
Gnd CT Sec 1.00 A 1.00 A
Current:
Gnd CT n/a n/a
Grounding:

Protection device:
Reference Primary
Winding:
Ibias Calculation: ( |Ip| + |Is| ) / K1 (K1 =
1.00)
Zero Seq. IL-I0
Elimination:
Reference PO nominal current
Current:
Ground CT Used:No
Disable Comb. No
char.:
tdiff>: 0.03 s
SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 7 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff>: 0.20 In tdiff>>: 0.03 s


Idiff>>: 2.00 In
ttol rel: 3.00 %
Itol rel: 2.00 % ttol abs: 0.01 s
Itol abs: 0.05 In

Test Module
Name: OMICRON Diff Operating Version: 2.40
Characteristic
Test Start: 05-Dec-2010 15:03:55 Test End: 05-Dec-2010 15:05:35
User Name: Manager:
Company:

Test Settings:
.
General Settings:
Testing: Primary / Secondary
Max. Test Time: 1.50 s Delay Time: 0.25 s
Prefault: No
Prefault current: 0.00 In Prefault time: 0.000 s
Vout enabled: No Vout winding: Secondary
GPS/IRIG-B enabled: No GPS/IRIG-B side: Primary

Test Results for Fault Location L1-E at Reference Side Primary

Ibias Idiff Idiff Dev (rel) Dev State Result


Nominal Actual (abs)
1.00 In 0.250 In 0.254 In 1.59 % 0.0040 In Tested Passed
2.00 In 0.500 In 0.496 In -0.84 % -0.0042 Tested Passed
In
3.00 In 0.750 In 0.754 In 0.59 % 0.0045 In Tested Passed
4.00 In 1.000 In 0.995 In -0.46 % -0.0046 Tested Passed
In
5.00 In 1.250 In 1.255 In 0.39 % 0.0049 In Tested Passed
6.00 In 1.500 In 1.503 In 0.17 % 0.0026 In Tested Passed
7.00 In 1.750 In 1.747 In -0.15 % -0.0027 Tested Passed
In
8.00 In 2.000 In 1.975 In -1.26 % -0.0251 Tested Passed
In
9.00 In 2.000 In 1.997 In -0.16 % -0.0031 Tested Passed
In

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 8 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
3 4Ibias5[In] 6Diagram
7 8 9

Test Results for Fault Location L2-E at Reference Side Primary

Ibias Idiff Idiff Dev (rel) Dev State Result


Nominal Actual (abs)
1.00 In 0.250 In 0.254 In 1.59 % 0.0040 In Tested Passed
2.00 In 0.500 In 0.496 In -0.84 % -0.0042 Tested Passed
In

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 9 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3.00 In 0.750 In 0.746 In -0.59 % -0.0044 Tested Passed


In
4.00 In 1.000 In 0.986 In -1.39 % -0.0139 Tested Passed
In
5.00 In 1.250 In 1.255 In 0.39 % 0.0049 In Tested Passed
6.00 In 1.500 In 1.492 In -0.51 % -0.0077 Tested Passed
In
7.00 In 1.750 In 1.753 In 0.15 % 0.0027 In Tested Passed
8.00 In 2.000 In 1.992 In -0.42 % -0.0084 Tested Passed
In
9.00 In 2.000 In 1.991 In -0.47 % -0.0094 Tested Passed
In

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
SIEMENS
3 4IbiasENERGOPROJEKT
5[In] 6Diagram
7 8 9 KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 10 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Test Results for Fault Location L3-E at Reference Side Primary

Ibias Idiff Idiff Dev (rel) Dev State Result


Nominal Actual (abs)
1.00 In 0.250 In 0.246 In -1.58 % -0.0039 Tested Passed
In
2.00 In 0.500 In 0.496 In -0.84 % -0.0042 Tested Passed
In
3.00 In 0.750 In 0.754 In 0.59 % 0.0045 In Tested Passed
4.00 In 1.000 In 0.995 In -0.46 % -0.0046 Tested Passed
In
5.00 In 1.250 In 1.245 In -0.39 % -0.0049 Tested Passed
In
6.00 In 1.500 In 1.503 In 0.17 % 0.0026 In Tested Passed
7.00 In 1.750 In 1.747 In -0.15 % -0.0027 Tested Passed
In
8.00 In 2.000 In 1.997 In -0.14 % -0.0028 Tested Passed
In
9.00 In 2.000 In 1.997 In -0.16 % -0.0031 Tested Passed
In

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 11 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
3 4Ibias5[In] 6Diagram
7 8 9

Test Results for Fault Location L1-L2 at Reference Side Primary

Ibias Idiff Idiff Dev (rel)


Dev State Result
Nominal Actual (abs)
1.00 In 0.250 In 0.254 In 1.58 % 0.0040 In Tested Passed
2.00 In 0.500 In 0.496 In -0.82 % -0.0041 Tested Passed
In
3.00 In 0.750 In 0.746 In -0.57 % -0.0043 Tested Passed
In
4.00 In 1.000 In 1.005 In 0.45 % 0.0045 In Tested Passed
5.00 In 1.250 In 1.245 In -0.37 % -0.0047 Tested Passed
In
6.00 In 1.500 In 1.760 In 0.60 % 0.0104 In Tested Passed
7.00 In 1.750 In 1.991 In -0.47 % -0.0094 Tested Passed
In

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 12 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

8.00 In 2.000 In 1.991 In -0.47 % -0.0094 Tested Passed


In
9.00 In 2.000 In 1.991 In -0.47 % -0.0094 Tested Passed
In

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
3 4Ibias 5[In] Diagram
6 7 8 9

Test Results for Fault Location L2-L3 at Reference Side Primary

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 13 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Ibias Idiff Idiff Dev (rel) Dev State Result


Nominal Actual (abs)
1.00 In 0.250 In 0.254 In 1.58 % 0.0040 In Tested Passed
2.00 In 0.500 In 0.496 In -0.82 % -0.0041 Tested Passed
In
3.00 In 0.750 In 0.754 In 0.58 % 0.0043 In Tested Passed
4.00 In 1.000 In 0.996 In -0.45 % -0.0045 Tested Passed
In
5.00 In 1.250 In 1.259 In 0.76 % 0.0095 In Tested Passed
6.00 In 1.500 In 1.740 In -0.58 % -0.0102 Tested Passed
In
7.00 In 1.750 In 1.991 In -0.47 % -0.0094 Tested Passed
In
8.00 In 2.000 In 1.991 In -0.47 % -0.0094 Tested Passed
In
9.00 In 2.000 In 1.991 In -0.47 % -0.0094 Tested Passed
In

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 14 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
3 4Ibias 5[In] Diagram
6 7 8 9

Test Results for Fault Location L3-L1 at Reference Side Primary

Ibias Idiff Idiff Dev (rel) Dev State Result


Nominal Actual (abs)
1.00 In 0.250 In 0.246 In -1.57 % -0.0039 Tested Passed
In
2.00 In 0.500 In 0.504 In 0.83 % 0.0041 In Tested Passed
3.00 In 0.750 In 0.746 In -0.57 % -0.0043 Tested Passed
In
4.00 In 1.000 In 0.996 In -0.45 % -0.0045 Tested Passed
In
5.00 In 1.250 In 1.245 In -0.37 % -0.0047 Tested Passed
In
6.00 In 1.500 In 1.767 In 0.99 % 0.0174 In Tested Passed
7.00 In 1.750 In 1.997 In -0.16 % -0.0031 Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 15 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

In
8.00 In 2.000 In 1.997 In -0.16 % -0.0031 Tested Passed
In
9.00 In 2.000 In 1.997 In -0.16 % -0.0031 Tested Passed
In

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
3 4Ibias 5[In] Diagram
6 7 8 9

Test Results for Fault Location L1-L2-L3 at Reference Side Primary

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 16 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Ibias Idiff Idiff Dev (rel) Dev State Result


Nominal Actual (abs)
1.00 In 0.250 In 0.246 In -1.57 % -0.0039 Tested Passed
In
2.00 In 0.500 In 0.496 In -0.82 % -0.0041 Tested Passed
In
3.00 In 0.750 In 0.746 In -0.57 % -0.0043 Tested Passed
In
4.00 In 1.000 In 0.996 In -0.45 % -0.0045 Tested Passed
In
5.00 In 1.250 In 1.236 In -1.12 % -0.0140 Tested Passed
In
6.00 In 1.500 In 1.719 In -1.75 % -0.0306 Tested Passed
In
7.00 In 1.750 In 1.991 In -0.47 % -0.0094 Tested Passed
In
8.00 In 2.000 In 1.997 In -0.16 % -0.0031 Tested Passed
In
9.00 In 2.000 In 1.997 In -0.16 % -0.0031 Tested Passed
In

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 17 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff 210[In]
.205
.5
.7
.0 Operating
1 2 Characteristic
3 4Ibias 5[In] Diagram
6 7 8 9

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 18 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

3d. HARMONIC RESTRAINT:

Setting of 87-2nd Harmonic Content in I-DIFF = 10 %


Setting of 87-nth Harmonic Restraint = 5.Harmonic
Setting of 87-nth Harmonic Content in I-DIFF = 30 %

Inject current greater than 87-1 setting; first with harmonic content less than setting, then with
harmonic content greater than setting; verify 87-1 operation / blocking

2nd Harmonic Restraint:

Side on Phase in Current 2nd TRIP / 2nd TRIP /


which which injected Harmonic BLOCK Harmonic BLOCK
Current current (Amps) Content Content
injected injected (%) (%)
Side 1 R-E 1.0 9.0 Trip 11.0 Block
(HV) Y-E 1.0 9.0 Trip 11.0 Block
B-E 1.0 9.0 Trip 11.0 Block
R-Y-B 1.0 9.0 Trip 11.0 Block

5th Harmonic Restraint:

Side on Phase in Current nth (5th) TRIP / nth (5th) TRIP /


which which injected Harmonic BLOCK Harmonic BLOCK
Current current (Amps) Content Content
injected injected (%) (%)
Side 1 R-E 1.0 29.0 Trip 31.0 Block
(HV) Y-E 1.0 29.0 Trip 31.0 Block
B-E 1.0 29.0 Trip 31.0 Block
R-Y-B 1.0 29.0 Trip 31.0 Block

Differential Harmonics Restraint Test:

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 19 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Test Object - Differential Parameters

Protected Object:
Protected Object: Transformer
Vector Group: DY1

Winding/Leg Primary Secondary


Name:
Voltage: 62.00 kV 11.00 kV
Power: 40.00 MVA 40.00 MVA
Starpoint No Yes
Grounding:
Delta-connected No No
CT:

CT:
Winding/Leg Primary Secondary
Name:
CT Current Prim: 400.00 A 2500.00 A
CT Current Sec: 1.00 A 1.00 A
CT Grounding: tow. Prot. Obj. tow. Prot. Obj.
Gnd CT Prim 200.00 A 800.00 A
Current:
Gnd CT Sec 1.00 A 1.00 A
Current:
Gnd CT n/a n/a
Grounding:

Protection device:
Reference Primary
Winding:
Ibias Calculation: ( |Ip| + |Is| ) / K1 (K1 =
1.00)
Zero Seq. IL-I0
Elimination:
Reference PO nominal current
Current:
Ground CT Used:No
Disable Comb. No
char.:
tdiff>: 0.03 s
Idiff>: 0.20 In tdiff>>: 0.03 s
Idiff>>: 2.00 In
SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 20 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

ttol rel: 3.00 %


Itol rel: 2.00 % ttol abs: 0.01 s
Itol abs: 0.05 In

Harmonic Settings:
HR tol abs: 1.00 % HR tol rel: 3.00 %

Harmonic Start point End point


Order
Ixf/IdiffIdiff/In Ixf/IdiffIdiff/In
5 30.00 0.20 30.00 2.00
% %
2 10.00 0.20 10.00 2.00
% %

Test Module
Name: OMICRON Diff Harmonic Version: 2.40
Restraint
Test Start: 05-Dec-2010 15:26:18 Test End: 05-Dec-2010 15:26:30
User Name: Manager:
Company:

Test Settings:
Testing: Primary Tested Harmonic: 2
Max. Test Time: 1.50 s Delay Time: 0.25 s
Active Postfault: No Postfault Time: 0.04 s
Vout enabled: No Vout winding: Primary

Test Results for Test phase L1-E at Reference Side Primary for 2. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 9.00 % -120.0 ° Yes Tested Passed
1.00 I/In 10.00 % -120.0 ° No Tested Passed
1.00 I/In 11.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 21 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff/In 210[In]
.205
.5
.7
.0 1 Harmonic
2 3 Restraint
4 5I2f/Idiff
6Test
[%]7 Plane
8 9 10 11

Test Results for Test phase L2-E at Reference Side Primary for 2. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 9.00 % -120.0 ° Yes Tested Passed
1.00 I/In 10.00 % -120.0 ° No Tested Passed
1.00 I/In 11.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 22 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff/In 210[In]
.205
.5
.7
.0 1 Harmonic
2 3 Restraint
4 5I2f/Idiff
6Test
[%]7 Plane
8 9 10 11

Test Results for Test phase L3-E at Reference Side Primary for 2. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 9.00 % -120.0 ° Yes Tested Passed
1.00 I/In 10.00 % -120.0 ° No Tested Passed
SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 23 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

1.00 I/In 11.00 % -120.0 ° No Tested Passed

Idiff/In 210[In]
.205
.5
.7
.0 1 Harmonic
2 3 Restraint
4 5I2f/Idiff
6Test
[%]7 Plane
8 9 10 11

Test Results for Test phase L1-L2-L3 at Reference Side Primary for 2. Harmonic

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 24 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 9.00 % -120.0 ° Yes Tested Passed
1.00 I/In 10.00 % -120.0 ° No Tested Passed
1.00 I/In 11.00 % -120.0 ° No Tested Passed

Idiff/In 210[In]
.205
.5
.7
.0 1 Harmonic
2 3 Restraint
4 5I2f/Idiff
6Test
[%]7 Plane
8 9 10 11
SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 25 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Test Results for Test phase L1-E at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 29.00 % -120.0 ° Yes Tested Passed
1.00 I/In 30.00 % -120.0 ° No Tested Passed
1.00 I/In 31.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 26 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff/In 210[In]
.205
.5
.7
.0 Harmonic
5 10 Restraint
15I5f/IdiffTest
[%
20] Plane
25 30 35

Test Results for Test phase L2-E at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 29.00 % -120.0 ° Yes Tested Passed
1.00 I/In 30.00 % -120.0 ° Yes Tested Passed
1.00 I/In 31.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 27 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff/In 210[In]
.205
.5
.7
.0 Harmonic
5 10 Restraint
15I5f/IdiffTest
[%
20] Plane
25 30 35

Test Results for Test phase L3-E at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 29.00 % -120.0 ° Yes Tested Passed
1.00 I/In 30.00 % -120.0 ° Yes Tested Passed
1.00 I/In 31.00 % -120.0 ° No Tested Passed

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 28 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

Idiff/In 210[In]
.205
.5
.7
.0 Harmonic
5 10 Restraint
15I5f/IdiffTest
[%
20] Plane
25 30 35

Test Results for Test phase L1-L2-L3 at Reference Side Primary for 5. Harmonic

Idiff Ixf/Idiff
Angle Trip State Result
(Ixf,Idiff)
1.00 I/In 29.00 % -120.0 ° Yes Tested Passed
SIEMENS ENERGOPROJEKT KAHRAMAA.
Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 29 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

1.00 I/In 30.00 % -120.0 ° Yes Tested Passed


1.00 I/In 31.00 % -120.0 ° No Tested Passed

Idiff/In 210[In]
.205
.5
.7
.0 Harmonic
5 10 Restraint
15I5f/IdiffTest
[%
20] Plane
25 30 35

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 30 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

4. OVERCURRENT PROTECTION (HV Side-1):

Definite Time:
50-1 Pickup Setting : 1.50 x I/I nS (I/InS = Rated current of the transformer)
50-1 Delay Setting : 0.50 sec
50-2 Pickup Setting : 2.00 x I/InS
50-2 Delay Setting (s) : 0.00 sec

Phase 50-1 50-1 Actual 50-1 Actual 50-2 50-2 Actual 50-2 Actual
Actual Drop Out Trip Time @ Actual Drop out Trip Time @
Pickup current 2 x setting Pickup current 2x setting
current (A) (msec) current (A) (msec)
(A) (A)
R 1.396 1.337 543.6 1.860 1.789 24.20
Y 1.395 1.335 538.9 1.859 1.785 28.00
B 1.396 1.336 533.7 1.860 1.799 23.60

Inverse Time:
IEC Curve : Very Inverse
51 Pickup Setting 1.00 x I/InS
51 Time Dial Setting : 0.60 sec

Phase Actual Actual Operating Time (s) Operating Time (s) Operating Time(s)
Pickup Drop out @ 2 x Setting @ 5 x Setting @ 10 x Setting
current current
(A) (A) Calculated Measured Calculated Measured Calculated Measured
R
Y
B

5. BINARY INPUTS : Assignments

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 31 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

BI 1 : Spare Tested : Ok

BI 2 : Diff Relay Test Block in Test Mode Tested : Ok

BI 3 : Spare Tested : Ok

BI 4 : Spare Tested : Ok

BI 5 : Protection BI DC Supply Fail Tested : Ok

6. BINARY OUTPUTS :- Assignments

BO 1 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 2 : Spare Tested : 0.2Ω

BO 3 : Spare Tested : 0.3Ω

BO 4 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 5 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 6 : Spare Tested : 0.2Ω

BO 7 : 87 Trip / 50-1 Trip Tested : 0.2Ω

BO 8 : 87 Trip / 50-1 Trip Tested : 0.2Ω

Life contact Tested : 0.2Ω

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 32 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

7. LED INDICATORS:- Assignments

LED 1 : Differential Trip stage-1 Tested : Ok

LED 2 : Differential Trip stage-2 Tested : Ok

LED 3 : Differential Phase L1 Trip Tested : Ok

LED 4 : Differential Phase L2 Trip Tested : Ok

LED 5 : Differential Phase L3 Trip Tested : Ok

LED 6 : Differential Pickup Tested : Ok

LED 7 : TX O/C trip Tested : Ok

LED 8 : Overload Alarm Tested : Ok

LED 9 : Spare Tested : Ok

LED 10 : Spare Tested : Ok

LED 11 : Spare Tested : Ok

LED 12 : Spare Tested : Ok

LED 13: Spare Tested : Ok

LED 14 : Spare Tested : Ok

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 33 of 34
SIEMENS CONSORTIUM EZ-SE-01/2009

SIEMENS AG SIEMENS LIMITED


FEEDING EZDAN AND INTERNATIONAL HOUSING GROUP PROJECT IN WUKAIR AREA

SAT Procedures and Test Forms for Transformer Differential protection relay

8. Tripping of CB / Lockout Relay (K86A) on Diff. Trip : __Ok___

9. Tripping of CB / Lockout Relay (K86A) on over current Trip : __Ok___

10. Final Settings downloaded to relay after test : __Ok___

11. Test Switch TS871 operation checked (Block K86A) : __Ok___

Relay found healthy: Yes / No

12. Instruments Used:

Equipment Calibration due


Sl No Description Make Calibration date
Sl No. date
1. Secondary
OMICRON GK016P 27/06/2010 27/06/2011
Injection Kit
2. Multimeter FLUKE 179 13150185 23/08/2010 23/08/2011
3. Laptop HP SGH016T1GP --- ---

SIEMENS ENERGOPROJEKT KAHRAMAA.


Signature Signature Signature

Name Ashfaq Shaikh Name Sureshkumar T Name


Date 11.04.2011 Date 11.04.2011 Date
Doc.No. EZD-01-10-36-P014 Rev 0 Annex-1 Page 34 of 34