You are on page 1of 1

All setting out must be checked on site

All levels must be checked on site and refer to Ordnance Datum Newlyn
unless alternative Datum given
All dimensions must be checked on site
This drawing must not be scaled
This drawing must be read in conjunction with the relevant specification clauses

May 2011
This drawing must not be used for land transfer purposes
Areas calculated in accordance with RICS Code of Measuring Practice
This drawing must not be used on site unless issued for construction
9643
Revision Status: P=Feasibility/Planning T=Tender C=Construction

© 2010 Hughes Jones Farrell Limited

Electronic File Ref: 0437 5001-E4

3 4 5 P4 Preliminary Issue 16.12.10

3050 3260

Liquid applied roofing (Kemperol


glass rooflight
Solarglaze or similar
or similar) on
100mm rigid insultaion on
vapour barrier on
PRELIMINARY
18mm ply on
3 layers 15mm soundbloc on
timber roof structure alu trim
FOR DISCUSSION

MAJOR BUILDING WORK BEGINS


860x500 (0.43sqm) supply duct
from Main House AHU

18mm timber cladding on


25x50 sw battens
on 100mm rigid insulation on
vapour barrier on
3 layers 15mm soundbloc

150
WELCOME
RECLAIMED 406x178
Liquid applied roofing
600 (Kemperol or similar) on
tapered rigid insultaion on
10mm glass in sw frame 100mm rigid insulation on
vapour barrier on
to u/s of lightwell 3 layers 15mm soundbloc ceiling on
isolated (resilient hangers) MF
framing system (Casoline MF)
1020
Spring is finally here and along with it
18mm ply on
timber roof

(0.18sqm)
250x725
oc on

the start of our major construction

1850
2225

work. As mentioned in the December


275x150 (0.04sqm) face fixed duct
to either side of auditorium code 4 lead flashing
1780

newsletter lots of non-visual work has


18mm ply on
timber floor

Hall Stage Sky Deck


Tension wire grid
1250x200
(0.25sqm)
been carried out and very soon you will
be able to see the progress. We are
5No. 200x150 OR
4No. 100x100 OR 160ø diffusers @
110ø diffusers @ 2500 c/c's
1400 c/c's

25mm painted MDF


soffit panels - joints to line
up with grid joints
still on track to open in Spring 2012.
The hard hats are coming out and steel
300 thick
acoustic wall

2550
toe boots are primed and ready. Keep
2150

2150
an eye on our daily blog for more day
7585

5No. 150x350 (0.05sqm)


50 800
ducts between studs
G.08
G.09 FoH Corridor
Circle
to day action. www.parktheatre.co.uk/
6mm marine ply on
5305 from stage

18mm t&g chipboard

New Upper Ground Floor blog and, if you havenʼt already done
flooring
on sw timber joists
210

+11.600

50mmø 'scaff' bar


50 800
so, check out our latest video, with
760

lighting rig 500x500


(0.25sqm)

architects Hughes Jones Farrell,here:


300
5No. 200x150 diffusers@1800c/c's
& 2No. 250x200 diffusers at ends
www.YouTube.com/theparktheatre
12mm varnished ply

LG.22
soffit to u/s circle
We are very pleased The that so many
Park Theatre Ltd
2696

Stalls
local residents have Thenoticed our
2014

920 895 920 970


Park Theatre,
LG.21
FoH Corridor banner and have approached us to
Clifton Terrace, N4 say

painted 18mm ply removable/


hello and find out ways Detailed
in which
Section 1
Cross
to get
metal tray raised floor
system (Kingspan or
flexible floor system - TBC

New Lower Ground involved. This is exactly


similar)
1:25 the warm @A1
190

+8.660

welcome we love about Oct'


Finsbury
10 Park.
380

400

590

400
210

0437 5001 P4
So please do keep coming forward,
20

Studio 8

PROJECTS add your name to the mailing list, join 30 Great Guildford Street
London SE1 0HS

N4 Stories, our project lead by writer-in-residence, Sarah the volunteer usher scheme, talk to us T
F
W
020 7928 6572
020 7928 5876
hjfarchitects.co.uk
E mail@hjfarchitects.co.uk
se
Rutherford, has been a huge success. about getting involved etc...
hughes
The goal was to find stories from the local community and ***SITE TOURS*** jones
- with the help of lots of fantastic North London actors - farrell
Now the moment youʼve been waiting
we have managed to do it. Sarah is working hard on
for! An early sneak peek at the
writing the script and continues to work with the N4
building. We are offering tours for
Stories actors in order to devise and develop the story.
local residents on the following dates:
EATING AND DRINKING Saturday 18th June at 6pm and 7pm
The Park Theatre is going to have an all day cafe and bar. Tuesday 21st June at 6pm and 7pm
So when you are longing for a cool drink in a unique Please contact us by email to book
atmosphere close to the station, remember - that day is your slot: info@parktheatre.co.uk
just around the corner! providing your name, number in your
OTHER NEWS party and your preferred slot.
We are delighted to have been invited to speak at this Please dress in clothes you donʼt mind
yearʼs Theatres Trust Conference on ʻConverting Spacesʼ getting dusty as we are now truly a
in June, alongside a number of other theatres including building site. If you have hard-soled
the BAC, Chichester Festival and Liverpool Theatres. shoes please wear them, otherwise we
will endeavour to provide you with
Also, look out for us at the Festival in Wray Crescent on
some.
the 18th June!

Be sure to follow us on all our social media sites and keep spreading the word: www.parktheatre.co.uk

You might also like