You are on page 1of 26

V112-3.

0 MW
Harnessing low and medium onshore winds for you.
Gianfranco Leoni - Vestas Italia
Agenda

1 The V112-3.0 MW – harnessing low and medium onshore winds for you

The V112-3.0 MW is designed to optimize your energy production and reduce


2
energy costs

3 The V112-3.0 MW delivers business case certainty

4 Vestas wind turbines also benefit from advanced monitoring solutions

2
Vestas’ new wind turbine: The V112-3.0 MW

DESIGNED FOR IECIIA and IECIIIA ...

IEC III IEC II IEC I

V80-2.0 MW
Existing
WTGs V90-1.8 MW

V100-1.8 MW

V90-3.0 MW

New  112 m rotor


V112-3.0 MW
WTG  3.0 MW rated power

6 6.5 7 7.5 8 8.5 9 9.5 10


Wind Speed [m/s]
The V112-3.0 MW covers
almost three wind classes

3
Optimized for onshore locations with low and medium wind speed

V112-3.0 MW AEP Benchmarking V112-3.0 MW Power Curve Probability @7.5 m/s

3500 12

3000
10

AEP [MWh]
V112-3.0 MW 2500
8

Frequency [%]
Power [kw]
15.000 2000
6
1500

4
12.000 1000

2
500

9.000 0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1617 18 19 20 21 22 23 24 25
0

Wind Speed [m/s]

6.000
 Approved for IECIIa and IECIIIa
 Optimized for wind speed 8,5 m/s
3.000
Industry Range  Nominal rating 3.0 MW

0
5,0 5,5 6,0 6,5 7,0 7,5 8,0 8,5

Annual Average Wind Speed [m/s]


High productivity

Standard Air Density 1.225 kg/m3

4
Agenda

1 The V112-3.0 MW – harnessing low and medium onshore winds for you

The V112-3.0 MW is designed to optimize your energy production and reduce


2
energy costs

3 The V112-3.0 MW delivers business case certainty

4 Vestas wind turbines also benefit from advanced monitoring solutions

5
Unprecedented energy production and reliable performance

Permanent magnet generator & Full scale converter


 Excellent grid support capability
 Reduced maintenance cost
 Highly adaptable for future requirements Pitch System
 HCCBA bearings (High Capacity Bearing)  Double feeding pump system ensuring
redundancy and reliability
 Solutions for safe work in hub integrated in
design

Vestas CoolerTopTM
 Operation up to 2,000 m
altitude without derating Blade
 No power consumption for  55% larger swept area over V90-
fans 3.0 MW
 No noise emission from  Large root diameter (Φ2.6 m)
cooling system ensures blade bearing longevity
 Lightning receptors and internal
grounding cable integrated
 Robust performing profiles less
sensitive to dirt
 Reduced noise level
Drive train
 Integrated rotor lock system to improve
maintenance ability Yaw System:
• Best performing gear solutions  8 yaw gears
 Robust plain bearing with build Robust Design
(proven from VPDC data) implemented. High Reliability
in frictions
Lower energy costs

6
Reducing noise impacts power production minimally

Power reduction of various noise modes Sound power


110
Mode 0
 Site specific operation modes possible
105 Mode 1
Mode 2
 High production during low noise operation due to 100
 Low noise blade profiles
95
 The full-scale converter
 Permanent magnet generator 90
3 4 5 6 7 8 9 10 11 12 13 14
Annual Average Wind Speed [m/s]

Power (KW)
Mode 0
Power Reduction of Various Noise Modes 3.000
Mode 1
STANDARD MODES 105.0 AEP REDUCTION Mode 2
DB(A)* @ 8 M/S 2.000

MODE 1: REDUCED SOUND 0.3% 1.000


EMISSION AT LOW WIND SPEED

MODE 2: MAXIMUM SOUND 4.3% 0


EMISSION 104.5 DB(A) 3 4 5 6 7 8 9 10 11 12 13
Annual Average Wind Speed [m/s]

Higher yield

7
V112-3.0 MW platform – the new power system

 Permanent magnet generator


Synchronous
No slip rings/brushes needed for operation
Internal ventilation and water jacket
cooled
Compact design
Low weight
Hybrid bearings (ceramic)
Full scale converter
Water cooled
Modular layout
Transformer
 650 V – 10-35 kV, air cooled
 High voltage cable
Switchgear

Simple and effective power system with


high efficiency and excellent fault ride
through capabilities

8
The new power system

Full grid compliance Features


 Voltage range 0,8 – 1,2  Designed for superior grid support
 Frequency 45-65 Hz  Power factor range: ± 0.9
 FRT Yes  Zero Voltage Ride Through: 0.5 s
 Reactive current injection Yes  Fast run back to 20%, spinning reserve 20% to 100%
 Power Recovery Yes
 Short-circuit contribution 1.5 pu
 Max short-circuit level 23 kA
 Fast ramp up Yes

Excellent grid support capability


Reduced Maintenance Cost
Highly adaptable for future requirements

9
Reactive power capability

Q (pu)
Power Factor = +/- 0.90
0.5

0.4

0.3

0.2

0.1

0.0 P (pu)
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0
-0.1

-0.2

-0.3

-0.4

-0.5
Over-excited Leading Capacitive Improved Grid Capability
Higher Power Efficiency
Under-excited Lagging Inductive

10
Low voltage ride through

Voltage FRT-profile (WTG)

1,2

1,1 0,00; 1,10

1,0 10,00; 0,90

0,9 0,00; 0,90 2,60; 0,80

0,8

0,7
U (pu)

0,6 10,00; 0,80

0,5
 Designed for FERC 661A regulations
0,4

0,3 0,00; 0,00

0,2

0,1
0,45; 0,00
0,0
-0,5 0,0 0,5 1,0 1,5 2,0 2,5 3,0 3,5 4,0 4,5 5,0 5,5 6,0 6,5 7,0 7,5 8,0 8,5 9,0 9,5 10,0 10,5 11,0

Time (s)

 Tested for FERC 661A regulations

Designed AND tested

11
Reduced BOP cost

Lower foundation costs


 Advanced control algorithms (Load Management System)
reduce the loads
 Low top head mass reduce the dynamic loads

Reduced substation cost


 Full converter reduces the substation size and cost by
eliminating need for StatComs and switched capacitors

Reduced road and crane pad stand cost


 No components weigh more than 70 tones'
 Replacement of components can be done by tower crane

Reduced BOP cost

12
Designed for uncomplicated transport

Turbine split in modules

“Easy” transport: In terms of weight,


height and width, all of its
components comply with local and
international limits for standard
transportation

Standard trailers useable for main


components

Easy to use jacking system

Easy to transport

13
Designed for easy service

Work area in nacelle increased by 60% over previous


Vestas turbines

Nacelle designed with technicians in the Virtual


Reality Centre to ensure good working environment
(easy access to tools, enough space to do service,
etc)

Service conditions improved by direct crane access to


converter modules for quick and safe maintenance.

Switch gear is controlled via internet connection

Serviceability build into design. Easy-to-understand


storyboards describe exchange of all critical
components

Modular design allows easy access and fast


component replacement

Designed for serviceability

14
Per garantire la priv acy , è stato impedito il download automatico di questa immagine esterna. Per scaricare e v isualizzare l'immagine, fare clic su Opzioni sulla barra dei messaggi, quindi fare clic su Attiv a contenuto esterno.

First of its kind – Vestas’ virtual technology improves the arrangement in the hub

 Virtual Reality helps you make


sure that service technicians can
perform their jobs safely
 Visualisation and simulation
technique allows Vestas to
communicate and move
knowledge much faster to you

Easy training of staff

15
Agenda

1 The V112-3.0 MW – harnessing low and medium onshore winds for you

The V112-3.0 MW is designed to optimize your energy production and reduce


2
energy costs

3 The V112-3.0 MW delivers business case certainty

4 Vestas wind turbines also benefit from advanced monitoring solutions

16
V112-3.0 MW design based on proven technology

Permanent magnet generator & Full scale converter


 PM generator: Designed by key employees Vestas acquired
from ePower LLC, which has 3 decades of experience in
motor and generator technology
 VND The full-scale converter in the V112 is based on 10(+)
years experience from design, operation and manufacture of Pitch System
converters for DFIG system  Design based on V90-3.0 MW
 Double feeding pump system ensuring
reliability

Control system
 Design based on V90-3.0 Blade
MW  Design based on V90-3.0 MW
 Red

Drive train
 Based on V90-2.0 MW gear technology
 Best performing gear solutions (proven from
VPDC data) implemented

Yaw System:
 Design based on V90-3.0 MW Towers:
and V90-2.0 MW  Designed based on V90-3.0
Robust Design
 Robust plain bearing with build MW technology
High Reliability
in frictions

17
Vestas Test Center ensures V112-3.0 MW platform reliability

RIGOROUS TESTING OF NEW COMPONENTS

GEARBOX For the new gearbox MONITORING OF


20+ FAILURE MODES IN 12 SEVERE
GENERATOR
USER SEQUENCE TESTS has been
conducted to identify known and
unknown potential failure modes

Generator
R = 90.0%
L10 @ 20 years
CI = 50%

Housing Stator Bearings Bearing Rotor Encoder, ground brushes

Comprehensive testing has been applied


R = 99.8% R = 94.0% R = 99.1% hardware R = 99.0% and lubrication system
L0.1 @ 20 years L6 @ 20 years L0.9 @ 20 years L10 @ 20 years R = 99.0%
R = 99.9%
CI = 50% CI = 50% L10mh @ 400 kh CI = 50% L1 @ 5/20 years
L0.1 @ 20 years
MTBR = 10.7 y CI = 50% MTBR = 5 years
CI = 50% CI = 50%
to ALL CRITICAL COMPONENTS
Rotor core Magnets Magnet
R = 99.9% R = 99.4% Fan and hub Shaft
retention system R = 99.8% R = 99.99%
L0.1 @ 20 years L0.6 @ 20 years R = 99.9%
CI = 50% CI = 50% L0.2 @ 20 years L0.01 @ 20 years
L0.1 @ 20 years CI = 50% CI = 50%
CI = 50%

Stator core Windings Insulation Electrical Temperature


ENCODER
R = 99.9% R = 99.8% system connections sensors
L0.1 @ 20 years
CI = 50%
L0.2 @ 20 years
CI = 50%
R = 99.0%
L1 @ 20 years
R = 98.5%
L1.5 @ 20 years
R = 96.7%
L3.3 @ 20 years
Stressors causing failure modes have
CI = 50% CI = 50% CI = 50%

been identified and TESTED IN


SPECIALIZED RIGS to ensure
reliability of each component

18
Specific procedures are in place for severe testing of new design elements

IDENTIFY FAILURE MODES & MECHANISMS DESIGN THE TEST

CONDUCT THE TEST & EXTRAPOLATE SETUP THE TEST

SCHOCK TEST

M10 Bolt
Direction of vibration Y

Encoder

Vertical Table

M10 Bolt

X
Direction of vibration
Encoder
Z
Slip Table

19
Vestas has identified all critical processes for both in-house and sub-supplier
production and is systematically installing and monitoring quality controls

5 SIGMA PRODUCTION PERFORMANCE


5 sigma performance target to ensure EACH
DESIGN
COMPONENT IS IDENTICAL to the validated SPECIFICATIONS
• …………
design specifications •………….
•………….
•………….

QUALITY CONTROLS ACROSS PRODUCTION


Nacelles
Span of Control 46%
Main Processes w ith Control 99
Count of Main Processes 213
VESTAS HAS A CLEAR OVERVIEW Span of Control
2MW Nacelle
53%
2MW Hub
23%
3MW
38%
3MW Hub
35%
V52
56%
1.65MW
77%
of span of control and sigma performance

Brighton (No Production)


Main Processes w ith Control 32 10 13 6 10 20
Count of Main Processes 60 44 34 17 18 26
levels at component, platform, factory and Low est Sigm a Level 1,51 4,06 3,67 3,94 0 4,04

Ringkøbing

Ringkøbing

Ringkøbing
process level

Chennai
Skagen

Taranto

Taranto
Tianjin

Tianjin

Tianjin
Viborg

Leon

Leon
Span of Control 50% 55% % 55% 45% 45% 0% 0% 35% 41% 35% 56% 56% 77%
Main Processes w ith Control 10 11 0 11 5 5 0 0 6 7 6 5 5 10
Count of Main Processes 20 20 0 20 11 11 11 11 17 17 17 9 9 13
Low est Sigm a Level 4,01 2,04 1,51 4,06 3,67 4,5 3,94 4,5

Quality Assurance

20
Agenda

1 The V112-3.0 MW – harnessing low and medium onshore winds for you

The V112-3.0 MW is designed to optimize your energy production and reduce


2
energy costs

3 The V112-3.0 MW delivers business case certainty

4 Vestas wind turbines also benefit from advanced monitoring solutions

21
Vestas performance & diagnostic center offers prevention through prediction

Global 24/7/365 Identify performance deviation


COVERAGE OF 16,227 and issues in the fleet based on
TURBINES with more than predictive models and INITIATE
50,000 high speed data PREVENTIVE MAINTENANCE
tracks per month though conditioning monitoring
system & Vestas Turbine monitor

MONITOR
IDENTIFY
&
INITIATE

Findings are used to improve Planning of maintenance based


predictive models to provide LEARN & on weather forecast & making
RELIABLE PERFORMANCE IMPROVE PLAN & repairs to MINIMIZE LOST
AND YIELD MANAGEMENT REPAIR PRODUCTION FACTOR

22
Vestas condition monitoring (CMS) - predicting costly mechanical failures

Vibration level

Functional loss

Corrective service

WITHOUT condition
monitoring Production loss

Damage detected

Inspect damage Order spare parts Repair work


Predictive service

Using condition
monitoring

Inspect component Order spare parts Repair work

Time

 Assessment of the "health" of a


machine by analysis of
measured signals
 Estimation of time of failure
optimised planning of
maintenance activities

Cost reduction
Optimization of maintenance efficiency
Maximized availability and production

23
VestasOnline® – Vestas’ SCADA solutions

Grid meter

This SCADA system turns a


group of wind turbines into a
wind power plant

24
VestasOnline® is the most advanced system on the market today

Standard features
 Plant Layout view
 Event notification
 Basic Statistics
 Online Production View
 Event View
 24/7 surveillance
 Standard Production Reports

Add-on features
 Production Control
 Grid Control
 3rd Party grid integration
 Plant Customization
 Maximized production at PCC
 Customized Reports

Allows monitoring of
complete park including
substation

25
THANK YOU FOR YOUR ATTENTION

Copyright Notice
The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied
in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems
A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other
notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.
26
Vestas wishes to acknowledge and respect all copyrights in connection with the illustrations used in this presentation. In case we have unintentionally violated copyrighted material, we want to be informed
immediately in order to straighten things out and thus to honour any obligatory fees.

You might also like