Professional Documents
Culture Documents
MAINTENANCE OF
CLASS
1
1.A. ANNUAL SURVEY
For seagoing ships, including:
– hull,
– anchoring eqpmt,
– machinery, electrical plant,
– special eqpmt classed
Interval: 12 months
Survey Period: 3 months (counted from the
current class will complete 1 year of validity)
On drydocking (if it is due), or on Ship afloat
Ship with accomdtn for more 12 passgr survey
must include drydocking survey
2
1.A. Annual Surveys (MACHINERY)
Machinery, Boiler Room, Aux Engine, Fire &
Explosive Sources, Emergency exit: General
Inspection
Boiler & Pressure Vessels (appliances and safety
devices)
Remote Control, Quick Stopping Devices
Main & Aux Steering Gear
Communication Syst: bridges to E/R
Bilge System
Main & Emg’cy Power Supply Systems
Explosion-proof Installations
3
1.B. INTERMEDIATE SURVEY
Refered as: Extended annual survey
Interval: 2.5 yrs after class renewal
For seagoing ships: on the 2nd or 3rd of
annual survey
Items to inspect:
– Ballast tank
– Cargo Holds
– Bow visors, Boe sides, and Stern doors
– Elastic mounting of deck houses
– Machinery and Electrical installations
4
1.B. Intermediate Surveys
(CARGO HOLDS)
5
1.B. Inter’mdt Surveys (MACHINERY
AND ELECTRICAL INSTALL’TN)
Measurement for components as follows:
Crank web deflections of M/E
6
1.C. CLASS RENEWAL SURVEY
To be carried out at the end of class period for
the ship’s items as follows:
– Hull, incl anchoring equipment
– Machinery, incl electrical plant
– Any special equipment classed
Period: start at 4th annual survey, and must be
completed not exeed in 15 months
May be carried out in several parts
Periodical survey and inspections for machinery
and propulsion system is integral part of class
renewal survey
Class renewals for hull are in sequence (I, II,
III, etc)