PROPELLER FITTING CALCULATIONS BY ABS RULES.
LDIMENSION OF PROPELLER BOSS
LENGTH
TAPER START POINT
1/20
2.BASIC DATA
Rated power 49410 kW
Propeller speed at rated power 100 min”
Rated propeller thrus 3.050E*06 N
Diameter of propeller shaf at mid-poing. of the Fapef a. 812 mm
Meen outer diameter of propeller bosg! = 1500 mm |
Contact sureface area between propeller BOSS & stalk +08 au
1L.8+04 N/mm
20.66+04 N/mm’
7.56-06 mm/mm’C
Modulus of elasticity for boss material (Ni-Al-Bronze)
shaft material (Forged steel)
Coefficient of linear expansion of boss material
shaft material nen /min'C
Poisson's ratio for boss material
shatt material
0.28 proof stress of boss matetial N/mm?
Half taper of propeller shait on radins (1/40)
Coefficient of friction between contact suria
dent on the type of propulsion ° L
Factor of safety Saas
Rated torque corresponding to the rated power Q = 4.71836+09 N-mm
Q =H y 60 X 1000_ x -
Q =p x SO Me t00
Shear force at pr Fy = 124286407 N
Fy
DBI: 4 gies
kK a 1.6462
Baa] asd? = e012
a MITSUBISHI HEAVY INDUSTRIES, LTD.3.CALCULATION
Minimum required contact surface pressure at 35°C
<= SO + 24 Py
ps =-SLx[ -s0 wet e (
Minimum push-up langth at 35°C
4
y’ ] = 50.63 N/mm
Ds.
By = Py x mm
2 28
Maximum permissible contact surface pressure at OC
Ss] 22.8 + 0.100 (35-t) | mm
Contact surface pressure at temperature tT
Pt 2.2275 6t
Push-up load
We = APE(o#6) = 12365604 Ot (ut8) KN
{CALCULATION Ri
enperature toe 0 35,
[Required push-up length St | (om) 22.80,
[Maximum push-up length Smax | (mm) (27.43)
Pusti-up load (Dry fitting) | Wty ois | (KN 5040546572 [43697
Pash-up load (Wet fitting) |Wt.ooas] (kN. 16585, 15324 14378
[Stress of propeller boss
[Contact surhice pressure | pt yam] iio) | 5858 | 5413 | 60.79
Hoop stress oh [N/mm] (132.56) | 127.10 117.44 110.19
[Equivalent str: ov_|(N/mm*)|_ (171.48) 164.41 151.92 142.55,
ov =f PPLobt oh?
re MITSUBISHI HEAVY INDUSTRIES, LTD.FIG.1 PUSH-UP LENGTH VS.
TEMPERATURE OF BOSS & SHAFT
UPPER EAT
st max= st+1.
PUSH-UP,
{REQUIRED PUSH-UP LENGTHES
228+0.10(35-T)
al
-10 0 10 20 30 40
T: TEMPERATURE OF BOSS & SHAFT (‘c)
(USE THE LOWER ONE)PUSIL-UP LOAD CAND
fx
2
G
x
=
1 at
wz i o