Dear Rajendra,

This is with reference to our discussions, Please find enclosed herewith energy requirement details :

Avg. cost per unit is Rs. 5.05 for High Tension connection. LT is slightly cheaper Rs. 0.10-0.20

                  Location                          Present Monthly Consumption (E-Bill) Future Consumption               


Unit 1         Palani, Tamil Nadu              LT 60,000 units = Rs. 3,00,000               100,000 - 200,000 units                 
Unit 2         Udumalpet, Tamil Nadu       LT 32,000 units = Rs. 1,60,000                same                                            
Unit 3         Tiruvadanai, Tamil Nadu      HT 4,20,000 units = Rs. 21,00,000          10,00,000 units = Rs. 50.50 Lacs     
Unit 4         Palani, Tamil Nadu             HT 99,000 units = Rs. 5,00,000               HT 200,000 units = Rs. 10 Lacs        
Unit 5         Coimbatore, Tamil Nadu     HT 99,000 units = Rs. 5,00,000               HT 200,000 units = Rs. 10 Lacs       

As per our discussions, the two remaining areas that we need to evaluate are as follows :

1) If we can purchase power from existing power plants in the neighbouring areas :
    a) We require power during the power cut hours i.e. ________________
    b) if lower than our existing tariff we can procure for the entire requirement

We need to know the exact tariff in which we will be able to purchase this power plus any other transmissions charges etc.and
Enzen can then get this tied-up for us for which we can pay some fees.

2) If any existing bio-mass unit is available for sale: 


    a) what capacity
    b) what cost
    c) economics of the unit (i.e. cost of production and saleable price etc.)
A contract can be given to Enzen to help us acquire this unit and commission it.

Awaiting an early response,

Thanks and Regards,

Chirag Pittie

ShriVallabh Pittie Group 


Corporate Office
97 & 99 Maker Tower 'F'
9th Floor
Cuffe Parade
Mumbai - 400 005

Tel : (91 22) 4029 0011


DID : (91 22) 4029 0001
Fax : (91 22) 4029 0033
Cell : (+91)   98201 47558
URL : www.svpittie.com
mption               
000 units                 
                
s = Rs. 50.50 Lacs     
its = Rs. 10 Lacs        
its = Rs. 10 Lacs       

ransmissions charges etc.and how soon we can start drawing it.


                  Location                          Present Monthly Consumption (E-Bill) Future Consumption               
Unit 1         Palani, Tamil Nadu              LT 60,000 units = Rs. 3,00,000               100,000 - 200,000 units                 
Unit 2         Udumalpet, Tamil Nadu       LT 32,000 units = Rs. 1,60,000                same                                            
Unit 3         Tiruvadanai, Tamil Nadu      HT 4,20,000 units = Rs. 21,00,000          10,00,000 units = Rs. 50.50 Lacs     
Unit 4         Palani, Tamil Nadu             HT 99,000 units = Rs. 5,00,000               HT 200,000 units = Rs. 10 Lacs        
Unit 5         Coimbatore, Tamil Nadu     HT 99,000 units = Rs. 5,00,000               HT 200,000 units = Rs. 10 Lacs       

Present Future MW MW
units/month units/year units/month units/year
60000 720000 200000 2400000 0.274
32000 384000 32000 384000 0.044
420000 5040000 1000000 12000000 1.370
99000 1188000 200000 2400000 0.274
99000 1188000 200000 2400000 0.274

Gasification: Solar
1. Biomass supply and agreements 1. Available roof top space or area available
2. Technology supplier 2. Technology supplier or EPCC contractor
3. Type of Biomass 3. Energy generation possible for the available area
4.cost of biomass 4. cost of the plant
5. cost of the gasifier 5. Economics of the plant
6. Economics of the plant
Consumption                100000
0 - 200,000 units                  100
                      0.138889
00 units = Rs. 50.50 Lacs     
000 units = Rs. 10 Lacs        
000 units = Rs. 10 Lacs       

Technologies that can be Power procurement


suggested
Gasifier Solar (rooftop) biomass power
plants, cogeneration
Gasifier Solar (rooftop) plants, Small hydro
Power plant plants
Gasifier Solar (rooftop)
Gasifier Solar (rooftop)

Power plant (Biomass/coal) Power Procurement


1. Biomass supply and agreements 1. biomass power plants
2. Technology or EPCC contractor 2. Small hydro power plants IPP's
the available area 3. Captive and sale ratio 3. sugar mills/distilleries with surplus energy for sale
4. Economics 4. power trading
5. Cost of the project