This is with reference to our discussions, Please find enclosed herewith energy requirement details :
Avg. cost per unit is Rs. 5.05 for High Tension connection. LT is slightly cheaper Rs. 0.10-0.20
As per our discussions, the two remaining areas that we need to evaluate are as follows :
1) If we can purchase power from existing power plants in the neighbouring areas :
a) We require power during the power cut hours i.e. ________________
b) if lower than our existing tariff we can procure for the entire requirement
We need to know the exact tariff in which we will be able to purchase this power plus any other transmissions charges etc.and
Enzen can then get this tied-up for us for which we can pay some fees.
Chirag Pittie
Present Future MW MW
units/month units/year units/month units/year
60000 720000 200000 2400000 0.274
32000 384000 32000 384000 0.044
420000 5040000 1000000 12000000 1.370
99000 1188000 200000 2400000 0.274
99000 1188000 200000 2400000 0.274
Gasification: Solar
1. Biomass supply and agreements 1. Available roof top space or area available
2. Technology supplier 2. Technology supplier or EPCC contractor
3. Type of Biomass 3. Energy generation possible for the available area
4.cost of biomass 4. cost of the plant
5. cost of the gasifier 5. Economics of the plant
6. Economics of the plant
Consumption 100000
0 - 200,000 units 100
0.138889
00 units = Rs. 50.50 Lacs
000 units = Rs. 10 Lacs
000 units = Rs. 10 Lacs