CUSTOM HOMES EXPERIENCE
Royal Oaks Development, Menlo Park, CA
- Superintendent for new custom home development with 7 homes valued from the mi
d $4 million each.
- Total project construction cost of over $20 million including homes and new de
velopment site work.
- Direct & supervise all site work including grading, drainage, sewer, utilitie
s, roadway, etc.
- Direct & supervise all build-out, basement excavation, concrete, framing, MEP
systems, high-end finishes, etc.
- Supervision, filing, updating drawings and extensive communications with the A
rchitects and Engineers.
- Scheduling, material purchase & deliveries, permits and all inspections includ
ing final inspections.
267 Amalfi Drive, Pacific Palisades, CA
- Superintendent & Project Manager for custom home with construction budget of $
2.5 million.
- Hillside construction with extremely limited access required creative solution
s for sequencing work.
- Details of 1900's Mediterranean Spanish style required working closely with re
nowned architect, Kevin Clark.
38 Beverly Park, Beverly Hills, CA
- Assistant Superintendent at $30 million, extensive remodel of existing 20,000
square foot custom home.
- Scheduling and supervision of concrete work, paver installation, framing, Divi
sion 9 finishes, plumbing, etc.
- Developed finish specifications with Client and Designer, Marla Sher including
plumbing fixtures and trim with over 200 items for 12 bathrooms and 2 steam roo
ms.
338 Swarthmore, Pacific Palisades, CA
- Superintendent & Project Manager handling 6,000 square foot, 4-level custom ho
me valued at $4.5 million.
- Subcontractor bid solicitation, created scope of work requirements for all tra
des, subcontract issuance.
- Scheduling subcontractors, material acquisition, Project Schedule development.
- All permit related activities and all job site supervision.

HOTEL RENOVATION EXPERIENCE


The Cartwright Hotel, San Francisco, CA
- Owner's Representative directing renovation of 100 year old boutique hotel at
Union Square in San Francisco.
- Oversight of all aspects of construction from bid phase, contractor selection,
build out and furniture install.
- Liaison to Hotel staff and management for coordinating construction activities
while fully occupied.
- Created and maintained project schedule, solved contractor constructability is
sues.
- Resolved design issues with architect and interior designer and minimized impa
cts to hotel operations.

PROJECT MANAGER EXPERIENCE (Commercial T.I.)


44 Montgomery, San Francisco, CA
- Account Manager for all work in this Building (6th largest in San Francisco).
- Integral player for landing this new account resulting in up to $2 million ann
ual gross revenue.
- Close collaboration with building management to ensure satisfaction of disting
uished clientele.
Bank of Canton Account/555 Montgomery, San Francisco, CA
- Project Manager for all construction projects in commercial office high-rise b
uilding.
- Clients included Wells Fargo Bank, The Canadian Consulate and The Taipei Econo
mic & Cultural Office.
- Experience working with foreign governments and high security issues, multi-ph
ase Tenant Improvements.
- Lobby Remodel/Fire Alarm Upgrade Project involving complete remodel of elevato
r lobbies and upgrade of fire alarm system on all 17 floors.
NationsBank Montgomery Securities/600 Montgomery, San Francisco, CA
- Project Manager for $6,500,000 T.I. build-out of 19,000 square feet on 7th flo
or of the Transamerica Pyramid.
- Project involved cutting edge audio-visual technology for state-of-the-art aud
itoriums.
- Efficiently managed over 100 drawing changes with associated coordination issu
es.
- Successfully negotiated over 100 change orders with owner's representatives.

PROJECT ENGINEER EXPERIENCE (Commercial)


Abovenet Colocation Facility, San Francisco, CA
- $115,000,000 Base Isolation project of existing 5-story concrete structure.
- Administration of RFI's and submittals utilizing ProjectTalk Prolog software,
daily updating of all logs.
- Daily RFI meetings with Architect and Structural Engineer.
- Distribution of numerous daily drawing updates.
- Management of various trades including waterproofing, aluminum louvers, exteri
or glazing and storefront windows, standing seam metal roof, and all expansion j
oints associated with the Base Isolation System.

ESTIMATOR EXPERIENCE (Commercial T.I)


- 2 years as Assistant Estimator to Chief Estimator at RCI.
- Estimator for own projects up to $3 million concurrent to assisting on estimat
es for entire company.
- Estimating experience at locations from Campbell to Santa Rosa to Concord, Cal
ifornia.
- List of clients include 44 Montgomery (Seagate Properties), Airbourne Express,
American Express, Bank of Canton, Canadian and Taipei consulates, the Marines M
emorial, Minolta, the San Francisco Giants at Pac Bell Park, the City of San Mat
eo, Stanford Linear Accelerator Center, Visa, the Warwick Regency Hotel in San F
rancisco, and Wells Fargo Bank (including bank branch offices).

SUPERINTENDENT EXPERIENCE (Commercial T.I)


Peralta Community Colleges District-Wide Power and Cable Upgrade, Oakland, CA
- Superintendent (subcontractor - Div 2 thru 9) constructing 60 new TelComm/Data
Rooms.
- Coordinated work across 3 separate colleges in Alameda and Oakland, CA.
- Directed crews of laborers and carpenters as well as all subcontractors under
contract with RCI.
- Quantity take-off's, weekly working schedules, acquire subcontractor bids, sch
edule and supervising all work.
- Schedule and supervise all subcontracted work - flooring, painting, plumbing,
scanning and concrete coring.
- Project Management including scheduling, RFI's, submittals, change orders, Pro
ject file binders, etc.

EDUCATION
B.S. in Construction Management, December 1997, Cal Poly State University, San L
uis Obispo, CA

COMPUTER SOFTWARE EXPERIENCE


- Microsoft Word
- Microsoft Excel
- Microsoft Project
- Microsoft Outlook
- Microsoft Powerpoint
- Prolog 6.0
- Prolog ProjectTalk
- J.D. Edwards (Accounting)

EMPLOYMENT HISTORY
2008 - Present
Persicon Company, Inc., Atherton/Menlo Park, CA - Superintendent of new custom
home
development for 7 homes valued from $4 million each, total construction at over
$20 million.
2007 - 2008
Rider Levett Bucknall, San Francisco/Los Angeles, CA - Owners Representative
Remodel of 100 year old boutique hotel at Union Square in San Francisco, CA
2005 - 2007
J.D. Group, Inc., Los Angeles, CA - Project Manager/Site Manager
Construction of Custom Homes in SoCal valued from $6,000,000 to $30 million
2004 - 2005
Shelter Builders Group, Calabasas Hills, CA - Project Manager/Site Manager
Construction of 6,000 s.f. Custom Home in Pacific Palisades valued at $4,500,000
2001 - 2004
Rudolph Commercial Interiors, San Francisco, CA - Project Manager/Superintenden
t/Estimator
Account Manager 44 Montgomery - Commercial T.I. projects from $5,000 to $3 milli
on.
2000 - 1998
Hathaway Dinwiddie - San Francisco, CA - Project Manager (T.I.)/Project Engineer
Commercial T.I. projects up to $7,000,000, Base Building projects up to $115 mil
lion.