You are on page 1of 20

Takes up Scheduling, Engineering, Material Indenting, Installation,

Commissioning, Testing & Handing over of the job

Provides automation solution to various customer requirements

Supports sales team with technical solution & costs

Utilizes automation innovatively to optimize throughput

should have experience in executing BMS & HVAC controls jobs

Must have sound knowledge of HVAC & HVAC controls

Must have hands on experience in estimation & controls through


DDC

Should have executed and lead several Integrated Building


Management Systems jobs

Course Content as given below:

Electrical Design manual for commercial & residential projects Upto


33KV voltage level

1. General

• Fundamentals of electricals
Types of electricity

Source of electricity

Generation, Transmission & distribution of electricity

Ohms law

Symbols

Definitations, Terms & terminologies

Important formulas

2. Codes & Standards to be followed

• Indian electricity rules

• National electrical code of India (NEC)

• National building code of India (NBC)

• Applicable standards issued by Bureau of Indian standards (BIS)

• Institute of Electrical & Electronics Engineers (IEEE)

• Regulations of local fire authorities.

• Requirements stipulated by Pollution control Board for Noise, Air &

• Water Pollution
3. Electrical equipments and it’s application used in the installation

• Control devices

• Measuring devices

• Circuit protection devices

• Transformers

• Diesel generators

• Capacitors

• Bus ducts, Busbars, Cables (HT/LT) & wires

• Motors & Pumps

• Luminaries – General & Emergency

• Isolators & socket outlets

• UPS/Inverter& Battery banks

• Earthing or Grounding

• Lightning arrestor

• Building Management Systems(BMS)


4. Means of electrical distribution for installation

• Panels(HT/LT)/Switch Board/Motor control centers (MCC’s)/Final

Distribution boards (DB’s)

• Cable trays,trunking or raceways, conduits & underground Pipes

(Concrete/PVC)

5. Major electrical loads used in the installation

• Lighting load – Internal & external

• Utility power load

• HVAC loads like Chillers, AHU’s, FCU’s, Pumps, Fans etc.

• PHE & FF loads like Water transfer pumps, Booster pumps, Fire

• Fighting pumps, Jockey pumps etc.

• Lifts (Elevator) load

• Computer & data centre (Server) loads for office building

6. Electrical design calculations


• Load & maximum demand calculation

• Transformer sizing calculation

• DG sizing calculation

• Short circuit calculation

• Voltage drop calculation

• Capacitor sizing calculation

• Cable sizing calculation

• Earthing calculation

• Lighting calculation

• UPS/Inverter sizing calculation

• Battery sizing calculation

7. Various design stages & Sequence of electrical design procedure

Concept design stage:


• Understanding the building plans, elevations & sections

• Gathering specific data from the utilities(Electricity board)

• Understanding clients specific requirements

• Assessment of the type of installation like outdoor/indoor


substation(Point of supply)

• Preparation of basis of design which should include the cost


estimate.

Schematic design stage:

• Preparation of Load calculation to arrive maximum peak demand

• Sizing of all Equipments,cables,cable trays

• Electrical design calculations

• Preparation of single line schematic of electrical distribution


system with metering options

• Preparation of equipment layouts like Substation, plant rooms.

• Preparation of lighting, small power, earthing & miscellaneous


layouts

• Preparation of technical specification

Detailed design stage:


• Preparation of detail layouts including sectional details wherever
required

• Coordination with other services like HVAC,PHE & FF layouts

• Preparation of bill of quantities(BOQ)

• Issue for tender

Construction design stage:(Generally this stage is performed by


electrical Contractors)

• Preparation of shop drawings based on the tender drawings issued


by

Electrical consultants for installation.

• After installation the entire installation shall be tested &


commissioned with the respective authorities.

• As built drawings shall be prepared and handed over to client’s


representative.

        After
the
completion
of the course, the participants would be able to : 
·         Handle the basic tools & equipments in the workshop with safety

·         Upkeep of the workshop tools & equipment

·         Identify the main mechanical components & electric motors used in RAC trade

·         Maintain the inventory

·         Install a refrigerator/room air conditioner/water cooler/deep freeze

         Service a refrigerator/room air conditioner/water cooler/deep freeze

·         Do Pre-delivery inspections

·         Check performance

·         Identify refrigerants using gauges

·         Air conditioner wiring

Detailed Course Content

I Basic Refrigeration & Air Conditioning 

i)                    Familiarization of Safety Procedures

ii)                  Identification of tools & equipments

iii)                Care and Maintenance

iv)                Identification of different types of :

a.       Compressor ( open type, Semi sealed ,


Sealed )b.       Condenser ( air cooled/ Water cooled)

c.       Evaporator

d.       Expansion device

e.       Use of thermometer

f.        Gauges( Compound & Pressure)

v)                  Use of measuring instruments such as

a.       Volt meter

b.       Ammeter

c.       Ohmmeter

d.       Multi meter

.       Series and Parallel Connection

vi)                Test of open & Short Circuit

vii)              Identification of various electric motors

viii)            Service & installation of Refrigerator & Air

Conditioner, Bottle Cooler, Water Cooler

II Repair & Maintenance of Refrigerator/Deep Freeze/Water Cooler

i)                    Cut, Flare, Swag, Braze

a.       Prepare joints before brazing

b.       Flare & Swag copper pipes


.       Braze

i)                  Practice measuring, Voltage, Current, Resistance

a.       Measure current, Potential difference, Resistance

b.       Check series of the compressor with the help of test lamp and Multi meter

iii)                Check resistance, Diode, Relay, thermostat, OLP etc.

iv)                Refrigerator & deep freezer wiring practices

a.       Refrigeration wiring

b.      Deep freezer wiring

v)                  Service of Refrigerator & deep freezer

a.       Replacement of Components

b.      Flush, Vaccumise & Gas Charging

c.       Performance testing

vi)                Trouble Shooting & Performance of Refrigerator/Deep freezer/Water


Cooler

a.       Fault finding in refrigerator

b.      Fault finding in Deep freezer.


c.       Fault Finding in Water Cooler

III Repair & Maintenance of Air Conditioners

i)                    Familiarization of Safety Procedures

ii)                  Identification of tools & equipments

iii)                Cut, Flare, Swag, Braze

a.       Prepare joints before brazing

b.       Flare & Swag copper pipes

c.       Braze

iv)                Practice measuring, Voltage, Current, Resistance


a.       Measure current, Potential difference, Resistance

b.       Check series of the compressor with the help of test lamp and Multi meter

v)                  Test electrical components used in Air Conditioner

a.       Relay testing, Thermostat, timer, starting capacitor, running capacitor, over
load protector, Fan capacitor, Fan / blower motor.

b.       Checking up of Compressor winding

vi)                All the A/c. unit wiring

a.       PSC, CSC, Split Ac With remote & without Remote wiring

vii)              Service of Window type air conditioner

a.       Fan/ Blower motor service

b.       Dismantling & assembling the unit


c.       Replacing of components

d.       Gas charging system

e.       Performance Testing

viii)            Service of split type air conditioner

a.       Fan/ Blower motor service

b.       Appliance Assessing

c.       Unit Dismantling & assembling

d.       Replacing of components

e.       Gas charging system


f.        Performance Testing

ix)                Trouble Shooting & performance of Air conditioner

x)                  units

a.       Fault finding in Window Ac/Split AC

b.       Fault finding in Remote window Ac

c.       Fault finding in Remote split Ac

d.      Air filter unit

           

urses Description

I.  Plumbing Systems As per NBC and UPC

Fundamentals of Plumbing System 


 

Introduction

Definitions

Concepts

Fixtures, Faucets and Fixture fittings

•      Wash Basin

•      Water Closet

•      Bidet

•      Bath Tub

•      Shower

•      Urinals

•      Kitchen Sink

•      Floor Drain

Design of Domestic Water Supply and Distribution System 

Requirements of Water Supply System

Water Demand Calculations


Water Storage Calculations

•         Underground Sump(UGS) sizing

•         Elevated storage Reservoir(ESR) sizing

Internal Water Supply System

•         Direct Pumping System

•         Hydro-pneumatic system

•         Over Head tank distribution system

Design Procedure for Internal Water Supply System

Flow rate (q) & Loading Unit (z) – From Probability equation

Hazen Williams Formula for Head Loss Calculation

Internal Water Supply Pipe sizing calculations]

Pumping Calculations – HP/Watts

Number of tapping to be connected in Bigger Diameter Pipe

Material used in Internal water supply system

External Water Supply System

•         Number of Population served

•         Number of Fixtures served by Each Pipe

Design Procedure for External Water Supply System

External Water Supply Pipe Sizing Calculations


Material used in External water supply system

Water Supply Schematic Layout 

  

Design of Sanitary Drainage System

Requirements of Sanitary Drainage System

Types of Sanitary Drainage Systems

•         Single stack system

•         Single stack (partially ventilated) system

•         One Pipe System

•         Two Pipe System

System requirement for Internal Sanitary Drainage System

Internal Sanitary Drainage Pipe Sizing Calculations

Design Procedure for External Sanitary Drainage System

External Sanitary Drainage Pipe Sizing Calculations

Calculation of Slope by Manning’s formula

Calculating Depth of Inspection Chamber/ Manholes

Sanitary Drainage Schematic Layout


Design of Storm Water Drainage System

Using Continuity Equation, Manning’s Formula and Rational Formula

Storm Water Drainage Pipe Sizing Calculations

Material used in Sanitary Drainage system

Introduction to the specialized PHE

Schematic Layout of Water Treatment Plants

Schematic Layout of Sewage Treatment Plants

Plumbing Drawings

Typical Floor Plan - Plumbing Layout

Toilet Plan & Elevations

Enlarged Toilet - Plumbing Layout

Toilet Fixtures Mounting Details

Enlarged Kitchen & Utility - Plumbing Layout

Water Supply, Drainage & RWP - Schematic

  
II. Fire Fighting Systems 

Fundamentals of Fire Protection System

Introduction

Definitions

  

Requirements of Fire Protection System

Fire extinguisher

Hose Reel

Dry Riser

Wet Riser

Down Comer

Yard Hydrant

Automatic Sprinkler system

Introduction to the Fire Detection Application 


Design of Fire Protection Schematic Layouts and Pipe Sizing 
Design of Fire Water Storage and Pumping Calculations