A 001 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from second floor level to roof level
PER Cu.m
A 002 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from first floor level to second floor level
PER Cu.m
A 003 Demolition of brick work in cement motar, bricks stacked and debris cleared away
from ground floor level to first floor level
PER Cu.m
A004 Demolition of cadjan roof or wall, timber stacked and debris cleared away, for
single storey building
PER Sq.m.
PER Sq.m.
PER Sq.m.
SUB TOTAL 0
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
A007 Demolition and removing of reinforced concrete (100mm) in roof or floor slabs
and debris cleared away (first floor level) scaffolding paid seperately
PER Sq.m.
A008 Removal of Galvanised iron or asbestos or aluminium corrugated sheets from roofs or
wall from a single storey building and stacked. Removal of frame work paid seperately
PRE Sq.m.
A009 Removal of corrugated Galvanised iron or asbestos or aluminium sheets from roof
or walls of two storeyed buildings and stacked. Removal of frame work paid seperately
PER Sq.m.
A010 Removal of corrugated Galvanised iron or aluminium or asbestos sheets from roof or
walls of 3 storeyed buildings. Removal of frame work paid seperately.
PER Sq.m.
SUB TOTAL 0
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
Vibrator hour
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
Carpenter Hour
Glazier Hour
Mason Hour
Painter Hour
Plumber Hour
Tinker Hour
Basin 360 x 560 with tap waste plug but excluding No.
Bitumen * Kg.
Boiled Lime Kg
Brick 1000nos
Cement 50kg
Cistern High level C.I. - including 1/2" dia Ball Valv No.
Clay m3
Coconut rafters m
*
DPC Tar Lit.
Note:-
The Undermentioned prices for the year are fixed with due consideration to the prices quated by Suppliers/ Manufactures with all taxes except Goods Services
Tax.
Emulsion * Lit.
Enamel * Lit.
Glue Kg.
Gravel m3
Holdfasts Nos.
Metal 20mm m3
Metal 25mm m3
Metal 40mm m3
Metal 50mm m3
Plugs No.
Sand m3
Snowcem Kg.
Thinner * Lit.
Weathershield * Lit.
Wood plugs. m
PER No.
A012 Removal of a door or a window frame including sashes (size over 4 sq.m.) from
existing wall and stacked
PER No.
A013 Removal of door or window sash(size upto 4sq.m.)from existing wall and
stacked.
PER No.
A014 Removal of door or window sash from existing wall(over 4sq.m.)and stacked.
PER No.
PER L.m.
A016 Demolition of brick drains and clearing debries as directed. Rate included to
backfill the drain with the available earth and compacted.
PER L.m.
A017 Removal of expanded metal or mesh from existing frames and stacking as
directed.
PER m2
A018 Uprooting of fence post, rolling up barbed wire and stacking all material as
directed. (length of the fencing to be measured).
PER L.m.
A019 Demolition of brick paved cement rendered floors and cleaning debris as directed
(75mm to 100mm thick floor)
PER M2
A020 Removing and stacking of gate sash (02 Nos.) after demolishing two cement concrete
columns or removing two posts and seperating pintles.
PER No.
A021 Removing glass panes in doors, windows and fanlights and stacking as
directed
PER M2
A022 Removing eaves gutter from roof of single storeyed buildings and stacking
as directed.
PER L.m.
A023 Removing eaves gutter from roof of two storeyed buildings and stacking
as directed.
PER L.m.
A024 Removing eaves gutter from roofs of 3 or more stroyed buildings and
stacking as directed.
PER L.m.
A025 Removing partition and stacking at site including making good to walls and floors.
Rate to include painting new plaster patches to match existing colour.
Note :- Material cost will cover from the labour cost.
PER M2
A026 Chipping and removing of lime plaster on Brick walls, cement concrete walls
and clearing debris as directed.
PER M2
A027 Chipping and removing of cement rendering on brick walls and floors and
clearing away debries.
PER M2
A028 Chipping and removing of cement rendering on cement concrete walls and
floors and clearing away debris
PER M2
A029 Removing roof tiles and timber and stacking serviceable material at ground and
clearing debris in single storeyed buildings.
PER M2
A030 Removing roof tiles and timber and stacking serviceable material and
clearing debris in 2 storeyed buildings
PER M2
A031 Removing roof tiles and timber and staking serviceable material at ground and
clearing debries in 3 storeyed buildings.
PER M2
A032 Demolition of rubble masonary in cement sand motar and stacking rubble and
clearing debris as directed.
PER M3
A033 Demolition of rubble masonary in lime cement sand motar stacking rubble and
clearing debris.
PER M3
A035 Removing half round tiles or calicut tiles from roof of single storeyed buildings
and stacking as directed at ground.
PER M2
A036 Removing of half round tiles or calicut tiles from roof of two storeyed buildings and
stacking as directed at ground.
PER M2
A037 Removing half round tiles or calicut tiles from roof of three storeyed building and
stacking as directed at ground
PER M2
A038 Removing water proof treatment of bitumen from flat roof and clearing
debris as directed
PER M2
A039 Removing asbestos ceiling including timber frame work, stacking serviceable materials
at ground and clearing debris as directed in single storeyed building.
PER M2
PER M2
A041 Removing valance barge boarding, stacking materials and clearing away
the debris in single storeyed buildings.
PER L.M.
A042 Removing valance barge boarding, stacking materials and clearing debris
as directed in two storeyed buildings.
PER L.M.
A043 Chipping of cement lime sand plastering in soffit and cleaning debris as directed
PER m2
A044 Cutting down trees girth not exceeding 600mm, grubing uprooting, logging and
stacking and fill in excavation with earth.
PER Nos.
A045 Cutting down trees, uprooting and grubbing girth exceeding 600mm but
less than 900mm excavation filled in earth logging and stacking.
PER No.
A046 Cutting down trees, uprooting and grubbing girth exceeding 900mm but
less than 1200mm excavation filled in earth logging and stacking.
PER No.
A047 Cutting down trees, uprooting and grubbing girth exceeding 1200mm but less than
1600mm excavation filled in earth, rate to include logging and stacking
Per No.
B001 Excavation of drains in any soil except rock requiring blasting as directed
by the engineer and soil deposited within site.
PER M3
B002 Excavation for foundation to a depth not exceeding 1.5 m in any material except rock
requrin blasting part return fill in and ram and surplus disposed within the site as directed
PER M3
B003 Excavation and levelling site in any material except rock requiring
blasting surplus disposed including transport upto 0.4Km depositing and
levelling
PER M3
B004 Filling under floors with gravel or other approved quality of filling spread,
watered and well rammed in 75mm layers (material avialable at site)
PER M3
B005 Filling under floors with gravel or other approved quality filling spread
and well rammed in75mm layers with imported earth (1.6Km transport)
PER m3
B006 Filling under floors with gravel or other approved quality of filling spread
watered and rammed in 75mm layers(6Km transport).
PER M3
PER M3
PER M3
C003 1:2 1/2:5 (25mm) cement concrete for volumes exceeding 3 cu.m.
PER M3
C004 1:2 1/2:5 (25mm) cement concrete for volumes upto 3 cu.m
PER M3
PER M3
PER M3
PER L.M
PER L.M
PER No.
C010 225mm high 75mm thick curb in cement concrete including and 15mm
thick 1:2 cement rendering Rate to include excavation.
PER L.M.
PER L.M
PER L.m
PER L.M.
PER L.m.
PER L.M.
PER L.M.
PER L.M
C018 340mm x 300mm size beam in 1:2:4 (20mm) cement concrete including
shuttering (reinforcement paid for separately.)
PER L.m
PER No.
C020 100mm thick flat roof in 1:2:4 (20mm) cement concrete and reinforced
with expanded metal, 12mm thick 1:2 cement rendering with 5% pudllo
cement and lime puttying soffit complete (reinforced paid seperately)
PER M2
L001 Unskilled labour Hour 8.75 0.00 0.00
L002 Skilled labour Hour 3.50 0.00 0.00
M014 Cement 50 Kg. 0.70 0.00 0.00
M007 Sand Cum 0.08 0.00 0.00
M006 Metal 20mm Cum 0.10 0.00 0.00
M008 Boiled lime Kg. 0.65 0.00 0.00
M012 Pudlo Cement Kg. 0.40 0.00 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
C021 75mm thick slabs over drains in 1:2:4(20mm) cement concrete reinforced
12mm 1:2 cement sand rendered (reinforcement paid seperately)
PER m2
PER No.
C023 100mm x75mm x 50mm spur stones in 1:2:4 (20mm) cement concrete
for door posts supplied and fixed
PER No.
C024 Squatting plates for latrines in 1:2:4(20mm) cement concrete with mild steel
reinforcements 225mm centres both ways.
PER No. say - 1.25 x 1.25 x 0.10 m
PER m3
PER m3
PER m3
PER m3
PER M3
PER m3
C032 Shuttering for floor slab concrete including 100mm x 50mm class ii
joints and necessary props( rate to include for removal)
PER m2
C033 Shuttering for 225mm x 225mm column shafts including class ii timber
joists and necessary props. ( rate to include for removal).
PER m2
C034 Shuttering for beams sides, soffit including class ii timber joists and
necessary props (rate include for removal)
PER m2
C035 1:2:4 (20mm) cement concrete in lintol and beams in ground floor using
mixer and vibrator (reinforcement and shuttering paid for separately)
PER m3
C036 1:2:4(20mm) cement concrete in lintol and beams as per item co35 in 1st floor
PER m3
PER m2
D001 Segmental brick arch in 1:3 cement sand mortar including centering
PER m3
D002 225mm Brick work in 1:5 cement sand mortar (above 3 cu.m) upto 1st floor level
PER m3
D003 225mm brick work in 1:5 cement sand mortar upto 1st floor level (upto 3cu.m)
PER m3
D004 225 brick work in 1:5 cement sand mortar in piers upto 1st floor level
PER m3
L001 Unskilled labour Hour 18.330 0.00 0.00
L002 Skilled labour Hour 12.730 0.00 0.00
M010 Brick 1000 Nos 0.517 0.00 0.00
M007 Sand Cum 0.090 0.00 0.00
M014 Cement 50 kg. 1.300 0.00 0.00
D005 225mm brick work in 1:5 cement sand mortar with bricks available at site
including sorting and clearing bricks
PER m3
D006 112mm brick work in 1:5 cement sand mortar upto 1st floor level
above 10 s.q.m.)
PER m2
D007 112mm brick work in 1:5 cement sand mortar upto 1st floor level(upto 10 sq.m.)
PER m2
D008 112mm brick work in 1:5 cement sand mortar using available bricks including
sorting and cleaning upto 1st floor level.
PER m2
D009 225mm brick work in 2.5 lime sand mortar upto first floor level (above 3cu.m)
PER m3
D010 225mm brick work in 2:5 lime sand mortar upto 1st floor level (upto 3Cu.m.)
PER m3
D011 225mm brick work in 2:5 lime sand mortar with bricks available at site,
including sorting out and cleaning bricks.
PER m3
D012 Extra over item D002 to D005 and D009 to D011 for brick work from
first floor level to seconed floor level
PER m3
D013 Extra over item D002 to D005 and D009 to D011 for brick work above second
floor level
PER m3
D014 Extra over item D006 to D008 for brick work from first floor level to
seconed floor level
PER m2
D015 Extra over item D006 to D008 for brick work above 2nd floor level
PER m2
D019 Weathered and throated brick coping in 1:5 cement sand mortar on 112mm thick
walls complete with 12mm thick 1:3 sand cement rendering and cement floating
coat.
PER L.m.
D020 Weathered and throated brick coping in 1:5 cement sand mortar on 340mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
D021 Wheathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls complete with 12mm thick 1:3 cement sand rendering and cement
floating coat.
PER L.m
D022 Weathered and throated brick coping in 1:5 cement sand mortar on 225mm
thick walls using available bricks complete with 12mm thick 1:3 cement sand
rendering and cement floating coat.
PER L.m
D023 Brick cornices in 1:5 cement mortar complete with 12mm thick 1:3
cement rendering up to 225mm projection and 225mm depth
PER L.m
PER No.
D025 300mm wide 225mm to 300mm deep, brick drains in with 112mm thick side walls
in 1:5 cement motar complete with 12mm thick 1:2 cement sand rendering with
smooth finish and necessary expansion joints(rate to included for excavation)
& backfilling.
PER L.m
D026 225mm wide 150mm to 225mm deep brick drains in 1:5 cement sand mortar
complete with 12mm thick 1:2 cement sand rendering with smooth finish and
necessary expansion joints (rate to included for necessary excavation and
backfilling) side walls should be 112mm thick.
PER L.m
D027 Scott's pattern drains including apron of overall width 750mm brick
masonary in 1:5 cement mortar and 12mm thick 1:2 cement sand rendering
and necessary expansion joints ( rate to include necessary excavation)
PER L.m
D028 300mm wide and 150mm to 225 high brick work in 1:5 cement sand motar
steps complete with 12mm thick 1:3 cement sand rendering with smooth
finish with 300mm deep foundation. Rate to include excavation.
PER L.m
D029 Formation of vent openings upto 300mm height and 150mm width on
existing walls and making good to walls. Rate to include painting to match
the existing colours.
PER No.
E001 Random rubble masonry in 1:5 cement sand mortar (above 3 cu.m.)
PER m3
E002 Random rubble masonry in 1:5 cement sand mortar (upto 3cu.m)
PER m3
E003 Random rubble masonary in 1:5 cement sand mortar using rubble available at
site including sorting out and cleaning rubble
PER m3
F001 Expansion joints in brick floors filled with bitumen and sand
PER L.m
F002 Expansion joints in concrete floors filled with bitumen and sand (to
full depth of concrete and rendering)
PER L.m
F003 75mm thick brick paved floor set in 1:5 cement sand mortar and including
12mm thick 1:3 cement rendering with smooth finish.
PER m2
F004 75mm thick brick paved floors set in 1:5 cement motar and 12mm thick
1:3 cement rendering with smooth finish with available brick including sorting out
and cleaning bricks.
PER m2
F005 75mm thick 1:2 1/2:5 (25mm) cement concrete floors including 12mm
thick 1:2 cement rendered with smooth finish with expansion joints filled with cement
and sand
PER m2
F006 100mm thick, 1:2:4 (20mm) cement concrete in upper floors including form
work, with 12mm thick 1:3 cement sand rendering with smooth finish and lime
putty rendering to soffit and expansion joints filled with cement and sand
(reinforcement paid for separately).
PER m2
F007 Spreading watering & ramming gravel in floors for 100mm thickness
PER m2
PER m2
F011 Supplying and fixing ceramic floor tiles to floors including 20mm
thick 1:3 cement sand bedding.
PER m2
M380 200mm x 200mm ceramic floor tile. No. 25.00 0.00 0.00
M014 Cement 50 Kg. 0.27 0.00 0.00
M007 Sand Cum 0.02 0.00 0.00
M010 Unskilled labour Hour 4.00 0.00 0.00
L020 Skilled labour Hour 5.60 0.00 0.00
ALLOW FOR WASTAGE
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
F012 Supplying and fixing of glazed tiles with all specials to walls including raking
plaster and bedding in 12mm thick 1:3 cement motar joints shall be filled with
tile grout.
PER m2
M021 Tile glazed 108 x 108mm * No. 86.000 0.00 0.00
M014 Cement 50 Kg. 0.270 0.00 0.00
M007 Sand Cum 0.021 0.00 0.00
L010 Unskilled labour Hour 4.000 0.00 0.00
L020 Skilled labour Hour 8.000 0.00 0.00
ADD 10% SPECIALS AND WASTAGES ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
F PAVIOR
F013 Supplying and fixing of glazed tiles to walls including raking plaster
and bedding in 12mm thick 1:2 cement motar (Tiles supplied by the
client
PER m2
F014 Supplying and fixing of pressed cement tiles of approved pattern and
colour to floors including 20mm thick 1:3 cement sand bedding
PER m2
M022 Tile cement pressed 200 x 200mm * No. 25.000 0.00 0.00
M014 Cement 50 Kg. 0.270 0.00 0.00
M007 Sand Cum 0.021 0.00 0.00
L010 Unskilled labour Hour 4.000 0.00 0.00
L020 Skilled labour Hour 5.600 0.00 0.00
ALLOW FOR WASTAGE
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
G- ROOFER
PER m2
G002 Supplying and fixing of corrugated GI (24 BWG) sheets roofing on class I timber
purlins complete including treating timber with wood preservatives
ridging measured seperately)
PER m2
G003 Supplying and fixing of corrugated GI (24 BWG) sheet on 100mm x 50mm
class I timber frame work for cladding
PER m2
G004 Supplying and fixing of corrugated GI (24 BWG) sheets on existing roof frame
or wall.
PER m2
G005 Supplying and fixing of corrgated asbestos sheet roofing on class I timber
purlins complete including treating timber with wood preservative
PER m2
PER m2
PER m2
PER m2
G009 supplying and fixing corrugated GI cladding on class I timber frame work
fixed complete.
PER m2
G010 24BWG Corrugated GI sheets fixid to roof wall or fence with necessary
cup washers hool bolts or screws (timber framing paid for seperately)
PER m2
PER No.
PER No.
PER No.
PER No.
PER No.
G016 Rectification of leaks in corrugated sheet roof patched with jute hesseian
dipped in asphalt and laid over with a cement and sand layer.
PER No.
PER L.M.
G018 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
to match tiles
PER L.m.
M028 Ridge tile calicut pattern Gr. I Nos. 3.000 0.00 0.00
M007 Sand Cum 0.010 0.00 0.00
M008 Slaked lime Kg. 2.280 0.00 0.00
M0143 Cement 50 Kg. 0.050 0.00 0.00
L001 Unskilled labour Hour 0.550 0.00 0.00
L002 Skilled labour Hour 0.550 0.00 0.00
G019 Calicut pattern ridging bedded in cement sand and lime mortar 1:1:4 coloured
to match tiles (Tiles available at site).
PER m
PER L.M.
PER L.M
G022 Half round tile ridging bedded in lime cement mortar 1:1:4 and coloured to
match tiles.
PER L.M
G023 Ridging with half round bedded in lime cement mortar 1:1:4 coloured to
match tiles. Tiles available at site
PER L.M
G024 Ridging with half round or calicut pattern tiles removed and relaid in lime
mortar 1:1:4 and coloured to match the tile
PER L.M
G025 0.6m X 0.6m x 5mm thick ribbed skylight glass supplied and fixed to
roof including necessary lime cement filleting
PER No.
G026 Supplying and laying calicut pattern flat tiles (up to 5 tiles) in single
storeyed building on existing frame.
G027 Supplying and laying calicut pattern flat tiles(above 5 tiles) in single
storeyed building
G028 Supplying and laying calicut pattern flat tiles (upto 5 tiles) in buildings of
more than one storey
G029 Supplying and laying calicut pattern flat tiles (above 5 upto 25 tiles)
in building of more than one storey
PER m2
G031 Laying calicut pattern tiles in any building (Tiles available at site)
PER m2
G034 Glass tiles laid in small quantities including fixing with G.I. Wire where
necessary (tiles supplied by the client)
PER No.
G036 Supplying and laying half round tiles upto 50 Nos. in single storeyed building
G037 Supplying and laying half round tiles above 50 and upto 100 in single
storeyed buildings.
G038 Supplying and laying half round tiles upto 50 on buildings of more than
one storeyed
G039 Supplying and laying half round tiles above 50 and upto 100 in number
on roof of buildings of more than one storeyed
PER m2
G041 Half round tiles laid in any building (Tiles available at site)
PER m2
PER m2
PER m2
G044 Supplying and laying one layer half round tiles over the existing asbestos roof
PER m2
M030 Tile half round (asbestos covering) Gr. I No. 38.00 0.00 0.00
L001 Unskilled labour Hour 0.08 0.00 0.00
G045 Supply and fixing of calicut pattern tiled roof on class I sawn timber frame work
including ridges, hips etc.
PER M2
I001 40mm to 50mm x 12mm plain chamfered class I timber beading fixed
complete with brass screw.
PER L.m.
M381 40mm to 50mm x 12mm local class I timber m 1.05 0.00 0.00
M382 Screws Brass 40mm x Gauge 8 Nos. 1.57 0.00
L001 Unskilled labour Hour 0.13 0.00 0.00
L002 Skilled labour Hour 0.13 0.00 0.00
I002 25mm x20mm plain chamfered Imported timber beadings fixed complete
with brass screws
PER L.m
I003 Beading or filleting in Class I timber for glass panes fixed complete
with brass springs of brass panel pins.
PER L.m
M384 12mm x 12mm local class I timber fillets m 1.100 0.00 0.00
L002 Skilled labour Hour 0.200 0.00 0.00
I004 Beading or filleting on under side of ceiling removed and re fixed with
brass screws complete.
PER L.m
M382 Screws Brass 40mm x Gauge 8 Nos. 2.0 0.00
L001 Unskilled labour Hour 0.2 0.00 0.00
L002 Skilled labour Hour 0.2 0.00 0.00
SUB TOTAL 0.00
OVER HEAD & PROFITS 0.00
TOTAL 0.00
I005 Beading filleting in class I local timber for glass panes fixed complete
with brass springs or brass panel pins
PER L.m
M386 12mm x12mm local class I timber fillets Lm. 1.1 0.00
L002 Skilled labour Hour 0.2 0.00 0.00
PER L.m
I005 Barge valance facia boards 20mm thick in class I timber fixed complete
with necessary iron screws (above 0.03 m3)
PER m2
I006 Barge valance facia boards 20mm thick in class I local timber fixed
complete with necessary iron screws (upto 0.03 m3)
I007 Barge valance facia boards 20mm thick in class II timber fixed complete
with necessary iron screws (above 0.03 m3)
PER m2
I008 Barge valance facia boards 20mm thick in class II local timber fixed
complete with necessary screws (upto 0.03 m3)
PER m2
I009 Barge valance facia boards available fixed including cutting and minor
repairs
PER m2
I010 Flat asbestos ceiling fixed to 100mm x 50mm joists and 50x50mm bearers
of class I timber including 40mm x 12mm cover fillets and 40 x 40mm coves
of class I timber. 2coats of alkali resisting primer and 2 coats of emulision paint.
PER m2
L001 Unskilled labour Hour 3.313 0.00 0.00
L002 Skilled labour Hour 1.767 0.00 0.00
L005 Painter Hour 1.767 0.00 0.00
M043 Timber Beams Class I Cu.m. 0.013 0.00 0.00
M037 Wire nail S.W.G. 12 to 14 * Hour 1.767 0.00 0.00
M141 Wood preservative (black / coloured) * Hour 1.767 0.00
M024 Asbestos plain ceiling sheet 1220 x 1220mm No. 0.75 0.00 0.00
M391 20mm G.I. Clout nails Kg. 0.025 0.00 0.00
M384 40mm to 50mm x 12mm local class I timber m 0.084 0.00 0.00
M382 Screws Brass 40mm x Gauge 8 No. 1.078 0.00
M469 Cove moulding(63mmx40mm)local class I m 1.00 0.00 0.00
M084 Alkali resisting primer * Lit. 0.020 0.00 0.00
M073 Emulsion * Lit. 0.040 0.00 0.00
PER m2
I012 Asbestos ceiling or partition fixed with clout heading nails to existing
bearers or frames (beadings or cover fillets paid seperately)
PER m2
M024 Asbestos plain ceiling sheet 1220 x 1220mm No. 0.75 0.00
L001 Unskilled labour Hour 0.65 0.00 0.00
L002 Skilled labour Hour 0.43 0.00 0.00
M391 20mm G.I. clout nails Kg. 0.006 0.00 0.00
ALLOW FOR SCAFFOLDING
PER m2
M024 Asbestos plain ceiling sheet 1220 x 1220mm No. 0.75 0.00
L001 Unskilled labour Hour 0.650 0.00 0.00
L002 Skilled labour Hour 0.430 0.00 0.00
M391 20mm G.I. clout nails Kg. 0.006 0.00 0.00
ALLOW FOR SCAFFOLDING
PER L.m
I014 Lunumidella ceiling fixed with wire nails (boards available at site)
PER m2
PER m2
PER m2
PER No.
PER m2
I019 Cove moulding with 63mm x 40mm imported class I timber fixed with
brass screws and plugs new or renewed
PER L.m
I020 Supplying and fixing of Doors and Windows ledged, braced and battened with
grooved and tongued joints 100mm x 75mm frames and 20mm thick sashes in
class I local timber complete with brass furniture with local mortice lock for doors
heavy gauge stays fastners and barrel bolts for windows.
PER m2
I021 Supplying and fixing of 20mm thick ledged, braced and battened sashes and
100mm x75mm frames in class II timber for doors and windows with local
mortice lock for doors or heavy gauge casement stays, fastners and barrael
bolts for windows.
PER m2
M044 Timber beams Class ii Cu.m. 0.03 0.00 0.00
M047 Timber plank 25mm class II Sq.m 1.30 0.00 0.00
M382 Brass screws (40mm) Guage 8 Nos. 40.00 0.00
M389 Screws Brass 50mm x Guage 10 Nos. 4.00 0.00
M117 Hinge Butt Brass 100mm x 63mm * Nos. 1.00 0.00 0.00
M127 Lock mortice single local made Nos. 0.70 0.00 0.00
L001 Unskilled Labour Hour 6.00 0.00 0.00
L002 Skilled Labour Hour 16.00 0.00 0.00
ALLOW FOR SPUR STONES RAWL, DOWELS SAND PAPER ETC.
SUB TOTAL 0.00
OVER HEAD & PROFITS 22.00% 0.00
TOTAL 0.00
I CARPENTER & JOINER
I022 Supplying and fixing of 20mm thick ledged, braced and battened sash
only for doors and windows in class I timber fixed with available furniture
PER m2
I 023 Supplying and fixing of 20mm thick ledged, braced and battened sash
for door and windows in class II timber fixed with available furniture.
PER m2
I024 Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
and 100mm x 75mm frame class I local timber complete with brass
furniture, for doors and windows (locks paid seperately)
PER m2
I025 Supplying and fixing of 25mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks paid seperately)
PER m2
I026 Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class I local timber complete with brass
furniture for doors and windows (locks paid seperately)
PER m2
I027 Supplying and fixing of 32mm thick framed and 15mm thick battened sashes
with 100mm x 75mm frames in class II local timber complete with brass
furniture for doors and windows (locks opaid seperately)
PER m2
I028 Supplying and fixing of 25mm thick, ledged, braced and battened sash in class I
timber for doors and windows (Barrel Bolts, Skeleton Bolts paid seperately)
PER m2
I029 Supplying and fixing of 25mm thick, ledged , braced and battened sash in class II
local timber for doors and windows( Barrel Bolts & Skeleton Bolts paid seperately)
PER m2
I030 Supplying and fixing of 32mm thick, ledged, braced and battened sash in class I
timber for doors and windows. (Barrel Bolts & Skeleton Bolts paid seperately)
PER m2
I031 Supplying and fixing of 32 thick, ledged, braced and battened sash in class II local
timber for doors and windows (Barrel Bolts & Slkeleton Bolts paid seperately)
PER m2
I032 Supplying and fixing of 25mm thick sash in imported timber for doors and
windows (Iron Mongery glazing paid seperately)
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I033 Supplying and fixing of battened, door for gurge 32mm framed 15mm thick battened w
125mm x 100mm frames in class I timber with iron pintels and strap hinges Iron towe
for Hasp & Staple.
PER m2
M381 Hasp and staple Iron 100mm * No. 0.200 0.00
M382 Screws Brass 40mm x Gauge 8 Nos. 3.400 0.00
M043 Timber beams class I Cu.m 0.02 0.00
M051 Timber plank 38mm class I sq.m 0.60 0.00
M425 25mm thick planks of class I local timber M2 0.64 0.00
M429 Holdfasts - 250 x 25 x 6 Nos. 1.00
M430 Pintels and stay hinges 50mm x 6mm x 1m Nos. 1.00 0.00
M062 Bolt & nut iron 45 x 6mm Nos. 5.00
M068 Bolt Tower iron 75mm * Nos. 0.20 0.00
L001 Unskilled labour Hour 4.000 0.00
L002 Skilled labour Hour 6.000 0.00
ALLOW FOR SPUR STONES SAND PAPER DOWELS
ALLOW FOR MACHINE PLANING
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I034 Supplying and fixing of glazed and panelled, 32mm thick sash and with 100mm x 75m
in class I local timber for doors and windows including all Brass furniture. (Door lock
seperately)
PER m2
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
I036 Supplying and fixing of doors or windows glazed and or panelled sashes
32mm thick in class I timber with brass furniture.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I037 Supplying and fixing of glazed or panelled, 32mm thick sashes in class
II timber with brass furniture for doors and windows.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I038 Supplying and fixingbof panelled 31mm thick sash and 100mm x 75mm
frames in class I timber and trelised with weld mesh no.32 and complete
with brass furniture
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I039 Supplying and fixing of 31mm door sash panelled and terllis with Gal
weld mesh with 31 class I timber and available furniture.
PER m2
SUB TOTAL
OVER HEADS & PROFITS 22 %
TOTAL
I040 Supplying and fixing of 32mm panneled doors sash and with BRC No. 32
weld mesh in class I timber with available furniture.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I041 Supplying and fixing of 32mm panelled door sashes and 100mm x 75mm
frames in class I timber fixed complete with brass furniture. (door lock paid seperately
PER m2
PER No
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I044 Renewing in short lenghs with Class I timber in Doors and Windows frames.
PER L.m.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
I045 Altering door or window frame by filleting existing rebate using Class I
timber and rehanging screws and sashes on opposite side.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I046 Renewing of glazing bars in door or windows in Class I timber, (per 2.0m,
32mm x 32mm)
PER m
M432 40mm x 40mm class I timber sash bars L.m. 1.17 0.00
L002 Skilled labour Hour 2.80 0.00
L001 Unskilled labour Hour 0.94 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I047 Fixing of louvered Door or Window sash 25mm to 32mm in Imported Timber with
available furniture.
PER m2
I048 Supplying and fixing 38mm x 38mm x 125mm tapered doors tops in Class I
timber
PER Nos.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I049 Fixing of door or window sashes to position (sash and fittings supplied by client)
PER NO.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
PER NO.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I051 Supplying and fixing of 25mm thick swing doors (900mm x 450mm each) with
12mm panel or glazed and panelled in Class I timber including brass gravity hinges.
PER PAIR
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
I052 Supplying and fixing 25mm thick swing doors (900mm x 450mm each) panels in
Class I timber complete with gravity hinges.
PER pair
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I053 Supplying and fixing quadrant fillets 20mm x 20mm with spring or nails
in Class I timber.
PER m
M388 25mm x 25mm class I local timber fillets Lm. 1.10 0.00
L002 Skilled labour Hour 0.33 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I054 Supplying and fixing quadrant fillets 25mm x 25mm with springs or nails in Class I
timber.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I CARPENTER & JOINER
I055 Supplying and fixing of gate sash with available posts at site including fixing post
(Gate and posts supplied by Client)
PER sash
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I056 Supplying and fixing of louver blades with 10mm minimum thickness in
Class I timber up to 100mm width.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I057 Supplying and fixing of louvers blades with 10mm minimum thickness and
100mm to 150mm wide in class I timber.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I CARPENTER & JOINER
I058 Supplying and fixing of louver blades with a 10mm minimum thickness and
150mm to 225mm wide in Class I timber.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I059 Fixing of available partitions including making good to walls and floors.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
I060 Fixing of full panelled or panelled and glazed 38mm thick partitions with
100mm x 50mm frames and 25mm x 25mm quadrant fillets, complete with
brass screws in Class I local timber.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I061 Fixing of glazed and plywood panelled partitions in Class I timber with
100mm x 100mm x 300mm intermediate posts 100mm x 50mm x 2150mm and
40mm x 200mm capping complete.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
I062 Supplying and fixing 100mm long tapered 75mm x 50mm plugs in Class I
timber on walls with 1:3 cement mortar finish neately.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I063 Supplying of 3 ply plywood panels 6mm thick and fixing to existing frames (beading p
separately).
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I064 Fixing of 2135mm long, 125mm x 125mm verandah post tapering to 100mm x 100mm
on spur stone in Class I timber(Spur stone paid for separately).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I CARPENTER & JOINER
I065 Fixing of 2135mm long, 150mm x 150mm verandah post tapering to 125mm x 125mm
on spur stone in Class I local timber(Spur stone paid for separately).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I066 Fixing of round jungle timber available wooden posts 150m to 200mm(posts
supplied by Client).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I CARPENTER & JOINER
I068 Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood prese
PER m
I069 Supplying and fixing of 50mm x 25mm reepers in Class I timber new or renewed with
nails over 30m (Shifting of tiles paid for separately) Rate include applying wood prese
PER m
I070 Supplying and fixing of 50mmx25mm reepers in ClassII local timber new or renewed
nails up to 30m (Shifting of tiles paid for separately) Rate include applying wood prese
PER m
PER m
I072 Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails up to 30m.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I CARPENTER & JOINER
I073 Supplying and fixing of 50mm x 12mm reepers in Class I local timber new or renewed
with Iron nails over 30m and apply wood preservative.
PER m
I074 Fixing of available reepers with wir nails and apply wood preservative.
PER m
PER m2
SUB TOTAL
OVER HEAD & PROFITS
TOTAL
I076 Supplying and fixing calicut pattern tiled roof on Class II sawn timber frame work
including ridges, hips etc.
PER m2
I078 Supplying material and fixing half round tiles roof on Class II sawn timber
frame work including fidges, hips etc.
PER m2
M044 Timber beams class II Cu.m. 0.017 0.00
M485 50mm x 25mm Class II timber m 7.218 0.00
M028 Ridge tile calicut pattern Gr. I m 0.810 0.00
M029 Tile half round Gr. I No. 61.340
M037 Wire nail S.W.G. 4 to 10 * Kg. 0.065 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.016 0.00
M141 Wood Preservative (black / coloured) * Lit. 0.245
M014 Cement 50 Kg. 0.027 0.00
M416 Slaked lime Bushels 0.027 0.00
M007 Sand Cum 0.004 0.00
L002 Skilled labour Hour 1.794 0.00
L001 Unskilled labour Hour 1.794 0.00
ALLOW FOR COLOURING POWDER ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I079 Sorting out of available timber cut to required sizes and fixed in partitions and frames.
PER m3
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I080 Sorting out of available timber cut to required sizes and fixed in roof and other
carpentry work.
PER m3
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I081 Fixing or renewing partitions and frames with Class I timber (excluding Milla)
including panels and boards.
PER m3
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I082 Fixing or renewing partitions and frames with Class II timber
including panels and boards
PER M3
PER m3
I084 Fixing or renewing Class II timber in roof and other carpentry work.
PER m3
PERm
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I086 Renewing of trellis laths 16mm x 16mm in Class I local timber in quantities
up to 30m.
PERm
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I087 Renewing of trellis laths 25mm x 12mm in Class I local timber in quantities over 30m.
PERm
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I088 Renewing of trellis laths 25mm x 12mm in Class I local timber in small
quantities upto 30m.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I089 Supplying and fixing of trellis laths 25mm x 25mm in Class I local timber.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I091 Supplying and fixing in position 100mm x 75mm door frame in Class I
timber
PER m2
SUB TOTAL
OVER HEAD & PROFITS
TOTAL
I092 Supplying and fixing in position of 100mm x 50mm Class I timber door frames.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I093 Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 75mm frame in Class I timber complete
with brass furniture(lock paid for separately).
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I094 Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door hung on 100mm x 50mm frame in Class I timber complete
with brass furniture(lock paid for separately).
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I095 Supplying and fixing of 32mm thick ordinary sash single (ordinary finish)
plywood door on existing frame(lock paid for separately).
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I096 Supplying and fixing of 32mm thick marine type plywood door (ordinary water
proof) on existing frame.(lock paid for separately).
PER m2
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
I098 Supplying & fixing 2100 to 3000mm high, 4mm thick glazed partition with
10mm thick chipboad panels on 100 x 75mm & 100x100mm uprights at 900mm interv
& horizontal members in Cl I timber and 50 x 12mm timber beading around glass pane
PER m2
M515 10mm chip board (8'x4') * No. 0.400 0.00
M043 Timber beams class I Cu.m. 0.017 0.00
M198 Glass pane Clear 4mm Sq.m. 0.544 0.00
M384 40mm to 50mm x 12mm local class I timber fille m 2.220 0.00
M038 Wire nail S.W.G. 12 to 14 * Kg. 0.144 0.00
M133 Screws Brass 25mm x Gauge 8 Doz 0.473 0.00
L002 Skilled labour Hour 8.833 0.00
L001 Unskilled labour Hour 1.890 0.00
ALLOW FOR CEMENT, SANS ETC.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I099 Supplying & fixing 2100 to 3000mm high panelled partition with 12mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Cl I timber.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I100 Supplying & fixing 2100 to 3000mm high panelled partition with 10mm thick
chipboard on both sides with 100 x 50mm & 100 x 100mm upright fixed at
900mm intervals & 100 x 50mm as horizontal members in Class I timber.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I101 Supplying & fixing 12mm thick lunumidella planks inceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
I102 Supplying & fixing 20mm thick lunumidella planks in ceiling to frame work
consisting of 100 x 50mm joists and 50 x50mm bearers in Class I timber.
Rate to include for 2 coats of tarnap to joists and bearers.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J001 Supplying and fixing of 45mm x 6mm bolts and nuts with washers.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J002 Supplying and fixing of 65mm x 10mm bolts and nuts with washers.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J003 Supplying and fixing of 125mm x 10mm bolts and nuts with washers.
PER No.
M064 Bolt and nut iron 125 x 10mm * No. 1.000 0.00
L002 Skilled labour Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J004 Supplying and fixing of 225mm x 10mm iron bolts and nuts washers.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J005 Supplying and fixing 125mm x 12mm iron bolts and nuts with washers.
PER No.
M066 Bolt and nut iron 125 x 12mm * No. 1.000 0.00
L002 Skilled labour Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J006 Suupplying and fixing of 150mm x 12mm iron bolts and nuts with washers.
PER No.
M067 Bolt and nut iron 150 x 12mm * No. 1.000 0.00
L002 Skilled labour Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J007 Supplying of 75mm iron heavy quality tower bolts and fixing with iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J008 Supplying of 100mm iron heavy quality tower bolts and fixing iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J009 Supplying of 125mm iron heavy quality tower bolts and fixing iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J010 Supplying of 150mm iron heavy quality tower bolts and fixing them with
iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J011 Making 1000mm (approx) iron brackets out of 40mm x 6mm flat iron with fish
tail at end and fixing to walls and making good to walls.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J012 Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to existing frame
with staples (Fillets and beading paid separately).
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J013 Supplying 50mm x 50mm G.I. Weldmesh (gauge 10) and fixing to window frame
with 50 x 12mm Class II timber beading including painting mesh with red lead and
2 coats of enamel paint, beading with primer and 2 coats of enamel.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J014 Supplying and fixing of 50mm iron cabin hooks and eyes.
PER No.
M072 Cabin Hook & Eye Iron 50mm * No. 1.000 0.00
L002 Skilled labour Hour 0.330 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J015 Supplying and fixing of 75mm iron cabin hooks and eyes.
PER No.
M072 Cabin Hook & Eye Iron 75mm * No. 1.100 0.00
L002 Skilled labour Hour 0.330 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J016 Supplying and fixing of 150mm iron cabin hooks and eyes.
PER No.
M073 Cabin Hook & Eye Iron 150mm * No. 1.000 0.00
L002 Skilled labour Hour 0.330 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J017 Supplying and fixing of 200mm iron cabin hooks and eyes.
PER No.
M074 Cabin Hook & Eye Iron 200mm * No. 1.000 0.00
L002 Skilled labour Hour 0.330 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J018 Making iron gate with 40 x 40 x 6mm angle iron frame work including bracing and
horizontal centre member with 16mm M.S. bar at 150mm centres and fixing in
position.
PER m2
J019 Supplying of 20mm x 3mm gutter hook brackets and fixing in position with iron screw
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J020 Supplying of approved heavy quality safety type 100mm iron hasp and staples
and fixing in position with iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J021 Supplying of approved heavy quality safety type 150mm iron hasp and staples
and fixing in position with iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J022 Making 300 x 50mm hasp and staple out of 6mm iron plate and fixing in position
with 6 x 50mm bolts and nuts.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J023 Supplying and fixing of approved heavy quality 50mmx38mm iron butt hinges.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J024 Supplying and fixing of approved heavy quality 75mmx38mm iron butt hinges.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J025 Supplying and fixing of approved heavy quality 100mmx63mm iron butt hinges.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J026 Supplying and fixing of approved heavy quality 125mmx100mm iron butt hinges.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J028 Supplying and fixing of 40 x 6mm, 300mm long iron strap hinge with necessary
bolts and nuts excluding pintle.
PER No.
J029 Supplying and fixing of 50 x 6mm , 900mm long iron strap hinges with necessary
bolts and nuts including pintles.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J030 Supplying of 60 x 10 x 1050mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J031 Supplying of 65 x 10 x 1650mm iron double strap hinges, flat iron bend to shape
and fixing with bolts and nuts.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J032 Supplying and fixing of heavy quality 150mm iron T hinges with iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J033 Supplying and fixing of heavy quality, 200mm iron T hinges with screws.
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J034 Supplying and fixing of heavy quality 250mm iron T hinges with iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J035 Supplying and fixing of heavy quality 300mm iron T hinges with iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J036 Supplying and fixing of 3mm x 50mm x 225mm iron hold fasts.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J037 Cutting iron rods supplied by Client to correct length inserting in window frames
including painting with red lead and 2 coats of anti - corrosive paint.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J038 Supplying mild steel rods in reinforcing lintols, beams, columns and laid in position w
binding wire.
PER Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J039 Supplying mild steel rods in reinforcing foundation and laid in position with
G.I. binding wire.
PER Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J040 Bending and tying reinforcement and laid in position in beams lintols, floors, etc.
with G.I. Wire, Steel rod supplied by Client, (mild steel or tor steel)
PER Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J041 Bending and tying reinforcement and laid in position in foundation with
G.I. Binding wire, (mild steel or tor steel supplied by Client, )
PER Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J042 Supplying 16mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.
PER m
J043 Supplying 20mm dia. Mild steel bars and fixing in window frames at 100mm
centres including painting with red lead and 2 coats anti - corrosive paint.
PER m
J044 Supplying pintels for gates and garage doors and fixing in position in cement
concrete (Concrete paid separately.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J IRON MONGER
J045 Supplying and fixing 100mm x 16mm rag bolts with nuts, washers.
PER No.
J046 Supplying and fixing of 24 B.W.G. plain G.I. Sheets to existing frame with wire
nails.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
J047 Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in beams, columns, slabs etc. with binding wire.
PER Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00 %
TOTAL
J048 Supplying and BS 4449 high Yeild steel bars and laid in positing as reinforcement
in foundation with binding wire.
PER Kg.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K001 Removing and refixing of Bolts, casement fastners or stays, including making good
to holes in frames and sashes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K002 Supplying fixing and polishing of 63mm heavy quality brass barrel bolts with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K003 Supplying fixing and polishing of 75mm heavy quality brass barrel bolts with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K004 Supplying fixing and polishing of 100mm heavy quality brass barrel bolts with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K005 Supplying fixing and polishing of 125mm heavy quality brass barrel bolts with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K006 Supplying fixing and polishing of 150mm heavy quality brass barrel bolts with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K007 Supplying and fixing of 200mm brass skeleten bolts with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K008 Supplying and fixing of 250mm brass skeleten bolts with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K009 Supplying and fixing of 300mm brass skeleten bolts with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K010 Supplying and fixing of 450mm brass skeleten bolts with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K011 Supplying , fixing and polishing of 50mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K012 Supplying , fixing and polishing of 75mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K013 Supplying , fixing and polishing of 150mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K014 Supplying , fixing and polishing of 200mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K015 Supplying , fixing and polishing of 225mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K016 Supplying , fixing and polishing of 250mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K017 Supplying , fixing and polishing of 300mm heavy quality brass cabin hooks
with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K018 Supplying and fixing of Brass heavy quality casement fastners with mortice plate
polished, with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K019 Supplying , fixing and polishing of 250mm heavy quality casement stays.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K020 Supplying , fixing and polishing of 300mm heavy quality casement stays.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K021 Supplying and fixing of Heavy quality brass fanlight catches complete with brass
screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K022 Supplying, fixing and polishing of Heavy quality brass door handles with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K023 Supplying, fixing and polishing of 150mm brass safety type heavy quality
hasp and staple with brass screws complete.
PER No.
M112 Hasp and staple safety type Brass 150mm * No. 1.000 0.00
M394 Screws Brass 20mm x gauge 8 No. 7.000
L002 Skilled labour Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K024 Supplying, fixing and polishing of 100mm brass safety type heavy quality
hasp and staple with brass screws complete.
PER No.
M111 Hasp and staple safety type Brass 100mm * No. 1.000 0.00
M394 Screws brass 20mm x Gauge 8 No. 7.000
L002 Skilled labour Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K025 Supplying and fixing of brass hat hooks with brass screws
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K026 Supplying, fixing and polishing of 50mmx 38mm heavy quality brass butt hinges with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K027 Supplying, fixing and polishing of 75mmx38mm heavy quality brass butt hinges with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K028 Supplying, fixing and polishing of 89mm x63mm heavy quality brass butt hinges with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K029 Supplying, fixing and polishing of 100mm x 63mm heavy quality brass butt hinges wi
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K030 Supplying, fixing and polishing of 125mm x 100mm heavy quality brass butt hinges w
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K031 Supplying, fixing and polishing of Brass center pivot hinges(Consisting of 2 pieces)
heavy quality with brass screws..
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K032 Supplying and fixing of Brass gravity hinges with brass screws complete.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K033 Supplying, fixing and polishing of 100mm x 90mm brass parliamentary heavy quality
hinges with brass screws complete.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K034 Supplying, fixing and polishing of 125mm x 150mm brass parliamentary heavy qualit
hinges with brass screws complete.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K035 Supplying, fixing and polishing of 150mm x 180mm brass parliamentary heavy quality
hinges with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K037 Supplying and fixing 100mm brass, double acting springs hinges.
PER No.
M532 Hinge Spring Double Acting Brass 100mm No. 1.000 0.00
M135 Screws brass 30mm x Gauge 8 No. 8.000
L002 Skilled labour Hour 2.000 0.00
L001 Unskilled labour Hour 2.000 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K038 Fixing of hinges in position with brass screws, the hinges supplied by Client.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K040 Supplying, fixing and polishing good quality brass door knobs.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K043 Supplying 65mm brass, 4 lever approved quality locks for cupboards and fiixing
in position with brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K045 Supplying, fixing and polishing 150mm brass, 2 lever , approved qualiry rim
lock.
PER No.
M126 Lock Rim Double lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K046 Supplying, fixing and polishing 150mm brass, single lever , approved qualiry rim
lock.
PER No.
M127 Lock Rim single lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K047 Supplying, fixing and polishing 150mm brass, double lever , approved qualiry rim
lock.
PER No.
M126 Lock Rim Double lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K048 Supplying and fixing of 125mm good quality single lever rim lock.
PER No.
M127 Lock Rim single lever Brass 150mm No. 1.000 0.00
M133 Screws brass 25mm x Gauge 8 Doz. 0.500 0.00
L002 Skilled labour Hour 1.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K047 Supplying and fixing of night latch Yale or Union lock with duplicate keys.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K048 Supplying and fixing of 32mm to 40mm brass rings to doors and windows with
brass screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K BRASS FOUNDER
K049 Supplying and fixing of Union mortice lock (imported) for single sash.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
K050 Supplying and fixing of Union Mortice (Imported) lock for double sash.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
PER m2
PER m2
L003 65mm x 65mm Cove moulding build in existing walls in 1:2 cement mortar.
PER m
L004 Plastering of 50mm to 100mm wide cracks in wall with 1:3 cement plaster after
chipping.
PER m
L005 Cresting with broken glass in 1:4 cement mortar on coping of boundary wall.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L006 75mm x 12mm Ddo moulding in walls in 1:1:4 lime and cement mortar for
replacement to match existing, or to be extra over rate for plastering.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
L007 150mm x 25mm Dado moulding in walls in 1:1:4 lime and cement mortar only for
replacement to match existing or to be extra over rate for plastering.
PER m
L008 100mm x 50mm Dado moulding in cement and sand 1:2 built in existing wall or to be
over rate for plstering
PER m
L009 Laying of Flashing or plaster bands over tiles 100mm to 150mm wide on roof
in 1:1:4 cement and lime mortar rate including scaffolding and colour figment to match
tile colour
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
L010 Letters embosed in plaster 20mm thick 150mm high in cement and sand
1:2 cement floated and painted.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L011 15mm thick 1:1:5 Lime plastering and finished smooth with lime putty.
PER m2
L012 1:2 cement plastering flush in surface cracks including raking out joints and lime putty
floating and painting to matchthe existing surface
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
L013 15mm 1:3 cement sand plastering in brick masonary etc. including cement floating
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
PER m2
L023 Brown or Green cement floating in rendering with black cement and finish
smooth.
PER m2
L024 Black cement floating in rendering with black cement and finish smooth.
PER m2
PER m2
L026 12mm x 150mm Skirting in 1:3, projected on flush with wall and including
forming groove with smooth finish
PER m
L027 12mm x 150mm Skirting in 1:3 cement mortar projected in flush with wall
and finished with red cement floating including forming groove.
PER m
L028 15mm thick plastering , 1:1:3 cement lime and sand to R.C. beams and slab
sooffit including floating with lime putty.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L029 20mm thick, 1:2 cement sand D.P.C. and finished smooth with 2 coats of hot
tar blinded with coarse sand.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L PLASTERER
L030 12mm x 100mm skirting in 1:3 cement sand mortar in flush with wall and finished wit
smooth cement floating. Rate include for forming groove.
PER m2
M010 cement 50Kg. 0.022 0.00
M007 Sand Cu.m. 0.002 0.00
L004 Mason Hour 0.700 0.00
L001 Unskilled labour Hour 0.700 0.00
ALLOW FOR WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
L031 12mm x 100mm skirting in 1:3 cement sand mortar projected in flush with wall and
finished with colour cement floating. Rate include for forming groove.
PER m
M010 Cement 50Kg. 0.021 0.00
M007 Sand Cu. m. 0.002 0.00
M011 Colour pigment for cement Kg. 0.001 0.00
L004 Mason Hour 0.900 0.00
L001 Unskilled labour Hour 0.700 0.00
ALLOW FOR WATER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M001 Supplying and fixing of 100mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M002 Supplying and fixing of 150mm dia. G.I. 24 BWG down pipes fixed to walls
with holdfast or plugs in 1:3 cement.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M003 Supplying and fixing of 100 x 75mm rectangular G.I. 24 BWG down pipes
fixed with holdfast or plugs in 1:3 cement.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M004 Fixing of 100 to 150mm circular or rectangular down pipes fixed with holdfast
or plugs in 1:3 cement mortar (G.I. Sheets supplied by Client.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M006 Extra over item M001 to M004 in buildings of three or more storeyed.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M007 Fixing of down pipes loose or new fixed with holdfast or plugs including making
good to walls (down pipes supplied by Client, plugs or holdfast paid for separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M008 450mm wide G.I. Flashing (G.I. 24 BWG) fixed with 150mm turned up along
and top edge tucked well into wall in cement lime mortar including removal of
old flashing.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M009 Refixing of G.I. Flashing including making good to walls in cement and lime
mortar.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M010 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and bolts and joints soldered complete.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M011 150mm G.I. Gutters eaves semi circular made with G.I. 24 B.W.G. and fixed with
hooks or brackets and screws and joints soldered complete (G.I. Sheets supplied
by Client.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M012 150mm Gutters, eaves moulded in G.I. 24 BWG and fixed complete including
brackets.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M013 Extra over items M010 to M012 and M026 in two storeyed Buildings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M014 Extra over items M010 to M012 and M026 in three storeyed Buildings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M015 Cleaning of Gutters, eaves and down pipes in single storeyed buildings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M016 Cleaning of Gutters, eaves and down pipes in two storeyed buildings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M019 Making openings to existing gutters to receive 100mm to 150mm down pipe
attaching spigot piece joints soldered including making good.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M020 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M021 Making of 250 x 300 x 500mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M022 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 24 B.W.G. down
pipe and fixed complete.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M023 Making of 250 x 300 x 300mm deep gutter head with G.I. Sheets 22 B.W.G. down
pipe and fixed complete.(Sheets supplied by Client).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M024 Supplying of 20mm x 3mm Gutter hooks or brackets and fixing with
iron screws.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M025 Gutters, leaks, replaced or joints soldered.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M026 G.I. 900mm wide overall, 22 B.W.G. Parapet gutters renewed on existing boards joints
soldered and laid complete.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M027 18 BWG 900mm wide valley gutters renewed on existing boards, sheets tarred,
joints soldered and cement lime filletting complete.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M TINKER
M032 18 BWG 900mm wide valley gutters renewed including timber 25mm thick
boarding sheet tarred joints soldered and cement lime filleting complete.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M033 Fixing of Half round, 150mm pvc Eaves gutters with aluminium brackets and brass scr
at 450mm intervals including necessary moulded fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M034 Fixing of 114mm PVC square Eave gutters with P.V.C. brackets and brass screws
at 450mm intervals including all necessary moulded fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
M035 Fixing of 87mm dia. PVC Down pipes with wooden plug including all necessary
moulded fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
N GLAZIER
N001 Fixing of Glass panes with class I timber boarding (Glass Supplied by Client)
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
N002 Supplying of 3mm thick clear Glass panes and fixing with class I timber
beading.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
N003 Supplying of 4mm clear Glass panes and fixing with class I timber beading.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
N GLAZIER
N004 Supplying of 3mm figured Glass panes and fixing with Class I timber beading.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
N005 Supplying of 5mm figured Glass panes and fixing with Class I timber beading.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P001 One coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P002 Two coat of cement washing to walls of single storeyed buildings, patching
and preparing surface.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P003 One coat of cement washing externally to walls of buildings upper floor
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P004 Flags average size 1800mm x 900mm hung upon buildings as directed and removed
when required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P005 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P006 Flags small (burges) up to 100 hungs upon buildings as directed and removed when
required (Flags supplied by Client. Any poles used are to be paid separately).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P007 Flag poles (Supplied by Client) planted as directed removed when required
and ground made good.
PER post
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P008 Lettering 25mm to 50mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P009 Lettering 50mm to 75mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P010 Lettering 100mm to 125mm painted in Sinhala, English or Tamil including painting
ground.
PER p/letter
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P011 Painting the metal surface with one coat of aluminium paint.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P012 Painting one coat of enamel paint including washing (using washing soda) , cleaning a
smoothing down with sand paper.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P013 Painting two coats of enamel paint including washing( using washing soda) cleaning a
down with sand paper.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P014 Painting new wood work with primer and 2 coats of oil paint.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P015 Painting new wood work with one coat of approved wood primer
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P016 Painting steel work, with 1 coat of red lead including removing scale and wire brushing
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P017 Painting steel work, with 2 coat of red lead including removing scale and wire brushing
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P019 Painting walls with one coat of emulsion paint including preparing surface
of new work.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P020 Painting walls with two coats of emulsion paint including preparing surface
of new work.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P021 Painting walls with one coat of emulsion paint including preparing surface
of old work.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P022 Painting walls with two coats of emulsion paint including preparing surface of old wor
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P023 Painting walls with two coats of snowcem or equivalent cemet paint to new work.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P024 Painting old walls with two coats of snowcem or equivalent cement paint after scraping
existing colourwash, sand papering and wiping down.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P025 Painting old walls with one coat of snowcem or equivalent cement paint after scraping
existing colour wash, sand papering and wiping
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P028 Painting G.I. Pipes 20mm to 40mm diameter with 2 coats of enamel paint.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P029 Applying of 1 coat Tarnap or other wood preservative to old wood work.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P030 Applying of 2 coats Tarnap or other wood preservative to new wood work.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P031 Varnishing with 1 coat of polyurethene best Copal varnish after washing down and san
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P032 Varnishing with 2 coats of Polyurathene varnish after washing down and sand paperin
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P034 Scraping and removing soot on walls and levelling internally(extra over colour
washing).
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P035 Scraping of walls to original plaster, sand papering and lime putting cracks and
defects, preparing surface for new application of distermper, snowcem paint or similar
application.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P036 White washing or colour washing wall with 1 coat in single storeyed building
including patching and preparing surface.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P039 White washing or colour washing external walls with one coat in buildings of more
than two storeys.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P040 White washing or colour washing external walls with two coats in 2 storeyed building
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P041 White washing or colour washing external walls with 2coat in buildings with more
than two storeys.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P042 Walls internal faces scraped to original plaster patching up cracks and defects
lime putty sand papering applying plaster of paris and preparing surfaces for
application of emulsion paint or enamel paint.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P043 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem / white washing
in single storeyed buildings.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P044 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washin
in two storeyed buildings.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P045 Walls external faces scraped to original plaster patching up cracks and defects and
preparing surface including sand papering for application of snowcem or white washin
in more than two storeyed buildings.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P046 Painting walls with 1 coat weathershield paint including preparing surface of new work
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P047 Painting walls with 2 coats weathershield paint including preparing surface of new wor
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P048 Painting walls with 1 coat weathershield paint including preparing surface of old work
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P049 Painting walls with 2 coats weathershield paint including preparing surface of old work
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P050 Painting floors with 1 coat floor paint including preparing surface.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
P PAINTER & DECORATOR
P051 Painting floors with 2 coats floor paint including preparing surface.
PER m2
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q007 Supplying and fixing of Ball only plastic, for 12mm valve.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q008 Supplying and fixing of Ball only plastic, for 20mm valve.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q009 Supplying and fixing of Ball only plastic, for 25mm valve.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q011 Fixing of lavatory Basin to wall and connected to existing water service and making
good (Basin brackets and fittings supplied by Client).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q012 Fixing of lavatory Basin on existing brackets(Tap , waste trap and basin supplied
by Client.).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q013 Supplying and fixing of lavatory Basin 560mm x 360mm with one taps, waste
plug, with new brackets (additional tap , trap and outlet pipe paid separately).
PER No.
M122 Basin 360 x 560 with tap waste plug but No. 1.000
excluding bracket.
M485 Plugs No. 4.000 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q014 Supplying and fixing of lavatory Basin 560mm x 360mm with one tap on existing
brackets complete (additional tap, trap and outlet pipe paid separately).
PER No.
M122 Basin 360 x 560 with tap waste plug but No. 1.000
excluding bracket.
M485 Plugs No. 4.000 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q015 Removing Basin, Urinal or sink including all fittings and walls made good.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q016 C.I. Enamelled baths removing and re - fixing in new position and making good to
walls and floors (extra pipes required paid separately).
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q017 C.I. Enamelled baths any size including trap, tap, outlet pipes etc. fixed complete
(Bath and fittings supplied by Client).
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q018 Fixing of C.I. Bends,elbows, tees, cresses any size upto 50mm(fittings supplied by Clie
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER N0.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q026 Supplying and fixing of chain, chromium plated for flushing cistern.
PER No.
M121 Chromium plated chain for flushing cistern No. 1.000 0.00
L008 Plumber Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q027 Supplying and fixing of PVC reducing Sockets from 20mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q028 Supplying and fixing of PVC reducing Sockets from 25mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q029 Supplying and fixing of PVC reducing Sockets from 32mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q030 Supplying and fixing of PVC reducing Sockets from 38mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q031 Supplying and fixing of PVC reducing Sockets from 50mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q032 Supplying and fixing of PVC reducing Tees from 20mm to smaller sizes.
PER No.
Q033 Supplying and fixing of PVC reducing Tees from 25mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q034 Supplying and fixing of PVC reducing Tees from 32mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q035 Supplying and fixing of PVC reducing Tees from 40mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q036 Supplying and fixing of PVC reducing Tees from 50mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q037 Supplying and fixing of 560mm x 510mm pedestal type wash basin(L)
with two way tapand waste plug.
PER No.
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q039 Supplying and fixing of 25mm p.v.c. Valve socket.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q069 Supplying and fixing of 50mm P.V.C. Sockets plain.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
M293 Pipe PVC 20mm type 1000 m 1.000
L008 Plumber Hour 0.050 0.00
L001 Unskilled labour Hour 0.050 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q073 Supplying and fixing of 25mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q074 Supplying and fixing of 32mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q075 Supplying and fixing of 40mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q076 Supplying and fixing of 50mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q077 Supplying and fixing of 63mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q078 Supplying and fixing of 75mm (type 1000) p.v.c. pipes.(Fittings paid separately.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q079 Fixing of Closet pedestal type available at site with cement concrete after
breaking concrete floor and making good and making connections to soil and
flush pipe.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q080 Fixing of 20mm to 50mm p.v.c. Pipes with specials (pipes and specials supplied
by Client.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q081 Supplying and fixing of 20mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q082 Supplying and fixing of 25mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q083 Supplying and fixing of 32mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q084 Supplying and fixing of 40mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q085 Supplying and fixing of 50mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q086 Supplying and fixing of 63mm (type 1000) p.v.c. Pipes including specials and
fittings.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q087 Supplying and fixing of 150mm x 12mm p.v.c. shower rose with specials.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q094 Supplying and installing of 400 gal capacity round plastic shell tank(with 2 Nos.
of 01 oz.mat.) including scaffolding & transport.
PER P/tank
M547 400 gal round plastic shell Tank No. 1.000 0.00
L011 Unskilled labour day 4.000
L018 Plumber day 1.000
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q095 Disconneting pedestal type closet and plugging sewer connction and making good
to all affected walls and floors.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q096 Supplying and fixing pedestal type Closet (seat and cover available).
PER No.
Q097 Supplying and fixing of Closet pedestal type with low level glazed earthenware
flushing cistern, flush pipe, double plastic seat cover 12mm stop cock trap etc.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q098 Supplying and fixing of Closet squatting type with trap excluding cistern.
PER No.
M091 Squatting Pan (M) with 'P' Trap No. 1.000 0.00
M010 Cement 50 Kg. 0.333 0.00
L018 Plumber day 1.000 0.00
L011 Unskilled labour day 1.000 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q099 Supplying and fixing of Closet, squatting type with trap with cistern flush
pipe including 12mm stop cock and specials.
PER No.
M091 Squatting Pan (M) with 'P' Trap No. 1.000 0.00
M010 Cement 50 Kg. 0.333 0.00
L018 Plumber day 1.000 0.00
L011 Unskilled labour day 1.000 0.00
M204 Stop Cock Brass, 12mm No. 1.000
M109 Fittings for Cistern No. 1.000 0.00
M110 Cistern Bracket Pair 1.000 0.00
M094 Low level cistern - White No. 1.000 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q100 Removing Closet , squatting type and plugging sewer connections and making
good to floors.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q101 Installing Closet, squatting type including breaking floor and fixed in cement
concrete (Closet supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q102 Installing Closet, squatting type including trap, breaking floor and fixed in cement
concrete (Closet and trap supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q103 Installing Closet, squatting type including flushing cistern and pipes complete
(Closet and all fittings supplied .)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q104 Supplying and fixing of 12mm brass bib cocks of approved quality.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q105 Supplying and fixing of 12mm chromium plated bib cocks of approved quality.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q106 Fixing of Cocks, brass any size or push (cock supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q107 Removing of Cocks, brass bib push or stop cock of size 12mm to 40mm.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
Q117 Fixing of connector any size upto 38mm (connector supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q118 Fixing of connector above 38mm and upto 75mm (connector supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q120 Supplying and fixing of 12mm G.I. Elbows.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
M251 Elbow G.I. 32mm No. 1.000 0.00
L008 Plumber Hour 0.250 0.00
L001 Unskilled labour Hour 0.250 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q126 Cleaning of cost iron Flushing cistern and painting with one coat Anti - corrosive
paint internally.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q127 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but including ball valve.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q128 Supplying and fixing of Flushing cistern, cistern, C.I. 9 litres, excluding flush pipe
and brackets but ball valve.
PER No.
Q PLUMBER
Q128 Supplying and fixing of Flushing cistern plastic 9 litres excluding flush pipe and
brackets but ball valve.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q131 Fixing of Flushing cistern lever forged out of wrought iron 25mm x 5m, bent to shape
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q132 Disconnecting C.I. Flushing cistern and plugging water connection including making
good to all damage walls, floors etc.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q133 Removing of Flushing cistern and re- fixing in new position including necessary
plugs, and making good to walls.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q134 Refixing of Flush pipe of pedestal closets after removing old putty etc.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q135 Fixing G.I. Flush pipe including solders, joints (Flush pipe supplied by Client).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q149 Fixing of Jam nuts any size upto 50mm (Jam nuts supplied by Client).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q150 Supplying and fixing of Bath room type oval shape bevelled mirror, 380mm x 330mm
with rawl plugs and chromium plated fittings.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q151 Supplying and fixing 320mm x 280mm Rectangular bevelled mirror to wall with rawl
plugs and chromium plated fittings.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q152 Supplying and fixing of 12mm G.I. Pipe. Rate to include trenching backfilling and
making good to wall (fittings and pipe hooks paid separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q153 Supplying and fixing of 20mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q154 Supplying and fixing of 25mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q155 Supplying and fixing of 32mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
M235 Pipe G.I. 32mm m 1.000 0.00
M520 Red lead Kg. 0.033
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 1.000 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q156 Supplying and fixing of 38mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q157 Supplying and fixing of 50mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q158 Supplying and fixing of 75mm G.I. Pipe. Rate to include trenching backfilling and
making good to walls(fittings and pipe hooks paid separately).
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q159 Fixing of 12mm to 50mm G.I. Pipes with specials bends, elbows etc.(Pipes and
specials supplied by Client). Rate to include trenching and making good to walls.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q160 Fixing of 63mm to 75mm G.I. Pipes Rate to include trenching and making good to wal
(Fittings and pipe hooks paid separately,)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q161 Removing of G.I. Pipes any size upto 50mm and trench filled in.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q162 Removing of G.I. Pipes 50mm to 100mm and making good to walls and floors.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q163 Existing G.I. Pipes upto 50mm takeout cleaned and relaid. Rate to include backfilling.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q164 Existing G.I. Pipes 63mm to 75mm takeout cleaned and relaid. Rate to include backfill
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q165 Existing G.I. Pipes upto 50mm takeout cleaned and relaid in new position.
Rate to include backfilling.
PER m
Q166 Cleaning of pipe outlets, upto 2400mm length, (Excluding removing and
replacing.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q167 G.I. Plugs of any size fixed in position (plugs supplied by Client).
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q174 Supplying and fixing of 25mm to 32mm rubber plugs for wash basins and sinks.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q175 Supplying and fixing of 38mm to 50mm rubber plugs for wash basins and sinks
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q176 Supplying and fixing of Wooden plugs in Class I timber , 100mm long, tapered 75mm
to 50mm square section bedded in 1:2 cement mortar.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q177 Supplying and fixing of 12mm heavy quality brass push taps.
PER No.
M212 12mm heavy quality brass push tap No. 1.000 0.00
L008 Plumber Hour 0.334 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
A178 Supplying and fixing of 12mm light pattern brass push taps.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q179 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 4575mm to 9145mm and removing same.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q180 Making a platform, with bamboo and planks for lifting or lowering of storage tank to
a height 9145mm to 15240mm and removing same.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q181 Supplying and fixing of 600mm x 125mm glass shelves with chromium plated bracket
to wall with rawl plugs.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q182 Fixing any size of shower rose in position (Shower rose supplied by client).
PER N.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q185 Shower rose soldered and re - fixed.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q188 Supplying and fixing of 25mm G.I. Nipples.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q192 Fixing in position of G.I. Nipples upto 50mm (nipple supplied by Client)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q193 Repairing Piller cock and fixing to basin without damaging the basin.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q194 Supplying and fixing 12mm chromium plated pillar cocks to basin.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q195 Supplying and fixing 20mm chromium plated pillar cocks to basin.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q196 Fixing of Sink in any size with all fittings (Sink and fittings supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q197 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fitting on existing brackets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q198 Supplying and fixing of 610mm x 380mm x 180mm glazed earthenware sink with all
fittings. Rate to include for provision of brackets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q200 Making 600mm x 600mm x 150mm sink in 112mm brick masonary in cement 1:5 incl
12mm thick 1:2 cement rendering. Rate to include making holes in the wall and supply
and fixing of 50mm outlet pipes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
Q208 Supplying and fixing of 20mm to smaller size G.I. Reducing sockets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q209 Supplying and fixing of 25mm to smaller size G.I. Reducing sockets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q210 Supplying and fixing of 32mm to smaller size G.I. Reducing sockets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q211 Supplying and fixing of 38mm to smaller size G.I. Reducing sockets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q212 Supplying and fixing of 50mm to smaller size G.I. Reducing sockets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q213 Supplying and fixing of 75mm to 50mm size G.I. Reducing sockets.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q214 Fixing in position of G.I. Socket in any size (Socket supplied by Client.)
PER No.
L008 Plumber Hour 0.125 0.00
L001 Unskilled labour Hour 0.125 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q215 Supplying of white porcelain soap tray and fixing to wall by rawl plugs.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q216 Steel work in RSJ's as supports for tanks. Fixed in position upto 6000mm in height
and painted 2 coats red and 2 coats anti corrosive paint.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
M204 Stop Cock Brass , 12mm No. 1.000
L008 Plumber Hour 0.500 0.00
L001 Unskilled labour Hour 0.500 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q224 Hoist & place in position of 1125 - 1800 litre GI tank upto a height of 6000mm
& remove old tank include disconnect & connect all pipes & paint the new tank with
red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client & scaffolding
paid.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q225 Hoisting and placing in position of 110 to 910 litre G.I. Tank upto a height of 6000mm
& removing the old tank including connecting & disconnecting all pipes & painting the
tank with red lead paint & 2 coats of anti corrosive paint.(Tank supplied by client &
scaffolding paid.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q226 Placeing in position of 110 - 910 litre GI tank upto a height of 6000mm & fix erction o
support, include fixing of all pipes & paint the tank & support with red lead paint & 2 c
anti corrosive paint.(Tank , pipes, fittings, RSJ's , supplied by the client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q227 Placeing in position of 1125 - 1800 litre GI tank at a height of 6000mm & remove &
supports, remove old tank include disconnect all pipes and paint new tank & supports w
lead paint & 2 coats of anticorrosive paint(Tank , pipes , fittings RSJs.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q230 Removing of G.I. Storage tank and making good to walls and floor (scaffolding
paid separately where necessary.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q231 Supplying and installing of 400 litre. 16 BWG G.I. Tank including painting the tank
with one coat of primer and 2 coats of anti - corrosive paint.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q232 Supplying and installing of 1125 litre. 16 BWG G.I. Tank including painting the tank
with primer and 2 coats of anti - corrosive paint.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q233 Supplying and installing of 1800 litre. 16 BWG G.I. Tank including painting the tank
with one coat primer and 2 coats of anti - corrosive paint.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
Q236 Fixing of P.V.C. bends elbows. Tees and other specials upto 75mm (Fittings
supplied by Client.)
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q238 Supplying and fixing of 25mm p.v.c. bends.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
M332 Bend PVC 50mm No. 1.000 0.00
L008 Plumber Hour 0.100 0.00
L001 Unskilled labour Hour 0.100 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q PLUMBER
Q251 Supplying and fixing of p.v.c. reducing sockets 20mm to smaller sizes.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
Q252 Supplying of 200mm x 400mm half rounded , tooth brush holders and fixing with
rawl plugs.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R DRAINLAYER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R002 600mm x 600mm manhole upto 600mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R DRAINLAYER
R003 1000mm x 700mm manhole 600mm to 1200mm deep, constructed with 225mm brick
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R004 1000mm x 700mm manhole 1200mm to 1800mm deep, constructed with 225mm bric
in 1:3 cement mortar and 12mm cement rendered walls and 150mm thick 1:3:6(25mm)
concrete foundation. Rate to include forming of channels.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R DRAINLAYER
R005 Supplying and fixing of 550mm x 500mm rectangular C.I. Manhole cover.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R006 Constructing and placing in position of 75mm thick 600mm x 600mm reinforced concr
manhole cover, reinforced with 6mm dia. M.S. rods at 75mm centres both ways.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R DRAINLAYER
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R009 110 dia. Pvc(type 600) laid in 350 x 150mm thick 1:3:6(25mm) concrete upto
600mm depth of trench. Rate to include excavation.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R DRAINLAYER
R010 110 dia. Pvc(type 600) laid in 150mm thick 1:3:6(25mm) concrete upto
600mm to 1200mm depth of trench. Rate to include excavation.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R011 110 dia. Pvc(type 600) embedded in 150mm thick 1:3:6(25mm) over 1200mm to
1800mm depth of trench. Rate to include excavation.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
R DRAINLAYER
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
M445 Props (bamboo) 3 - 4m No. 0.350
L001 Unskilled labour Hour 0.132 0.00
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
S004 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting timber post with GI staples.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S005 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) an exsisting concrete post .
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
S006 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths and timber posts with G.I. Staples.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S007 Supplying and fixing of light duty galvernized mild steel barbed wire (conforming to
SLS 31 of 1988) in short lengths an concrete or steel posts with available hook bolts..
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S008 Fixing of Barbed wire with G.I. Staples in existing timber posts(Barbed wire supplied
by Client.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
S009 Fixing of barbed wire fence with hook bolts on concrete or steel posts (Barbed wire
supplied by Client.)
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S010 Straining and refixing of barbed wire on the fence with staples.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S011 Straining and refixing only the barbed wire on concrete or steel posts with available ho
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
S012 Construction and fixing of 100mm x 150mm and 1700mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm d
MS rods.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S013 Construction and fixing of 100mm x 150mm and 2285mm high in 1:1
1/2:3 (20mm) cement concrete intermediate fence posts reinforced with 4 Nos. 6mm d
MS rods.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
Q014 Construction and fixing of end posts and struts as per drawing. Rate to include excavat
and base concrete.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S015 Construction of barbed wire fence 5 strands with 4 points at 75mm centre. Including
corner posts, struts, intermediate post binding concrete as per drawing.
PER m
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S MISCELLANEOUS
S016 Supplying and fixing of 12mm dia. 450mm long straining bolts.
PER No.
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
PER P/Block
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL
S018 Cleaning of lavatory or sewage block (with contractor and clearing rods).
PER P/Block
SUB TOTAL
OVER HEAD & PROFITS 22.00%
TOTAL